Integrated Management System

Policy & System

Document Ref.
KCT-IMS-PS-0002
Rev.No
0

Rev. Date
15-Jan-2013

Page

Integrated Management System Manual

2 of 34

Table of Contents
Revision History .............................................................................................................................. 4
1.0

Management Statement ........................................................................................................ 5

1.1

Introduction ....................................................................................................................... 5

1.2

Statement of Scope and Purpose ........................................................................................ 5

1.3

Statement of Authority ....................................................................................................... 6

1.4

SHEQ Provisions and Exclusions .......................................................................................... 6

2.0

Reference Documents ............................................................................................................ 6

3.0

Definitions, Acronyms and Abbreviations ............................................................................... 7

4.0

The Way KCT Operates ........................................................................................................... 7

4.1

The Organisation of the Main Processes .............................................................................. 7

4.2

Outsourced Processes ......................................................................................................... 7

4.3

Integrated Management System ......................................................................................... 8

5.0

Management Commitment .................................................................................................... 8

IMS Policy Statement ................................................................................................................. 10


6.0

The Documented Integrated Management System ............................................................... 11

6.1

Management System Set-up ............................................................................................. 11

6.2

Purpose of Integrated Management System Documents ................................................... 11

7.0

Management Structure, Responsibility and Authority .......................................................... 12

7.1

Management Structure ..................................................................................................... 12

7.2

Responsibility and Authority ............................................................................................. 12

7.3

Customer Focus ................................................................................................................ 14

8.0

Management System Elements ............................................................................................ 15

8.1

Resources Management.................................................................................................... 15

8.2

Human Resources ............................................................................................................. 15

8.3

Infrastructure ................................................................................................................... 17

8.4

Work Environment ........................................................................................................... 17

8.5

Control of Documents ....................................................................................................... 17

Integrated Management System


Policy & System

Document Ref.
KCT-IMS-PS-0002
Rev.No
0

Rev. Date
15-Jan-2013

Page

Integrated Management System Manual

3 of 34

8.6

Control of Records ............................................................................................................ 17

8.7

Planning ........................................................................................................................... 18

9.0

Product Realisation .............................................................................................................. 19

9.1

Planning of Service Realisation.......................................................................................... 19

9.2

Design and Development .................................................................................................. 20

9.3

Procurement .................................................................................................................... 20

9.4

Service Provision .............................................................................................................. 20

9.5

Control of Monitoring and Measuring Devices................................................................... 21

9.6

Measurement, Monitoring, Analysis and Improvement ..................................................... 22

9.7

Corrective and Preventive Action ...................................................................................... 23

9.8

Internal Audits .................................................................................................................. 23

9.9

Customer Satisfaction ....................................................................................................... 23

10.0

Monitoring and Measurement .......................................................................................... 24

10.1

Process .......................................................................................................................... 24

10.2

Monitoring and Measurement of Service ....................................................................... 24

10.3

Control of Non-conformance ......................................................................................... 24

10.4

Analysis of Data ............................................................................................................. 24

10.5

Continual Improvement ................................................................................................. 24

10.6

Management Review ..................................................................................................... 25

11.0

Operational Controls ........................................................................................................ 26

11.1

Planning for Hazardous Identification, Risk Assessment and Risk Control ....................... 26

11.2

Environmental Aspects and Impacts Assessments and Management .............................. 26

11.3

Emergency Preparedness and Response ......................................................................... 26

12.0

Legal and Other Requirements .......................................................................................... 27

13.0

Consultation and Communication ..................................................................................... 27

14.0

Manual Maintenance ........................................................................................................ 27

Attachments ................................................................................................................................. 28

Document Ref.
KCT-IMS-PS-0002

Integrated Management System


Policy & System

Rev.No
0

Rev. Date
15-Jan-2013

Page

Integrated Management System Manual

4 of 34

Revision History
Rev.
No.

Rev.
Date

Reason
of Revision

Prepared

Reviewed

Approved

15-01-2013

First issue

TGC

SAJ

MAK

Remark

Integrated Management System


Policy & System

Document Ref.
KCT-IMS-PS-0002
Rev.No
0

Rev. Date
15-Jan-2013

Page

Integrated Management System Manual

1.0

5 of 34

Management Statement
1.1

Introduction
KCT is one of Qatars leading support services and construction companies, with over 6,000
employees in Qatar alone, and annual revenues of over1bnQR. KCT also operates as a separate
company in Syria.
KCT was formed in Qatar in 2011 and is a sister company of Urbacon (UCC). Although closely
linked, the two companies are separate entities and apart from a limited number of shared
resources, are managed by separate teams.
KCT is a regional leader in design, construction, facilities management and maintenance
services. From land reclamation, industrial and infrastructure projects, to the creation of villa
complexes, palaces, restaurants, leisure facilities and retail parks.
KCT adopts a philosophy of working with its clients to combine construction excellence with a
long-term service commitment to bring added value to the construction process. KCT believes
in working closely with clients and project design teams, to deliver buildable, innovative and
cost-effective solutions.
KCT incorporates its practical knowledge and experience of contracting with an understanding
of the interactive and collaborative process that is essential to meet project challenges and
successful delivery of the work.
KCT is pleased to reflect the core values and vision of its shareholders in both its daily activities
and its long-term planning.
The integrated management system described in this manual addresses the requirements of
the ISO9001, ISO14001 and BS OHSAS 18001 standards and compliance is mandatory.

1.2

Statement of Scope and Purpose


The KCT Integrated Management System covers processes across the following disciplines:
Safety, Health, Environmental & Quality Management,
Risk,
Tendering and Estimating,
Procurement,
Accounting and Finance,
Human Resources,
Information Technology,

Integrated Management System


Policy & System

Document Ref.
KCT-IMS-PS-0002
Rev.No
0

Rev. Date
15-Jan-2013

Page

Integrated Management System Manual

6 of 34

Planning & Monitoring,


Contractsand Commercial Management
Pre-contract Administration (including Planning, Tender Handover, Contract Launch, Site
Launch)
Execution & Construction
Contract Close-out,
Measurement, Monitoring, Analysis and Improvement.

1.3

Statement of Authority
This document forms part of the SHEQ Policy of KCT and has been compiled to meet the
objectives of the Company and the requirements of the ISO 9001:2008, ISO 14001:2004 and
OHSAS 18001:2007 International Standards.
Compliance with all procedures contained herein are mandatory within the Company.
This KCT Integrated Management System Manual is issued with the Chief Executive Officers
authority and shall be controlled in accordance with the Document and Record Control
procedures internally.
The SHEQ Director is granted full authority as Management Representative to carry out all his
duties, including the delegation of some of those duties to the HSE and QA/QC
Representatives. He has the express authority to report directly to the General Director on any
matters concerning the KCT Integrated Management System.
Personnel allocated responsibilities in this manual and all other procedures will have the
authority to act on those responsibilities.

1.4

SHEQ Provisions and Exclusions


KCT will implement the companys Integrated Management System on projects, when:
KCT is the sole main contractor, or in charge of a clearly defined portion of a
consortium.
KCT is the leading Joint Venture (JV) partner, or provides the management of the
Project. (This is subject to the approval of the major JV partners).
KCT, although responsible in many instances as the design and build contractor, does not
directly undertake any design responsibility whatsoever. Design will be subcontracted to
consultants and processes will therefore be limited to the management of the designer. In the
event of design being carried out by KCT then KCT will implement a procedure(s) to meet the
requirements of the standard.

2.0

Reference Documents
International Standard ISO 9001: 2008 Quality Management System
International Standard ISO 14001: 2004 Environmental Management System

Integrated Management System


Policy & System

Document Ref.
KCT-IMS-PS-0002
Rev.No
0

Rev. Date
15-Jan-2013

Page

Integrated Management System Manual

7 of 34

International System OHSAS 18001:2007 Occupational Health and Safety


Management System
Qatar Construction Standard 2010
Contract Review
Document and Record Control
Hazard Identification and Risk Assessment
Environmental Aspects and Impacts Assessment
SHEQ Objectives, Targets and Programs
Legal and Other Requirements
Control of Non-conformances
Safety, Health, Environmental and Quality Records
Internal Audits
Measurement, Monitoring, Analysis and Improvement.

3.0

4.0

Definitions, Acronyms and Abbreviations


IMS

Integrated Management System

MS

Management System

KCT

Al Khayyat Contracting and Trading

SHEQ

Safety, Health, Environmental and Quality

PQP

Project Quality Plan

The Way KCT Operates


4.1

The Organisation of the Main Processes


On many occasions, KCT are asked to provide a price for a projects projects are awarded
directly and do not involve the preparation of a formal tender. Where tenders are required,
they will be prepared in accordance with system requirements.
In meeting Client requirements all departments are responsible for providing a service to the
project to ensure that time, cost and quality requirements are complied with.
The KCT Integrated Management System Model is shown in Appendix A whilst the IMS
Procedures are shown under Appendix B.

4.2

Outsourced Processes
Control of Supplier and Sub-contractor processes is defined through the requirements of the
Procurement Procedures identified in Appendix B.
The outsourced service/material providers are prequalified through a stringent process of

Integrated Management System


Policy & System

Document Ref.
KCT-IMS-PS-0002
Rev.No
0

Rev. Date
15-Jan-2013

Page

Integrated Management System Manual

8 of 34

assessment to ensure that service providers have robust management systems, have the
capability, capacity and are financially able to meet KCT requirements.
The implementation of the providers controls are monitored and verified through the KCT IMS
System. There are formal agreements between the parties and these specify the acceptance
criteria by which performance will be measured.
Records are verified during implementation and final handover documentation or data packs
are checked prior to KCT acceptance.
The outsource partner is managed on an interactive basis and performance is reviewed and
discussed internally during weekly and monthly progress meetings and during supplier/subcontractor assessments.

4.3

Integrated Management System


KCT has an established documented Integrated
Management System based on the requirements of ISO 9001:2008, ISO 14001:2004 and
OHSAS 18001:2007, and implements and maintains the same.
This IMS Manual sets out the organisation, management policy and objectives and a policy
overview summarising each element of the international standards.
The IMS Manual contains, or makes reference to, detailed operating procedures describing the
controls used to address each element of ISO 9001:2008, ISO 14001:2004 and OHSAS
18001:2007, and serves to:
Assist in the prevention of quality defects, environmental impacts and health and
safety exposure.
Provide a reference to policy, procedures and instructions against which current
practice can be audited.
Provide an aid to ensure uniformity of understanding, continuity of performance and
consistence of action easily updated and distributed.
Procedures have been developed as site process controls; detailing how functionsare to be
performed and this will form the basis for training in the way that KCT operate.

5.0

Management Commitment
KCTs Management expresses their commitment to the KCT Integrated Management System and to the
continual improvement of the Integrated Management System in the following ways:

Through establishing and reviewing the KCT IMS Policy Statement

Defining Objectives and Targets

Integrated Management System


Policy & System

Document Ref.
KCT-IMS-PS-0002
Rev.No
0

Rev. Date
15-Jan-2013

Page

Integrated Management System Manual

9 of 34

By appointing a management representative and delegating authority to this management


representative regarding all SHEQ matters

Through systematic involvement in the management processes

Through continual evaluation of all the projects management processes

By organising and conducting Management Reviews

By establishing an annual plan for Improvement of the Integrated Management System

By supporting the implementation of innovative measures during all production and


execution activities.

Integrated Management System


Policy & System

Document Ref.
KCT-IMS-PS-0002
Rev.No
0

Rev. Date
15-Jan-2013

Page

Integrated Management System Manual


IMS Policy Statement

10 of 34

Integrated Management System


Policy & System

Document Ref.
KCT-IMS-PS-0002
Rev.No
0

Rev. Date
15-Jan-2013

Page

Integrated Management System Manual

6.0

11 of 34

The Documented Integrated Management System


6.1

Management System Set-up


The Management System documentation of KCT ensures the effective operation and control of
its business processes. The extent of such documentation depends on the complexity of the
processes and their interaction as well as the competence of the personnel who perform those
processes.
The Management System is designed to meet the requirements of ISO 9001:2008, ISO
14001:2004 and OHSAS 18001:2007 management systems and considers the companys
policies and procedural requirements applicable to the KCT operations and the type of services
provided.
The IMS Manual (Level 1 documentation) covers not only the IMS Policy Statement, but also all
procedures relating to the requirements of ISO 9001:2008, ISO 14001:2004 and OHSAS
18001:2007.
Mandatory documentation such as Procedures and Process Flow Diagrams (Level 2
documentation) describe how the Management System processes are implemented to comply
with the stated policies and as required by ISO 9001:2008, ISO 14001:2004 and OHSAS
18001:2007 management systems.
Forms (Level 3 documentation) verify that the key controls required within documented
processes have been implemented in accordance with ISO 9001:2008, ISO 14001:2004 and
OHSAS 18001:2007.
The authority for the approval, issue and control of theKCT IMS Manual, Policies, Procedures
and all other related Integrated Management System documentation has been delegated to
the Management Representative.

6.2

Purpose of Integrated Management System Documents


The purpose of the KCT Integrated Management System (IMS) is to continually improve the
effectiveness and efficiency of KCT performance by considering the requirements of all
stakeholders whether internal or external. KCT strives to continually improve the processes as
well as the Integrated Management System as a whole. By defining safety, health,
environmental and quality (SHEQ) objectives and using the Integrated Management System to
meet these objectives, this improvement is achieved. Through process monitoring and
measuring where appropriate and the analysis of data collected during such monitoring, the
degree to which the set SHEQ objectives are met is determined. KCT continuously analyse and
set SHEQ objectives to improve its services. This is done by using formal processes in order to
achieve customer satisfaction, as well as using methods and techniques that engender
continual improvement via the principles that are integral to the way that KCT does business
and which supports the company value of Building Trust.

Integrated Management System


Policy & System

Document Ref.
KCT-IMS-PS-0002
Rev.No
0

Rev. Date
15-Jan-2013

Page

Integrated Management System Manual

12 of 34

This manual identifies the processes that are necessary for the successful operation of the
Integrated Management System. The sequence, interaction and management of these
processes are described in this manual together with supporting procedures and process flow
diagrams, where necessary, which detail the criteria and methods used to ensure that the
operation and control of these processes is effective.
Where necessary, each of the processes is implemented through supporting procedures and
where necessary process flow diagrams which detail how the operations are performed
correctly. This procedural support, coupled with training and detailed instructions, ensures
that employees know that their processes are in a state of control and that they are producing
satisfactory results.

7.0

Management Structure, Responsibility and Authority


Top management will nominate a management representative with specific duties to ensure that the
KCT Integrated Management System meets with ISO 9001, ISO 14001, OHSAS 18001 and legal
requirements. Where legislation requires specific appointments, this will be made in conjunction with
the KCT Integrated Management System stipulations. The delegated Management Representative for
KCT is the SHEQ Director.

7.1

Management Structure
With regards to the Management Structure, the respective Departmental Heads and the
responsible Project Heads are responsible for the updating of departmental / project
organisational charts. Respective organisational charts are reviewed and updated at least
quarterly and approved by the General Director.
The overall company management organisation chart is shown in Appendix C.
Job Descriptions are established / documented for each role within KCT and approved by
Senior Management and communicated to the respective post holders.
To ensure the successful implementation of the management systems and to comply with
stated legislation, clear lines of responsibility are defined to ensure that both the spirit of
relevant legislated regulations as well as the requirements of associated regulations is met.
The General Director has most control over decisions affecting the day to day running of the
business and is the person ultimately responsible to ensure compliance with legislation.
As with the financial running of a company, responsibility and accountability structures are in
place to ensure efficient profitable results. To ensure profitable results for the SHEQ
programme, management structures will define clear responsibility and accountability
structures.
KCT has developed a Levels of Authority Matrix which clearly identifies the responsibilities for
key decisions relating to the business. The Levels of Authority Matrix is shown in Appendix D.

7.2

Responsibility and Authority


The KCT management team lines of responsibility and reporting is detailed in the

Integrated Management System


Policy & System

Document Ref.
KCT-IMS-PS-0002
Rev.No
0

Rev. Date
15-Jan-2013

Page

Integrated Management System Manual

13 of 34

KCTorganisation chart shown in Appendix C. In order to ensure that personnel understand


their authorities and responsibilities associated with the Integrated Management System,
authorities and responsibilities are further documented in specific procedures.
All authorities and responsibilities reside with senior management and are delegated to
functions and / or individual members of staff within their control as appropriate. All personnel
who manage, perform and / or verify work are responsible for the safety and health of
employees, environmental protection and quality of services provided by KCT. All such
personnel are authorised to identify and record problems relating to products, processes, and
the management system as a whole.
All staff and personnel have the responsibility to comply with documented procedures and the
direction of management. All personnel have the responsibility to assure that processes in
which they are working is in a state of control and that the tasks are completed in a
responsible manner. Personnel are also responsible for identifying non-conformance, notifying
management, and controlling the situation until the problem has been corrected / rectified. To
prevent non-conformities, they may also initiate, recommend, or provide solutions through
designated channels, such as the Control of Non-conformances Procedure.
SHEQ Responsibility and Authority are exercised in the following ways:

Corporate Management:

The General Director and his senior management team shall determine the company
policy and vision for KCT. Through the General Directors support and focus, KCT shall be
led to the realisation of this vision.

Departments:

The following department heads report directly to the General Director as part of the
Senior Management team.
Technical and Engineering Department:
The Technical and Engineering Director is responsible to ensure that projects are
supported in terms of review of technical documentation, constructability checks,
value engineering, method statement input etc.
Human Resources Department:
The Human Resources Director is responsible to implement policies and procedures
for the effective management of personnel. This department is responsible for
salaries and benefits, recruitment, people logistics, communications and
administration to ensure that all human resources and industrial relations policies
and procedures are being adhered to throughout the company.
Accounts and Finance Department:
The Accounts and Finance Director is responsible for company reporting, budgeting,
administration, procurement and financial control in the Company including the
responsibility to ensure that the projects and KCT are legally sound and that all legal
matters are properly managed and controlled.

Integrated Management System


Policy & System

Document Ref.
KCT-IMS-PS-0002
Rev.No
0

Rev. Date
15-Jan-2013

Page

Integrated Management System Manual

14 of 34

SHEQ Department:
The SHEQ Director is the appointed Management Representative for the Company.
The SHEQ Director is responsible for the overseeing of the safety, health,
environmental and quality management functioning and IMS documentation within
KCT as well as to ensure that all elements of the Company are working under the
control of the principles as defined in the SHEQ Policy Statement and KCT Integrated
Management System. The SHEQ Directorassists in preparing and reviews the general
procedures and ensures that departmental procedures are implemented for activities
that may impact on Client satisfaction.

Planning Department:
The Planning Director is responsible for ensuring that the Contract requirements are
translated into a coordinated programme for the efficient planning and monitoring of
progress. The Planning Director is also responsible to ensure that weekly and
monthly reports are provided to Project and Senior Management to enable actions to
be identified that will ensure that projects are completed on time.
IT Department:
The IT Director is responsible for developing solutions to improve the effectiveness
of activities for KCT. This may include but not be limited to:
o
o
o
o

Communications systems (email; intranet etc)


Reporting systems
Information retrieval systems
ERP

Procurement Department:
The Procurement Director is responsible for coordinating prequalification of
suppliers and sub-contractors and ensuring that only those service providers that can
meet the requirements of KCT are considered in the supply chain. The Procurement
Director is responsible for ensuring that negotiations with providers ultimately result
in value for KCT in terms of cost, ability to supply/provide services and quality.
Operations Department:
The Operations Director is responsible for the management of operations and
includes all projects undertaken by KCT. The Operations Director is also responsible
for the Labour Resource Department, deployment and demobilisation of staff and
Plant, Motors and Vehicles. The Operations Director leads the drive towards health
and safety, quality and environmental and ensures that operational staff comply with
the requirements of the IMS system.

7.3

Customer Focus
The training requirements for KCT dictate that each employee understands the importance of

Integrated Management System


Policy & System

Document Ref.
KCT-IMS-PS-0002
Rev.No
0

Rev. Date
15-Jan-2013

Page

Integrated Management System Manual

15 of 34

fulfilling customer requirements for both internal and external customers. Customer needs
and expectations are processed in such a manner to satisfy customer requirements, in an
effort to gain and retain their confidence.
Management ensures that any legal, statutory and regulatory requirements applying to its
operations, the safety and health of employees, the protection of the environment and to the
quality of its services, are identified and adhered to. Where such requirements exist, these
have been included in the processes to ensure that they are complied with. New legislative
requirements will be considered during Management Review Meetings and more frequently as
deemed appropriate by Management.

8.0

Management System Elements


8.1

Resources Management
Processes affecting the quality of the services offered by KCT are identified and described in
this manual. Senior Management ensures that resource requirements are identified and that
adequate resources and trained personnel are provided. Any employee may also identify
resource needs, which will be evaluated and if necessary addressed.
Resources needed to implement and improve the Integrated Management System processes,
including enhancing customer satisfaction by meeting their requirements, are identified and
reviewed during Management Review Meetings.
KCT has a Human Resources Department to provide for the necessary staffing to implement
and maintain the Integrated Management System and manage the required levels of
competence, awareness and training for product realisation.
KCT has provided adequate company infrastructure and created a working environment
needed to achieve conformity to requirements.
Plant, material and human resource management is of crucial importance to ensure continued
process capability, production and on time delivery and therefore ensures client requirements
are met.
Plant, material and human resources are reviewed (when required) during the Monthly Project
Progress Meetings.

8.2

Human Resources
All personnel that could have an effect on the quality of the services provided are qualified to
perform specific tasks on the basis of appropriate education, training, skill and experience as
evidenced by qualifications and training records.
All personnel receive appropriate training to ensure that they are understand their duties,
responsibilities and level of authority and to ensure that the working practices specified in the
KCT Integrated Management System documentation are implemented and followed.
Human Resources are managed in line with the following objectives:

Integrated Management System


Policy & System

Document Ref.
KCT-IMS-PS-0002
Rev.No
0

Rev. Date
15-Jan-2013

Page

Integrated Management System Manual


a)

16 of 34

Mobilisation, Provision and Management of Resources:


The HR Director maintains the organisational structure of the Company and updates it
at least quarterly.
The Monthly Project Progress Meetings facilitate the evaluation of the resources
required, including Human Resources.
The functions of the Human Resource Department include the following:

b)

Manage the manpower resources continually


Manage immigration and visa requirements
Update employees personnel files
Maintain, update and train personnel on the Industrial Relations and the Human
Resources procedures
Plan, arrange and maintain records for developmental training as defined and
identified in performance appraisals
Induction of new employees
Management of payroll, medical and health insurance, etc.
Management and control of all employee housing.(Camps)
Management of travel to and from Qatar.

SHEQ Competence, Training and Awareness:


All employees undergo induction and orientation training, during which the companys
commitment to Health, Safety, Environment and Quality is communicated (procedure
KCT-IMS-HR-4003 Induction and Orientation) and the Project Safety Induction
process. The importance of meeting customer requirements, the importance of their
respective positions and how they contribute to the achievement of the SHEQ
objectives is also communicated.
Subsequent training needs are identified by management and are recorded on each
employees Training Record. The provision of such training is also recorded on the
employees Training Record after the training has been provided, evaluated and
training effectiveness been determined.
Senior Management ensures that staffing and skill levels within the organisation are
appropriate to ensure the optimal efficiency and effectiveness of operations.
In order to control and improve competence, awareness of requirements and
personnel training, the following is implemented at least once annually:

The remuneration policy, as agreed with executive management


The annual performance appraisal to review personnels competence and
performance to:
i.
Set new individual objectives and targets,

Integrated Management System


Policy & System

Document Ref.
KCT-IMS-PS-0002
Rev.No
0

Rev. Date
15-Jan-2013

Page

Integrated Management System Manual


ii.
iii.

8.3

17 of 34

Define actions to be taken for further development, and


Anticipated training in support of future development.

Infrastructure
Management ensures that the facilities are maintained appropriately to achieve conformity to
the service provided. This includes workspace, equipment, software and any supporting
services related to facilities maintenance. Such considerations are discussed during
Management Review Meetings.

8.4

Work Environment
Management ensures that the appropriate human and physical factors of the work
environment are considered and provided. Consideration of such factors includes safety,
health and environmental conditions, work methods, handling methods and equipment. Such
considerations are also discussed and reviewed during Risk Review Meetings.

8.5

Control of Documents
KCT has established the necessary documentation (IMS Management System Manual, IMS
Policy Statement, SHEQ objectives and procedures) to ensure effective planning, operation and
control of its processes.
The KCT Integrated Management System (IMS) and important information sources are
controlled in accordance to procedure KCT-IMS-M-1009 Control of Documents Procedure.
This ensures that outdated or inaccurate information is not used and that appropriate
information is available when and where it is required. All documentation is reviewed and
approved prior to use and changes to documentation are also reviewed, approved and
controlled. These documents are maintained in such a manner that they remain legible,
readily identifiable and retrievable. Any such documents that become obsolete are marked to
prevent unintended use.
The Management Representative maintains a master file of all IMS documentation, as well as
any associated forms. The most current versions of documents will be maintained in the
master file, which will also indicate any further distribution of such documents. The
Management Representative also maintains the electronic originals of such documentation.
In order to maintain control of electronic IMS documents and data that are maintained on the
company network, regular back-ups are performed and anti-virus software is in use.

8.6

Control of Records
Records are maintained as defined in procedure KCT-IMS-CM-3307 Control of Quality
Records Procedure.
Records are legible and compiled for all important operations in order to provide sufficient and
comprehensive evidence of conformance to specification and client requirements.

Integrated Management System


Policy & System

Document Ref.
KCT-IMS-PS-0002
Rev.No
0

Rev. Date
15-Jan-2013

Page

Integrated Management System Manual

18 of 34

The Management Representative in conjunction with other management personnel, establish


what records or documentation are to be retained, by whom, and for how long, in order to
demonstrate the effectiveness of the Management System. All records are safely retained for
a minimum period as required and made available to authorised personnel and the client for
evaluation where required.
Documents are filed in acordance with proceduresKCT-IMS-M-1006 Control over
Correspondence and KCT-IMS-CM-3201 Project Control over Correspondence Procedures.

8.7

Planning
8.7.1

Objectives, Targets and Management Programmes


KCT has a procedure in place (KCT-IMS-M-1008 Setting Objectives Procedure) for the
effective setting and management of all departmental objectives and targets, for
specified periods under review as a driver for continuous improvement.
Safety, Health, Environmental and Quality (SHEQ) objectives have been established to
continually improve the Management System as a whole as well as each management
process, extending to processes involved with meeting service requirements and
deliverables. SHEQ objectives are measurable, in order that they can be continually
analysed during during operational and production process and to continiously
monitor and determine the performance and degree to which objectives and set
targets are met, to:
Ensure the effectiveness and efficient delivery of project resources to enable
KCT to deliver planned Shareholder value. This will be measured through
continuous monitoring of the quality of services provided to clients, through the
customer satisfaction surveys and customer complaint systems.
Ensure that individuals understand and own their specific responsibilities in
relation to SHEQ by ensuring all individuals are inducted regarding the
importance of safety, health, environmental and quality and how they are
expected to comply with the Management system and relevant management
standards.
Ensure that the training facilities provided by the KCT Academy and internally
within departments, effectively addresses the skills issues of KCT, through
regular communication with the HR department and the Training and
Development Forum.
Strive for continuous improvement through a process of regular measurement,
review and assessments. This will be measured through regular department and
site audits and reporting on a monthly basis.

8.7.2

Management System Planning


In general, the SHEQ plans are consistent with normal methods of operation covered
by existing procedures. These plans ensure that SHEQ objectives set forth in the Health
and Safety, Environmental and Sustainability and Quality Policies and those identified
during Management Review Meetings are met. Where customer-specified

Integrated Management System


Policy & System

Document Ref.
KCT-IMS-PS-0002
Rev.No
0

Rev. Date
15-Jan-2013

Page

Integrated Management System Manual

19 of 34

requirements identify activities that are outside of our standard methods and
practices, specific method statements / procedures will be prepared and issued.
As part of the regular maintenance of the Integrated Managment System, proposed
modifications to processes and procedures are reviewed during Management Review
Meetings to ensure that the requirements of the management system have been
addressed prior to the implementation of any modifications. This review ensures that
no new process is implemented without first considering the actions that must be
taken to ensure that the company remains in compliance with the system as it is
documented. Items are evaluated and planned actions are documented during the
Management Review Meeting.

9.0

Product Realisation
9.1

Planning of Service Realisation


In general, KCTs realisation process planning is consistent with normal methods of operation
covered by existing procedures. In planning the processes for realisation of services falling
outside the normal methods, the following is considered:
Quality objectives for services / product provided
The need for process documentation, for example, a specific Inspection and Test Plan and
any necessary resources specific to the services/product
Any records necessary to provide confidence of conformity of the processes and resulting
product / services.
9.1.1

Customer Related Processes


Determination of Requirements Related to the Services Offered
Customer specifications, both internal and external and / or standards issued to KCT are
reviewed, distributed and implemented in a timely manner. Respective Departments
within KCT review customer requirements prior to final request and prior to accepting
changes to those requests.
Review of Requirements Related to the Services Offered
Each department within KCT ensures that customer requirements have been clearly
defined to ensure that the department has the ability to meet the requirements. This
process includes, as appropriate:
Determination that the client / customer requirements are clearly defined
An assessment of the departments ability to meet the requirements
Negotiation and agreement with the client / customer on requirements
Assessment and provisions for confidentiality
Customer Communication

Integrated Management System


Policy & System

Document Ref.
KCT-IMS-PS-0002
Rev.No
0

Rev. Date
15-Jan-2013

Page

Integrated Management System Manual

20 of 34

Any other communications by clients / customers will be directed to the appropriate


personnel within the respective department. This includes any communication relating to
non-conformances and corrective / preventive actions. KCT Department Heads will also
obtain customer feedback through appropriate comunication means and reviewed during
Management Review.

9.2

Design and Development


Every project where KCT is responsible for Design and Buildwill require the preparation of a
Design Management Plan. This document will identify how the design will be managed and will
include a reference to any specific procedures required such as the management of
Consultants and the interfaces within the design process. Procedures that normally include the
review of design information have been prepared and are contained within Project Technical
procedures identified in Appendix B.

9.3

Procurement
9.3.1

Procurement Process
The procurement process at KCT, including subcontractor and supplier evaluation and
selection, is controlled to ensure that product conforms to the applicable specifications
and requirements. The type and extent of control exerted depends on the type of
product or service, the impact on the realisation process and / or the quality of the
final product and. Consideration is also given to the potential health, safety and
environmental impact of the product. A criterion for selection, evaluation and reevaluation of subcontractors and suppliers and other procedure relating to the
procurement process are shown in Appendix B.

9.3.2

Purchasing Information
Designated employees are authorised to identify resource or purchasing requirements.
As appropriate, a Purchase Requisition is initiated to procure the required items. The
Purchase Requisition details all necessary information, including where applicable, the
requirements for qualification / specification of the product or any Management
System requirements. Designated members of management, prior to a Purchase
Order being initiated, approves purchase requisitions.

9.3.3

Verification of Purchased Product


Purchased products are verified upon receipt. When requested, all purchased
products are to be supplied with appropriate product certification and relevant
Material Safety Data Sheets.

9.4

Service Provision
9.4.1

Control of Service Provision


Service provision is planned and controlled by Heads of Departments who are
responsible for providing a suitable working environment and resources to ensure
efficient delivery of the services offered.

Integrated Management System


Policy & System

Document Ref.
KCT-IMS-PS-0002
Rev.No
0

Rev. Date
15-Jan-2013

Page

Integrated Management System Manual

21 of 34

The Head of Department is also responsible to ensure that appropriate information is


provided and if necessary issue and implement work instructions for use when
undertaking certain tasks within a department.
Heads of Department determine the appropriate monitoring and measuring activities
related to the service delivery. This ensures that the requirements for effective service
delivery is met troughout all stage of the process and at the same time confirms the
continuing ability of each process to satisfy its intended process.
When non-conformance to a product, process, procedure, work instruction or method
statement is detected, then this will be dealt with and controlled in accordance with
procedure KCT-IMS-CM-3305 Control of Non-conforming Product Procedure.
9.4.2

Validation of Processes for Service Provision


Service provision process is qualified by a history of use. Should a new or changed
process become a requirement then these will be validated by suitably qualified
individuals. Suitable Objective Evidence of performance will be retained for record
purposes.

9.4.3

Identification and Traceability


Where applicable all received goods are identified by packing documents, tags and / or
stamps. Once received items are accepted; they are moved to the appropriate storage
location or recipient.

9.4.4

Customer Property
All customer property will be treated in the same way as property belonging to KCT
and the necessary steps will be taken to ensure the appropriate requirements for
storage and protection are implemented. In the event of any property damage, reports
will be raised and the company insurance company informed.

9.4.5

Preservation of Product
Procedures are available to ensure product preservation until delivery of material to
designated locations.

9.5

Control of Monitoring and Measuring Devices


KCT has established procedure KCT-IMS-CM-3304 Project Control of Inspection,
Measurement and Test Instruments Procedure to ensure the effective management of
monitoring and measurement devices and to ensure that such devices are used in a known
state of calibration. Programmed verification checks are performed to ensure and maintain
required accuracy. Controls are established that defective or uncalibrated equipment is
rectified or removed from service. Records of such equipment identification and calibration
status are retained.

Integrated Management System


Policy & System

Document Ref.
KCT-IMS-PS-0002
Rev.No
0

Rev. Date
15-Jan-2013

Page

Integrated Management System Manual


9.6

22 of 34

Measurement, Monitoring, Analysis and Improvement


Planning for measurement, monitoring analysis and improvement activities are in place to
ensure that there is demonstrated conformity of the KCT Management System, products and
processes. Planning also ensures that the SHEQ objectives are achieved. Such planning
includes scheduling internal audits, construction production and execution performance
measurement and measurement of customer satisfaction. It also addresses through continual
improvement the effectiveness of the Management System and any opportunities for
improvement and / or preventive action.
Senior Management evaluate the effectiveness of measuring and monitoring activities during
Management Review Meetings, where further application of such activities are also
considered, including the use of statistical techniques where possible. Any such activities
identified are implemented according to the resulting action plan, which is recorded in minutes
of the Management Review Meetings. This level of planning is focused upon the measurement
of processes, determination of system conformity and upon achieving improvement to the
Management System.
Measurements and analysis are made at various levels within the organisation. On projects the
following apply:
Internal and External Audit results
Quality Audit results
Safety Audit results
Environmental Audit results
Evaluation of corrective and preventive actions
Analysis of cost reports on Non-conformance reports
Analysis of SHE incidents, accident, near-miss and dangerous occurrence reports
Evaluation of the construction programme and target dates
Evaluation and analysis of the financial objectives
Client satisfaction.
The process of managing the project is done through the procedures identified in Section 3000
of the IMS procedures and these are detailed in Appendix B.
At Head Office level, the following measurements and analysis apply:

Analysis of corrective and preventive actions


Analysis of cost reports
Evaluation of audit reports
Evaluation of SHEQ-audit results
Evaluation of SHE statistics
Evaluation of SHEQ objectives and targets
Evaluation of the Quality Indicators including: defect and non-compliance
management, delayed payments and respecting timeframes.

Integrated Management System


Policy & System

Document Ref.
KCT-IMS-PS-0002
Rev.No
0

Rev. Date
15-Jan-2013

Page

Integrated Management System Manual


9.7

23 of 34

Corrective and Preventive Action


The very nature of implementing corrective and preventive action management facilitates the
principle of continual improvement. The detection and dealing with non-conformities gives rise
to the search for appropriate measures to anticipate the risk of this anomaly re-occurring.
Corrective / Preventive actions are highlighted to eliminate the causes of non-conformance in
order to prevent their recurrence. Actions taken are appropriate to the impact of the
problems encountered. Corrective / Preventive actions may be initiated by anyone in the
company according to procedures KCT-IMS-CM-3305 Project Control of Non-Conforming
Products Procedure and KCT-IMS-CM-3306 Project Corrective Action and Preventive Action
Procedure. Such actions will be recorded and processed using form KCT-IMS-CM-3305A Nonconformance Report (NCR) Form.
Any resulting changes to procedures or process flow diagrams will be reflected in the relevant
documents.
Corrective / Preventative actions may arise from a variety of sources, including Management
Review Meetings, Internal Audits, Customer Complaints and any identification of nonconformity.

9.8

Internal Audits
KCT has procedures in place to ensure that periodic assessments / audits of the KCT Integrated
Management System are conducted to ensure that the KCT Integrated Management System is
properly implemented, maintained, effective in meeting the Companys policy and objectives,
and in accordance to the requirements of the ISO and OHSAS Standards.
Internal audits are conducted in accordance with procedure KCT-IMS-M-1005 - Audits
Procedure.
The Management Representative is responsible for scheduling and managing regular internal
and site quality and safety, health and environmental audits. Every area of KCT that affects the
quality of service delivery will be scheduled for internal auditing; frequency of auditing will be
determined in accordance to the status and importance of the activities being audited, taking
into consideration the results from previous audits.
Audit findings and results are reviewed during Management Review Meetings.

9.9

Customer Satisfaction
Customer satisfaction surveys are conducted bi-annually and reviewed during Management
Review Meetings. Customer satisfaction data is collected and reported using customer
feedback data and various satisfaction results. Such data is summarised and analysed into
reports that are presented to senior management. Senior management ensures that data
regarding service delivery, process conformance and customer satisfaction is collected,
recorded and analysed.

Integrated Management System


Policy & System

Document Ref.
KCT-IMS-PS-0002
Rev.No
0

Rev. Date
15-Jan-2013

Page

Integrated Management System Manual

24 of 34

10.0 Monitoring and Measurement


10.1

Process
Where applicable, KCT has implemented the necessary methods to ensure that its services
meet the planned results. When results are not achieved, corrective / preventative action shall
be documented on the applicable form KCT-IMS-CM-3305A Non-conformance Report (NCR)
Form and actions taken as deemed necessary.
Internal IMS audits, project audits and management reviews are only some of the methods
used to monitor the process.

10.2

Monitoring and Measurement of Service


Process checks are included in various procedures and process flow diagrams and relate to
both quality control and service delivery checks. Provision is made for the identification and
resolution of non-conformance. The emphasis is to prevent any actions / activity / problems
which could affect customer satisfaction, quality of product, level of service or have a
detrimental effect on the health and safety of persons and the environment.
Appropriate action is taken promptly to resolve any problems that arise or potentially could
arise.

10.3

Control of Non-conformance
KCT ensures that any non-conformance, either product or system related, is reported and
implemented as per the Control of Non-conformances Procedure (KCT-IMS-CM-3305).
Action is taken to rectify the non-conformance in the form of concession or rework when it is
product related.
System non-conformances are dealt with using the Process improvement methodology
depending on the nature of the non-conformance. Records of such changes and outcomes are
retained.

10.4

Analysis of Data
Data demonstrating the suitability and effectiveness of the Management System is presented
and analysed during Management Review Meetings.
Information resulting from these analyses includes customer satisfaction levels, conformity of
service delivery requirements, characteristics and trends of processes and services including
opportunities for preventive action as well as subcontractor and supplier performance.

10.5

Continual Improvement

Integrated Management System


Policy & System

Document Ref.
KCT-IMS-PS-0002
Rev.No
0

Rev. Date
15-Jan-2013

Page

Integrated Management System Manual

25 of 34

KCT will continually improve the effectiveness of the Integrated Management System using the
IMS Policies and Procedures, SHEQ objectives, audit results, analysis of data, corrective and
preventive actions and management reviews. Continual improvement activities will be
reviewed during Management Review Meetings and will be documented accordingly.
The Management Representative will monitor improvement requests related to all areas of the
Integrated Management System and operations and further investigate improvements in the
disciplines of System related, technical, quality, health, safety, environmental improvements or
behavioural aspects. These statistics will be discussed at Management Review Meetings and
delegated to the relevant Department Head.
KCT Management further relies on the corporate values to encourage and develop the
involvement of personnel in the active search for opportunities to improve the management
system.

10.6

Management Review
KCT will hold an IMS Management System Management Review Meeting at least bi-annually to
ensure the continued suitability, adequacy and effectiveness of the Integrated Management
System. The Management Review Meeting is conducted in accordance with KCT-IMS-M-1001
Management Review Meeting.
The review shall consider opportunities for improvement of change to the Integrated
Management System including policy, objectives and programs / time frames. The reviews will
be based on:

Audit report results internal and external;

Corrective and preventive actions taken and their effectiveness

Analysis of non-conformances , their trends and significance;

Customer feedback positive or negative

Outstanding actions from previous review periods

Change needed and improvements recommended

Accident / Incident analysis

Safety Statistics

Environmental Statistics

Feedback on the performance of suppliers and subcontractors.

Emergency Reviews

Continuous Improvement

Changing Circumstances

Legal Compliance

The SHEQ Director must in collaboration with the General Director, make a conclusion as to

Integrated Management System


Policy & System

Document Ref.
KCT-IMS-PS-0002
Rev.No
0

Rev. Date
15-Jan-2013

Page

Integrated Management System Manual

26 of 34

the effectiveness of the Integrated Management System. The outcome of the reviews could
result in corrective action plans being initiated, revision to the Integrated Management System
or process procedures.
All management reviews must be recorded reflecting action responsibility and response dates
to demonstrate that timely action will be taken to ensure continued commitment to safety,
health, environment and quality.
An IMS Summary Report is drafted by the SHEQ Director and issued to the Management
Review Meeting Members. This report forms the basis of the management review. The
members of the meeting evaluate this report during the meeting and all changes or
improvementsrequired to the system are recorded in the Management Review Meeting
Minutes and followed up / closed-out by the SHEQ Director.

11.0 Operational Controls


KCT have established procedures to ensure that management is equipped with the necessary tools to
deal with and ensure that whilst work is being conducted related those operations and activities, that
are associated with the identified hazards, using mechanical, electrical and manual means, is
performed in a safe manner and to ensure that activities that could have an potential environmental
impact, is executed in an controlled and responsible manner.
Construction operations will be executed in accordance with the procedures identified in Appendix B.

11.1

Planning for Hazardous Identification, Risk Assessment and Risk Control


KCT has established procedures for the ongoing identification of the source of hazards, the
assessment of the levels of risk, and the implementation of control measures to reduce the
level of risk to acceptable levels of exposure in accordance to procedure KCT-IMS-CM-3301
Project Method Statements Procedure.
This includes all routine and non-routine activities of all persons having access to the
workplace, products and processes under the control of KCT.

11.2

Environmental Aspects and Impacts Assessments and Management


Procedure KCT-IMS-HSE-6016 Environmental Aspects & Impacts Evaluation Procedure has
been established for the ongoing identification and review of environmental legislative
requirements applicable to its activities, products and services as well as the continuous review
of identified Environmental Aspects and Impacts and the suitable and appropriate mitigation
thereof.

11.3

Emergency Preparedness and Response


KCT has established a procedure KCT-IMS-HSE-6013 HSE Emergency Evacuation and Planning
Procedure, to identify the potential emergency situations and to respond to such emergency
procedures, ensuring that all emergencies, irrespective of the nature, is managed effectively,
assessed and measured accordingly.

Integrated Management System


Policy & System

Document Ref.
KCT-IMS-PS-0002
Rev.No
0

Rev. Date
15-Jan-2013

Page

Integrated Management System Manual

27 of 34

12.0 Legal and Other Requirements


The Management Representative is responsible for the identification and annual monitoring, assessing
and updating of existing legal requirements, regulations and authoritative guidance with respect to any
amendments / changes applicable to legislation. This also includes any other requirements i.e.
requirements laid down by the client.

13.0 Consultation and Communication


The HR Director is responsible for guiding internal and external communication processes with relevant
parties.
The General Director has overall responsibility to communicate with interested and affected parties
and the media (external communication), and may delegate this function to any manager who he
deems fit.
The senior staff member responsible for the project / facility / yard shall be responsible to receive,
document and respond to relevant communication from external interested parties. This shall be done
in consultation with the General Director as and when required.
The SHEQ Results, Statistical Analysis and Improvement Report will be made available to interested
parties on request and approval of the General Director.
Under no circumstances will an employee of KCT divulge any information to the media or any outside
source without prior approval from the General Director.
At appropriate levels and depending on the position of the employee, staff members are consulted and
informed / made aware of the SHEQ Policy Statement and the procedures applicable to his / her
position. Personnel have access to the KCT Intranet. KCTs major internal communications are:

Project Kick Off Meetings


Project Execution reports
Management Reviews
Annual Performance Appraisals
The Corporate newsletter
Corporate learning bulletins (and safety briefings)
Intranet
Management meetings at an operational level
Toolbox talks
Memos and E-Mail.

14.0 Manual Maintenance


Any deviation from this document should be discussed with the KCT SHEQ Director. The General
Director and the KCT SHEQ Director are to approve the alternative process.

Integrated Management System


Policy & System

Document Ref.
KCT-IMS-PS-0002
Rev.No
0

Rev. Date
15-Jan-2013

Page

Integrated Management System Manual

28 of 34

Any changes required to this procedure should be carried out in accordance with Control of
Documents Procedure KCT-IMS-M-1009.

Attachments
APPENDIX A KCT Integrated Management System Model
APPENDIX B IMS Procedures Index
APPENDIX C KCT Organisation Chart
APPENDIX D Levels of Authority Matrix; KCT-IMS-PS-0002A

Integrated Management System


Policy & System

Document Ref.
KCT-IMS-PS-0002
Rev.No
0

Rev. Date
15-Jan-2013

Page

Integrated Management System Manual


APPENDIX A KCT Integrated Management System Model

29 of 34

Integrated Management System


Policy & System

Document Ref.
KCT-IMS-PS-0002
Rev.No
0

Rev. Date
15-Jan-2013

Page

Integrated Management System Manual

APPENDIX B IMS Procedures

30 of 34

Integrated Management System Procedures


MANAGEMENT
INTEGRATED MANAGEMENT SYSTEM DOCUMENTATION INDEX
Doc. Ref.

Title

Document Reference
KCT-IMS-M-1009C
Rev. No.

Rev. Date

00

05/05/2013
Page Number
1 of 7

Rev. No.

Rev. Date

0000- POLICY & SYSTEM


KCT-IMS-PS-0001

Integrated Management System Policy

28/07/2012

KCT-IMS-PS-0002

Integrated Management System Manual

15/01/2013

KCT-IMS-PS-0003

Health and Safety Policy

0
0

KCT-IMS-PS-0004

Environment and Sustainability Policy

01/08/2012

KCT-IMS-PS-0005

Quality Policy

01/12/2012

KCT-IMS-PS-0006

Phone Policy

20/04/2013

KCT-IMS-PS-0007

Harassment Policy

20/04/2013

KCT-IMS-PS-0008

Drugs and Alcohol Policy

20/04/2013

KCT-IMS-PS-0009

Annual Vacation Leave Policy

20/04/2013

KCT-IMS-PS-0010

Recruitment and Selection Policy

20/04/2013

KCT-IMS-PS-0011

Company Vehicles

20/04/2013

KCT-IMS-PS-0012

Code of Ethics

20/04/2013

KCT-IMS-PS-0013

Company Benefits

20/04/2013

KCT-IMS-PS-0014

Other Leaves Policy

20/04/2013

KCT-IMS-PS-0015

Salary Policy

20/04/2013

KCT-IMS-PS-0016

Employment and Relationship Policy

20/04/2013

KCT-IMS-PS-0017

Termination of employment Policy

20/04/2013

KCT-IMS-PS-0018

Communication Policy

20/04/2013

01/08/2012

1000- MANAGEMENT
KCT-IMS-M-1001

Management Review Meeting

01/12/2012

KCT-IMS-M-1002

Management Reporting

07/11/2012

KCT-IMS-M-1003

Continuous Improvement & Benchmarking

10/11/2012

KCT-IMS-M-1004

Customer Complaints

0
0

KCT-IMS-M-1005

Audits

01/12/2012

KCT-IMS-M-1006

Control over Correspondence

10/07/2012

KCT-IMS-M-1007

Business Continuity Planning

KCT-IMS-M-1008

Setting Objectives

27/04/2013

KCT-IMS-M-1009

Control of Document Procedure

01/12/2012

01/12/2012

2000- COMMERCIAL & CONTRACTS


Tender & Estimating
KCT-IMS- CC-2001

Business Development & Company Profile

KCT-IMS- CC-2002

Tendering & Estimating

14/04/13

KCT-IMS-CC-2003

Post Tendering

14/04/13

KCT-IMS-CC-2004

Tender Bonds

14/04/13

KCT-IMS-CC-2005

Contract Handover & Management Handover Meeting

14/04/13

14/04/13

Control & Cost Management


KCT-IMS-CC-2101

Cost Control & Budget Management

Integrated Management System Procedures


MANAGEMENT
INTEGRATED MANAGEMENT SYSTEM DOCUMENTATION INDEX
Doc. Ref.

Title

Document Reference
KCT-IMS-M-1009C
Rev. No.

Rev. Date

00

05/05/2013
Page Number
2 of 7

Rev. No.

Rev. Date

KCT-IMS- CC-2102

Standard Contract Agreement

14/04/13

KCT-IMS- CC-2103

Legal/Contractual Issues

14/04/13

KCT-IMS-CM-3001

Project Construction
Project/Construction Kick Off Meeting

01/12/2012

KCT-IMS-CM-3002

Project Mobilization & Start Up

01/12/2012

KCT-IMS-CM-3003

Project Daily Report

01/12/2012

KCT-IMS-CM-3004

Project Staff Requisition

30/12/2012

Commercial
KCT-IMS-CC-2201

Company Cash flow Procedure

KCT-IMS-CC-2202

Company Commercial Report


3000- CONSTRUCTION MANAGEMENT (PROJECTS)

Project Technical
KCT-IMS-CM-3101

Technical Submittal

31/10/2012

KCT-IMS-CM-3102

Shop Drawings Submittals

31/10/2012

KCT-IMS-CM-3103

Request For Information

31/10/2012

KCT-IMS-CM-3104

As-built Drawing Preparation

31/10/2012

KCT-IMS-CM-3105

Material Submittals
Project Document Control

31/10/2012

KCT-IMS-CM-3201

Project Control Over Correspondence


Project Quality Control

31/10/2012

KCT-IMS-CM-3301

Method Statements

03/11/2012

KCT-IMS-CM-3302

Measurement, Monitoring, Analysis and Improvement Procedure

17/12/2012

KCT-IMS-CM-3303

Project QCP & ITP Inspection & Testing

01/12/2012

KCT-IMS-CM-3304

0
0

01/12/2012

KCT-IMS-CM-3305

Project Control Of Inspection Measurements & Test Instruments


Control Of Non-Conformance Procedure

KCT-IMS-CM-3306

Corrective & Preventive Action Procedure

01/12/2012

KCT-IMS-CM-3307

Control Of Quality Records

01/12/2012

01/12/2012

Project Procurement
KCT-IMS-CM-3401
KCT-IMS-CM-3402

Project Sub Contractor and Supplier Procurement Procedure


Project Long Lead Items Schedule

16/12/2012

22/10/2012

Project Store Keeping


KCT-IMS-CM-3501

Material Receiving & Inspection

1/12/12

KCT-IMS-CM-3502

Material Issues & Transfers

1/12/12

KCT-IMS-CM-3503

Material Handling & Storage

1/12/12

KCT-IMS-CM-3504

Material Verification & Handover

1/12/12

KCT-IMS-CM-3505

Site Store Demobilization

1/12/12

KCT-IMS-CM-3506

Scrap Handling
Project Time Keeping

1/12/12

KCT-IMS-CM-3601

Labor Attendance ,Time Keeping & Payroll Procedure

1/12/12

Integrated Management System Procedures


MANAGEMENT
INTEGRATED MANAGEMENT SYSTEM DOCUMENTATION INDEX
Doc. Ref.
KCT-IMS-CM-3602

Title
Staff Attendance, Time Keeping & Payroll Procedure

Document Reference
KCT-IMS-M-1009C
Rev. No.

Rev. Date

00

05/05/2013
Page Number
3 of 7

Rev. No.

Rev. Date

1/12/12

Project Commercial & Contracts


KCT-IMS-CM-3701

Contract Review

14/04/13

KCT-IMS-CM-3702

Project Cost and Budget Management

14/04/13

KCT-IMS-CM-3703

Project Sub-Contractors & Suppliers Management

14/04/13

KCT-IMS-CM-3704

Project sub-contractor bond and guarantees

14/04/13

KCT-IMS-CM-3705

Project Insurance

14/04/13

KCT-IMS-CM-3706

Monthly interim application of payment

14/04/13

KCT-IMS-CM-3707

Project claim variations and disputed items

KCT-IMS-CM-3708

Project Close Outs

14/04/13
23/02/13

KCT-IMS-CM-3801

Project Planning & Scheduling

30/09/12

KCT-IMS-CM-3802

Project Weekly Reports

30/09/12

KCT-IMS-CM-3803

Project Monthly Reports

30/09/12

KCT-IMS-CM-3804

Project Manpower Histogram

30/09/12

KCT-IMS-CM-3805

Project Machinery Schedule

30/09/12

KCT-IMS-CM-3806

Project Material Schedule

30/09/12

KCT-IMS-CM-3807

Project S-Curves

30/09/12

KCT-IMS-CM-3808

Project Cash Flow Report

30/09/12

Project Planning

4000- HUMAN RESOURCES


KCT-IMS-HR-4001

Recruitments (Local & Overseas )

20/04/13

KCT-IMS-HR-4002

Business Travel & Meeting Procedure

20/04/13

KCT-IMS-HR-4003

Induction & Orientation

20/04/13

KCT-IMS-HR-4004

Time & Attendance For HO

KCT-IMS-HR-4005

Annual Leave Management

20/04/13

KCT-IMS-HR-4006

Probation Evaluation

20/04/13

KCT-IMS-HR-4007
KCT-IMS-HR-4008

Medical
Staff Loans & Advances Procedures

KCT-IMS-HR-4009

Training & Development.

0
0
0

20/04/13
20/04/13
20/04/13

KCT-IMS-HR-4010

Performance Appraisal Procedure

20/04/13

KCT-IMS-HR-4011

Immigration

20/04/13

KCT-IMS-HR-4012

Disciplinary Procedures

20/04/13

KCT-IMS-HR-4013

Grievances Procedures

20/04/13

KCT-IMS-HR-4014

Company Vehicle and Maintenance

20/04/13

KCT-IMS-HR-4015

Internal Transfer Procedure

20/04/13

KCT-IMS-HR-4016

Job Description Procedure

20/04/13

5000- INFORMATION TECHNOLOGY


KCT-IMS-IT-5001

Software Installation Procedure

02/03/13

KCT-IMS-IT-5002

Service Level Agreement Procedure

02/03/13

Integrated Management System Procedures


MANAGEMENT
INTEGRATED MANAGEMENT SYSTEM DOCUMENTATION INDEX
Doc. Ref.

Title

Document Reference
KCT-IMS-M-1009C
Rev. No.

Rev. Date

00

05/05/2013
Page Number
4 of 7

Rev. No.

Rev. Date

KCT-IMS-IT-5003

Share Point Procedure

02/03/13

KCT-IMS-IT-5004

Antivirus Procedure

02/03/13

KCT-IMS-IT-5005

Blackberry/ Iphone Support Procedure

02/03/13

KCT-IMS-IT-5006

Email Procedure

02/03/13

KCT-IMS-IT-5007

Firewall Procedure

02/03/13

KCT-IMS-IT-5008

Internet and Computer Acceptable Procedure

02/03/13

KCT-IMS-IT-5009

IT Support Procedure

02/03/13

KCT-IMS-IT-5010

Laptop Procedure

02/03/13

KCT-IMS-IT-5011

Move/ Add/(MAC) Procedure

02/03/13

KCT-IMS-IT-5012

Password Procedure

02/03/13

KCT-IMS-IT-5013

Printer/ Photocopier Procedure

02/03/13

KCT-IMS-IT-5014

Server Configuration Standard Procedure

02/03/13

KCT-IMS-IT-5015

Desk Telephone Use Procedure

02/03/13

KCT-IMS-IT-5016

Data Security Procedure

02/03/13

KCT-IMS-IT-5017

IT Equipment Borrowing/ Loan Policy

02/03/13

KCT-IMS-IT-5018

Wireless Access point Procedure

02/03/13

KCT-IMS-IT-5019

Third Party Access point Procedure

02/03/13

KCT-IMS-HSE-6001

6000- HEALTH, SAFTEY & ENVIROMENT


Personal Protective Equipment

01/11/12

KCT-IMS-HSE-6002

HSE for Control of Sub- Contractors

01/11/12

KCT-IMS-HSE-6003

Hazard Identification and Risk Assessment

01/11/12

KCT-IMS-HSE-6004

HSE Accident Reporting and Investigation Procedure

01/11/12

KCT-IMS-HSE-6005

HSE Objective, Targets and Programmes

01/11/12

KCT-IMS-HSE-6006

First Aid Procedure

01/11/12

KCT-IMS-HSE-6007

HSE Management Structure and Responsibility Procedure

01/11/12

KCT-IMS-HSE-6008

HSE Disciplinary and Penalty Provision Procedure

01/11/12

KCT-IMS-HSE-6009

HSE Awareness and Incentive Scheme

01/11/12

KCT-IMS-HSE-6010

HSE Communication, Participation and Consultation Procedure

01/11/12

KCT-IMS-HSE-6011

SHEQ Competence, Training and Awareness Procedure

01/11/12

KCT-IMS-HSE-6012

Legal and other requirements procedure

01/11/12

KCT-IMS-HSE-6013

HSE Emergency & Evacuation Planning Procedure

01/11/12

KCT-IMS-HSE-6014

HSE Measurement, Monitoring, Analysis & Improvement Procedure

01/11/12

KCT-IMS-HSE-6015

Management of Change Procedure

01/11/12

KCT-IMS-HSE-6016

Environmental Aspects & Impacts Evaluation Procedure

01/11/12

KCT-IMS-HSE-6017

General Environmental Management Procedure

01/11/12

KCT-IMS-HSE-6018

Waste Management & Recycling Procedure

01/11/12

KCT-IMS-HSE-6019

Noise Management and Hearing Conservation Procedure

01/11/12

Hazardous Materials Management Procedure

01/11/12

Community Relations and Communications

01/11/12

KCT-IMS-HSE-6020
KCT-IMS-HSE-6021

Integrated Management System Procedures


MANAGEMENT
INTEGRATED MANAGEMENT SYSTEM DOCUMENTATION INDEX
Doc. Ref.

Title

Document Reference
KCT-IMS-M-1009C
Rev. No.

Rev. Date

00

05/05/2013
Page Number
5 of 7

Rev. No.

Rev. Date

KCT-IMS-HSE-6022

Project Specific HS&E Plan

01/11/12

KCT-IMS-HSE-6023

Fire Prevention Procedure

01/11/12

KCT-IMS-HSE-6024

Occupational Health Procedure

01/11/12

KCT-IMS-HSE-6025

SOP HSE Operational Control Procedure-

01/11/12

KCT-IMS-HSE-6026

SOP - Protection of Premises and Housekeeping Site Procedure

01/11/12

KCT-IMS-HSE-6027

SOP Isolation & Lock Out & Tag Out

01/11/12

SOP Access, Egress and Working at Height Procedure

01/11/12

01/11/12

01/11/12

KCT-IMS-HSE-6028

KCT-IMS-HSE-6030

SOP -Lifting Operations, Lifting Machinery & SOP - Lifting Gear Site Operational
Control Procedure
SOP - Permit to Work Procedure

KCT-IMS-HSE-6031

SOP -Scaffolding, Platforms, Support Work and Form work Procedure

01/11/12

KCT-IMS-HSE-6032

SOP - Man Cages and Cradles Procedure

01/11/12

KCT-IMS-HSE-6033

SOP - Vessels Under Pressure Procedure

01/11/12

KCT-IMS-HSE-6034

SOP - Portable Electrical Equipment & Electrical Machinery Procedure

01/11/12

KCT-IMS-HSE-6035

SOP - Grinding Machinery Procedure

01/11/12

KCT-IMS-HSE-6036

SOP - Working in Hot and Humid Climate Procedure

01/11/12

KCT-IMS-HSE-6037

SOP - Excavation, Trial Pits & Trenching Procedure

01/11/12

KCT-IMS-HSE-6038

SOP - Flame cutting equipment procedure

01/11/12

KCT-IMS-HSE-6039

SOP - Chemical Handling and Storage procedure

01/11/12

KCT-IMS-HSE-6040

SOP Working Near, On or over Water Procedure

01/11/12

KCT-IMS-HSE-6029

7000- PROCUREMENT
KCT-IMS-PRO-7001

Procurement of Material

04/02/13

KCT-IMS-PRO-7002

Sub-Contractor and Supplier Selection

04/02/13

KCT-IMS-PRO-7003

Central Warehouse Procedure

04/02/13

8000- ACCOUNTS & FINANCE


KCT-IMS-AF-8001

Capex-Fixed Assets & Capital Expenditure

28/11/12

KCT-IMS-AF-8002

Accounts Receivables & Revenue Recognition

01/01/13

KCT-IMS-AF-8003
KCT-IMS-AF-8004

Accounts Payables & Subcontractors


Cash & Bank Transactions

28/11/12

KCT-IMS-AF-8005

Petty Cash

0
0
0

KCT-IMS-AF-8006

Bank Guarantees

13/12/12

KCT-IMS-AF-8007

Letters of Credit

28/11/12

KCT-IMS-AF-8008

Financial Statements & Annual Audit

13/11/12

KCT-IMS-AF-8009

Annual Closing of Account

12/11/12

KCT-IMS-AF-8010

General & Administration Expenses

13/11/12

KCT-IMS-AF-8011

Budget Preparation, Evaluation, Review & Follow Up

KCT-IMS-AF-8012

Company Credit Cards

1312/12

KCT-IMS-AF-8013

Risk Management- Insurance

13/12/12
26/08/12

Integrated Management System Procedures


MANAGEMENT
INTEGRATED MANAGEMENT SYSTEM DOCUMENTATION INDEX
Doc. Ref.

Title

Document Reference
KCT-IMS-M-1009C
Rev. No.

Rev. Date

00

05/05/2013
Page Number
6 of 7

Rev. No.

Rev. Date

1312/12
15/10/12

KCT-IMS-AF-8014

Banking Relationships & Projects Financing

KCT-IMS-AF-8015

Accruals & Pre- payments

KCT-IMS-AF-8016
KCT-IMS-AF-8017

Related Parties
Control of Diesel Deliveries

KCT-IMS-AF-8018

Chart of Accounts

0
0
0

KCT-IMS-AF-8019

Shared Cost

0
9000- PLANT, MOTORS & VEHICLE (PMV)

KCT-IMS-PMV-9001

PMV General Procedure

02/02/13

KCT-IMS-PMV-9002

PMV Service Division Administration Procedure

02/02/13

KCT-IMS-PMV-9003

PMV Service Division- Project Control of Servicing Procedure

02/02/13

KCT-IMS-PMV-9004

PMV Service Division- Storage and issue of spare parts Procedure

02/02/13

KCT-IMS-PMV-9005

PMV Service Division- Storage and issue of fuel and lubricants Procedure

02/02/13

KCT-IMS-PMV-9006

PMV Service Division- Handling, Storage, Packaging, Preservation and Delivery

02/02/13

KCT-IMS-PMV-9007

PMV Service Division- Registration and Insurance of Road Going Vehicles

02/02/13

KCT-IMS-PMV-9008

PMV Service Division- Training and Third Party Certification

02/02/13

KCT-IMS-PMV-9009

PMV Service Division- Disposal

02/02/13

KCT-IMS-PMV-9010

PMV Transportation Division Procedure

02/02/13

KCT-IMS-PMV-9011

PMV Transportation Division - Hire Contract Conditions

02/02/13

KCT-IMS-PMV-9012

PMV Transportation Division - Condition for Internal Use

02/02/13

KCT-IMS-PMV-9013

PMV Workshop Division Procedure

02/02/13

KCT-IMS-PMV-9014

PMV Workshop Division - Preventive Maintenance for Equipment

02/02/13

KCT-IMS-PMV-9015

PMV Workshop Division- Corrective Maintenance of Equipment

02/02/13

KCT-IMS-PMV-9016

PMV Workshop Division - Receiving Inspection

02/02/13

10000- LABOUR CAMP


KCT-IMS-LC-10001

New Arrivals to labor camps

01/11/2012

KCT-IMS-LC-10002

Labor Transportation from camps/sites to sites/camps

01/11/2012

KCT-IMS-LC-10003

Administration at Labor Camps

01/11/2012

KCT-IMS-LC-10004

House Keeping in Labor Camps

01/11/2012

KCT-IMS-LC-10005

Maintenance at Labor Camps

01/11/2012

KCT-IMS-LC-10006

Safety In Labor Camps

01/11/2012

KCT-IMS-LC-10007

Labor Welfare

01/11/2012

KCT-IMS-LC-10008

Electricity , Water , Gas , Rubbish Removal at Labor Camps

01/11/2012

KCT-IMS-LRD-15001

15000- LRD
Objective, Scope and LRD/Project Team Responsibilities

25/04/13

KCT-IMS-LRD-15002

Activities and Direct Manpower for the Projects

25/04/13

KCT-IMS-LRD-15003

New Project Mobilization and Forecasts

25/04/13

KCT-IMS-LRD-15004

LRD and Project Overall Forecasting

25/04/13

Integrated Management System Procedures


MANAGEMENT
INTEGRATED MANAGEMENT SYSTEM DOCUMENTATION INDEX
Doc. Ref.

Title

Document Reference
KCT-IMS-M-1009C
Rev. No.

Rev. Date

00

05/05/2013
Page Number
7 of 7

Rev. No.

Rev. Date

KCT-IMS-LRD-15005

LRD Overall Structure, Job Descriptions and Responsibilities

25/04/13

KCT-IMS-LRD-15006

LRD Summary of Average Target Productivity Rates

25/04/13

KCT-IMS-LRD-15007

LRD Report Summary

25/04/13

KCT-IMS-LRD-15008

LRD for Concrete Works

25/04/13

KCT-IMS-LRD-15009

LRD for Formwork

25/04/13

KCT-IMS-LRD-15010

LRD for Reinforcement

25/04/13

KCT-IMS-LRD-15011

LRD for Block Works

25/04/13

KCT-IMS-LRD-15012

LRD for Plaster Works

25/04/13

KCT-IMS-LRD-15013

LRD for Gypsum Works

25/04/13

KCT-IMS-LRD-15014

LRD for Ceramic Tiling Works

25/04/13

KCT-IMS-LRD-15015

LRD for Painting Works

25/04/13

KCT-IMS-LRD-15016

LRD for Steel Fabrication

25/04/13

KCT-IMS-LRD-15017

LRD for Scaffolding Works

25/04/13

KCT-IMS-LRD-15018

LRD for Other Finishing Works

25/04/13

KCT-IMS-LRD-15019

LRD for Marble Works

25/04/13

KCT-IMS-LRD-15020

LRD for Landscaping Works (Pavers)

25/04/13

KCT-IMS-LRD-15021

LRD Timekeeping Procedure and Coordination with HR Department

25/04/13

KCT-IMS-LRD-15022

LRD Coordination with Camps

25/04/13

KCT-IMS-LRD-15023

Activities and Direct Manpower for Projects - Flowchart

25/04/13

16000- OPERATIONS
KCT-IMS-OP-16001

Staff Re allocation Management Procedure

05/05/13

KCT-IMS-OP-16002

Maintenance Procedure

05/05/13

Integrated Management System


Policy & System
Integrated Management System Manual
APPENDIX C Organisation Chart

Document Ref.
KCT-IMS-PS-0002
Rev.No
0

Rev. Date
15-Jan-2013

Page
31 of 34

APPENDIX D Levels of Authority Matrix