You are on page 1of 84

Importance of On-site testing and Diagnosis of Transmission Power Cables

Prof.dr.hab.ir. Edward Gulski, FIEEE


onsite.hv.solutions AG, Switzerland
Poznan University of Technology, Poland
Delft University of Technology, The Netherlands

In co-operation with:

Grid companies

International manufactures

Universities and not-forprofit organizations

IEEE HK Joint Chapter of PES/IAS/PELS/IES Seminar: Importance of On-site testing and Diagnosis of Transmission Power Cables

1.

Basic Aspects of Condition Assessment of Transmission Power Cables

2.

International Trends in Testing and Diagnosis

3.

Principles of using sinusoidal damped AC voltages for on-site energizing of


power cables

4.

Examples of Modern Condition Assessment of HV Power Cables

IEEE HK Joint Chapter of PES/IAS/PELS/IES Seminar: Importance of On-site testing and Diagnosis of Transmission Power Cables

1.

Basic Aspects of Condition Assessment of Transmission Power Cables

2.
2.

International
International Trends
Trends in
in Testing
Testing and
and Diagnosis
Diagnosis

3.
3.

Principles
Principles of
of using
using sinusoidal
sinusoidal damped
damped AC
AC voltages
voltages for
for on
on--site
site energizing
energizing of
of
power
power cables
cables

4.
4.

Examples
Examples of
of Modern
Modern Condition
Condition Assessment
Assessment of
of HV
HV Power
Power Cables
Cables

IEEE HK Joint Chapter of PES/IAS/PELS/IES Seminar: Importance of On-site testing and Diagnosis of Transmission Power Cables

On-site testing and diagnosis of (E) HV power cables

Quality and cable system integrity


of the cable circuit

New installed /
repaired cables

On-site testing
to:
exclude poor
workmanship
(installation defects)

Availability /reliability of the cable


circuit

Serviced aged
cables

On-site diagnosis
to:
detect local aging and
check insulation
degradation status

IEEE HK Joint Chapter of PES/IAS/PELS/IES Seminar: Importance of On-site testing and Diagnosis of Transmission Power Cables

Asset management classification of the cable condition

On-site testing and diagnosis


voltage withstand

PD detection and diagnosis

New installed, diverted cables

quality and integrity

dielectric-loss diagnosis

Service aged cables

reliability and availability

maintenance and replacement

Asset management decision support

IEEE HK Joint Chapter of PES/IAS/PELS/IES Seminar: Importance of On-site testing and Diagnosis of Transmission Power Cables

Asset management decision

Status

Condition

Maintenance goal

A New connection, very


good condition

New or aged: no defects or


aging symptoms

Minimal maintenance, go for optimal availability.

B Good condition

Aged: degradation
observed, possibly harmful
defects present

No impact on reliability. Keep in status B, against


minimal cost and maintain optimal availability.

Significantly aged: very


degraded, serous defects
present

Very low reliability. Instable situation, end as quick


as possible.

C Stable, but poor


condition

D Instable situation
E End of life cycle

Reliability decreased. Refurbish to status B, or if this


is not possible, stabilise to prevent quick aging.
Maintain optimal availability, by periodical condition
assessment.

No operation recommended. Maintenance aimed to


prevent environmental pollution and safe
conservation. Extension of life time or availability is
no issue.

IEEE HK Joint Chapter of PES/IAS/PELS/IES Seminar: Importance of On-site testing and Diagnosis of Transmission Power Cables

Integral approach: non-destructive insulation condition assessment

Cable
termination

Cable
insulation

Cable joint

Weak -spots insulation condition


assessment by:
PD detection and localisation
at voltages up to 1.7 U0
-PDIV
-PD magnitudes at voltages up to 1.7xU0
-PD location
-PD patterns

Local defects

Integral insulation condition


assessment by:
Dielectric losses measurement up to 1.7U0

Return voltage measurement RVM


Voltage Withstand Diagnosis up to 1.7 U0

Global degradation

IEEE HK Joint Chapter of PES/IAS/PELS/IES Seminar: Importance of On-site testing and Diagnosis of Transmission Power Cables

Typical defects in a power cable joints

Ref: NEETRAC

IEEE HK Joint Chapter of PES/IAS/PELS/IES Seminar: Importance of On-site testing and Diagnosis of Transmission Power Cables

Typical defects in a power cable insulation

Ref: NEETRAC
IEEE HK Joint Chapter of PES/IAS/PELS/IES Seminar: Importance of On-site testing and Diagnosis of Transmission Power Cables

Dielectric loss factor and PD magnitude

[Source: PD in Electrical Power Apparatus; ISBN 3-8007-1760-3]


IEEE HK Joint Chapter of PES/IAS/PELS/IES Seminar: Importance of On-site testing and Diagnosis of Transmission Power Cables

Partial discharges: quantities

Discharge test. Any particular discharge larger than q0 measured below test voltage Ut leads to
rejection of the object under test, see shaded area.

IEEE HK Joint Chapter of PES/IAS/PELS/IES Seminar: Importance of On-site testing and Diagnosis of Transmission Power Cables

Partial discharges: PD behavior of cable termination


[Source: PD in Electrical Power Apparatus; ISBN 38007-1760-3]

IEEE HK Joint Chapter of PES/IAS/PELS/IES Seminar: Importance of On-site testing and Diagnosis of Transmission Power Cables

Dielectric properties of HV insulation

I.

All HV power cables have high voltage life expectancy;

II.

During the whole service life > 30 years they are subjected to thermal, mechanical and environmental
stresses;

III.

All these influences raise the working temperature of the HV power cable;

IV.

Higher temperature accelerates chemical reactions resulting in degradation of dielectric characteristics;

V.

Increase of degradation results in increases of loss factor and future degradation;

VI.

Measurement of dielectric losses is important issue to avoid failures.

IEEE HK Joint Chapter of PES/IAS/PELS/IES Seminar: Importance of On-site testing and Diagnosis of Transmission Power Cables

Dielectric losses: physical origin of losses

Conductive losses

Dipole losses

Interface losses
Partial discharges losses

IEEE HK Joint Chapter of PES/IAS/PELS/IES Seminar: Importance of On-site testing and Diagnosis of Transmission Power Cables

Dielectric loss factor of an oil-paper-insulated cable


[Source: PD in Electrical Power Apparatus; ISBN 3-8007-1760-3]

IEEE HK Joint Chapter of PES/IAS/PELS/IES Seminar: Importance of On-site testing and Diagnosis of Transmission Power Cables

Dielectric loss factor and PD magnitude of an oil-paper-insulated cable


[Source: PD in Electrical Power Apparatus; ISBN 3-8007-1760-3]

1.

healthy cable

2.

insulation screen
damage 1cm2

3.

insulation screen
damage 6cm2

IEEE HK Joint Chapter of PES/IAS/PELS/IES Seminar: Importance of On-site testing and Diagnosis of Transmission Power Cables

Dielectric losses: tan as function of the conductor temperature

IEEE HK Joint Chapter of PES/IAS/PELS/IES Seminar: Importance of On-site testing and Diagnosis of Transmission Power Cables

Tan of a 150kV as function of the conductor temperature

IEEE HK Joint Chapter of PES/IAS/PELS/IES Seminar: Importance of On-site testing and Diagnosis of Transmission Power Cables

Dielectric losses

1.

The tan measurement can be applied for the determination of the loss factor of the
insulation material. This factor increases during the ageing process of the cable.

2.

The tan measurement should be regarded as a diagnostic and/or supporting


measurement.

3.

In practice, in HV insulation is known that in addition to absolute value of tan at


certain test voltage also the increment of tan delta as measured at two designated
voltages so called tan or tip-up is important for condition assessment.

Se ction Alkm r-Oter3

L1
L2

0.5

L3

dielectric losses [%]

0.45
0.4
0.35
0.3
0.25
0.2
40

45

50

55

60

65

70

test voltage [kVpeak ]

IEEE HK Joint Chapter of PES/IAS/PELS/IES Seminar: Importance of On-site testing and Diagnosis of Transmission Power Cables

1.
1.

Basic
Basic Aspects
Aspects of
of Condition
Condition Assessment
Assessment of
of Transmission
Transmission Power
Power Cabl
Cables
es

2.

International Trends in Testing and Diagnosis

3.
3.

Principles
Principles of
of using
using sinusoidal
sinusoidal damped
damped AC
AC voltages
voltages for
for on
on--site
site energizing
energizing of
of
power
power cables
cables

4.
4.

Examples
Examples of
of Modern
Modern Condition
Condition Assessment
Assessment of
of HV
HV Power
Power Cables
Cables

IEEE HK Joint Chapter of PES/IAS/PELS/IES Seminar: Importance of On-site testing and Diagnosis of Transmission Power Cables

Norms (voltage testing)

Standards/norms/guides

Description

IEC 60840

Power cables with extruded insulation and the


accessories for rated voltages above 30kV up to 150kV
Test methods and requirements;

IEC 62067

Power cables with extruded insulation and the


accessories for rated voltages above 150kV;

IEC 60141

Tests on oil-filled and gas-pressure cables and their


accessories up to and including 400kV;

IEC 60060-3

High Voltage test techniques Part 3: Definitions and


requirements for on-site testing;

IEEE 400

Guide for Field Testing and Evaluation of the Insulation


of Shielded Power Cable Systems Rated 5KV and
Above.

IEEE HK Joint Chapter of PES/IAS/PELS/IES Seminar: Importance of On-site testing and Diagnosis of Transmission Power Cables

International recommendations

Cable type
MV
(630 kV)

XLPE

PILC

(E) HV
(30 400 kV)

XLPE

Oil-filled

Internationally not
recommended

DC

VLF 0.1 Hz

AC 50 Hz

DAC 20-300 Hz

Installation test / Acceptance test

No

Yes*

Yes

Yes

Maintenance test / Diagnostic test

No

Yes*

Yes

Yes

Installation test / Acceptance test

Yes

Yes

Yes

Yes

Maintenance test / Diagnostic test

Yes

Yes

Yes

Yes

Installation test / Acceptance test

No ***

No **

Yes

Yes

Maintenance test / Diagnostic test

No ***

No **

Yes

Yes

Installation test / Acceptance test

Yes

No **

Yes

Yes

Maintenance test / Diagnostic test

No

No **

Yes

Yes

Internationally
recommended

* Partial discharge (PD) inception voltage (PDIV) can be different as compared to continuous and damped AC stresses
** according to
[1] IEC 60840 Power cables with extruded insulation and their accessories for rated voltages above 30 kV (Um = 36 kV) up to
150 kV (Um = 170 kV) Test methods and requirements.
[2] IEC 62067, Standard Power cables with extruded insulation and their accessories for rated voltages above 150 kV (Um =
170 kV) up to 500 kV (Um
*** according to
[3] Recommendations for a new after laying test method for HV extruded cable systems CIGRE 1990, Paris, paper 21-105
[4] CIGRE WG 21-09; After-laying tests o HV extruded cable systems; Elektra 173, August 1997

IEEE HK Joint Chapter of PES/IAS/PELS/IES Seminar: Importance of On-site testing and Diagnosis of Transmission Power Cables

Effectiveness of routine HV withstand testing

Type of
insulation defect
A.

B.

C.

Homogenous

Weak
inhomogeneo
us
Strong
inhomogeneo
us

Example

Failure type

Breakdown test effectiveness /


PD presence effectiveness

AC

DAC

24Uo

DC

e.g. less or no
insulation, moisture

Breakdown,
No partial
discharges

/ --

/ --

/-

/ --

e.g. missing field


grading

Not necessary a
breakdown;
possible predischarges

/ -+

/ -+

/-

/-

/ -+

/-

e.g. sharp edges,


cavities, small
installation defects

Partial discharges
+ breakdown

NO PD -> No breakdown

/ ++

++

NO PD -> NO breakdown

IEEE HK Joint Chapter of PES/IAS/PELS/IES Seminar: Importance of On-site testing and Diagnosis of Transmission Power Cables

Norms (PD detection)

TEST TYPE

DESCRIPTION

I.

AC or DAC voltage test & PD


measurement in accordance to
IEC60270, IEC885-3 and IEEE
400.3

a.
b.
c.

PD level measurement in [pC]


localization of PD in cable insulation
localization of PD in cable accessories

II.

AC or DAC voltage test & PD


measurement (unconventional) not
standardized (IEC 62478 under
preparation, Cigre WG D1.37)

a.

RF (up to 500 MHz) PD measurement


in [V]
detection of PD in cable accessories
only (not applicable for direct burred
cables)

b.

IEEE HK Joint Chapter of PES/IAS/PELS/IES Seminar: Importance of On-site testing and Diagnosis of Transmission Power Cables

On-site electrical tests using AC and damped AC voltages

New installed cables

Repaired / refurbished
cables

Service aged
cables

Installation test /
Acceptance test

Maintenance test

Diagnostic test

Object

Test type

Evaluation
method

Voltage withstand test


Diagnostics: e.g.: partial discharges (PD)
dissipation factor (tan )

Monitored
Evaluation of the diagnostic
data

Acceptance
thresholds

Non-monitored
Criteria
Criteria Pass/Fail

IEEE HK Joint Chapter of PES/IAS/PELS/IES Seminar: Importance of On-site testing and Diagnosis of Transmission Power Cables

On-site electrical tests using AC and damped AC voltages

Installation / Acceptance test

Maintenance / Diagnostic test

DAC excitations at max. test


voltage
Over -voltage
not failed
PD -free -> increase

failed

PD present -> evaluate


PD
observed

PD not
observed
Repair

Evaluation of PD
data

Harmful PD

Harmless PD

Test passed

IEEE HK Joint Chapter of PES/IAS/PELS/IES Seminar: Importance of On-site testing and Diagnosis of Transmission Power Cables

On-site electrical tests using AC and damped AC voltages

DAC excitations at max. test voltage*


Over-voltage

(*) the time duration will be in accordance to


IEC recommendations or resp. to IEEE 400 document (50
excitations)

PD-free -> increase


PD present -> evaluate

Power cable rated


voltage

Ref

(*) AC/DAC voltage test level


Acceptance test

< 30kV

IEC 60502

Max. 3.0.2.0xUo

30kV-150kV

IEC 60840

Max. 2.01.7xUo

150kV-500kV

IEC 60067

Max. 1.71.1xUo

(*) AC/DAC voltage test level


Maintenance test
In general i has to be lower than
acceptance test e.g. 80%

IEEE HK Joint Chapter of PES/IAS/PELS/IES Seminar: Importance of On-site testing and Diagnosis of Transmission Power Cables

1.
1.

Basic
Basic Aspects
Aspects of
of Condition
Condition Assessment
Assessment of
of Transmission
Transmission Power
Power Cabl
Cables
es

2.
2.

International
International Trends
Trends in
in Testing
Testing and
and Diagnosis
Diagnosis

3.

Principles of using sinusoidal damped AC voltages for on-site energizing of


power cables

4.
4.

Examples
Examples of
of Modern
Modern Condition
Condition Assessment
Assessment of
of HV
HV Power
Power Cables
Cables

IEEE HK Joint Chapter of PES/IAS/PELS/IES Seminar: Importance of On-site testing and Diagnosis of Transmission Power Cables

DAC voltage type equivalence to continuous AC voltage

continuous sinusoidal AC (20-300Hz)

damped sinusoidal AC (20-300Hz)

dielectric
losses

PD inception voltage PDIV

PD inception voltage PDIV

PD extinction voltage PDEV

PD extinction voltage PDEV

PD level in [pC]

PD level in [pC]

PD pattern information

< PD pattern information

Test over-voltage destructiveness > Test over-voltage destructiveness


Dielectric losses Dielectric losses

IEEE HK Joint Chapter of PES/IAS/PELS/IES Seminar: Importance of On-site testing and Diagnosis of Transmission Power Cables

What is damped AC voltage ?

1. The damped alternating


voltage (DAC) is an
oscillating switching impulse
voltage (OSI) of quite low
damping and a frequency in
the range of 20Hz up to
400Hz.

2.

Damped AC voltages are accepted test voltages for on-site testing:


i.
IEC 60060-3 High Voltage test techniques Part 3: Definitions and
requirements for on-site testing
ii. IEEE 400 Guide for Field Testing and Evaluation of the Insulation
of Shielded Power Cable Systems
iii. IEEE 400.3 Guide for PD Testing of Shielded Power Cable Systems
in a Field Environment.
IEEE HK Joint Chapter of PES/IAS/PELS/IES Seminar: Importance of On-site testing and Diagnosis of Transmission Power Cables

What is damped AC voltage ?

50kV

100kV

Example: PD as measured on a termination


of a 220kV power cable

150kV

IEEE HK Joint Chapter of PES/IAS/PELS/IES Seminar: Importance of On-site testing and Diagnosis of Transmission Power Cables

International survey about using damped AC voltages (2007)


Purpose of testing using DAC voltages

partial discharge
measurement

voltage testing
23%

52%
25%
dielectric losses
measurement
Relevance of combining PD test and the voltage test
Yes: 50%

No: 50%

[Ref] IEEE PES Insulated Conductor Committee Spring 2008 Meeting, Minutes F05D Damped AC Voltages Testing

IEEE HK Joint Chapter of PES/IAS/PELS/IES Seminar: Importance of On-site testing and Diagnosis of Transmission Power Cables

International survey about using damped AC voltages (2007)


Voltage testing

Max. Utest 3xU0


18%

82%

Max. Utest 2xU0

Breakdown during voltage testing:

0% . 2%

Before breakdown PD has been measured:

81%

[Ref] IEEE PES Insulated Conductor Committee Spring 2008 Meeting, Minutes F05D Damped AC Voltages Testing

IEEE HK Joint Chapter of PES/IAS/PELS/IES Seminar: Importance of On-site testing and Diagnosis of Transmission Power Cables

International survey about using damped AC voltages (2007)


Test voltage level as used for PD measurements
Max. Utest 3xU0
18%
9%

Max. Utest 1xU0

73%

Max. Utest 2xU0


The present standards IEEE 400 is using the name Oscillating Waves (OW).
The present IEC 60060-3 is using the name damped alternating voltages (DAC).
To avoid any confusion between oscillating voltages in the range of kHz and damped AC voltage in the range of
20Hz-500Hz as there are in use 100% of responders support the proposal to change the name to DAC.
[Ref] IEEE PES Insulated Conductor Committee Spring 2008 Meeting, Minutes F05D Damped AC Voltages Testing

IEEE HK Joint Chapter of PES/IAS/PELS/IES Seminar: Importance of On-site testing and Diagnosis of Transmission Power Cables

Damped AC On-site testing of (E) HV power cables

has been introduced by Seitz Instruments AG in Switzerland end of 90s.


Since than worldwide almost 200 systems are successfully implemented for testing and
diagnosis of distribution and transmission power cables using different OWTS (oscillating
wave test system) solutions:
OWTS 25 since 1999
OWTS HV 250 since 2004
OWTS M-series 28 since 2005
OWTS M-series 60 since 2006
OWTS HV 150 since 2007
OWTS HV 350 since 2008
OWTS HV 250 system

IEEE HK Joint Chapter of PES/IAS/PELS/IES Seminar: Importance of On-site testing and Diagnosis of Transmission Power Cables

What is damped AC voltage ?

Example of a continuous AC voltage source

On-site testing and PD measurement on a 150 kV


XLPE cable at KEMA, The Netherlands, 1994
[Ref] ISBN 90-73192-5-6

Example of a damped AC voltage source

On-site testing and PD measurement on a 150 kV


external gas pressurized cable at a Dutch utility
Nuon, The Netherlands, 2007

technological progress
IEEE HK Joint Chapter of PES/IAS/PELS/IES Seminar: Importance of On-site testing and Diagnosis of Transmission Power Cables

On-site testing of (E) HV power cables

Example of a continuous AC voltage source

Example of a damped AC voltage source

Weight: 20.000kg

Weight: 1.000kg

Supply voltage: 3 x 400V (200kVA)

Supply voltage: 8kW

Load: 20 nF - 5000 nF

Load: 20 nF 13000 nF

Output: AC 220kVrms (25 Hz - 300 Hz)

Output: DAC 250kVrms (20 Hz - 300 Hz)

Test object: power cables 220kV / 8km

Test object: power cables 220kV / 30km

IEEE HK Joint Chapter of PES/IAS/PELS/IES Seminar: Importance of On-site testing and Diagnosis of Transmission Power Cables

What is damped AC voltage ?

Applicability for testing different power cable ratting


voltages
Power cable
rated voltages
[kV]

Uo
[kV]

HV 150
x Uo

HV 250
x Uo

HV 350
x Uo

66

38,1

2,8

110

63,5

1,7

2,8

132

76,2

1,4

2,3

150

86,6

1,2

2.0

2,8

220

127

0.8

1,4

1,9

330

190,5

0.9

1,3

380

219,4

Type HV150

Type HV350

1,1

IEEE HK Joint Chapter of PES/IAS/PELS/IES Seminar: Importance of On-site testing and Diagnosis of Transmission Power Cables

Damped AC On-site testing of (E) HV power cables

Applicability for HV and


EHV power cables
Results of several successful comparison
tests as published by
Cigre (1990),
TU Delft/Kema (1999),
Cesi (2002),
EuroTest (2007),
TU Helsinki (2007),
Prysmian Cables and Systems BV,
EPRI State Grid, China (2010),
have demonstrated the applicability of
damped ac (dac) voltages.

OWTS HV technology uses damped


sinusoidal ac voltages in the range of 20Hz
up to 500Hz

IEEE HK Joint Chapter of PES/IAS/PELS/IES Seminar: Importance of On-site testing and Diagnosis of Transmission Power Cables

Important Standards

IEC 60060-3: High Voltage test techniques


Part 3: Definitions and requirements for on-site testing;
IEEE 400: Guide for Field Testing and Evaluation of the
Insulation of Shielded Power Cable Systems;
IEEE 400.3: Guide for PD Testing of Shielded Power
Cable Systems in a Field Environment;
IEC 60270: Partial discharges measurements;
IEC 885-3 Test methods for partial discharges measurements on lengths
of extruded power cable;
IEC 60840: Power cables with extruded insulation and the accessories
for rated voltages above 30kV up to 150kV Test methods and
requirements;

OWTS HV 150 system

IEC 62067: Power cables with extruded insulation and the accessories
for rated voltages above 150kV;.
IEC 60141: Tests on oil-filled and gas-pressure cables and their
accessories

IEEE HK Joint Chapter of PES/IAS/PELS/IES Seminar: Importance of On-site testing and Diagnosis of Transmission Power Cables

Damped AC On-site testing of (E) HV power cables

has been introduced in 1998 as a consequence


of experience in on-site ac testing on the one
hand and the technological progress in power
electronics and advanced signal processing on
the other hand and it is characterized by
lightweights measured with max. 6kg/MVA
compactness versus output voltage
system assembling and voltage erecting
effort
necessary power demand for long lengths
possibility of sensitive PD detection and tan
measurement

After-laying testing of new installed


HV and EHV cables using OWTS
HV system

IEEE HK Joint Chapter of PES/IAS/PELS/IES Seminar: Importance of On-site testing and Diagnosis of Transmission Power Cables

Damped AC On-site testing of (E) HV power cables

The damped alternating voltage (dac) is an


oscillating switching impulse voltage (OSI) of quite
low damping and a frequency in the range of 20Hz
up to 400Hz

IEC 60060-3 Damped alternating


voltage

IEEE HK Joint Chapter of PES/IAS/PELS/IES Seminar: Importance of On-site testing and Diagnosis of Transmission Power Cables

Damped AC On-site testing of (E) HV power cables


Principles of damped
sinusoidal ac (dac) voltage
generation

350kV HV divider and PD measuring unit


including measurement and control system

350kV external inductance build up with a


coil base, 3 coils and 1 coil with top
electrode

350kV switch unit

350 kV power unit, 2 parallel units in master


slave configuration which deliver 16 mA

IEEE HK Joint Chapter of PES/IAS/PELS/IES Seminar: Importance of On-site testing and Diagnosis of Transmission Power Cables

Damped AC On-site testing of (E) HV power cables

Principles of damped
sinusoidal ac (dac) voltage
generation

HV Source

HV Solid-State
Switch

Inductor L
Test Object: Power Cable

Cc

HV Divider
Process Control Unit

PD Coupling Capacitor

Data Storage

PD detector

PD Analysis
Dielectric losses
estimation

For the generation of dac voltages the capacitance of the HV power cable in series in a
large air-core inductor L in the range of few Hs is charged with a continuously increasing
HV voltage with a low current in the range of 10mA up to 30mA.
IEEE HK Joint Chapter of PES/IAS/PELS/IES Seminar: Importance of On-site testing and Diagnosis of Transmission Power Cables

Damped AC On-site testing of (E) HV power cables

Principles of damped
sinusoidal ac (dac) voltage
generation

HV Source

HV Solid-State
Switch

Inductor L
Test Object: Power Cable

Cc

HV Divider
Process Control Unit

PD Coupling Capacitor

Data Storage

PD detector

PD Analysis
Dielectric losses
estimation

By linear charging with continuously increasing HV voltage no steady state DC


conditions occur in the test object. After the LC loop is closed in a time e.g. < 1s by
HV solid-state switch in the loop a sinusoidal damped ac voltage with a frequency
between 20Hz and few hundreds of Hz is produced.
IEEE HK Joint Chapter of PES/IAS/PELS/IES Seminar: Importance of On-site testing and Diagnosis of Transmission Power Cables

Damped AC On-site testing of (E) HV power cables

Principles of damped
sinusoidal ac (dac) voltage
generation

OWTS HV 350 system


the dac voltage frequency is approximately the resonant frequency of the circuit
LC.
the maximum capacitance which can be tested using dac system can be calculated
in dependence of maximum test voltage applied and the permissible ac current in the
resonant circuit and is in the range up to 13F.

IEEE HK Joint Chapter of PES/IAS/PELS/IES Seminar: Importance of On-site testing and Diagnosis of Transmission Power Cables

Damped AC On-site testing of (E) HV power cables

Examples of typical damped ac voltage frequencies for different lengths of two


typical 230kV power cables
Length [km]

XLPE (C=200pF/m) [Hz]

Oil filled (C=350pF/m) [Hz]

0.25

258

195

0.5

183

138

129

98

91

69

65

49

46

35

16

32

24

20

29

22

IEEE HK Joint Chapter of PES/IAS/PELS/IES Seminar: Importance of On-site testing and Diagnosis of Transmission Power Cables

Damped AC On-site testing of (E) HV power cables


User steps
De-energizing and disconnection
of the HV power cable circuit
Connection of the OWTS HV system

Test object definition and IEC60270 PD calibration


Energizing the cable with dac voltages

Partial discharges
detection
Voltage
testing

Dielectric loss
measurement
Voltage withstand
test

Disconnection of the OWTS HV system


Analysis and report generation
IEEE HK Joint Chapter of PES/IAS/PELS/IES Seminar: Importance of On-site testing and Diagnosis of Transmission Power Cables

Damped AC On-site testing of (E) HV power cables


User steps
Step 1: test object definition

Step 2: IEC60270 PD calibration

IEEE HK Joint Chapter of PES/IAS/PELS/IES Seminar: Importance of On-site testing and Diagnosis of Transmission Power Cables

Damped AC On-site testing of (E) HV power cables


User steps
Step 3: voltage testing and diagnosis

IEEE HK Joint Chapter of PES/IAS/PELS/IES Seminar: Importance of On-site testing and Diagnosis of Transmission Power Cables

Damped AC On-site testing of (E) HV power cables


User steps
Step 4: PD mapping generation

Step 5: report generation

IEEE HK Joint Chapter of PES/IAS/PELS/IES Seminar: Importance of On-site testing and Diagnosis of Transmission Power Cables

Damped AC On-site testing of (E) HV power cables


Tools
Testing and diagnosis
IEC60270 standardized PD detection
PD-pattern generation
Advanced PD pulse analysis
TDR analysis of PD pulses
PD mapping in cable insulation and
accessories
Multiple PD sites localization
Dielectric loss estimation
2
1.8
1.6
D
ie
l.L
o
s
s
e
s

Tan and tan in function of the test


voltage

1.4
1.2
1
0.8
0.6
0.4
0.2
0
0.40
L1

L2

L3

0.80

1.00

1.36

x Uo

IEEE HK Joint Chapter of PES/IAS/PELS/IES Seminar: Importance of On-site testing and Diagnosis of Transmission Power Cables

Damped AC On-site testing of (E) HV power cables

Experiences values of partial discharges (PD) evaluation criteria


for on-site electrical tests on power cables using damped AC (DAC) voltage
Cable type

PD site localisation

Condition assessment
Safe

Extruded new-installed /
service aged

cable insulation

Extruded service aged

accessories

Fluid-Filled (low pressure)


service aged

Semi safe

Not save

PD free*
PD free*

<100pC **

>100pC**

distributed; no local spot(s)

<100pC **

<500pC **

>1000pC **

Fluid-Filled (low pressure)


service aged

spot(s) in cable insulation and


accessories

<50pC **

<200pC **

>200pC **

Fluid-Filled (high pressure)


/ Gas cable service aged

distributed; no local spot(s)

PD free*

<300pC **

>500pC**

Fluid-Filled (high pressure)


/ Gas cable service aged

spot(s) in cable insulation and


accessories

PD free*

(*) PD free (PDIV > 1.3 Uo) and with an acceptable background noise level e.g. 25..50pC (standardized PD detection)
(**) only as an indication; depends on the PDIV, insulation type and condition of a individual cable

IEEE HK Joint Chapter of PES/IAS/PELS/IES Seminar: Importance of On-site testing and Diagnosis of Transmission Power Cables

Damped AC On-site testing of (E) HV power cables


Experiences values of dielectric loss (tan and tan ) evaluation criteria
for on-site electrical tests on power cables using damped AC (DAC) voltage
Cable type

PD site localisation

Condition assessment
Safe

Semi safe

Not save

tan <0.1%

Extruded new-installed /
service aged

cable insulation

Extruded service aged

accessories

tan <0.1%
tan <0.1%***

tan <0.2%
tan <0.1%***

tan >0.2%
tan >0.1%***

Fluid-Filled (low pressure)


service aged

distributed; no local spot(s)

tan <0.2%
tan <0.1%***

tan <0.3%
tan <0.2%***

tan >0.3%
tan >0.2%***

Fluid-Filled (low pressure)


service aged

spot(s) in cable insulation and


accessories

tan <0.2%
tan <0.1%***

tan <0.3%
tan <0.2%***

tan >0.3%
tan >0.2%***

Fluid-Filled (high pressure)


/ Gas cable service aged

distributed; no local spot(s)

tan <0.2%
tan <0.1%***

tan <0.3%
tan <0.2%***

tan >0.3%
tan >0.2%***

Fluid-Filled (high pressure)


/ Gas cable service aged

spot(s) in cable insulation and


accessories

tan <0.3% / tan <0.2%***

(***) tip-up value between 0.5Uo and 2Uo [IEC 60141]

IEEE HK Joint Chapter of PES/IAS/PELS/IES Seminar: Importance of On-site testing and Diagnosis of Transmission Power Cables

1.
1.

Basic
Basic Aspects
Aspects of
of Condition
Condition Assessment
Assessment of
of Transmission
Transmission Power
Power Cabl
Cables
es

2.
2.

International
International Trends
Trends in
in Testing
Testing and
and Diagnosis
Diagnosis

3.
3.

Principles
Principles of
of using
using sinusoidal
sinusoidal damped
damped AC
AC voltages
voltages for
for on
on--site
site energizing
energizing of
of
power
power cables
cables

4.

Examples of Modern Condition Assessment of HV Power Cables

IEEE HK Joint Chapter of PES/IAS/PELS/IES Seminar: Importance of On-site testing and Diagnosis of Transmission Power Cables

Examples
No 1: New 132kV XLPE
Cable data:
Location: Malaysia
Installation year: 2009
Cable length: 7700m
Operation voltage: Uo= 76kVrms
Damped AC frequency during test: 44Hz
Cable capacitance (one phase): 1.64uF
History: Breakdown in two joints during soaking test

IEEE HK Joint Chapter of PES/IAS/PELS/IES Seminar: Importance of On-site testing and Diagnosis of Transmission Power Cables

Examples
No 1: New 132kV XLPE
TDR analysis examples:
L1 (Red)

L2 (Yellow)

IEEE HK Joint Chapter of PES/IAS/PELS/IES Seminar: Importance of On-site testing and Diagnosis of Transmission Power Cables

Examples
No 1: New 132kV XLPE cable
PD mappings and histograms:
Voltage

PD Mappings

PD Histograms

70kV

110kV

IEEE HK Joint Chapter of PES/IAS/PELS/IES Seminar: Importance of On-site testing and Diagnosis of Transmission Power Cables

Examples
No 1: New 132kV XLPE
PD measurements results (after repair):
800
700

PD [pC]

600
500

L1

400

L2
L3

300
200
100
0
0

20

40

60

80

100

120

140

160

Voltage [kV]

Voltage Withstand Test @ 1.4xUo (50 excitations-30min per phase):

Voltage Withstand Test passed by three phases however in L1 PD were localized


IEEE HK Joint Chapter of PES/IAS/PELS/IES Seminar: Importance of On-site testing and Diagnosis of Transmission Power Cables

Examples
No 2: New 132kV XLPE cable

Installation year: 2009


Insulation type: XLPE
Cable length: 1700m
Voltage ratting: Uo =76 kVrms
Measuring DAC frequency: 95Hz,
Cable capacitance: 0.38uF

Up to 1.4Uo (106kVrms) no PD activity in the cable has been observed.

IEEE HK Joint Chapter of PES/IAS/PELS/IES Seminar: Importance of On-site testing and Diagnosis of Transmission Power Cables

Examples
No 3: Serviced aged 110kV XLPE cable
Installation year: 1974
Insulation type: early XLPE (manufactured by
Russian Cable Company)
Number of joint: Unknown (due to repayments
different number of joints in each cable phase)
Length: 1500m
Localization: Moscow
History:
5 years after installation, unexpected random
breakdowns in all phases due to electrical treeing.
Investigation showed that cable samples taken from
deteriorated phases showed a symptom of water
treeing phenomenon and electrical treeing.
Last breakdown occurred in 2009. Cable was repaired
and tested with OWTS 150 HV before putting to
operation service.

IEEE HK Joint Chapter of PES/IAS/PELS/IES Seminar: Importance of On-site testing and Diagnosis of Transmission Power Cables

Examples
No 3: Serviced aged 110kV XLPE cable
Diagnostic (energizing up to Uo 64kVrms/90kVpeak) due to service history
L1

L2

L3

10kV

70/40/70kV
90kV

IEEE HK Joint Chapter of PES/IAS/PELS/IES Seminar: Importance of On-site testing and Diagnosis of Transmission Power Cables

Examples
No 3: Serviced aged 110kV XLPE cable

PD vs. Test Voltage


PD vs. Test Voltage [kV]
500

[pC]

400
L1

300

L2
200

L3

100
0
0

10

20

30

40

50

60

70

80

90

100

[kVpeak]

IEEE HK Joint Chapter of PES/IAS/PELS/IES Seminar: Importance of On-site testing and Diagnosis of Transmission Power Cables

Examples
No 3: Serviced aged 110kV XLPE cable
Dielectric loss estimation ( tan )

IEEE HK Joint Chapter of PES/IAS/PELS/IES Seminar: Importance of On-site testing and Diagnosis of Transmission Power Cables

Examples
No 3: Serviced aged 110kV XLPE cable

PD localization (TDR) phase L2

IEEE HK Joint Chapter of PES/IAS/PELS/IES Seminar: Importance of On-site testing and Diagnosis of Transmission Power Cables

Examples
No 3: Serviced aged 110kV XLPE cable

PD mapping L1,L2,L3 (40kVpeak)

IEEE HK Joint Chapter of PES/IAS/PELS/IES Seminar: Importance of On-site testing and Diagnosis of Transmission Power Cables

Examples
No 3: Serviced aged 110kV XLPE cable

PD mapping L1,L2,L3 (60kVpeak)

IEEE HK Joint Chapter of PES/IAS/PELS/IES Seminar: Importance of On-site testing and Diagnosis of Transmission Power Cables

Examples
No 3: Serviced aged 110kV XLPE cable

PD mapping L1,L2,L3 (90kVpeak)

IEEE HK Joint Chapter of PES/IAS/PELS/IES Seminar: Importance of On-site testing and Diagnosis of Transmission Power Cables

Examples
No 4: Serviced aged 110kV EGP

Testing 110kV external gas- pressure cable circuit (2.2 F), length 8.5 km using damped
AC voltages (40 Hz); power grid in Holland
IEEE HK Joint Chapter of PES/IAS/PELS/IES Seminar: Importance of On-site testing and Diagnosis of Transmission Power Cables

Examples
No 4: Serviced aged 110kV EGP

L1

L2

L3

PD at Uo diagnostic results (left: IEC 60270 phase revolved PD pattern, right: HF PD pulse sequences

IEEE HK Joint Chapter of PES/IAS/PELS/IES Seminar: Importance of On-site testing and Diagnosis of Transmission Power Cables

Examples
No 4: Serviced aged 110kV EGP

Phase 4 (yellow) shows different behavior as compared to other phases: at Uo voltage PD activity has been observed.

IEEE HK Joint Chapter of PES/IAS/PELS/IES Seminar: Importance of On-site testing and Diagnosis of Transmission Power Cables

Examples
No 4: Serviced aged 110kV EGP

TDR analysis of data from phase 4 (yellow) shows that there are no significant concentrations of PD activity in the
cable insulation and cable accessories.
A number of PD-pulses have been localized in the total length indication distributed characteristics.

IEEE HK Joint Chapter of PES/IAS/PELS/IES Seminar: Importance of On-site testing and Diagnosis of Transmission Power Cables

Examples
No 5: 110kV XLPE cable
Test Measurement procedure damped AC voltages
1. The test voltage is raised in steps of 10 kV and three excitations at each voltage level are
performed.
2. At the selected maximum voltage level voltage withstand test up to 1.7Uo is performed: 50
excitations (IEEE 400) or 1hrs (IEC 60840).
3. Final maximum test voltage depends on PDIV and PD magnitude at PDIV.
4. During the voltage test PD and the dielectric losses is measured.
No
.

U rms [kV]

U peak [kV]

7.1

10

14.1

20

21.2

30

140

28.3

40

120

35.4

50

42.4

60

49.5

70

56.6

80

63.6

90

10

70.7

100

11

77.8

110

20

12

84.9

120

13

91.9

130

14

99.0

140

15

106.1

150

U peak [kV

160

100

80
60
40

0.1 0.2 0.3 0.4 0.6 0.7 0.8 0.9 1.0 1.1 1.2 1.3 1.4 1.6 1.7

x Uo

IEEE HK Joint Chapter of PES/IAS/PELS/IES Seminar: Importance of On-site testing and Diagnosis of Transmission Power Cables

Examples
No 5: 110kV XLPE cable
Goal field investigation:
1.
2.
3.
4.
5.
6.

Possibility of energizing the test circuit with damped ac voltages


IEC 60270 Calibration of the test circuit in its full range
PD Measurement according to IEC 60270
PD Localization according to TDR method (VHF mode)
Voltage withstand test
Phase:
A
B
Dielectric losses measurement

48 Hz damped AC test set up


Cable circuit: 110kV XLPE (5.77km)

Far-end of the 110 kV XLPE cable in GIS


Due to presence of non-disconnected VT in GIS
phase A was not tested

IEEE HK Joint Chapter of PES/IAS/PELS/IES Seminar: Importance of On-site testing and Diagnosis of Transmission Power Cables

Examples
No 5: 110kV XLPE cable
Phase C

Phase B
90kV (Uo)

140kV (1.55xUo)

90kV (Uo)

120kV (1.33xUo)

IEEE HK Joint Chapter of PES/IAS/PELS/IES Seminar: Importance of On-site testing and Diagnosis of Transmission Power Cables

Examples
No 5: 110kV XLPE cable

600

L2 B

Q-V graphics

L3 C

500

[pC]

400
300
200
100
0
0

20

40

60

80

100

120

140

160

[kV] peak

90kV (Uo)

DAC voltages withstand test of 50


excitations (18 minutes) at 1.1Uo

IEEE HK Joint Chapter of PES/IAS/PELS/IES Seminar: Importance of On-site testing and Diagnosis of Transmission Power Cables

Examples
No 5: 110kV XLPE cable
PD mapping @ 140 kV (1.6 Uo)

IEEE HK Joint Chapter of PES/IAS/PELS/IES Seminar: Importance of On-site testing and Diagnosis of Transmission Power Cables

Examples
No 5: 110kV XLPE cable

0.25

Dielectric loss
[%]

0.2
0.15
0.1

0.05
0
0.4 Uo

Uo

1.3 Uo

Ur
Phase B

Phase C

IEEE HK Joint Chapter of PES/IAS/PELS/IES Seminar: Importance of On-site testing and Diagnosis of Transmission Power Cables

Examples
No 6: Serviced aged 50kV oil-filled cable

Installation year:
1958
Insulation type:
oil filled
Cable length:
9.6km
Power cable capacitance:
2.8uF
Damped AC frequency:
35Hz
Service history:
Oil-leakages in L1 and L2

IEEE HK Joint Chapter of PES/IAS/PELS/IES Seminar: Importance of On-site testing and Diagnosis of Transmission Power Cables

Examples
No 6: Serviced aged 50kV oil-filled cable

Oil filled (1968); 6.8km

Up to 1xUo no PD activity has been observed.


Starting at 1.3Uo up to 1.7Uo PD activity has been
observed close to the near cable termination and at
the joint No 14 position. Due to the fact that PDIV >
Uo during normal operation no PD occur on the
above mentioned sites

The measured values vary between 0.29% and


0.42%;
With the test voltage increase up to 1.7 Uo the
max increase is 0.075%

IEEE HK Joint Chapter of PES/IAS/PELS/IES Seminar: Importance of On-site testing and Diagnosis of Transmission Power Cables

Examples
No 7: Serviced aged 230kV oil-filled cable

2
1.8

Installation year:
Insulation type:
Cable length:
Voltage ratting:
Cable capacitance:
On-site testing using
damped ac voltages:

1976
Oil-filled
13.314 m
Uo = 132 kVrms
4 F

Diel. Losses

1.6
1.4
1.2
1
0.8
0.6
0.4
0.2
0
0.40
L1

L2

L3

0.80

1.00

1.36

x U_0

(29 Hz) up to 1.36 Uo

IEEE HK Joint Chapter of PES/IAS/PELS/IES Seminar: Importance of On-site testing and Diagnosis of Transmission Power Cables

Examples
No 8: Serviced aged 230kV oil-filled cable

2
1.8

Installation year:
Insulation type:
Cable length:
Voltage ratting:
Cable capacitance:
On-site testing using
damped ac voltages:

1982
Oil-filled
27.513 m
Uo = 132 kVrms
8.5 F

Diel. Losses

1.6
1.4
1.2
1
0.8
0.6
0.4
0.2
0
0.40

(20 Hz) up to 1.36 Uo

L1

L2

L3

0.80

1.00

1.36

x Uo

IEEE HK Joint Chapter of PES/IAS/PELS/IES Seminar: Importance of On-site testing and Diagnosis of Transmission Power Cables

Conclusions

1.

Electrical testing on-site is an important step of quality insurance of new/repaired and service aged cable
systems.

2.

Enhanced voltage testing up to e.g. 2.5xU0 of defect-free /non aged insulation does not have destructive
influence on the service life of the component.

3.

Enhanced voltage testing up to e.g. 2.5xU0 of defective/aged insulation may have destructive influence on
the service life of the component. Even if no breakdown has occurred.

4.

The Utest/U0 ratio decreases for on-site testing of HV cables above 150kV and therefore it has to be
compensated by additional measures e.g. PD detection.

5.

Service aged HV power cables are important assets and there is an increasing need to obtain information
about actual condition by applying integral and defect related on-site diagnostics.

6.

Sinusoidal damped AC voltages (DAC) can be applied for voltage testing of power cables (up to 380kV
cable systems) in combination with diagnostic measurements.

7.

Partial discharges, dielectric losses diagnostic measurements at damped AC voltages can be used for nondestructive on-site testing and diagnosis of new and service aged power cables.

8.

Combining on-site testing with PD detection provides information about discharging insulation defects and
about the fact if the on-site test had a destructive impact on the insulation system.

9.

For HV and EHV power cables more attention is needed to implement on-site testing and diagnosis.

IEEE HK Joint Chapter of PES/IAS/PELS/IES Seminar: Importance of On-site testing and Diagnosis of Transmission Power Cables

Contacts for further information

Seitz Instruments AG
Mellingerstrasse 12
5443 Niederrohrdorf
Switzerland
phone 41 56 496 7480
fax +41 56 496 7485
www.seitz-instruments.ch

SebaKMT GmbH
Dr. Herbert Iann Str.6
96148 Baunach
Germany
phone +49 9544 680
fax
+49 9544 2273
www.sebakmt.com

onsite.hv.solutions AG
Tpferstrasse 5
6004 Luzerne
Switzerland
phone: + 41 41 500 0550
fax: + 41 41 500 0551
www.onsitehv.com

IEEE HK Joint Chapter of PES/IAS/PELS/IES Seminar: Importance of On-site testing and Diagnosis of Transmission Power Cables