1- General

1.1- Safety

1.2- Standardization of Equipment

1.3- Quality Control, Inspection and Testing

1.4- Training

1.5- Recommended Spares

1.6- Special Tools

1.7- Manning

1.8- Weights of Plant, Equipment and Materials

1.9- Manufacturers

1.10- Supervision of Erection

10

1.11- Time Schedule

11

2- Direct Reduction Plant Specification

14

3- Raw Material Handling Plant Specification

40

4- Process and Process Equipment Data Sheets

47

5- Material Handling System Data Sheets

71

6- Fluid System Data Sheets

83

7- Electrical Equipment Data Sheets

105

8- Instrumentation and Control Data Sheets

123

Table of Contents

Doc No.: TA-143-D00-G-TD006

16-Sep-07

Rev 0

NISCO
Baft Steel Complex

DR & Material Handling Plant Project

TARA TARH

Engineering & Technological Co.

Plant Specification and Data Sheets

Page 1 of 144

1- GENERAL
The Employer intends to construct a direct reduction and a material handling plant in Baft
steel company located near Baft city, in Kerman province.
For this propose, implementation of a direct reduction module with nominal capacity of
800,000 TPY-DRI (+5 mm) and raw material handling plant with nominal capacity of
2,500,000 tonne pellet and lump ore per year shall be in the scope of obligations of the
Contractor for the present Project.
The direct reduction plant and raw material handling plant shall be complete in all respects
and any devices which is not included in the specification but is necessary for proper
operation of equipment and process, shall be considered as included within the specification
whether specifically mentioned in this Specification and Data sheets or not.

Section 1

Doc No.: TA-143-D00-G-TD006

16-Sep-07

Rev 0

NISCO
Baft Steel Complex

DR & Material Handling Plant Project

TARA TARH

Engineering & Technological Co.

Plant Specification and Data Sheets

Page 2 of 144

1.1- SAFETY
The Contractor shall ensure that the supplied Plant and Material, equipment, machinery
and apparatus are designed in conformity with all those codes and regulations in normal
usage for the type of equipment and machinery being offered.
The Contractor shall list the steps and special design features included in the design of
the Plant, equipment, machinery and apparatus to ensure that all the safety requirements
has been taken into account.

1.2- STANDARDIZATION OF EQUIPMENT


To reduce the quantity of spares that must be held and to simplify maintenance, the
Contractor shall wherever possible use similar components and sub- assemblies throughout
the Plant supplied under this Contract.

1.3- QUALITY CONTROL, INSPECTION AND TESTING


The Contractor required supplying information to enable the Employer to make assessment
of quality control, inspection and testing policies of the Contractor. Also certain minimum
requirements in this respect have been laid down here.

1.3.1- Tender Information


The Contractor shall submit with his tender a description of the quality control, inspection
and testing procedure currently in use in the Contractor's manufacturing works and those
of his principal Sub- Contractors. This description shall include non-destructive testing
(NDT) facilities, material testing, control of critical welding operations, material
classifications and identification and all test facilities. The Contractor shall submit with
his tender a description of the quality assurance procedure which he intends to adopt for
the Contract Works.

Section 1

Doc No.: TA-143-D00-G-TD006

16-Sep-07

Rev 0

NISCO
Baft Steel Complex

DR & Material Handling Plant Project

TARA TARH

Engineering & Technological Co.

Plant Specification and Data Sheets

Page 3 of 144

1.3.2- Draft Quality Control Procedure


Within one month of the effectiveness of Contract, the Contractor shall submit to the
Employers Representative for approval a draft procedure of quality control, inspection
and testing activities which he proposes to perform, together with a program indicating
when these activities are to be carried out. The program of inspection and testing shall be
related to the preliminary program of plant design, manufacture, erection and start-up.
Individual quality assurance procedures shall be proposed for any specialized item of
Plant but standardized procedures may be proposed for common items such as castings,
forging, fabrications, structural steel, fans, pumps, pipe work, valves, tanks, drive units,
ducting, compressors, couplings, bearings, motors, conveyors, switchgear, control gear,
batteries, transformers and instruments. The Employers Representative will have the
right to modify or complete the draft quality control procedure whenever the
modifications are supported by the Employer specifications except welding which shall be
according to applicable international standards i.e. UNI, DIN, B.S and applicable
American standards.

1.3.3- Detailed Quality Control Procedure


Within three months of effectiveness of Contract and following approval of the draft
procedure by the Employers Representative , the Contractor shall submit to the
Employers Representative

four copies of the agreed detailed quality assurance

procedure and a detailed program of the inspections and testing to be carried out. This
program shall conform to general Time Schedule of the Contract. In order to achieve a
uniformity of quality assurance procedures, inspection and testing throughout all aspects
of the Contract Works from design to commissioning, the procedure shall be issued by
the Contractor to all members of his quality assurance organization, to all SubContractors and to all supervising engineers. The document shall also be issued by the
Contractor to the Employer or Employers Representatives carrying out inspection
surveillance. The procedure shall not be
Employers Representative

Section 1

altered

but the Contractor

without

prior agreement by the

shall maintain

Doc No.: TA-143-D00-G-TD006

a complete list of

16-Sep-07

Rev 0

NISCO
Baft Steel Complex

DR & Material Handling Plant Project

TARA TARH

Engineering & Technological Co.

Plant Specification and Data Sheets

recipients of all issues of the procedure, in order to ensure

Page 4 of 144

correct updating by

revisions, which may be so approved.

1.3.4- Reports
The Contractor shall provide reports of all visits made by his quality assurance personnel
and any other inspecting engineers appointed and acting on his behalf. The Contractor
shall fully document all quality assurance checks, inspections and tests carried out in his
own works and those of all Sub-Contractors. Four copies of all such reports and
certificates shall be forwarded to the Employers Representative within one week of
testing. Inspections or tests resulting in the discovery of defects, damage or rejections
shall be labeled prominently with a capital 'D' in the top right-hand corner of the first page.
Any discovered damage, defects or rejections which in the Contractors view may prevent
satisfactory completion of the Contract Works, or cause delays to program shall be
advised to the Employer by telex or facsimile and be confirmed by written report within
one week. The Contractor shall submit to the Employer, at intervals of not more than four
weeks, a summary of all quality control, inspection and testing activities which have taken
place in the previous four weeks.

1.3.5- Tests at Manufacturers' Works


1.3.5.1- Materials
Materials test and analysis certificates shall be supplied as required by the Employers
Representative.

1.3.5.2- Inspection and Witnessed tests


The following shall be witnessed or inspected by the Contractor and as required by the
Employer or the Employers Representative:
(a) Check material tests and chemical analysis of each cast or batch of material.
(b) All dimensions.

Section 1

Doc No.: TA-143-D00-G-TD006

16-Sep-07

Rev 0

NISCO

DR & Material Handling Plant Project

TARA TARH

Engineering & Technological Co.

Baft Steel Complex

Plant Specification and Data Sheets

Page 5 of 144

(c) Protective coating when applicable


(d) Joint edge preparation
(e) Weld tests as selected by the Employers Representative with magnetic crack or
dye penetrate tests of up to 100% of attachment fillet welds
(f) Plant and equipment performance tests
(g) Transformer, switchgear and electrical equipment tests
(h) Protection for transport and storage.

1.3.5.3. Mechanical Tests & Chemical Analysis


Test pieces shall be branded in the presence of the Contractor and the Employers
Representative and for important forgings and castings the position of the pieces
shall be to approval of the Employers Representative . Where heat treatment of the
casting or forging is necessary the test piece shall not be removed before the treatment is
carried out.

1.3.5.4. Castings and Forgings


The type and extent of non-destructive examination of castings and forgings at relevant
stages of manufacture will be suggested by the Contractor and approved by the
Employers Representative taking into account the service for which the component is
intended.

1.3.5.5. Welding
Welding procedures and tests shall conform to the appropriate A.W.S. Standard. Where
specified welds shall be subjected to an approved crack detection test, for example
dye penetrate or magnetic particle test , the Employers Representative may ask for
additional tests at its discretion.

Section 1

Doc No.: TA-143-D00-G-TD006

16-Sep-07

Rev 0

NISCO
Baft Steel Complex

DR & Material Handling Plant Project

TARA TARH

Engineering & Technological Co.

Plant Specification and Data Sheets

Page 6 of 144

1.3.6. Plant and Equipment


Items of Plant and equipment having a definite performance specified either in the
relevant Standard or in the Specifications shall be tested for such performance in the
presence of the Contractor and the Employers Representative. Pressure tests shall be
carried out on all pressure-containing components. Where practicable items of associated
equipment which together comprise a complete assembly shall be assembled at the
manufacturer's works and tested to prove the combined performance. Test certificates
shall be supplied for all such tests.

1.3.7. Electrical Plant and Equipment


All electric power, control, supervisory, alarm and communication equipment such
as transformers, switchgear, control gear, motors, batteries, rectifiers, thyristors, electronic
apparatus, telephones and radio equipment (if any), cables and associated materials shall
be tested in accordance with the Employer Specifications particularly in relation to
correct operational functioning, safety and clearances. Type, routine, insulation,
temperature rise and performance tests shall be fully documented and four copies of all
test records and certificates submitted to the Employers Representative within one week
of test. Where thyristor control systems (if any) are used the performance tests of the
complete system up to and including the motors shall be witnessed by the Contractor
and the Employer and /or the Employers Representative.

1.3.8. Utilities
All Plant, equipment and pipe work shall be tested in accordance with appropriate
ANSI standards, which will be proposed by the Employers Representative .

1.4. TRAINING
In order to enable the Employer to properly operate and maintain the Plant, it is necessary to
train the Employer personnel. Training package shall include training of personnel for

Section 1

Doc No.: TA-143-D00-G-TD006

16-Sep-07

Rev 0

NISCO

DR & Material Handling Plant Project

TARA TARH

Engineering & Technological Co.

Baft Steel Complex

Plant Specification and Data Sheets

Page 7 of 144

proper operation and maintenance of equipment .In addition in order to specialize and
familiarize the Employer personnel with the supplied equipment and machinery, the
Contractor shall ensure for the Employer 's personnel a suitable period of staying at his
and/or Sub- Contractor's design and fabrication installations during the relevant stages
of

progress

of work, in order that they may be made

fully aware of design and

construction details to ensure an effective maintenance and operation of the Plant.


Tenderers are required to provide with their offer the proposed training program showing
the extent and periods of training to be provided, places where training will be carried out,
the number, grades of personnel, expected previous experience and educational standard
of the personnel to be trained, etc. Language of training shall be English.

1.5. RECOMMENDED SPARES


The Contractor shall submit with his tender the recommended list for all spare parts relevant
to equipment of the Plant. The spare parts shall be subdivided by the tenderer into the
following categories:

1.5.1. Commissioning Spares


The commissioning spares shall include the spares that according to the experience and
judgment of the tenderer must be available at the Site before commencement of the
commissioning period. These spares will be available for use by the Contractor during this
period, but the Contractor shall replace them at the earliest opportunity at his own expense.

1.5.2. Capital Spares


The capital spares shall include

the spares that the tenderer recommends to be kept in

stock at all times because, in the event of the breakage or failure of such item, the time of
repair or replacement would incur serious deterioration of performance.

Section 1

Doc No.: TA-143-D00-G-TD006

16-Sep-07

Rev 0

NISCO
Baft Steel Complex

DR & Material Handling Plant Project

TARA TARH

Engineering & Technological Co.

Plant Specification and Data Sheets

Page 8 of 144

1.5.3. Operating Spares


The operating spares shall include the spares that the tenderer recommends to be kept in
stock to permit systematic replacement in order to maintain the plant in good operating
condition for a period of two years, in normal operation. These spares will not be available
for use by the Contractor during commissioning period. After completion of detailed
design, the Contractor shall furnish to the Employer complete fabrication drawings and
specification for spare parts to enable the Employer to manufacture or procure all the spare
parts from all possible suppliers. The Contractor shall also give the name of the suppliers
of each and every spare part and shall indicate clearly the single-supplier items (if any).

1.6. SPECIAL TOOLS


The tenderer shall submit with his tender the recommended list for special tools required
for erection, maintenance and operation of the supplied equipment. These tools shall be
provided by the Contractor and will be available for use by the Contractor during erection
and commissioning periods.

1.7. MANNING
The tenderer shall submit with his tender the recommended manning requirements for
staffing all shifts of the Plant. This manning requirement should be given under different
categories such as, maintenance, operation, management, etc. The tenderer shall also specify
the required qualifications, of the personnel and their brief job description.

1.8. WEIGHTS OF PLANT, EQUIPMENT AND MATERIALS


The Contractor shall insert in the table below or any extension required to it a breakdown
of the total weight of the Plant, to be supplied. The breakdown shall conform in general to
the sub-divisions in the Schedule of Prices. Items of plant and equipment such as
miscellaneous motors, pumps, instrumentation and cabling for which it is not practical
to give itemized weights, shall be listed in the table and the overall weight inserted in

Section 1

Doc No.: TA-143-D00-G-TD006

16-Sep-07

Rev 0

NISCO
Baft Steel Complex

DR & Material Handling Plant Project

TARA TARH

Engineering & Technological Co.

Plant Specification and Data Sheets

Page 9 of 144

order to arrive at the total weight of the Plant.

Reference
Number

Description

Weight

1.9. MANUFACTURERS
The Contractor shall insert in the table below and required extensions to it, the names of
the manufacturers of the principal items of equipment which shall include the name of
associated companies and divisions within the Contractor's organization. The table shall
also include the location where the items will be manufactured and tested.

Section 1

Doc No.: TA-143-D00-G-TD006

16-Sep-07

Rev 0

NISCO

DR & Material Handling Plant Project

Engineering & Technological Co.

Baft Steel Complex

Item

TARA TARH

Plant Specification and Data Sheets

Page 10 of 144

Name of Supplier, Sub-Supplier

Place of Manufacture

or Associated Firm

and Testing

1.10. SUPERVISION OF ERECTION


The Contractor for fulfilling properly its erection obligation shall provide a sufficient
number of competent engineers

thoroughly experienced in the erection, operation and

maintenance of apparatus similar to that which will be utilized in this Contract who will
supervise the, erection, carry out Site quality assurance, report on erection progress and
make the tests on completion of erection of the Plant and the subsequent commissioning
and setting to work. The Contractor shall prepare erection instruction manuals giving
detailed instructions for the handling, erection, alignment, tolerances and the subsequent
commissioning and setting to work of all items of the Plant. An adequate number of copies
of these instruction manuals shall be made available to the Contractor's erection supervisors
and six copies shall be supplied to the Employers Representative . All levelling, aligning
and bedding onto concrete and walls before grouting shall be carefully checked by
Contractors supervisors.

Section 1

Doc No.: TA-143-D00-G-TD006

16-Sep-07

Rev 0

NISCO
Baft Steel Complex

DR & Material Handling Plant Project

TARA TARH

Engineering & Technological Co.

Plant Specification and Data Sheets

Page 11 of 144

1.11- TIME SCHEDULE


1.11.1. Introduction
Contractor shall submit with his tender a program which adequately describes the Contract
Works. As a minimum this program shall comprise the complete time schedule together
with a bar chart, or a network drawn to time scale, which shall show the periods proposed
for basic design, detailed design, material procurement, main stages of manufacture,
assembly and tests in the manufacturer's works, packing and delivery, civil construction
works, erection, testing and commissioning of major items of the Plant, both for Local
Supply and Foreign Supply.
In preparation of time schedule Contractor shall take into account the following:
From Contract Coming into Force up to issuance of take over certificate shall not be more
than 30 months.

1.11.2. Preliminary Program


Within four weeks of Coming into Force of the Contract, the Contractor shall provide the
Employers Representative with two CDs and three copies of the following items in draft
proposal form:
- an equipment list
- a program of drawing and data submission which shall conform to the requirements of
relevant specifications and Contract Documents
- a program of supply and erection
- a program of civil construction works
- a program of inspection and testing
- a progress report
The information supplied shall be sufficiently detailed

to

enable

the Employers

Representative to ascertain the Contractor's compliance with the dates given in tender
program.

Section 1

Doc No.: TA-143-D00-G-TD006

16-Sep-07

Rev 0

NISCO
Baft Steel Complex

DR & Material Handling Plant Project

TARA TARH

Engineering & Technological Co.

Plant Specification and Data Sheets

Page 12 of 144

It will be used to form a basis for production by the Contractor of an agreed detailed
program for the Contract Works. It will be used to relate the Contract Works to program
of work of others involved in the Contract and the timing of any inspection, progress
control, verification and expediting functions to be carried out by the Employer and/ or the
Employers Representative.

1.11.3. Detailed Contract Program


Within eight weeks of Coming into Force of the Contract following discussion and
approval by the Employers Representative of preliminary program information, the
Contractor shall provide the Employers Representative with two CDs and three copies of
the following items in agreed final form:
- master plant list
- sub-order schedule
- detailed program of supply and erection
-detailed program of drawing and data submission which shall conform to the
requirements of relevant specifications and Contract Documents.
- detailed civil construction program.
- program of inspection and testing
- progress report
Subsequently this information, suitably updated, extended and revised as agreed by the
Employers Representative will be provided by the Contractor at regular two-months
intervals throughout the period of the Contract Works.

1.11.4. Shipping Information


Ninety days before dispatch of the first consignment to Site, the Contractor shall provide
a schedule of shipments setting out details of all consignments, weights and sizes,
packaging, markings, number and identification, port of delivery. This information,

Section 1

Doc No.: TA-143-D00-G-TD006

16-Sep-07

Rev 0

NISCO
Baft Steel Complex

DR & Material Handling Plant Project

TARA TARH

Engineering & Technological Co.

Plant Specification and Data Sheets

Page 13 of 144

suitably updated, extended and revised as agreed by the Employer , will be provided by
the Contractor at intervals of not more than four weeks, from the initial issue until
completion of D.D.U Site delivery of all Foreign Supply and D.D.P Site delivery of all
Local Supply items included in the Contract Works.

Section 1

Doc No.: TA-143-D00-G-TD006

16-Sep-07

Rev 0

NISCO
Baft Steel Complex

DR & Material Handling Plant Project

TARA TARH

Engineering & Technological Co.

Plant Specification and Data Sheets

Page 14 of 144

2- DIRECT REDUCTION PLANT SPECIFICATION


2.1- GENERAL DESCRIPTION
In this section a preliminary description of the direct reduction plant will be brought
forward, the plant set-up objective, main, auxiliary, and support systems and their
functions.
The module objective is to produce metallic iron (direct reduced iron, DRI) from iron oxide
material through a gas-based direct reduction process, and then delivering the DRI as feed
material to the steel making plant. The process of iron oxide reduction will be done by
means of reducing gas (CO&H2), which is produced by the so-called reforming of natural
gas (NG, mainly CH4), either by a mixture of carbon dioxide (CO2), and water vapor
(H2O) in a reformer.
The DR. module will be set up with the following general specifications:
- One module with nominal capacity 800,000 TPY-DRI (+5 mm). Pellet coating system is
in the scope of Work in this Project but this module shall be capable to produce the
nominal capacity of 800,000 TPY-DRI (+5 mm) without using coated oxide pellet
- Operating time of the module shall be 8000 hours per year, with 100 t/hr production rate.

As a whole, the DR. module will include but not limited to the following main parts:
1- Oxide material handling system: for transferring iron oxide material in the form of
oxide pellets to the shaft furnaces as specified in Sub Clause 2.3 of this Specification
and Data sheets.
2- Product material handling system: for transferring the DRI from the shaft furnace to the
storage bins as specified in Sub Clause 2.4 of this Specification and Data sheets.
3- Main part of direct reduction module: in which the direct reduction process will be
performed. In connection with DR module, the units and systems which are
incorporated in which the direct reduction process takes place, may be classified as
follows:

Section 2

Doc No.: TA-143-D00-G-TD006

16-Sep-07

Rev 0

NISCO
Baft Steel Complex

DR & Material Handling Plant Project

TARA TARH

Engineering & Technological Co.

Plant Specification and Data Sheets

Page 15 of 144

- Shaft Furnace: where iron oxide is reduced to metallic iron by high temperature
reducing gas.
- Reformer: where the reducing gas is produced.
- Recuperator: a heat recovery unit where the hot exiting flue gas is utilized for
preheating various gas flows including process gas, natural gas, and combustion air.
- Process Gas System: for transferring the gas flow containing oxidized gas
(CO2&H2O) and natural gas for reforming and recycling back to the reduction shaft
furnace.
- Cooling Gas System: for providing the cooled gas required for cooling zone of the
shaft furnace.
- Combustion/dilution Air System: where the combustion and dilution air required in
the reformer is provided by a series of air blowers.
- Flue Gas System: where the combustion exit gases from the reformer, after being heat
recovered and cleaned, is ejected to the atmosphere through the ejector stack.
4- Civil, Building and Infrastructure: including all buildings with their related
infrastructures and HVAC (Heating, Ventilation and Air-Conditioning) systems.

In addition to the main systems as mentioned above, the following auxiliary systems is
considered in connection with the DR plant.
- Seal gas generation and distribution system.
- Utility and water treatment system including cooling water in top gas scrubber and
cooling gas scrubber, clarification and recycling.
- Dust collection systems.
- Compressed air generation (including both plant air and instrument air) and
distribution system.
- Sewage collection and treatment system.
- Fire detection and fighting system.
- Electrical system (including telecommunication system)

Section 2

Doc No.: TA-143-D00-G-TD006

16-Sep-07

Rev 0

NISCO
Baft Steel Complex

DR & Material Handling Plant Project

TARA TARH

Engineering & Technological Co.

Plant Specification and Data Sheets

Page 16 of 144

- Instrumentation and control system.


- Repair shop
- Laboratory
- Warehouse
- Offices
- Lockers and showers to serve DR and material handling plants.

Cold Briquetting Plant


Due to DRI fine production in DR plant and for making it useable in the arc furnace a cold
briquetting plant shall also be in the Contractor scope of Works.
The capacity of this plant shall be 33,000 tonnes/year and 12 t/h . A screening station shall
be installed after DRI silos and DRI fines shall be handled to briquetting plant by a belt conveyor
by Contractor and necessary bins for fines and binders (such as molasses, hydrated lime, etc.)
storage is in the Contractor's scope of Work in this Project.
The briquettes will be handled to melt shop by truck but necessary stock pile for briquettes
storage is in the Contractor's scope of Work.
Fine particle size will be 0-8 mm and briquette dimensions shall be approximately
44mmx38mmx20mm.

2.2- DIRECT REDUCTION PROCESS DESCRIPTION


Direct reduction process converts iron oxide, in the form of oxide pellets, to highly reduced
product in order to be used in steel making. To accomplish this, the reduction process
utilizes a continuous flow of reducing gas to remove the oxygen from the iron oxide and to
carburize the reduced product.
The reduction process is carried out below the fusion temperature of the feed material. The
reducing gas, a mixture of H2 & CO is produced in the reformer and introduced into the
reduction furnace at controlled temperature and composition. This gas flows up the

Section 2

Doc No.: TA-143-D00-G-TD006

16-Sep-07

Rev 0

NISCO
Baft Steel Complex

DR & Material Handling Plant Project

TARA TARH

Engineering & Technological Co.

Plant Specification and Data Sheets

Page 17 of 144

furnace, heating the descending iron oxide to the reduction temperature. Hydrogen and
carbon monoxide remove the oxygen from the feed, yielding a highly reduced product.
The most significant features of the process are:

1- A steady- state process and uninterrupted flow of reducing gas for the removal of
oxygen from the feed and for carburizing the reduced iron.
2- A gas reforming system, which either uses CO2 and water vapor contained in top gas
and natural gas to produce CO & H2 rich reducing gas without formation of soot.
3- Maximum gas utilization by recycling the top gas from the shaft furnace to the process.

The principal components of plant are the gas reformer for the production of the reducing
gas, and the shaft furnace in which the reduction process takes place. In addition, there are
transportation systems for oxide feed material, and metallized product automatically
controlled from control room and water, gas and other utilities circulation systems.
The shaft furnace is divided into two zones with separate gas systems. The upper zone for
reduction and the lower zone for cooling. The iron oxide material descends from the
reduction furnace charge hopper by gravity through a dynamic gas seal system into
distribution pipes which feed the material into the reduction furnace, thereby maintaining a
uniform profile of material in the furnace. The feed rate to the charge hopper is controlled
by the discharge rate of the product from the bottom of the furnace.
The distribution feed pipes and the furnace geometry must be specifically designed to
maintain a uniform flow of material downward through the refractory-lined furnace. The
shape of the oxide material is not changed during the reduction, as most oxide materials are
normally free of swelling. The metallized material is highly porous, as oxygen is removed
from the ore, and tends to reoxidate. Therefore, the hot metallized material must be cooled
before exposure to the atmosphere to prevent any reoxidation. Most chemical constituents
of the raw material are not affected by direct reduction and remain in the metallized
material, however the gangue constituents will show a percentage increase due to oxygen

Section 2

Doc No.: TA-143-D00-G-TD006

16-Sep-07

Rev 0

NISCO
Baft Steel Complex

DR & Material Handling Plant Project

TARA TARH

Engineering & Technological Co.

Plant Specification and Data Sheets

Page 18 of 144

removal during the reduction process. The final product analysis will therefore depend on
the iron oxide analysis.
The principal part of reforming equipment is the gas reformer which mainly consists of
radiation fire boxes, in which reforming takes place in the reformer tubes.
The gas reformer generates reformed gas. The reformed gas containing hydrogen, carbon
monoxide and some other gases at a controlled temperature and ratio.
The vertical reformer tubes shall be filled of catalysts. These tubes shall be made of high
quality alloy (heat resistant) with spring supports.
The reformer boxes shall be provided gas tight to avoid cold air leakage into the fire boxes.
Two different systems of burners shall be installed in the reformer that are main burners
and auxiliary burners. The task of the auxiliary burners are as follows:
- They are used as pilot burners.
- During start-up, the reformer will be heated up to nearly operating temperature by them.
- The idling condition: these burners keep the reformer at a temperature slightly below
operating temperature. In idling condition, it is necessary to stop gas flow through
reformer tubes and shaft furnace.
In case the tenderer willing to propose an other process (rather than described above) for
DR-module process it should be proposed as an option.

2.3- OXIDE MATERIAL HANDLING SYSTEM


Oxide pellets and lump ore shall be delivered by a belt conveyor to the D.R. module day
bin. A day bin with the capacity of 1800 m3 shall be considered and equipped by two
discharge feeders. Oxide pellets shall be discharged by these feeders to belt conveyors with
the rated capacity of 250 t

and transported to the screening stations for separation of

fines and oversizes. The screened pellets after passing through coating station shall be
transported to D.R. shaft furnance hopper by belt conveyors.
Oxide fine bin elevation shall be suitable for loading the fines to trucks.

Section 2

Doc No.: TA-143-D00-G-TD006

16-Sep-07

Rev 0

NISCO
Baft Steel Complex

DR & Material Handling Plant Project

TARA TARH

Engineering & Technological Co.

Plant Specification and Data Sheets

Page 19 of 144

The Contractor shall construct suitable open storage area for stacking the fines.
The oxide materials belt weighers shall be installed on conveyors at proper places.
A complete remet handling system shall be installed for direct reduction plant. For this
propose, a belt conveyor with the capacity of 170 t

shall handle remet to day bin

discharge conveyor.
A remet hopper and relevant feeder shall be installed in suitable place for remet charging.

2.4- PRODUCT MATERIAL HANDLING SYSTEM


The output from direct reduction furnace shall be transported by a conveyor that includes a
weighing system to measure the outgoing rated capacity 170 t . In emergency situations
h
DRI shall be piled in an emergency pile. After separation of oversize material in grating
feeder, a diverter gate shall transfer the material to a discharge belt conveyor or to remet
belt conveyor. Belt conveyors shall handle DRI to silos.
The silos consist of four bins with the capacity of 2200 m3 each, totally 8800 m3. These bins
shall be equipped by two discharging feeders with the capacity of 2x200 t

for each bin.

The reduced materials in silos shall be passivated by inert gas for prevention of explosion
and sticking so the silos shall be equipped with inert gas distribution system.
A storage area shall be constructed for passivation of DRI in case of the operators can't send
DRI to silos. The dimensions of this area shall be approximately 30mx100m. All the
necessary equipment and facilities for transferring DRI to this storage area and charging
DRI to product material handling system is in the scope of Work. The silos discharge
material shall be handled to the screen station where the fine is separated and stored in the
bin. The fine shall be handled to the cold briquetting plant by conveyors. The fine bin
discharge chute shall be so designed to have the capability to discharge material on belt
conveyor or in truck.

Section 2

Doc No.: TA-143-D00-G-TD006

16-Sep-07

Rev 0

NISCO
Baft Steel Complex

DR & Material Handling Plant Project

TARA TARH

Engineering & Technological Co.

Plant Specification and Data Sheets

Page 20 of 144

2.5- DEDUSTING SYSTEM OF MATERIAL HANDLING SYSTEM & GAS CLEANING


The Contractor shall provide dedusting system for material handling system of DR plant to
reduce dust emission to a level acceptable to Iranian Environmental Protection Organization
(IEPO) and reduce fire and explosion hazards.
The dedusting system shall be provided at any point dust may be produced during operation
of plant i.e. silos, day bin, transferring points between belt conveyors and screening station.
Provisions shall be made to collect and remove such dust from the operating area and to
clean them before they are discharged into the atmosphere considering high importance of
safety in DR plant.
Contractor shall clearly describe the steps taken to ensure safety of operation of dust
collection and cleaning systems offered.
In addition, a gas cleaning system shall be provided to clean the emission from fume ejector
stack to the level required by IEPO.
The Contractor shall provide disposal facilities for fines captured by the dedusting & gas
cleaning equipment.
2.6- WATER TREATMENT PLANT AND WATER RECIRCULATION SYSTEM
The direct reduction plant water treatment unit and cooling water system shall include, but
not limited to the following systems.
1- Indirect cooling system serving machinery cooling systems.
2- Direct cooling system mainly serving top gas scrubbers, cooling gas scrubbers,
dedusting system, and etc. (contaminated process water cycle equipped with
contaminated cooling tower)
3- Direct cooling system mainly serving reformed gas cooler, seal gas cooler, plate heat
exchangers of machinery cooling water system and etc. (clean process water cycle
equipped with clean cooling tower)
4- Make up water treatment and softening systems.

Section 2

Doc No.: TA-143-D00-G-TD006

16-Sep-07

Rev 0

NISCO

DR & Material Handling Plant Project

TARA TARH

Engineering & Technological Co.

Baft Steel Complex

Plant Specification and Data Sheets

Page 21 of 144

1- Indirect cooling system


Warm water from machine water basin is pumped toward the plate heat exchangers
where warm water is cooled by means of cold water which is prepared in the open loop
cooling system to cool machinery and equipment.
Note: Chlorine content of make up water for machinery process water shall not be higher
than 30 ppm.

2- Direct cooling system (contaminated process water cycle)


Contaminated warm water returning from top gas scrubber and cooling gas scrubber is
routed by gravity toward a clarifier.
Other contaminated warm water such as compressor spray system, drainage from seal
system and slurry from all dedusting systems are collected in the basin and pumped to
the clarifier.
The settled sludge will partially re-circulated while excess sludge will be pumped to the
mud settling pond.
Clarifier overflow is conducted by gravity into hot water basin of contaminated cooling
tower and then pumped to the scrubbers and dedusting systems.
Cold water is collected into cold water basin and pumped to consumers.
Note: Max TSS in clarifier effluent shall be 50 ppm.
3- Direct cooling system (clean process water cycle)
The warm water returning from reformed gas cooler, seal gas cooler and seal gas after
cooler and plate heat exchangers is routed to clean process water cooling tower.
4- Make up water treatment and softening system
Industrial water which is characterized in Employers Requirements will be delivered to
the Contractor in battery limits.
Appropriate water shall be produced by water treatment systems from industrial water.
Any water treatment systems supply shall be in the scope of work of the Contractor.

Section 2

Doc No.: TA-143-D00-G-TD006

16-Sep-07

Rev 0

NISCO

DR & Material Handling Plant Project

TARA TARH

Engineering & Technological Co.

Baft Steel Complex

Plant Specification and Data Sheets

Page 22 of 144

Water with appropriate specifications will be used as make up water in the open and
close loop cooling water systems.
Industrial water shall be conducted to Industrial water reservoir and then pumped to the
softeners.

2.7. Electrical Distribution System


2.7.1- MV/MV Transformers
x Main characteristics:
Transformer shall be three phase, core type design, oil immersed and outdoor type.
o Standard for design, manufacturing
and test

IEC 76

o Standard for loading and guaranteed


overload

IEC 354

o Rated power

to be defined by tenderer

o Ratio

33 2x2.5% / 6.9kV

o Tap changer type

off load

o Impedance

Max. 10%

o Vector Group

Dyn11

o Cooling system

ONAN / ONAF

o Insulation class

o Protection of 33 and 6.6 kV terminals

IP54

o Accessories

IEC standard

2.7.2- 6.6kV switchgear


x Main characteristics:
o Type

metal clad

o Insulation voltage

7.2 kV

o Duty voltage

6.6 kV

o Short circuit current

31.5 kA 1sec

o CBs breaking capacity

31.5 kA

Section 2

Doc No.: TA-143-D00-G-TD006

16-Sep-07

Rev 0

NISCO

DR & Material Handling Plant Project

TARA TARH

Engineering & Technological Co.

Baft Steel Complex

Plant Specification and Data Sheets

Page 23 of 144

o Feeder type for > 1MW

SF6/Vacuum-Withdrawable CB

o Feeder type for 1MW

Vacuum Contactor withdrawable


type equipt with HRC type fuse

o Rated lightning impulse withstand voltage

60 kV

o Power frequency voltage test (60 sec)

20 kV

o Aux. and control rated voltage

110 V DC

o Degree of protection

IP 42

o Complete with digital Multifunction


devices

yes (protection, measuring, monitoring)

o Protection function

86, 50, 51, 51N, 27 & others

o Measuring function

V, I, F, P, Q, Ph, Qh, PF

2.7.3- MV/LV Transformers (6.6/0.42 kV Transformer)


x Main characteristics:
o Ratio

6.6/0.40kV

o Manual off load tap changer

2 x 2.5%

o Impedance

about 6%

o Vector group

Dyn11

o Secondary winding neutral

Solidly grounded

o Placing

Out door

o Accessories

IEC standard

o Rating

By Tenderer

2.7.4- 400 V Power Center Board


The low voltage distribution switchboard , power center type will be foreseen with metal clad
design, single busbar system, with short circuit and over current trips, complete and fully wired
up to the terminals and with the following operating characteristics :
o Rated voltage

400 V

o Insulating voltage

1000 V

o Short circuit current

50 kA, 1sec

Section 2

Doc No.: TA-143-D00-G-TD006

16-Sep-07

Rev 0

NISCO

DR & Material Handling Plant Project

TARA TARH

Engineering & Technological Co.

Baft Steel Complex

Plant Specification and Data Sheets

o Main bus bar rated current

By Tenderer

o CBs breaking capacity

50 kA

o Installation

Indoor

o Protection degree

IP42

Page 24 of 144

2.7.5- Low Voltage Motor Control Center (M.C.C.s)


Refer to Annex III item 3.5.

2.7.6- LV/LV Transformers (Lighting Transformer 400/400-230 V)


x Main characteristics:
o Insulating liquid

Dry type

o Rating

To be defined by tenderer

o Primary voltage

400 V

o Rated secondary voltage

400 V 230 V

o Impedance

about 4%

o Vector group

Dyn11

o Secondary winding neutral

Solidly grounded

o Manual off load tap changer on Primary


side

2 x 2.5%

o Placing

Indoor

o Accessories

IEC standard

2.7.7- 400 Volt Induction Motors


Refer to Annex III item 3.7.

2.7.8- 6 kV Induction Motors


Refer to Annex III item 3.8.

2.7.9- Neutral grounding resistors (6.6 kV)


For the control of over voltages and earth fault protection of the 6.6kV system, the star point of
secondary side of the 33 / 6.9 kV transformers is grounded via neutral grounding resistor.

Section 2

Doc No.: TA-143-D00-G-TD006

16-Sep-07

Rev 0

NISCO
Baft Steel Complex

DR & Material Handling Plant Project

TARA TARH

Engineering & Technological Co.

Plant Specification and Data Sheets

Page 25 of 144

x Main characteristics:
o Rated voltage

6.6/ 3 kV

o Rated current / time

By tenderer

o Material

stainless steel AISI 304

o Degree of protection

IP54

o External surface temperature rise after a


30 C

fault to ground

x General features:
The panel will be divided in a resistor part and a switchboard part.
The switchboard parts consist of:
o A single pole disconnector
o A current transformer, 5P5
2.7.10- 6.6 kV cables and terminals
x Main characteristics:
o Cables
Conductor

Copper

Insulation type

XLPE

Jacket type

PVC

Shield

Yes

No cracking, UV resistant, No carbon


black, red colored Outer sleeves

yes

o Terminals
Type

Heat shrinkable

Insulation voltage

>7.2 kV

2.7.11- Low voltage and auxiliary cables


Refer to Annex III item 3.10.
x Main characteristics:

Section 2

Doc No.: TA-143-D00-G-TD006

16-Sep-07

Rev 0

NISCO

DR & Material Handling Plant Project

TARA TARH

Engineering & Technological Co.

Baft Steel Complex

Plant Specification and Data Sheets

o Conductor

copper

o Insulation type

XLPE / PVC

o Jacket type

PVC

Page 26 of 144

2.7.12- Stand by Diesel Generators


x Main characteristics:
o Generators
Rated voltage

400V

Power factor

0.8

Rated voltage

400V

Standard

IEC 34-1

Excitation

Brushless

Enclosure

IP23

Cooling

Self ventilated

Speed

750~1500 rpm

Over speed

1.25urated speed

Winding

Star

Heater

For winding & Bearing

Insulation class

Temperature class

Auto start/stop

Yes

o Diesels:

Section 2

Number of strokes

Starter

DC motor

Doc No.: TA-143-D00-G-TD006

16-Sep-07

Rev 0

NISCO

DR & Material Handling Plant Project

TARA TARH

Engineering & Technological Co.

Baft Steel Complex

Plant Specification and Data Sheets

Page 27 of 144

2.7.13- UPS
x Main characteristics:
o Input voltage

400/230 V 10%

o Input frequency

50 Hz 5%

o Out put voltage

400/230 V 2%

o Out put frequency

50 Hz 0.5%

o Harmonic content of output

3%

o Efficiency

> 90%

o Standard

IEC

o With by pass transformer

Yes

o Protection degree

IP51

o Batteries

Ni/Cd, sealed type

o Battery duration

30 minutes

2.7.14- 6.6 kV Bus Ducts


x Main characteristics:
o Type

Air insulation type

o Conductor material

copper

o Enclosure material

Steel

o Insulators

porcelain brown glazed

o Short circuit

31.5 kA, 1sec

o Degree of protection

IP 54

o Rated voltage

7.2 kV

o Peak dynamic current

80 kA

o Ventilation

Natural

o Anti vibration facilities

Yes

Section 2

Doc No.: TA-143-D00-G-TD006

16-Sep-07

Rev 0

NISCO

DR & Material Handling Plant Project

TARA TARH

Engineering & Technological Co.

Baft Steel Complex

Plant Specification and Data Sheets

Page 28 of 144

2.7.15- Telecom
x Main characteristics:
o Back up battery for central unit of
Intercom. System

2 hours duration

o Min. protection degree for peripheral units IP50/IP54


o Paging system shall be included

Yes

o Type of mounting

Desk/wall mounted

o Load speaker type for paging

High watt/volume control

2.7.16-PFC
x Main characteristics:
o Rated voltage

6.6 KV, 400V, 3Ph, 50Hz

o Power withstand voltage

7.2 KV, 2.5 KV

o Short circuit current

31.5 KA, 50 KA, 1Sec.

o Control voltage

110V DC

o Standard

IEC

o Discharge device

<50V, 1min.

o Protection (S.C. and O.C.)

H.R.C. Fuses, thermal relay, Unbalance


protection (If needed), etc.

o Protection degree

IP54

o Insulation

Dry type

2.7.17-Lightning protection and earthing system


x Main characteristics:
o Earthing grid resistance

o Conductor size (main mesh, bare, buried)

185 mm2

o Conductor type

Standard, soft drawn, annealed


copper

o Step & touch voltage

Acc. To IEEE80

o Earthing rod size

16mmu3m

Section 2

Doc No.: TA-143-D00-G-TD006

16-Sep-07

Rev 0

NISCO

DR & Material Handling Plant Project

TARA TARH

Engineering & Technological Co.

Baft Steel Complex

Plant Specification and Data Sheets

o Conductor to conductor connection

Cad weld

o Above ground conductor

PVC insulated

o Testing links shall be provided

Yes

o Buildings/structures (Non metallic and high)

Lightning rod

Page 29 of 144

o Lighting protection for ordinary non metallic


buildings

Faraday cage Method

o Lightning protection conductor

Copper belt 5u30 mm

2.8- INSTRUMENTATION AND CONTROL SYSTEM


2.8.1- General
This specification should apply for the instrumentation and control system togetherness
with Engineering Standard, Instrumentation And Control (Annex IV) whether specifically
mentioned or not; and any control device, field equipment and other requirements
concerning the design, material selection, erection, commissioning, etc. should comply
with it.

2.8.2- Scope
Contractor should install an advanced DCS control system, all field instrumentation,
cabling and all necessary accessories for direct reduction plant.

2.8.3- Design Criteria


2.8.3.1- Automation Systems Features
The main general features requested to the automation system, are the following:
x High availability (the availability is defined as the ratio between the up-time and the
total operating time)
x High reliability (the reliability is defined as the probability that a device will function
without failure over a specified time period or amount of usage)

Section 2

Doc No.: TA-143-D00-G-TD006

16-Sep-07

Rev 0

NISCO
Baft Steel Complex

DR & Material Handling Plant Project

TARA TARH

Engineering & Technological Co.

Plant Specification and Data Sheets

Page 30 of 144

x Scalability (the scalability is defined as the possibility to add new part of system or to
increase the performance of the existent systems to comply with the new
requirements)
and from the Hardware point of view are:
x High similarity
x High redundancy
The design and the implementation of the automation systems for this project should
consider all the above mentioned features.

2.8.3.2- Automation Levels


A complete plant automation system is a sequence of layers, organized into a pyramid
shape, where each level is superimposed to the lower one, starting from the field
instrumentation:
a) Field Instrumentation (level 0)
b) Basic automation and supervision (level 1)
including:
- Reformer control
- Furnace control
- Logic sequences, interlocks, alarms, events
- Closed loop control
- Field signals collection
- MMI mimics, event logging, trends
- Material tracking
c) Process control and optimization (level 2)
including:

Section 2

Doc No.: TA-143-D00-G-TD006

16-Sep-07

Rev 0

NISCO
Baft Steel Complex

DR & Material Handling Plant Project

TARA TARH

Engineering & Technological Co.

Plant Specification and Data Sheets

Page 31 of 144

- Data exchange with basic automation


- Quality tracking and supervision
- Mathematical models calculations
- Technical standard management
- Operating procedures managements
- Production reports
d) Production control (level 3)
- Connection to MIS system
including:
- Production planning
- Production control
- Quality management
- Quality control
- Material management
- Maintenance management

2.8.4- Control system configuration


The proposed control system should be selected according to the section 2 of Engineering
Standard, Instrumentation and Control (Annex IV).

2.8.5- Field Instrumentation And Control Cables


All necessary field instrumentation and cabling should be according to section 6 and 7
of Engineering Standard, Instrumentation And Control (Annex IV).

Section 2

Doc No.: TA-143-D00-G-TD006

16-Sep-07

Rev 0

NISCO
Baft Steel Complex

DR & Material Handling Plant Project

TARA TARH

Engineering & Technological Co.

Plant Specification and Data Sheets

Page 32 of 144

2.9- REPAIR SHOP


2.9.1- Design basis
This section is a typical description of the direct reduction and raw material handling
plants maintenance shop, which has the repair and maintenance facilities to support
operation.
The facilities indicated in this section are selected to carry out most of the normal and
routine maintenance work inside the direct reduction and raw material handling plants.
The tenderers shall complete or revise the list and supply according to their experience
for above mentioned purposes.
The tenderer shall submit specification, type, quantity, and manufacturer of the facilities.
The repair shop consists of the following:
- Mechanical repair shop equipped by 8 tones overhead traveling crane.
- Electrical & instrument workshop

2.9.2- Planning basis


1- Mechanical repair shop:
Assembling and disassembling of equipment, repair of mechanical, hydraulic and
pneumatic components and related piping, fitting, etc.
2- Electrical & instrument workshop:
Repair, inspection and test of electrical and instrumentation equipment.

2.9.3- Equipment list


Mechanical repair shop facilities
- Horizontal hydraulic press
- Hoists

Section 2

Doc No.: TA-143-D00-G-TD006

16-Sep-07

Rev 0

NISCO

DR & Material Handling Plant Project

TARA TARH

Engineering & Technological Co.

Baft Steel Complex

Plant Specification and Data Sheets

Page 33 of 144

- Ratchet lever hoist


- Hydraulic jack
- AC welder
- Hand pallet truck
- Hydraulic equipment
- Upright drilling machine
- Electric floor grinder
- Bench drilling machine
- Jib crane
- One lathe machine
- One hack saw machine
- One heavy duty tube bender
- One TIG and one MIG-MAG welding machine
- One portable vulcanizing device
- One grinding machine
- Set of wrenches, screw drives, pliers, etc
Electrical & instrument workshop facilities
The electrical and instrument workshop is mainly planned to repair, inspect and test
electrical and instrumentation equipment. Its a totally convened workshop with clean and
controlled atmosphere.
- Cable repair facilities
- Calibration room
Typical test and calibration equipment for onsite instrument testing, and precommissioning. Test and calibration equipment shall be calibrated in the units of

Section 2

Doc No.: TA-143-D00-G-TD006

16-Sep-07

Rev 0

NISCO
Baft Steel Complex

DR & Material Handling Plant Project

TARA TARH

Engineering & Technological Co.

Plant Specification and Data Sheets

Page 34 of 144

measurement selected for the project. All test equipment shall be approved by the
Employers Representative.
General Equipment
1) Workbench for Instrument repairing and calibration
2) Printed circuit board check device
3) Combined pneumatic/electronic portable tester
4) Control valve test bench or test rig.
General Electronic/Electrical Test and Calibration Equipment
5) Digital voltmeters (DVM) portable (minimum 3 portable types) with an accuracy of
+/-0.1% of range or better and with a discrimination of 10 uv or better, incorporating an
internal calibration, standardizing feature and 0.1% calibration resistors.
6) Precision milli volt, volt and milliamp, source measuring device.
7) Portable multi meters (analogue).
8) Insulation resistance testers.
9) Stop-watch and relay contact timing device.
10) Dual beam oscilloscope.
11) Portable, variable mA power supply unit (0 to 50 mA Max.).
12) Portable multi meters (digital).
13) Signal generator.

Pressure Testing and Calibration Equipment


14) Portable manually operated hydraulic pump (bucket pump).
15) Low pressure, hand-held pressure pump (range up to 1 bar).
16) Vacuum pump manually operated.
17) Dead weight tester. (Oil, different ranges from 0 ~ 700 kg/Cm2).
18) Dead weight tester. (Air, different ranges from 0 ~ 700 kg/Cm2).
19) Pressure gage comparison test pump.
20) Precision air filter/regulator sets.
21) Glass thermometers (different ranges from -10 ~ 300 bar).
22) Digital pressure calibrator (0 ~ 400 bar).

Section 2

Doc No.: TA-143-D00-G-TD006

16-Sep-07

Rev 0

NISCO
Baft Steel Complex

DR & Material Handling Plant Project

TARA TARH

Engineering & Technological Co.

Plant Specification and Data Sheets

Page 35 of 144

23) Liquid filled manometer (ranges below 10 mbar).


24) U-tube manometer (ranges approx. +/-25 mbar).
25) Precision-inclined manometer (ranges below 10 mbar).
26) Precision-sealed mercury manometer (ranges up to approximately 1000 mbar).
27) Certified test gauges, 0.25% accuracy or better.
28) Portable pneumatic digital calibrator (different ranges from -1 ~ 20 bar).
29) Portable air compressor (If air supply is not available).
Temperature Test and Calibration Equipment
30) Thermostatically controlled temperature bath(s) (oil and antifreeze liquid).
31) Thermostatically controlled oven, for checking cold junction compensation.
32) Sets of standard (precision) mercury in glass thermometers.
33) Precision potentiometer and milli volt generator.
34) Precision Whetstone Bridge incorporating a detachable resistance box where
resistance thermometers will be installed. Accuracy 0.05% on any resistance value.
35) Decade resistance box 0.1% accuracy.
36) Thermocouple simulator

Note:
All test instruments shall be provided with test leads complete with test probes, clips and
distribution terminals.
Electrical workshop facilities, including but not limited to the following:
1- Digital multi meter

2- AC/DC clamp on current meter

3- Meger (250 ~ 5000 VDC)

4- Ground resistance meter

5- Phase sequence indicator

6- Tacho meter

7- Frequency meter

8- Cable fault locator

Section 2

Doc No.: TA-143-D00-G-TD006

16-Sep-07

Rev 0

NISCO

DR & Material Handling Plant Project

TARA TARH

Engineering & Technological Co.

Baft Steel Complex

Plant Specification and Data Sheets

9- Oil insulation tester

10-Soldering

11- Schering bridge

12- Manual earth (perch)

13- General tools

Page 36 of 144

2.10- LABORATORY
Contractor shall construct and supply a complete laboratory with all laboratory equipment
for carrying out all required analysis and tests in direct reduction and raw material handling
plants.
The facilities indicated in this section are selected to carry out most of the normal analysis
and tests inside the direct reduction and raw material handling plants.
The tenderer shall complete or revise the list according to his experience for above
mentioned purposes.
The tenderer shall submit specification, type, quantity and manufacturer of the laboratory
equipment.

2.10.1- Laboratory equipment


- Atomic absorption
- Spectrophotometer
- Gas chromatograph
- C. & S. analyzers
- Chamber furnace
- Balances
- Oven

Section 2

Doc No.: TA-143-D00-G-TD006

16-Sep-07

Rev 0

NISCO

DR & Material Handling Plant Project

TARA TARH

Engineering & Technological Co.

Baft Steel Complex

Plant Specification and Data Sheets

Page 37 of 144

- Jaw crusher
- Grinding mill
- Cross beating mill
- Crusher
- Automatic press (compression test for DRI)
- Size analysis device (granulometer laser type)
- Grave and crush tests (for DRI)
- Fast DRI metallization measurement device
- Equipment for DRI characterization (drop number and resistance, bulk density)

2.11- WAREHOUSE
The warehouses of DRP shall be constructed by Contractor.
These warehouses shall have necessary equipment, hardware and software for servicing to
the plant in maintenance and operation time. These warehouses are for storing spare parts,
equipment, chemicals and refractories. Warehouses shall be equipped with shelves, ladders,
railing, platforms, lifts, etc which in a modern warehouses for easy handling is required. At
least one three ton capacity fork lift for general purpose shall be provided. Required No. of
hardware (computers, printers, copy machine, etc) and powerful software for handling the
duty shall be provided. The provide system shall be capable of communication with steel
complex MIS/ERP which in future will be provide by Employer.

2.12- HVAC SYSTEM


2.12.1- General
Outdoor design conditions will be determined according to the operation and climatic condition
at site.
2.12.2- Air conditioning system
Air conditioning system with cooling and heating system shall be used to serve control room,
electrical room, gas analyzer room, laboratory, offices, etc.

Section 2

Doc No.: TA-143-D00-G-TD006

16-Sep-07

Rev 0

NISCO

DR & Material Handling Plant Project

TARA TARH

Engineering & Technological Co.

Baft Steel Complex

Plant Specification and Data Sheets

Page 38 of 144

The equipment shall be capable of maintaining internal conditions according to the ASHRAE
standard for offices and specification of equipment from manufacturer for electric equipment in
control and electrical rooms.
Suitable internal conditions for control room, electrical room and laboratory are 222oc and
relative humidity equal 45 to 50%.
The air cooling system, without humidity control for the electrical room and air conditioning
system with humidity control for the control room for PLC equipment shall be considered.
Air systems shall be balanced to the conditions set forth in drawings and specifications and
following items shall be performed:
- Balancing air supply, return and exhaust system.
- Balancing chilled water system.

2.12.3- Heating and ventilation


Heating and ventilation shall be used for warehouses, workshop, locker, shower and suitable
ventilation system shall be provided for all of these spaces are according to ASHRAE or relevant
standard. In heating system for the piping material and flange rating, DIN or equivalent code
shall be applied.
For fans, performance curve showing air volume shall be delivered at various pressure drops.

2.12.4- Specification for HVAC system


Air conditioning equipment should included the following data and specifications.
- Cooling and heating data
- Fresh air rate
- Motor power
- Total heat rejection

Section 2

Doc No.: TA-143-D00-G-TD006

16-Sep-07

Rev 0

NISCO
Baft Steel Complex

DR & Material Handling Plant Project

TARA TARH

Engineering & Technological Co.

Plant Specification and Data Sheets

Page 39 of 144

2.13- FIRE DETECTION AND FIGHTING SYSTEM


2.13.1- Specifications of fire detection and fighting system
Complete fire detection system including fire alarm panel, detectors (fire, smoke, heat, and
explosion), manual fire call, available and visual alarms shall be provided. A complete fire
hazard study shall be done to classify areas of plant. For more information for fire alarm can
refer to following specification and engineering standards Annex III item 3.18.
x

Detectors

Hydrocarbon gas, Heat, Smoke, Fire,


Explosion

Detectors pilot light

Yes

Detectors signal

4~20 mA DC

Detectors calibration

25% and 50% of LEL (lower explosion limit)

Fire alarm panel

Generates 24 VDC

Protection degree

IP54

Horn silence button

Yes

Horn silence for testing & calibration

Yes

I/O fault alarm

Yes

Panel input

220VAC from UPS

Cables

Fire resistant, shielded

Alarm type

Audible and Visual

Alarm location

Field, fire alarm Panel, Operator console in


control room

Fire alarm panel with battery back up

Yes

Section 2

Doc No.: TA-143-D00-G-TD006

16-Sep-07

Rev 0

NISCO

DR & Material Handling Plant Project

TARA TARH

Engineering & Technological Co.

Baft Steel Complex

Plant Specification and Data Sheets

Page 40 of 144

3- RAW MATERIAL HANDLING PLANT SPECIFICATION


3.1- GENERAL DESCRIPTION
For feeding DR plant, pellet as a charging material is required.
For this propose, provision of a raw material handling plant with the capacity of 2,500,000
tonne per year pellet and lump ore (by consideration of future expansion) is one of the
Contractor's obligations.
This plant shall be designed for 7500 hours working time per year with handling rate of
600 t .
h
The Employer will use oxide pellet and lump ore produced from indigenous ore and some
imported pellets and lump ore, therefore Contractor shall provide truck unloading stations
for unloading pellet and lump ore. Train unloading station isnt in the scope of Work but
the Contractor shall foreseen suitable location for car tippler in material handling plant
layout , meanwhile the Contractor shall foreseen an optimum manner for pellet conveying
from car tippler to MHP in material handling plant design for future stage.
After trucks unloading, belt conveyors shall handle pellet and lump ore to pellet storage
area.
A combined stacker reclaimer shall be installed in pellet storage area for raw material
stacking and reclaiming.
When the trucks are unloading, the belt conveyors system shall be able to handle raw
material directly to direct reduction module day bin, as well.
As a whole, the raw material handling plant will include but not limited to the following
main parts:
A- Truck unloading station
B- Pellet open storage area equipped with combined stacker reclaimer and yard
conveyor
C- Belt conveyors system
D- Screen, Feeders, Silos, Chutes, Bins and whatever similar equipment

Section 3

Doc No.: TA-143-D00-G-TD006

16-Sep-07

Rev 0

NISCO

DR & Material Handling Plant Project

TARA TARH

Engineering & Technological Co.

Baft Steel Complex

Plant Specification and Data Sheets

Page 41 of 144

In addition to the main systems as mentioned above, the following auxiliary systems shall
be considered in connection with this plant and shall be designed, supplied, erected and
tested by the Contractor:
-

Civil, building and infrastructure including all buildings such as substation, control room,
ware house, office, etc. with their related infrastructures and HVAC (Heating, Ventilation
and Air-Conditioning) systems.

Potable water distribution system.

Industrial water for spraying over the belt conveyors at conveyor loading and at dust
return in train unloading station and truck unloading station. (if required), based on
Contractor's design.

Dust collection systems.

Compressed air generation (including both plant air and instrument air) and distribution
system based on Contractor's design.

Sewage collection and treatment system.

Fire detection and fighting system.

Electrical system(including communication system).

Instrumentation and control system.

Warehouse.

3.2- RAW MATERIAL HANDLING PLANT DESCRIPTION


3.2.1- TRUCK UNLOADING STATION
The different kinds of trucks in size and type containing pellets, lump ore, and lime shall
be unloaded in truck unloading station.
The unloading station consists of five substations. Two for flatbed trucks or articulated
lorries and three for dumper trucks (jack bodies). Each of these substations shall have one
unloading unit, in such a way that five trucks can unload their contents simultaneously.

Section 3

Doc No.: TA-143-D00-G-TD006

16-Sep-07

Rev 0

NISCO
Baft Steel Complex

DR & Material Handling Plant Project

TARA TARH

Engineering & Technological Co.

Plant Specification and Data Sheets

Page 42 of 144

For the articulated Lorry or flatbed, two hydraulic truck unloaders shall be installed by
the Contractor. Each of these units shall have unloading hoppers.
The hoppers shall be designed to accept both unloading trucks by hydraulic truck
unloader and trucks with flatbeds. These hoppers shall be equipped with grating network
for avoiding oversize entrance to hoppers.
The Contractor shall provide five hoppers , each hopper capacity 100 cubic meters and
five feeders with the capacity of 300 t/h .
Raw material shall be transferred to storage area by belt conveyors.
The truck road, truck weigher, provision the suitable parking for the trucks and other
relevant facilities are in the Contractor's scope of Work.

3.2.2- PELLET STORAGE AREA EQUIPPED WITH COMBINED STACKER RECLAIMER


A pellet storage area with two piles shall be considered. Dimensions of this area is
350mx96m and maximum height of the piles will be approximately 13m.
Any necessary civil works for construction of pellet storage area is in the Contractor's
scope of Work.
A combined stacker reclaimer with stacking capacity of 1500 t
of 600 t

and reclaiming capacity

shall be installed in this storage area. The combined stacker reclaimer shall be

able to stacking in and reclaiming from two piles.


3.2.3- BELT CONVEYOR SYSTEM
Raw material shall be transferred from truck unloading station to direct reduction plant
day bin by belt conveyors. Belt conveyor capacity from truck unloading station to stack
piles shall be 1500 t/h and from stack piles to DRP day bin shall be 600 t/h.
Weighers shall be installed on the conveyors where it is necessary.
All necessary cranes and hoists for erection, dismantling and maintenance of equipment
shall be installed.

Section 3

Doc No.: TA-143-D00-G-TD006

16-Sep-07

Rev 0

NISCO
Baft Steel Complex

DR & Material Handling Plant Project

TARA TARH

Engineering & Technological Co.

Plant Specification and Data Sheets

Page 43 of 144

3.3- DEDUSTING SYSTEM OF MATERIAL HANDLING SYSTEM


Industrial dedusting systems to maintain compliance with the laws and regulations of
Iranian Environmental Protection Organization shall be provided for raw material handling
plant.
Dedusting system shall be provided everywhere dust may be produced during operation of
the plant i.e. truck unloading station, transferring points between belt conveyors and
screening station, considering plant operation, dust concentration and particle size.
Safety requirements in collection & cleaning of dust shall be considered and the step taken
to ensure safety of the operation of dedusting system shall be described by the Contractor.
The Contractor shall also provide disposal facilities for dusts collected by the dedusting
system.

3.4- ELECTRICAL DISTRIBUTION


Refer to item 2.7

3.5- INSTRUMENTATION AND CONTROL SYSTEM


3.5.1- General
This specification should apply for the instrumentation and control system togetherness
with Engineering Standard, Instrumentation And Control (Annex IV) whether specifically
mentioned or not; and any control device, field equipment and other requirements
concerning the design, material selection, erection, commissioning, etc. should comply
with it.
3.5.2- Scope
Contractor should install an advanced control system, all field instrumentation, cabling and
all necessary accessories for raw material handling plant.
The control system shall be capable of controlling a car tippler which may be added in
future and necessary installed spares shall be provided in control system.

Section 3

Doc No.: TA-143-D00-G-TD006

16-Sep-07

Rev 0

NISCO

DR & Material Handling Plant Project

TARA TARH

Engineering & Technological Co.

Baft Steel Complex

Plant Specification and Data Sheets

Page 44 of 144

The control system shall be connected to DR plant control system as well.


3.5.3- Design Criteria
3.5.3.1- Automation Systems Features
The main general features requested to the automation system, are the following:
x High availability (the availability is defined as the ratio between the up-time and the
total operating time)
x High reliability (the reliability is defined as the probability that a device will function
without failure over a specified time period or amount of usage)
x Scalability (the scalability is defined as the possibility to add new part of system or to
increase the performance of the existent systems to comply with the new
requirements)
and from the Hardware point of view are:
x High similarity
x High redundancy
The design and the implementation of the automation systems for this Project should
consider all the above mentioned features.

3.5.3.2- Automation Levels


A complete plant automation system is a sequence of layers, organized into a pyramid
shape, where each level is superimposed to the lower one, starting from the field
instrumentation:
e) Field Instrumentation (level 0)
f) Basic automation and supervision (level 1)
g) Process control and optimization (level 2)
h) Production control (level 3)

Section 3

Doc No.: TA-143-D00-G-TD006

16-Sep-07

Rev 0

NISCO
Baft Steel Complex

DR & Material Handling Plant Project

TARA TARH

Engineering & Technological Co.

Plant Specification and Data Sheets

Page 45 of 144

- Connection to MIS system


including:
- Production planning
- Production control
- Quality management
- Quality control
- Material management
- Maintenance management
3.5.4- Control system configuration
The proposed control system should be selected according to the section 2 of Engineering
Standard, Instrumentation and Control (Annex IV).
3.5.5- Field Instrumentation and Control Cables
All necessary field instrumentation and cabling should be according to section 6 and 7 of
Engineering Standard, Instrumentation and Control (Annex IV).
3.6- WAREHOUSE
The Contractor shall construct a suitable warehouse for the raw material handling plant.
This warehouse shall have necessary equipment, hardware and software to serve the plant in
maintenance and operation period. Warehouses shall be equipped with shelves, ladders,
railing, platforms, lifts, etc which in a modern warehouses for easy handling is required. At
least one three ton capacity fork lift for general purpose shall be provided. Required No. of
hardware (computers, printers, copy machine, etc) and powerful software for handling the
duty shall be provided. The provide system shall be capable of communication with steel
complex MIS/ERP which in future will be provide by Employer.

Section 3

Doc No.: TA-143-D00-G-TD006

16-Sep-07

Rev 0

NISCO

DR & Material Handling Plant Project

TARA TARH

Engineering & Technological Co.

Baft Steel Complex

Plant Specification and Data Sheets

Page 46 of 144

3.7- HEATING, VENTILATION AND AIR CONDITIONING SYSTEM


3.7.1- Air conditioning system
Air conditioning system shall be used to serve control room (material handling pulpit), electrical
room, and offices.
The equipment shall be capable of maintaining internal conditions according to the ASHRAE
standard for offices and specification of equipment from manufacturer for electric equipment in
control and electrical room.
Suitable internal conditions for these spaces is 222oc and relative humidity equal 45 to 50%.
The air cooling system, without humidity control for the electrical room and air conditioning
system with humidity control for the control room for PLC equipment shall be considered.
3.7.2- Heating and ventilation
Heating and ventilation shall be used for spare part storage and suitable ventilation system and
minimum quantity of outside air shall be provided according to ASHRAE or relevant standard.
For fans, performance curves showing air volume shall be delivered at various pressure drops.

3.7.3- Specification for HVAC system


For Specification of HVAC system can refer to 2.12.4.

3.8- FIRE DETECTION AND FIGHTING SYSTEM


3.8.1- Specification
For specification of fire detection and fighting system can refer to 2.13.1.

Section 3

Doc No.: TA-143-D00-G-TD006

16-Sep-07

Rev 0

NISCO

DR & Material Handling Plant Project

TARA TARH

Engineering & Technological Co.

Baft Steel Complex

Plant Specification and Data Sheets

Page 47 of 144

4- PROCESS AND PROCESS EQUIPMENT DATA SHEETS


Tenderer shall fill out process data in process data sheets.
Tenderer shall fill out data of offered equipment in data sheets provided hereinafter.
Tenderer shall complete one data sheet for each type of equipment.

Consumptions Data Sheet


The tenderer shall fill out the consumptions table for DR module.
No.

Item

Unit

Oxide pellet

t/t DRI (+5mm sponge iron)

Natural gas

Nm3/hr

Nitrogen

Nm3/hr

Electric power consumption

kWh/t DRI (+5mm sponge


iron)

Make up water

M3/hr

Service (plant) comp. air

Nm3/hr

Instrument Comp. air

Nm3/hr

Section 4

Doc No.: TA-143-D00-G-TD006

Tenderer Proposal

16-Sep-07

Rev 0

NISCO

DR & Material Handling Plant Project

TARA TARH

Engineering & Technological Co.

Baft Steel Complex

Plant Specification and Data Sheets

Page 48 of 144

Shaft Furnace Data Sheet


- Total weight of reduction furnace excluding
refractories (tonne)

.......

- Estimated weights of required refractories


(tonne)

.......

- Inside dimension of reduction zone (m)


Height x Diameter

.......

- Effective volume of reduction zone (m3)

..........

- Shell plate thickness (mm)

..........

- Shell plate material

..........

- Input rate (tonne/h)

..........

- Output rate (tonne/h)

..........

- Temperature of sponge iron at discharge (c)

..........

- Operating temperature (furnace bed) approx.


(c)

..........

- Pressure of reduction gas at entry to the


furnace (ata)

..........

- Pressure of reduction gas at exit of the furnace


(ata)
..........
- Temperature of reduction gas at entry to the
furnace (c)

..........

- Gas composition (bustle & top) Approx. (vol


%)

.... bustle gas . top gas

- H2

..........

Section 4

Doc No.: TA-143-D00-G-TD006

16-Sep-07

Rev 0

NISCO
Baft Steel Complex

DR & Material Handling Plant Project

TARA TARH

Engineering & Technological Co.

Plant Specification and Data Sheets

Page 49 of 144

- CO

..........

- CO2

..........

- H2O

..........

- CH4

..........

- N2

..........

- Natural gas requirement per tonne of product


(Nm3/tonn)

..........

- Reduction gas requirement per tonne of


product (Nm3/tonn)

..........

- Number of reducing gas tuyeres

..........

- Retention time (reduction and cooling) (hour)

..........

- Cooling gas system

..........
..........
..........

- Charging system

..........
..........
..........

- Discharging system

..........
..........
..........

- Method of sealing

..........
..........

Section 4

Doc No.: TA-143-D00-G-TD006

16-Sep-07

Rev 0

NISCO

DR & Material Handling Plant Project

TARA TARH

Engineering & Technological Co.

Baft Steel Complex

Plant Specification and Data Sheets

Page 50 of 144

..........
- Level of carbon content (%)

..........
..........
..........

- Method of carbon content control

..........
..........
..........

- Bruden feeder equipment

..........
..........
..........

- Lubrication system type and description

..........
..........
..........

Section 4

Doc No.: TA-143-D00-G-TD006

16-Sep-07

Rev 0

NISCO
Baft Steel Complex

DR & Material Handling Plant Project

TARA TARH

Engineering & Technological Co.

Plant Specification and Data Sheets

Page 51 of 144

Gas Reformer Data Sheet


- Number of reformers per module

..........

- Total weight excluding refractories (kg)

..........

- Estimated weight of required refractories (kg)

..........

- Length (m) x width (m)

..........

- Reformed gas capacity (Nm3/h)

..........

- Natural gas consumption for reforming


(Nm3/h)

..........

- Natural gas consumption for fuel (Nm3/h)

..........

- Reforming method

..........

- Feed gas

..........

- Reformer type

..........

- Gas flow direction

..........

- Composition of the reformed gas at exit


approx. (vol%)

..........

- CO

..........

- H2

..........

- CO2

..........

- H2O

..........

- CH4

..........

Section 4

Doc No.: TA-143-D00-G-TD006

16-Sep-07

Rev 0

NISCO

DR & Material Handling Plant Project

TARA TARH

Engineering & Technological Co.

Baft Steel Complex

Plant Specification and Data Sheets

Page 52 of 144

- N2

..........

- Operating temperature (c)

..........

- Temperature of preheated feed gas before


reforming (c)

..........

- Temperature of reformed gas at exit (c)

..........

- Pressure of feed gas before reforming (ata)

..........

- Pressure of reformed gas at exit (ata)

..........

- Permissible sulphur in feed gas (ppm)

..........

- Reformer burners fuel

..........

- Fuel gas mixer type

..........

- Number and type of burners

..........

- Main burners

..........

- Auxiliary burners

..........

- Capacity of each burner (Gcal/h)

..........

- Gas consumption of each burner (Nm3/h)


Natural gas + top gas

..........

- Air consumption of each burner (Nm3/h)

..........

- Total heat input in normal working condition


(Gcal/h)
- Number of catalyst tubes

Section 4

..........
..........

Doc No.: TA-143-D00-G-TD006

16-Sep-07

Rev 0

NISCO
Baft Steel Complex

DR & Material Handling Plant Project

TARA TARH

Engineering & Technological Co.

Plant Specification and Data Sheets

Page 53 of 144

- Material of tubes

..........

Method of construction

..........

- Internal diameter of tubes (mm)

..........

- External diameter of tubes (mm)

..........

- Tube length (m)

..........

- Tube life (years)

..........

- Provision for thermal expansion of tubes

..........

- Catalyst tubes fixed end

..........

- Weight of catalyst (kg)

..........

- Temperature distribution along the tube

..........

- length (c)

..........

Bottom

..........

Middle

..........

Top

..........

- Catalyst temperature at the tube center line


(c)

..........

Bottom

..........

Middle

..........

Top

..........

- Reformed gas cooler type

Section 4

..........

Doc No.: TA-143-D00-G-TD006

16-Sep-07

Rev 0

NISCO
Baft Steel Complex

DR & Material Handling Plant Project

Engineering & Technological Co.

Plant Specification and Data Sheets

- Reformed gas cooler capacity (Nm3/hr)

Section 4

TARA TARH
Page 54 of 144

..........

Doc No.: TA-143-D00-G-TD006

16-Sep-07

Rev 0

NISCO
Baft Steel Complex

DR & Material Handling Plant Project

TARA TARH

Engineering & Technological Co.

Plant Specification and Data Sheets

Page 55 of 144

Fuel Gas Mixer Data Sheet


- Type

.....

- Natural gas input rate

.....

- Top gas input rate

.....

- Output rate

.....

- Manufacturer

.....

- Place of manufacture

.....

Section 4

Doc No.: TA-143-D00-G-TD006

16-Sep-07

Rev 0

NISCO

DR & Material Handling Plant Project

TARA TARH

Engineering & Technological Co.

Baft Steel Complex

Plant Specification and Data Sheets

Page 56 of 144

Recuperator Data Sheet


- Total weight excluding refractories

- Estimated weight of required refractories

- Geometry and dimension

- Heating media

- Preheated gases

- Heating media rate (Nm /h)

- Preheated gases rate (Nm3/h)


- Heating media temperature (c)

Input & Output


- Preheated gases temperature (c)

Input & Output

- Number of tubes

- Material of tubes

- Method of construction

- Internal diameter of tubes (mm)

- External diameter of tubes (mm)

- Total tube length (for each type) (m)

- Tube life (year)

- Provision for thermal expansion of tubes


- Shell plate material
- Shell plate thickness

Section 4

Doc No.: TA-143-D00-G-TD006

16-Sep-07

Rev 0

NISCO

DR & Material Handling Plant Project

TARA TARH

Engineering & Technological Co.

Baft Steel Complex

Plant Specification and Data Sheets

Page 57 of 144

Top Gas & Cooling Gas System


- Top gas scrubber type

- Top gas scrubber capacity (Nm3/hr)

.....

- Top gas scrubber water quantity (m3/hr)

- Top gas scrubber operating pressure (ata)

- Top gas scrubber dimension

- Top gas scrubber shell thickness (mm)

- Process gas mixer type

.....

- Process gas mist eliminator type

.....

- Process gas mist eliminator capacity


(Nm3/hr)

.....

- Cooling gas scrubber type

.....

- Cooling gas scrubber capacity (Nm3/hr)

.....

- Cooling gas scrubber water quantity (m3/hr)

.....

- Cooling gas scrubber operating pressure


(ata)

.....

- Cooling gas scrubber dimensions

.....

- Cooling gas scrubber shell thickness (mm)

.....

- Cooling gas mist eliminator type

.....

- Cooling gas mist eliminator capacity


(Nm3/hr)

.....

Section 4

Doc No.: TA-143-D00-G-TD006

16-Sep-07

Rev 0

NISCO

DR & Material Handling Plant Project

TARA TARH

Engineering & Technological Co.

Baft Steel Complex

Plant Specification and Data Sheets

Page 58 of 144

Seal, Inert and Purge Gas System


- Brief description of seal, inert, purge gas
system

..

-Total generated seal gas (Nm3/h)

- Total necessary seal gas flow (Nm3/h)

- Seal gas cooler capacity (Nm3/h)

.....

- Seal gas cooler water quantity (Nm3/h)

.....

- Seal gas cooler dimensions

.....

- Seal gas dryer capacity (Nm3/h)

- Seal gas dryer operating pressure (ata)

- Seal gas dryer shell thickness (mm)

- Number of purge gas tank


- Purge gas tank dimensions

- Purge gas tank shell thickness (mm)

.....

- Number of gas generators

- Capacity of each generator (Nm3/h)

- Number of inert gas storage tank

..

- Total capacity of inert storage tank (Nm3)

Section 4

Doc No.: TA-143-D00-G-TD006

16-Sep-07

Rev 0

NISCO
Baft Steel Complex

DR & Material Handling Plant Project

TARA TARH

Engineering & Technological Co.

Plant Specification and Data Sheets

Page 59 of 144

Dust Collectors
- Item number

..

- Type and function description

..

- Quantity of dust collected (kg/hr)

..

- Fan rating (Nm3/min)

.....

- Duct air velocity (m/sec)

.....

- Unit weight

.....

- Motor rating (kW)

.....

- Assumed dust load (mg/Nm3)

.....

- Collected dust discharge and removal


system

.....

- Dust content of exhaust air (mg/Nm3)

.....

- Type and quantity of nozzles (if any exist)

.....

- Manufacturer

.....

- Place of manufacture

.....

- Other details and technical particulars

.....

Section 4

Doc No.: TA-143-D00-G-TD006

16-Sep-07

Rev 0

NISCO

DR & Material Handling Plant Project

TARA TARH

Engineering & Technological Co.

Baft Steel Complex

Plant Specification and Data Sheets

Page 60 of 144

Bag Filter
- Number of bag filter/system

- Number of compartments per bag filter

- Number of bags per compartment

- Bag diameter (mm)

- Bag effective length (mm)

- Over all dimensions of bag filter


a) Length (m)

b) Width (m)

c) Height (m)

- Cladding material

- Material of filter

- Max, safe operation temperature ( $ C )

- Outlet air specification (mg

Nm 3

- Guaranteed life of bags (years)

- Number of dust hoppers

- Slope of sides
(referred to horizontal) (degree)

- Type of dampers

- Number of dampers

Section 4

Doc No.: TA-143-D00-G-TD006

16-Sep-07

Rev 0

NISCO
Baft Steel Complex

DR & Material Handling Plant Project

TARA TARH

Engineering & Technological Co.

Plant Specification and Data Sheets

Page 61 of 144

- Bag cleaning method

- Describe cycle of cleaning

- Manufacturer

- Place of manufacture

Section 4

Doc No.: TA-143-D00-G-TD006

16-Sep-07

Rev 0

NISCO

DR & Material Handling Plant Project

TARA TARH

Engineering & Technological Co.

Baft Steel Complex

Plant Specification and Data Sheets

Page 62 of 144

Dust Collection Duct System


- Duct diameter (mm)

- Steel plate quality

- Plate thickness (mm)

- Type of dampers

- Size of dampers

-Volume
open ( Nm

of
3

air

entrained

when

fully
.

- Manufacturer

- Place of manufacture

- Type of temperature detector

- Temperature of actuation

Section 4

Doc No.: TA-143-D00-G-TD006

16-Sep-07

Rev 0

NISCO

DR & Material Handling Plant Project

TARA TARH

Engineering & Technological Co.

Baft Steel Complex

Plant Specification and Data Sheets

Page 63 of 144

Fans of Dust Collection Systems


-

No. of fans/system

....

Type of fan

Manufacturer

Place of manufacture

Capacity per fan ( Nm

Working temperature (max.) ( $ C )

Static pressure (kpa.gauge)

Power required (kW)

Fan motor rating (kW)

Motor type and speed (rpm)

Motor manufacturer

Place of manufacturer of motor

Weights

Noise level (dB)

Section 4

Doc No.: TA-143-D00-G-TD006

16-Sep-07

Rev 0

NISCO

DR & Material Handling Plant Project

TARA TARH

Engineering & Technological Co.

Baft Steel Complex

Plant Specification and Data Sheets

Page 64 of 144

Dust Conveying System


-

Brief description of dust conveying


System

.
.
.
.

Type of dust discharge valves

Capacity of valves (m

Manufacturer

..

Place of manufacture

Section 4

..
..

Doc No.: TA-143-D00-G-TD006

16-Sep-07

Rev 0

NISCO

DR & Material Handling Plant Project

TARA TARH

Engineering & Technological Co.

Baft Steel Complex

Plant Specification and Data Sheets

Page 65 of 144

Compressors Data Sheet


- Item No.

General:
- Function

.....

No. of units:
In operation

.....

Stand by

.....

- Manufacturer

- Place of manufacture

Compressor Characteristics:
- Type

- No. of stages

- Fluid handled

- Suction pressure (kg/cm2)

- Delivery pressure (kg/cm2)

- Suction temperature (c)

- Delivery temperature (c)

- Rated capacity (Nm3/hr)

- Nature of cooling fluid

- Cooling fluid requirements (Nm3/hr)

Section 4

Doc No.: TA-143-D00-G-TD006

16-Sep-07

Rev 0

NISCO
Baft Steel Complex

DR & Material Handling Plant Project

TARA TARH

Engineering & Technological Co.

Plant Specification and Data Sheets

Page 66 of 144

- Bearing type

.....

- Lubrication system

.....

- Coupling type

.....

- Efficiency at normal operating condition (%)

.....

- Speed (rpm)

.....

- Motor power (kW)

.....

Material:
- Casing

.....

- Impeller

.....

- Shaft

.....

- Bed plate

.....

Section 4

Doc No.: TA-143-D00-G-TD006

16-Sep-07

Rev 0

NISCO

DR & Material Handling Plant Project

TARA TARH

Engineering & Technological Co.

Baft Steel Complex

Plant Specification and Data Sheets

Page 67 of 144

Fans and Blowers Data Sheet


- Item No.

.....

General:

.....

- Function

.....

- No. of units:
In operation

.....

Stand by

- Manufacturer

.....

- Place of manufacture

.....

Characteristics:

.....

- Type

.....

- Fluid handled

.....

- Total pressure (mm H2O)

.....

- Suction pressure (mm H2O)

.....

- Efficiency at rated capacity (%)

.....

- Capacity (Nm3/h)

.....

- Fan speed (rpm)

.....

- Absorbed power at rated capacity (kW)

.....

- Noise level (at a distance of one meter from


perimeter of the fan)
- Motor power (kW)

Section 4

.....
.....

Doc No.: TA-143-D00-G-TD006

16-Sep-07

Rev 0

NISCO

DR & Material Handling Plant Project

TARA TARH

Engineering & Technological Co.

Baft Steel Complex

Plant Specification and Data Sheets

Page 68 of 144

Stack Data Sheet


- Dimension

- Material

- Total weight excluding refractories

- Weight of required refractory

Section 4

Doc No.: TA-143-D00-G-TD006

16-Sep-07

Rev 0

NISCO
Baft Steel Complex

DR & Material Handling Plant Project

TARA TARH

Engineering & Technological Co.

Plant Specification and Data Sheets

Page 69 of 144

Cranes and Hoists Data Sheet


- I.D. No.

- Function/Location

- Type

- Quantity

- Capacity

- Manufacturer

- Place of manufacture

Section 4

Doc No.: TA-143-D00-G-TD006

16-Sep-07

Rev 0

NISCO
Baft Steel Complex

DR & Material Handling Plant Project

TARA TARH

Engineering & Technological Co.

Plant Specification and Data Sheets

Page 70 of 144

Shaft Furnaces Passenger and Goods Elevators Data Sheet


- Quantity

- Carrying capacity (kg)

- Inside cabinet dimensions (m)

- Power of elevator motor (kW)

- Speed (m/s)

- Lift (m)

- Number of stops

- Manufacturer

- Place of manufacture

Section 4

Doc No.: TA-143-D00-G-TD006

16-Sep-07

Rev 0

NISCO
Baft Steel Complex

DR & Material Handling Plant Project

TARA TARH

Engineering & Technological Co.

Plant Specification and Data Sheets

Page 71 of 144

5- MATERIAL HANDLING SYSTEM DATA SHEETS


Tenderer shall fill in data of offered equipment in data sheets provided hereinafter.
Tenderer shall complete one datasheet for each type of equipment for raw material handling

Section 5

Doc No.: TA-143-D00-G-TD006

16-Sep-07

Rev 0

NISCO
Baft Steel Complex

DR & Material Handling Plant Project

TARA TARH

Engineering & Technological Co.

Plant Specification and Data Sheets

Page 72 of 144

Combined Stacker Reclaimer Data Sheet


- Design stacking capacity (t/h)

- Design reclaiming capacity (t/h)

- Boom length (m)

- Total weight(t)

....

- Pile

...

Width

...

Height

...

Belt Conveyor
- Width (mm)

- Speed (m/s)

- Power (kW)

- Length (m)

Travel
- Traveling speed (working speed) (m/min)

- Out of operation traveling speed (m/min)

- Rail type

- Wheels diameter (mm)

- Machine wheels Nr.

Section 5

Doc No.: TA-143-D00-G-TD006

16-Sep-07

Rev 0

NISCO
Baft Steel Complex

DR & Material Handling Plant Project

TARA TARH

Engineering & Technological Co.

Plant Specification and Data Sheets

Page 73 of 144

- Drive power (kW)

- Operating wind pressure (kg/m2)

Bucket Wheel
Type :
- Diameter (mm)

- Speed (rpm)

- Power (kW)

Section 5

Doc No.: TA-143-D00-G-TD006

16-Sep-07

Rev 0

NISCO
Baft Steel Complex

DR & Material Handling Plant Project

TARA TARH

Engineering & Technological Co.

Plant Specification and Data Sheets

Page 74 of 144

Truck Hydraulic Unloader Data Sheet


- Brief description of the system

- Dimensions

- Capacity (t)

- Angle of rotation (o)

- Hydraulic jack pressure

- Hydraulic cylinder diameter

- Hydraulic motor power

- Tipping cycle time

- Manufacturer

- Other infromation

Section 5

Doc No.: TA-143-D00-G-TD006

16-Sep-07

Rev 0

NISCO

DR & Material Handling Plant Project

TARA TARH

Engineering & Technological Co.

Baft Steel Complex

Plant Specification and Data Sheets

Page 75 of 144

Belt Conveyors Data Sheet


- I.D. No.

...

- Center distance of end pulleys (m)

...
...

- Lift (mm)

...

- Belt width (mm)

...

- Belt speed (m/s)

...
- Handling rate (MT/h)

...

- Material handled

...

- Drive system and its components type


- Power consumption of conveyors
(including 15% extra power requested by
THE EMPLOYER ) (kW)

...
..

- Power installed of conveyors (kW)

...

- Type of take-up device

......

- Size of tail and drive pulleys

......

- Type of belt

......

- Belt material

Section 5

Doc No.: TA-143-D00-G-TD006

16-Sep-07

Rev 0

NISCO
Baft Steel Complex

DR & Material Handling Plant Project

TARA TARH

Engineering & Technological Co.

Plant Specification and Data Sheets

Page 76 of 144

Oxide Pellet Coating System Data Sheet

Coating material

Amount of coating material (kg/t)

Brief description of coating system

Section 5

Doc No.: TA-143-D00-G-TD006

16-Sep-07

Rev 0

NISCO
Baft Steel Complex

DR & Material Handling Plant Project

TARA TARH

Engineering & Technological Co.

Plant Specification and Data Sheets

Page 77 of 144

Screen Stations Data Sheet


- I.D. No.

......

- Function & description of unit

..

- Type

..

- Rating (MT/h)

- Method of suspension & vibration

.
.

- No. of decks
- Mesh opening & screening area for each

deck
- Drive system type

.....

- Power consumption of screen (kW)

.....

- Time between deck replacements

.....

- Specific materials used (e.g. for wear,


corrosion protection, etc. If any).

Section 5

.....

Doc No.: TA-143-D00-G-TD006

16-Sep-07

Rev 0

NISCO

DR & Material Handling Plant Project

TARA TARH

Engineering & Technological Co.

Baft Steel Complex

Plant Specification and Data Sheets

Page 78 of 144

Belt Scales (Weighing System) Data Sheet


- I.D. No

- Function and description of unit

- Capacity & accuracy

- Other technical data

Section 5

Doc No.: TA-143-D00-G-TD006

16-Sep-07

Rev 0

NISCO

DR & Material Handling Plant Project

TARA TARH

Engineering & Technological Co.

Baft Steel Complex

Plant Specification and Data Sheets

Page 79 of 144

Feeders Data Sheet


- I.D. No.

- Function & description of unit

- No. of units

- Type

- Rating (MT/h)

.....

- Method of suspension

.....

- Feed motion mechanism and particulars, e.g.


stroke length & rate, vibration, amplitude &
frequency, etc. Depending on the design
.....
.....
.....
.....
-Flow rate regulation system
.....
-Installed drive power (kW)
.....
-Manufacturer
.....
-Place of manufacture
.

Section 5

Doc No.: TA-143-D00-G-TD006

16-Sep-07

Rev 0

NISCO
Baft Steel Complex

DR & Material Handling Plant Project

TARA TARH

Engineering & Technological Co.

Plant Specification and Data Sheets

Page 80 of 144

Transfer Towers Data Sheet


- I.D. No.

..

- Dimensions: base area x height. Approx. (m) ..


- No. of platforms

..

- Covers, grating, etc.

..

Section 5

Doc No.: TA-143-D00-G-TD006

16-Sep-07

Rev 0

NISCO
Baft Steel Complex

DR & Material Handling Plant Project

TARA TARH

Engineering & Technological Co.

Plant Specification and Data Sheets

Page 81 of 144

Diverters Data Sheet


- I.D. No.

- Function & description of unit

- Method of actuation

- Specific materials used (e.g. for wear,


corrosion protection, etc. if any)

Section 5

.....

Doc No.: TA-143-D00-G-TD006

16-Sep-07

Rev 0

NISCO
Baft Steel Complex

DR & Material Handling Plant Project

TARA TARH

Engineering & Technological Co.

Plant Specification and Data Sheets

Page 82 of 144

Bins and Hoppers Data Sheet


- I.D. No.

- Function & description of unit

- Geometry

- Dimensions & capacity

.....

- Specific materials used (e.g. for wear,


corrosion protection, etc. if any)

Section 5

.....

Doc No.: TA-143-D00-G-TD006

16-Sep-07

Rev 0

NISCO
Baft Steel Complex

DR & Material Handling Plant Project

TARA TARH

Engineering & Technological Co.

Plant Specification and Data Sheets

Page 83 of 144

6- FLUID SYSTEM DATA SHEET


Design, selection and installation of fluid systems and equipment shall be in accordance with
standards and specification which have been specified in these tender documents. Tenderer shall
fill in data of offered system and equipment in the data sheets provided hereinafter.
Technical specification for the equipment which has not been specified here and is necessary for
reliability of the system shall be specified by the tenderer.

Section 6

Doc No.: TA-143-D00-G-TD006

16-Sep-07

Rev 0

NISCO
Baft Steel Complex

DR & Material Handling Plant Project

TARA TARH

Engineering & Technological Co.

Plant Specification and Data Sheets

Page 84 of 144

Plate heat exchangers


- Manufacturer

......

- Place of manufacturer

..

- Number

..

- Flow rate of cooling water (m3/hr)

..

- Flow rate of cold water (m3/hr)

..

- Cooling water inlet/outlet temperature (C) ..


- Cold water inlet/outlet temperature (C)

..

- Cooling water pressure drop (kpa)

..

- Cold water pressure drop (kpa)

..

- Overall heat transfer coefficient (kcal/m2. c.h)

..

- Overall heat transfer Area (m2)

..

- Heat transferred (kW)

..

- Fouling factor (m .h. $ c kcal)

..

- Surface margin (%)

..

- Material
a ) Plate

..

b) Gasket

..

c) Frame

..

Section 6

Doc No.: TA-143-D00-G-TD006

16-Sep-07

Rev 0

NISCO

DR & Material Handling Plant Project

TARA TARH

Engineering & Technological Co.

Baft Steel Complex

Plant Specification and Data Sheets

Page 85 of 144

Clarifier
- Number of tanks

..................................................................

- Type of tank

circular

- Capacity (m3/h)

..................................................................

- Detention time

..................................................................

- Tank Net volume (m3)

..................................................................

- Design surface load (m3/m2.h)

..................................................................

- Tank Dimensions (m)

..................................................................

- Slope of Bottom (%)

..................................................................

rectangular

- Expected effluent suspended solid


concentration (in maximum inlet
suspended solid condition) (mg/l)

..................................................................

- Bridge traveling velocity (m/min)

..................................................................

- Manufacture and place of manufacture

..................................................................

a) bridge structure

..................................................................

b) gear

..................................................................

c) motor

..................................................................

d) scraper

..................................................................

e) wheels

..................................................................

f) weir

..................................................................

g) power transfer system

..................................................................

- bridge length (m)

..................................................................

- width of bridge walk way (cm)

..................................................................

- weir length

..................................................................

Section 6

Doc No.: TA-143-D00-G-TD006

16-Sep-07

Rev 0

NISCO
Baft Steel Complex

DR & Material Handling Plant Project

TARA TARH

Engineering & Technological Co.

Plant Specification and Data Sheets

Page 86 of 144

- time interval between each blow off in


maximum inlet suspended solids (min)

..................................................................

- material

..................................................................

a) tank

..................................................................

b) bridge structure

..................................................................

c) scraper and wheels

..................................................................

d) weir

..................................................................

- protective treatment

..................................................................

a) shot blasting

..................................................................

b) coating

..................................................................

d) description

..................................................................

- Chemical used & quantity

Section 6

..................................................................

Doc No.: TA-143-D00-G-TD006

16-Sep-07

Rev 0

NISCO

DR & Material Handling Plant Project

TARA TARH

Engineering & Technological Co.

Baft Steel Complex

Plant Specification and Data Sheets

Page 87 of 144

Cooling Circuit
- Cooling circuit denomination

..........................................................................

- Acceptable cooling water analysis

..........................................................................

- Water flow rate (m3/h)

..........................................................................

- Water volume in the circuit (m3)

..........................................................................

- Supply water temperature (oC)

..........................................................................

- return water temperature (oC)

..........................................................................

- Supply water pressure (kpa)

..........................................................................

- Expected corrosion rate (mpy)

..........................................................................

- Chemical conditioning system description


for circulation water

Section 6

..

Doc No.: TA-143-D00-G-TD006

16-Sep-07

Rev 0

NISCO

DR & Material Handling Plant Project

TARA TARH

Engineering & Technological Co.

Baft Steel Complex

Plant Specification and Data Sheets

Page 88 of 144

Cooling Towers
- Manufacturer

..........................................................................

- place of manufacturer

..........................................................................

- Preliminary duty of tower (Design condition)

..........................................................................

a) Water flow (m3/h)

..........................................................................

b) Inlet water temperature (oC)

..........................................................................

c) Outlet water temperature (oC)

..........................................................................

- Type of tower

..........................................................................

- Number of cells

..........................................................................

- Lifetime of cooling tower and its auxiliaries

..........................................................................

- Maximum size of largest section

..........................................................................

a) Length

..........................................................................

b) Width

..........................................................................

c) Height

..........................................................................

- Preliminary proposed packing

..........................................................................

a) Type

..........................................................................

b) Material

..........................................................................

c) Depth

..........................................................................

- Casing

Section 6

..........................................................................

Doc No.: TA-143-D00-G-TD006

16-Sep-07

Rev 0

NISCO

DR & Material Handling Plant Project

TARA TARH

Engineering & Technological Co.

Baft Steel Complex

Plant Specification and Data Sheets

Page 89 of 144

a) Material

..........................................................................

b) Protective material

..........................................................................

- Fans

..........................................................................

a) Type

..........................................................................

b) Number of fans

..........................................................................

c) Fan static pressure (mm H2O)

..........................................................................

d) Fan speed (rpm)

..........................................................................

e) Blade material

..........................................................................

- Motors

..........................................................................

a) Manufacturer

..........................................................................

b) Number

..........................................................................

c) Absorbed power (kW)

..........................................................................

d) Rated power (kW)

..........................................................................

e) Speed (rpm)

..........................................................................

f) Electrical supply

..........................................................................

x Voltage (V)

..........................................................................

Phase

..........................................................................

Frequency (Hz)

..........................................................................

Frame size

..........................................................................

Section 6

Doc No.: TA-143-D00-G-TD006

16-Sep-07

Rev 0

NISCO

DR & Material Handling Plant Project

Engineering & Technological Co.

Baft Steel Complex

TARA TARH

Plant Specification and Data Sheets

Page 90 of 144

..........................................................................

Enclosure

- Drift eliminators

..........................................................................

a) Material

..........................................................................

b) Expected drift loss (%)

..........................................................................

- Make up water

..........................................................................

a) type

..........................................................................

b) temperature (oC)

..........................................................................

c) pressure (kpa)

..........................................................................

d) expected maximum flow rate (m3/h)

..........................................................................

e) analysis

..........................................................................

- Noise level and spectrum with all fans


working ratio dB(A)

Section 6

..........................................................................

Doc No.: TA-143-D00-G-TD006

16-Sep-07

Rev 0

NISCO
Baft Steel Complex

DR & Material Handling Plant Project

TARA TARH

Engineering & Technological Co.

Plant Specification and Data Sheets

Page 91 of 144

Centrifugal Pumps
- Manufacturer

..........................................................................

- place of manufacturer

..........................................................................

- Type of pump

..........................................................................

- Number of pumps (operating, stand by)

..........................................................................

- Function

..........................................................................

- Liquid

..........................................................................

- Capacity (m3/h)

..........................................................................

- Differential head (m.W.c)

..........................................................................

- Efficiency (%)

..........................................................................

- Absorbed power (kW)

..........................................................................

- Rotating speed (rpm)

..........................................................................

- Motor power and speed (kW, rpm)

..........................................................................

- Impeller type

..........................................................................

- Impeller diameter (min/rated/max) (mm)

..........................................................................

- Seal type

..........................................................................

- Material

..........................................................................

a) Casing

..........................................................................

b) Impeller

..........................................................................

c) Shaft

..........................................................................

Section 6

Doc No.: TA-143-D00-G-TD006

16-Sep-07

Rev 0

NISCO

DR & Material Handling Plant Project

TARA TARH

Engineering & Technological Co.

Baft Steel Complex

Plant Specification and Data Sheets

Page 92 of 144

Chemical Dosing Units


- Manufacturer

..........................................................................

- Place of manufacturer

..........................................................................

- Function

..........................................................................

- Chemical solution preparation tank

..........................................................................

a) Material

..........................................................................

b) Type

..........................................................................

c) Dimensions (m)

..........................................................................

- Mixer

..........................................................................

a) Manufacturer

..........................................................................

b) Mixer type

..........................................................................

c) Absorbed power (kW)

..........................................................................

d) Rotating speed (rpm)

..........................................................................

e) Motor power and speed (kW, rpm)

..........................................................................

f) Propeller/Impeller type, material

..........................................................................

& diameter
g) Shaft and coupling material
- Dosing pumps

..........................................................................
..........................................................................

a) Manufacturer

..........................................................................

b) Place of manufacturer

..........................................................................

Section 6

Doc No.: TA-143-D00-G-TD006

16-Sep-07

Rev 0

NISCO
Baft Steel Complex

DR & Material Handling Plant Project

TARA TARH

Engineering & Technological Co.

Plant Specification and Data Sheets

Page 93 of 144

c) Type

..........................................................................

d) Number (operating , Stand by)

..........................................................................

e) Maximum capacity (lit/hr)

..........................................................................

f) Discharge pressure (kpa)

..........................................................................

g) Motor speed and power (rpm, kW)

..........................................................................

h) Instrument included: Relief valve:


.. Pressure gage: other:
..
- Material
x

Liquid end

..........................................................................

Plunger/Diaphragm

..........................................................................

Packing/Seal

..........................................................................

Section 6

Doc No.: TA-143-D00-G-TD006

16-Sep-07

Rev 0

NISCO

DR & Material Handling Plant Project

TARA TARH

Engineering & Technological Co.

Baft Steel Complex

Plant Specification and Data Sheets

Page 94 of 144

Air Compressors
x

Manufacturer

..

Place of manufacturer

..

Type

..

Number of compressor (operation, standby)

..

Function

...

Number of stages

..

Capacity (Nm3/h)

..

Working pressure

Min/Max pressure (bar)

...

Efficiency (%)

..

Rotating speed

Motor

(bar)

(rpm)

o power and speed

..

..

(kW, rpm)

...

o Manufacturer

...

o Place of manufacturer

...

o Protection insulation

...

Compression:

Oil free, Dry

Oil free, liquid injected

Oil injected

Cooling type

water cooled
x

Noise level (in 1 m distance)

Material

Air cooled
..

Air end casing

..

Rotor

..

Section 6

Doc No.: TA-143-D00-G-TD006

16-Sep-07

Rev 0

NISCO

DR & Material Handling Plant Project

TARA TARH

Engineering & Technological Co.

Baft Steel Complex

Plant Specification and Data Sheets

Page 95 of 144

Air Dryers
x

Manufacturer

Place of manufacturer

Air dryer type

Number of air dryer (operation, stand by)

Function

.
3

Capacity (Nm /hr)

Min / Max working pressure (bar)

Test pressure (bar)

Dew point of air at the dryer exit (C)

Regeneration type ( for adsorption type )

Change over cycle ( for adsorption type )

Material

o Vessel

o Desicant (for adsorption type)

Section 6

Doc No.: TA-143-D00-G-TD006

16-Sep-07

Rev 0

NISCO

DR & Material Handling Plant Project

TARA TARH

Engineering & Technological Co.

Baft Steel Complex

Plant Specification and Data Sheets

Page 96 of 144

Air Receivers
x

Item No.

Manufacturer

Place of manufacturer

Type

Number

Function

Net capacity (m3)

Working pressure (bar)

Design pressure (bar)

Test pressure (bar)

Design code

Head thickness

Shell thickness

Dimension
o Height

o Diameter

Internal lining

External coating

Insulation type and thickness

Material of construction

Section 6

Doc No.: TA-143-D00-G-TD006

16-Sep-07

Rev 0

NISCO

DR & Material Handling Plant Project

TARA TARH

Engineering & Technological Co.

Baft Steel Complex

Plant Specification and Data Sheets

Page 97 of 144

Filters
x

Manufacturer

..

Place of manufacturer

..

Type

..

QTY

..

Function

..

Number of stages

..

Capacity (Nm3/h)

..

Working pressure

Max pressure

Drain method (automatic, manual)

..

Particle removal

..

Section 6

(bar)

..
..

(bar)

Doc No.: TA-143-D00-G-TD006

16-Sep-07

Rev 0

NISCO
Baft Steel Complex

DR & Material Handling Plant Project

TARA TARH

Engineering & Technological Co.

Plant Specification and Data Sheets

Page 98 of 144

Heating, Ventilation and Air Conditioning System


Data sheet

Contractor shall submit a complete description of heating, ventilation and air conditioning
system offered for the direct reduction plant and raw material handling plant specification of
equipment. Catalogue of equipment shall also be enclosed.

Section 6

Doc No.: TA-143-D00-G-TD006

16-Sep-07

Rev 0

NISCO

DR & Material Handling Plant Project

TARA TARH

Engineering & Technological Co.

Baft Steel Complex

Plant Specification and Data Sheets

Page 99 of 144

Air Conditioning Unit


x Location

x Item number (s)

x Number of units:
o In operation

o Stand-by

.
.

x Type

Air Conditioning Unit Characteristics


.

x Heating data
o Heating load

o Fresh air rate

.
.

x Cooling data
o Total cooling load

o Fresh air rate

.
Fan data

x Capacity

x Motor power

.
Compressor data

x Number

x Total power of compressors

Remote Condenser Characteristics


x Total heat rejection

x Ambient air temp.

x Condensing temp.

x Refrigerant

x Number of fan motor

x Power of each motor

Section 6

Doc No.: TA-143-D00-G-TD006

16-Sep-07

Rev 0

NISCO
Baft Steel Complex

DR & Material Handling Plant Project

TARA TARH

Engineering & Technological Co.

Plant Specification and Data Sheets

Page 100 of 144

Fire Fighting, Detection and Alarm System


Data Sheets

Contractor shall submit a complete description of fire detection, alarm and fighting system
offered for the direct reduction plant and raw material handling plant including specification of
equipment. Catalogue of equipment shall also be enclosed.

Section 6

Doc No.: TA-143-D00-G-TD006

16-Sep-07

Rev 0

NISCO
Baft Steel Complex

DR & Material Handling Plant Project

TARA TARH

Engineering & Technological Co.

Plant Specification and Data Sheets

Page 101 of 144

Fire Alarm
x

Manufacturers name and country:


o

Type designation

..

Detector type

..

Calibration level of LEL

..

Fire alarm panel generated voltage

..

Input voltage

..

Protection degree

..

Number of loops

..

Cable type

..

Audible alarm type

..

Visual alarm type

..

Back up battery duration

..

Quality

..

Section 6

Doc No.: TA-143-D00-G-TD006

16-Sep-07

Rev 0

NISCO
Baft Steel Complex

DR & Material Handling Plant Project

TARA TARH

Engineering & Technological Co.

Plant Specification and Data Sheets

Page 102 of 144

Fixed fire extinguishing CO2 Cylinder Specifications


x

Location

..

Number of cylinders

..

Capacity

..

Height

..

Diameter

..

CO2 pressure at 20 C

..

Test pressure

..

Section 6

Doc No.: TA-143-D00-G-TD006

16-Sep-07

Rev 0

NISCO
Baft Steel Complex

DR & Material Handling Plant Project

TARA TARH

Engineering & Technological Co.

Plant Specification and Data Sheets

Page 103 of 144

Portable Fire Extinguishing (CO2 System)


x

Item No.

..

Number of unit

..

Gas weight

..

Total weight

..

Cylinder material

..

Hose material

..

Working pressure

..

Discharge duration

..

Discharge distance

..

Section 6

Doc No.: TA-143-D00-G-TD006

16-Sep-07

Rev 0

NISCO
Baft Steel Complex

DR & Material Handling Plant Project

TARA TARH

Engineering & Technological Co.

Plant Specification and Data Sheets

Page 104 of 144

Portable Fire Extinguishing (chemical dry powder)


x

Item No.

..

Number of unit

..

Total weight

..

Cylinder material

..

Hose material

..

Working pressure

..

Discharge duration

..

Discharge distance

..

Section 6

Doc No.: TA-143-D00-G-TD006

16-Sep-07

Rev 0

NISCO
Baft Steel Complex

DR & Material Handling Plant Project

TARA TARH

Engineering & Technological Co.

Plant Specification and Data Sheets

Page 105 of 144

7. Electrical Equpment Data Sheet


7.1- Medium Voltage Switchgear Cubicle
x Plant Unit Number (P.U No.)

......

x Manufacturers name and country

......

x Manufacturers type designation

......

x GIS or conventional

......

x Indoor or outdoor installation

......

x Number of phases

......

x Number of busbars

......

x Rated voltages

kV (r.m.s)

x Rated insulation level (at IEC service


conditions):

..

o Rated 1 min. power frequency withstand


voltage

kV (r.m.s)

o Rated lightning impulse withstand voltage

kV (r.m.s)

x Rated normal current of circuits:


o Busbar & bus-section feeder

A (r.m.s)

o Trafo feeder

A (r.m.s)

o Outgoing feeder

A (r.m.s)

o Rated short-time withstand current

kA (r.m.s)

x Rated duration of short circuit

....(S)

x Rated peak withstand current

..kV (peak)

x Current transformer type and manufacturer

......

x Current transformer burden and accuracy

......

x Current transformer ratio

......

x Voltage transformer type and manufacturer

......

x Voltage transformer burden and accuracy

......

x Voltage transformer ratio

......

x Ground switch type and manufacturer

......

Section 7

Doc No.: TA-143-D00-G-TD006

16-Sep-07

Rev 0

NISCO

DR & Material Handling Plant Project

TARA TARH

Engineering & Technological Co.

Baft Steel Complex

Plant Specification and Data Sheets

Page 106 of 144

x Ground switch type of mechanism

......

x Ground switch type of interlock

......

x Ground switch number and type of


......

auxiliary switch
x Ground switch type of blade

......

x Type and rating of fuses for voltage

......

x Transformer circuits:
o Primary H.V. fuses

.(A)

o Secondary L.V. fuses

.(A)

x Degree of protection for the enclosure and


partitions

..

o For the enclosure

......

o Between LV+HV compartments

......

x Cubicle weight
o Incoming

..(kg)

o Bus-section

..(kg)

o Outgoing

..(kg)

x Cubicle shipping weight including circuit


breaker

..(kg)

o Cubicle dimensions (L W H)

.....(cm3)

o Earthquake protection (coefficient of g)

......

x Type of metal enclosed switchgear

......

x SF6 gas filling pressure (abs)

......

x Minimum SF6 gas operation pressure (abs)

......

x Gas pressure for alarm

......

x Gas pressure for trip

......

NOTE: For each type of Switchgear an individual data sheet shall be prepared.

Section 7

Doc No.: TA-143-D00-G-TD006

16-Sep-07

Rev 0

NISCO
Baft Steel Complex

DR & Material Handling Plant Project

TARA TARH

Engineering & Technological Co.

Plant Specification and Data Sheets

Page 107 of 144

7.2- Circuit Breakers & Contactor


Circuit breakers:
x Current brekers

......

x Plant Unit Number (P.U No.)

......

x Manufacturers name and country

......

x Manufacturers designation (Type)

......

x Applicable technical

......

x standards

......

x Type of circuit breaker (SF6 or vacuum)

......

x Mass of complete circuit breaker

......

x Creepage to earth over insulation

......

x Minimum clearances:

......

o Between phases

.(mm)

o Between live parts to earth

.(mm)

x Overall dimension of the installation

......

x Indoor or outdoor installation

......

x Number of phases

......

x Number of poles

......

x Rated Voltages

.....kV (r.m.s)

x Rated frequency

(Hz)

x Rated insulation level (at IEC service


......

conditions):
o Rated 1 min. power frequency withstand
voltage

.....kV (r.m.s)

o Rated lightning impulse withstand voltage

..kV (peak)

x Rated normal current (at IEC service


conditions):

.. A (r.m.s)

x Rated short-circuit breaking current

kA (r.m.s)

x Rated duration of short circuit

.(S)

Section 7

Doc No.: TA-143-D00-G-TD006

16-Sep-07

Rev 0

NISCO

DR & Material Handling Plant Project

TARA TARH

Engineering & Technological Co.

Baft Steel Complex

Plant Specification and Data Sheets

Page 108 of 144

x Rated line-charging breaking current

A (r.m.s)

x Rated cable-charging breaking current

A (r.m.s)

x Rated small- indactive breaking current


x First pole to clear factor

..

x Rated transient recovery voltage (TRV) for


terminal faults

kV (r.m.s)

x Rated characteristics for short-line faults

kA (r.m.s)

x Rated short-circuit making current

kA (r.m.s)

x Rated out-of- phase breaking current

kA (r.m.s)

x Rated operating sequence

......

x Rated time quantities:

......

o Rated opening time

..(ms)

o Rated break time

..(ms)

o Rated closing time

..(ms)

o Rated make time

..(ms)

o Max. Time interval between opening of


first and last phase of three phase circuitbreaker

..(ms)

o Closing time from energize of close coil


to latching of circuit breaker in fully
closed position

..(ms)

x Max. Temperature rise under rated load


condition

...(C)

x Max. Peak value of switching over voltage


when interrupting rated line charging current

(kV)

x Voltages drop across terminals of a phase at


(mV)

100 A DC
x Breaking current (Asymmetrical)

....(A)

x Number of NO & NC auxiliary contacts

......

Section 7

Doc No.: TA-143-D00-G-TD006

16-Sep-07

Rev 0

NISCO
Baft Steel Complex

DR & Material Handling Plant Project

TARA TARH

Engineering & Technological Co.

Plant Specification and Data Sheets

Page 109 of 144

Contactors
x Fuse type

......

x Fuse rated voltage

......

x Fuse rated current

......

x Contactor type

......

x Contactor rated voltage

......

x Contactor rated current

......

NOTE: For each type of Circuit Breaker and contractors an individual data sheet shall be
prepared.
7.3- Transformers
x

Plant Unit Number (P.U No.)

..

Manufactures name and country

..

Type and designation

..

Rated capacity

..

Number of phases

..

Frequency

..

Voltage ratio

..

Cooling

..

Temperature Rise at rated capacity

..

Windings

..

o H.V.
Rated capacity

..

Voltage rating

..

Connection

..

o L.V.
Voltage rating

..

Connection

..

(i) Insulation Levels

Section 7

Doc No.: TA-143-D00-G-TD006

16-Sep-07

Rev 0

NISCO

DR & Material Handling Plant Project

Engineering & Technological Co.

Baft Steel Complex

TARA TARH

Plant Specification and Data Sheets

Page 110 of 144

Power frequency test voltage for 60 Sec.


o On windings:
H.V. Neutral

..

L.V. Winding

..

o On bushings:

H.V. Winding

..

H.V. Neutral

..

L.V. Winding

..

Impulses withstand voltage, wave 1.2/50 P s


o On windings:
H.V. Winding

..

L.V. Winding

..

o On bushings:
H.V. Winding end

..

H.V. Neutral end

..

L.V. Winding end

..

(ii) On load tap changer


x

Tapping Range

..

Number of tap steps

..

(iii) Current transformers installed in the H.V.


Bushings
x

Number for each phase

..

Number in the neutral

..

Current Ratios

..

Standard

..

(iv) Item fault level

..

(v) Vacuum Requirements

..

(vi)Terminations

..

H.V.

..

L.V.

..

Section 7

Doc No.: TA-143-D00-G-TD006

16-Sep-07

Rev 0

NISCO

DR & Material Handling Plant Project

TARA TARH

Engineering & Technological Co.

Baft Steel Complex

Plant Specification and Data Sheets

(vii) Vector group

Page 111 of 144

..

NOTE: For each type of transformer an individual data sheet shall be prepared.

7.4- DC Supplies and Equipment Battery


Plant Unit Number (P.U No.)

..

Manufacturer name/country of origin

..

x Rating of system:
o

Nominal supply voltage of system (V)

..

Float voltage of battery (V)

..

Battery voltage after 10 hour discharge


period (at 25A discharge rating) (V)

..

x Rated discharge capacity:


o

Discharge current (250m sec. impulse)

..

At 1 hr. rate (Ah)

..

At 10 hr. rate (Ah)

..

Type of cell (i.e.: Lead acid or alkaline) and


designation

..

x Particulars of cells:
o

Voltage per cell when float charged (V)

Voltage per cell at end of 1 hr. discharged


period (V)

..

Voltage per cell at end of 10 hr. discharge


period (V)

..

Charging current:

..

Initial (A)

..

Starting (Max.) (A)

..

Continuous (A)

..

Final

voltage

charged (V)

Section 7

per

cell

when

boost
..

Doc No.: TA-143-D00-G-TD006

16-Sep-07

Rev 0

NISCO

DR & Material Handling Plant Project

Engineering & Technological Co.

Baft Steel Complex

o
o

TARA TARH

Plant Specification and Data Sheets

Page 112 of 144

Maximum permissible instant current at


one minute(A)

..

Total resistance of battery (Ohm)

..

x Battery and cell arrangement:


o

Number of cells

..

Number of tiers and cells per tier

..

Type of container (plastic, glass or steel)

..

Number of cells and method of assembly


per group (Alkaline batteries only)

..

Mass of cell complete with electrolyte (kg)

..

Maximum mass of largest transportation (state


item if cell not transported complete) (kg)

..

Mass of battery and stands as in service (kg)

..

Type of positive plate

..

Type of negative plate

..

Electrolyte specific gravity at 25C, when


the cells are fully charged (gr/cm3)

..

Complete battery dimension HWH

..

Expected life of battery (Year)

..

..

Battery fuse: (A)


o

Manufacturer and type designation

..

Rating- amps. (Ah)

..

7.5- Battery Charger


x

Plant Unit Number (P.U No.)

..

Manufacturer name/country of origin

..

Standard

..

Input voltage/frequency

..

Tolerances of input voltage/frequency

..

Output voltage

..

Section 7

Doc No.: TA-143-D00-G-TD006

16-Sep-07

Rev 0

NISCO
Baft Steel Complex

DR & Material Handling Plant Project

TARA TARH

Engineering & Technological Co.

Plant Specification and Data Sheets

Page 113 of 144

Output regulation

..

Output ripple

..

Protection degree

..

Max. Charging current

..

Power rating

..

Transformer type

..

Thyristor type

..

Cooling system

..

7.6- Lighting
x

Plant Unit Number (P.U No.)

..

Manufactures name and country

..

Min. Illumination level (Name of areas)

..

Max. Illumination level (Name of areas)

..

Protection degree of Indoor/outdoor fixture

..

Indoor fixture type/Lamp type/rating

..

Outdoor fixture type/Lamp type/rating

..

Fixture with capacitor

..

Power factor of lighting

..

Max. Noise level of lighting

..

Fluorescent start system

..

Socket out let type and rating

..

Switch type and rating

..

7.7- Low Voltage AC Switchgear


x

Plant Unit Number (P.U No.)

Manufacturer name/country and type


designation

Section 7

Doc No.: TA-143-D00-G-TD006

16-Sep-07

Rev 0

NISCO

DR & Material Handling Plant Project

Engineering & Technological Co.

Baft Steel Complex

TARA TARH

Plant Specification and Data Sheets

Page 114 of 144

Degree of protection (IEC 144) for indoor/


outdoor boards

Normal current rating of Busbars

..(A)

Short time current rating of Busbars and


connections

..(1sec.) (kA)

Short time current rating of outgoing fuse


....(kA)

protected connections
x

Type of insulation provided on Busbars and


connections

...(kA)

Whether busbar cross section is graded?

Method of earthing incoming supply circuit

Type of protection provided within cubicles


(shutters, insulation cover, etc.)

Are Busbars sectionalized between

cubicles?
x

Are down dropper connections segregated


from incoming/outgoing connections?

Maximum temperature rise and location


within switch-board, any unit when carrying
rated current.

Type of insulation or material subjected to


this temperature rise

Method of neutral earthing

Applicable technical standard

Nominal service voltage

.V (r.m.s)

Rated dynamic current of incomer C.B

...kA (peak)

Type and designation

Rated continuous current of incomer C.B

.A (r.m.s)

Max. Breaking capacity (symmetrical) of

...kA (r.m.s)

Section 7

Doc No.: TA-143-D00-G-TD006

16-Sep-07

Rev 0

NISCO

DR & Material Handling Plant Project

TARA TARH

Engineering & Technological Co.

Baft Steel Complex

Plant Specification and Data Sheets

Page 115 of 144

incomer C.B

7.8- Low Voltage Motor Control Center (MCC)


x

Plant Unit Number (P.U No.)

Manufacturer name/country and type


designation

Degree of protection (IEC 144) for indoor/


outdoor boards

Normal current rating of Busbars

.(A)

Short time current rating of Busbars and


..(1sec.) (kA)

connections
x

Short time current rating of outgoing fuse


protected connections

.(kA)

Type of insulation provided on Busbars and


connections

...(kA)

Maximum temperature rise and location


within switch-board, any unit when carrying
rated current.

Type of insulation or material subjected to


this temperature rise

Method of neutral earthing

Applicable technical standard

Nominal service voltage

..V (r.m.s)

Rated dynamic current of incomer C.B

....kA (peak)

Type and designation

Rated continuous current of incomer C.B

..A (r.m.s)

Max. Breaking capacity (symmetrical) of


incomer C.B

..kA (r.m.s)

Type of MCB/MCCBs

Type of fuses

Section 7

Doc No.: TA-143-D00-G-TD006

16-Sep-07

Rev 0

NISCO

DR & Material Handling Plant Project

TARA TARH

Engineering & Technological Co.

Baft Steel Complex

Plant Specification and Data Sheets

Page 116 of 144

Type of contactors

Type of Bimetal thermal relays

Type of residual current relays

Type of motor starters:

o Direct on line

o Star/delta

o Soft start

7.9- Standby Diesel Generator


Plant Unit Number (P.U No.)
x

..

Diesel:
o Manufacturers name and country

..

o Type designation

..

o Number of cylinders

..

o Speed

..

o Type of cooling

..

o Coupling

..

o Start-up time from initiation until circuit


breaker closes

..

o Number of strokes

..

o Compression ratio

..

o Efficiency at rated load

..

o Fuel injection system

..

o Specific fuel consumption at: (Based on


generator output)

Section 7

..

110% of rated output (lit/kWh)

..

100% of rated output (lit/ kWh)

..

75% of rated output

(lit/ kWh)

..

10% of rated output

(lit/ kWh)

..

Doc No.: TA-143-D00-G-TD006

16-Sep-07

Rev 0

NISCO

DR & Material Handling Plant Project

TARA TARH

Engineering & Technological Co.

Baft Steel Complex

Plant Specification and Data Sheets

Page 117 of 144

o Aspiration (Natural or supercharger)

..

o Type of fuel

..

Generator:
o Manufacturers name & country

..

o Type of Generator

..

o Apparent power (kVA)

..

o Rated voltage (kV)

..

o Rated frequency (Hz)

..

o Power factor

..

o Number of poles

..

o Insulation class

..

o Temperature rise class

..

o Winding Connection

. star

o Star point grounding

..

o Excitation system

..

o Auto start

..

o Auto atop

..

o Protection system

..

o Cooling system

..

o Heating system voltage

..

o Heating system Monitoring

..

7.10- Low Voltage Electrical Motors


x

Plant Unit Number (P.U No.)

..

Driven equipment

..

Equipment reference number

..

Manufacturer

..

Type

..

Model number

..

Frame size

..

Section 7

Doc No.: TA-143-D00-G-TD006

16-Sep-07

Rev 0

NISCO

DR & Material Handling Plant Project

TARA TARH

Engineering & Technological Co.

Baft Steel Complex

Plant Specification and Data Sheets

Page 118 of 144

Horsepower/kW output(HP/kW)

..

Confirming standards

..

Voltage (V)

..

Frequency(Hz)

..

Max. Voltage(V)

..

Min. Voltage(V)

..

Max. frequency(Hz)

..

Min. frequency(Hz)

..

Min. volts for starting(V)

..

Phases

..

Starting current not to exceed (%)

..

Service factor (%)

..

Full load current (A)

..

Normal continuous duty (%)

..

Short time duty (%)

..

Peak duty (30s) (%)

..

Power frequency withstands (1 min.)(kV)

..

Insulation class

..

Temperature rise limited to class

..

Enclosures

..

Over speed test for 2 min. (%)

..

Noise levels(IEC 34-9)

..

Indoor(dBA)

..

Outdoor (dBA)

..
..

Heaters
o

Voltage (V)

..

Wattage (W)

..

Power frequency 1 min. test (V)

..

NOTE: Individual sheet to be provided for each motor

Section 7

Doc No.: TA-143-D00-G-TD006

16-Sep-07

Rev 0

NISCO

DR & Material Handling Plant Project

TARA TARH

Engineering & Technological Co.

Baft Steel Complex

Plant Specification and Data Sheets

Page 119 of 144

7.11- Medium Voltage Electrical Motors


x

Plant Unit Number (P.U No.)

..

Driven Equipment

..

Equipment Reference Number

..

Manufacturer

..

Type

..

Model Number

..

Frame size

..

Conforming standards

..

IEC

..

NEMA

..

ANS I

..

Voltage (kV)

..

Frequency (Hz)

..

Max. Voltage (V)

..

Min. Voltage (V)

..

Max. Frequency (HZ)

..

Min. Frequency (Hz)

..

Min. Volts for Starting (V)

..

Phases

..

Starting Current not to exceed % of FLC (%)

..

Rated Output (kW)

..

Service Factor

..

Short time duty (%)

..

Peak duty (%)

..

Full Load Current (A)

..

Insulation

..

Insulation Class

..

Temperature rise Limited to class

..

Enclosures

Section 7

..

Doc No.: TA-143-D00-G-TD006

16-Sep-07

Rev 0

NISCO

DR & Material Handling Plant Project

Engineering & Technological Co.

Baft Steel Complex

TARA TARH

Plant Specification and Data Sheets

Page 120 of 144

..

(TEFC)

Water-to-Air Coolers
o Water velocity in tubes not to exceed
(m/sec)
o Cooler material with clean fresh water:

..
..
..

Type 1: tube material

tube plate material

..

header material

..

Type 2: tube material

tube plate material

..

header material

..

Air-to-Air Coolers

..

Over speed test for 2 min.

..

Noise Levels (IEC 34-9)

..

o
o

250 kW-1.5MW-indoor (dBA)


outdoor (dBA)
1.5 MW to 10 MW-indoor (dBA)
outdoor (dBA)

..
..
..
..
..

Heaters
o Voltage (V)

..

Wattage (W)

..

Power Frequency 1 min. test (V)

..

Requirement for neutral connections for


differential protection

..

14. Sub transient reactance X ccd (%)

..

NOTE: Individual sheet to be provided for each motor

7.12- UPS
x

Plant Unit Number (P.U No.)

..

Manufacturer / country

..

Section 7

Doc No.: TA-143-D00-G-TD006

16-Sep-07

Rev 0

NISCO

DR & Material Handling Plant Project

TARA TARH

Engineering & Technological Co.

Baft Steel Complex

Plant Specification and Data Sheets

Page 121 of 144

Type designation / Version

..

Rating at Cos=0.8

..

Input voltage and tolerance

..

Output voltage and tolerance

..

Input frequency and tolerance

..

Output frequency and tolerance

..

Harmonic content of output

..

Efficiency

..

Standard

..

Bay pass transformer

..

Protection degree

..

Batteries type

..

Batteries sealed type

..

Batteries work duration

..

7.13- Tele Communication


Plant Unit Number (P.U No.)

Manufacturers name and country

Type designation

Protection degree

Mounting type

Backup battery duration

Paging system load speaker

Volume control

7.14- PFC
x Plant Unit Number (P.U No.)

x Manufacturers name and country

x Type

x Voltage

Section 7

Doc No.: TA-143-D00-G-TD006

16-Sep-07

Rev 0

NISCO

DR & Material Handling Plant Project

TARA TARH

Engineering & Technological Co.

Baft Steel Complex

Plant Specification and Data Sheets

Page 122 of 144

x Power withstand voltage

x Short circuit current

x Rated MVAR

x Control voltage

x Insulation liquid

x Regulator system

x Discharge device residual voltage

x Protection for short circuit and over current

x Protection degree

7.15- Lightning Protection and earthing system


x Plant Unit Number (P.U No.)

x Max. Earthing grid resistance

x Max. Earthing rod resistance

x Max. Step voltage

x Max. Touch voltage

x Connection type

x Conductor burying depth

x Earthing rod specifications

x Lightning rod specifications

x Earthing pit specifications

x Lighting protection for high non metallic

Buildings/structures

x Lightning protection for ordinary non metallic


.
Buildings
.
x Lightning protection conductor
x Main mesh conductor specifications

x Branch conductor specifications

Section 7

Doc No.: TA-143-D00-G-TD006

16-Sep-07

Rev 0

NISCO

DR & Material Handling Plant Project

TARA TARH

Engineering & Technological Co.

Baft Steel Complex

Plant Specification and Data Sheets

Page 123 of 144

8- INSTRUMENTATION AND CONTROL DATA SHEETS


The following data sheets should be filled in for both direct reduction plant and raw material
handling plant and tenderer should prepare and fill enough datasheets for each type of
instrument and control device for both a.m. plants separately.

8.1- GENERAL
8.1.1- Design Criteria
- How many years the proposed control
system had been in used in direct
reduction plants

- Manufacturer of control system

- System redundancy:
- Central processing unit

.Yes/No

- Process interface

.Yes/No

- Communication components & BUS

.Yes/No

- Power supply

.Yes/No

- Degree of automation

(Possibility to run in automatic mode)

.Yes/No

- Component selection, individual testing, .Yes/No


worst-case design.
- Protection against over voltage

.Yes/No

- Passive & active protection for


equipments and systems.

.Yes/No

- Low number of contact point, short


circuit proof output.

.Yes/No

Section 8

Doc No.: TA-143-D00-G-TD006

16-Sep-07

Rev 0

NISCO

DR & Material Handling Plant Project

TARA TARH

Engineering & Technological Co.

Baft Steel Complex

Plant Specification and Data Sheets

Page 124 of 144

8.1.2- Plant Control and Supervision


- CRT or LCD based control/Eng. Station

- Diagnostics system:

Yes/No

- Degree of diagnostics (short


explanation)

- Sequence of event recorder:

Yes/No

- Resolution

- Number of input signals

- Number of control locations

- Local control room

- Remote central control room

- Provision of proper space and


arrangement for future expansion in
the central control room and building

Yes/No

8.1.2.1- Remote and Local Control


- CRT/LCD based local control HMI

Yes/No

- CRT/LCD based central control HMI

Yes/No

- HMI control facilities:


- Start up/shut down

Yes/No

- Mixed operation possibility

Yes/No

- Lube oil and seal oil control facilities Yes/No


- Alarm handling

Section 8

Yes/No

Doc No.: TA-143-D00-G-TD006

16-Sep-07

Rev 0

NISCO

DR & Material Handling Plant Project

TARA TARH

Engineering & Technological Co.

Baft Steel Complex

Plant Specification and Data Sheets

Page 125 of 144

8.1.3- Plant Protection and Safeguarding


- The following consideration for
instruments:
- Dust weather proof
- Flame proof (if necessary)
- Explosion proof (if necessary)
- IP30 for inside the cabin, buildings

Yes/No
Yes/No
Yes/No
Yes/No

- IP54 for indoor installation

Yes/No

- IP65 for outdoor installation

Yes/No

8.1.4- Availability
- Independent manual control facilities
for all automatic systems.

Yes/No

- All drives can be operated from at least


two places

Yes/No

- Automatic change over facilities for


duplicate drives.

Yes/No

- Redundant power supply from two


sources

Yes/No

- Self monitoring and self diagnostic


feature

Yes/No

- Equipment testing can be carried out on


load

Yes/No

- Distributed automation structure

Yes/No

Section 8

Doc No.: TA-143-D00-G-TD006

16-Sep-07

Rev 0

NISCO
Baft Steel Complex

DR & Material Handling Plant Project

TARA TARH

Engineering & Technological Co.

Plant Specification and Data Sheets

Page 126 of 144

- Hierarchical subsystem structure


(processing all the functions of the
individual control level in the I/O
section).

Yes/No

- Redundant automation functions

Yes/No

- Redundant signal distribution

Yes/No

- Redundant monitoring & operation

Yes/No

- Redundant structure

Yes/No

8.2- Field Instrumentation & Alarm System


8.2.1- Instrumentation
- Instrument vendor list is attached

Yes/No

- Separation of control and monitoring


field instruments from protection field
instruments

Yes/No

- Uniform type, model and manufacturer


of instruments which perform similar

Yes/No

duties

8.2.1.1- Temperature Instruments


- Manufacturer

- Country of origin

- Type of thermocouples (double,


single, )

- Type of thermocouples (K/T/)

Section 8

Doc No.: TA-143-D00-G-TD006

16-Sep-07

Rev 0

NISCO

DR & Material Handling Plant Project

TARA TARH

Engineering & Technological Co.

Baft Steel Complex

Plant Specification and Data Sheets

Page 127 of 144

- Suitable protective sheath /well is


provided

Yes/No

- Type of local measurements

- Accuracy

- Protection class of indicators and


transmitters

...

8.2.1.2- Pressure Instrument


- Manufacturer

- Country of origin

- Types of pressure instruments

- Material of sensor

- Accuracy

- Protection class of
indicators/transmitters

8.2.1.3- Flow Instrument


- Manufacturer

- Country of origin

- Types of flow measurement

- Material

- Thickness of orifice edge

- Accuracy

Section 8

Doc No.: TA-143-D00-G-TD006

16-Sep-07

Rev 0

NISCO

DR & Material Handling Plant Project

TARA TARH

Engineering & Technological Co.

Baft Steel Complex

Plant Specification and Data Sheets

- Protection class of
indicator/transmitters

Page 128 of 144

8.2.1.4- Level Instruments


- Manufacturer

- Country of origin

- Types of level instruments

- Material

- Accuracy

- Protection class of
indicator/transmitters

8.2.1.5- Control Valve


- Manufacturer

- Country of origin

- Material of valve body

- Control valve actuators are selected so Yes/No


that on failure of the operating
medium the valve will automatically
take a safe position
- Type of actuator

- Valve position indication is provided

Yes/No

Section 8

Doc No.: TA-143-D00-G-TD006

16-Sep-07

Rev 0

NISCO
Baft Steel Complex

DR & Material Handling Plant Project

TARA TARH

Engineering & Technological Co.

Plant Specification and Data Sheets

Page 129 of 144

- Actuators are sized for positioning the


valve against 1.20 times the Max.
differential pressure

- Positioner

Yes/No

- Limit switch

Yes/No

- Torque switch

Yes/No

- Hand operated facilities

Yes/No

- Control valves are sized for 120% of


normal operating design flow rate

Yes/No

- 150% of normal operating design


pressure and temperature

Yes/No

- Normal operating point of valve is


60% valve opening position

Yes/No

Following tests will be performed:


- Chemical analysis and mechanical test

Yes/No

- Magnetic particle inspection on each body

Yes/No

- Random radiographic inspection on body

Yes/No

- 100% radiographic inspection on welds

Yes/No

- Hydraulic test

Yes/No

- Leak test

Yes/No

- Noise level

Yes/No

Section 8

Doc No.: TA-143-D00-G-TD006

16-Sep-07

Rev 0

NISCO

DR & Material Handling Plant Project

TARA TARH

Engineering & Technological Co.

Baft Steel Complex

Plant Specification and Data Sheets

Page 130 of 144

8.2.1.6- Position transducers (encoders)


a- Absolute rotating encoders
- Manufacturer

..

- Country of origin

..

- Resolution

..

- Frequency range

..

- Rated speed

..................

- Frequency range

..

- Output format

..

- Power supply

..

b- Incremental encoders
- Manufacturer

..

- Country of origin

..

- Resolution

..

- Number of pulse

..

- Rated speed

..

- Frequency range

..........

- Output format

..

- Power supply

..

8.2.1.7- Load cell


- Application

..

- Manufacturer

..

- Country of origin

..

- Type

..

- Quantity

..

Section 8

Doc No.: TA-143-D00-G-TD006

16-Sep-07

Rev 0

NISCO

DR & Material Handling Plant Project

TARA TARH

Engineering & Technological Co.

Baft Steel Complex

Plant Specification and Data Sheets

- Nominal load

Page 131 of 144

..

- Max overload without change of


characteristics

..

- Max overload without mechanical damage ..


- Class

- Linearity error in full scale output

.....

- Hysteresis in full scale output

.....

- Repeatability in full scale output

- Calibration accuracy

- Operating temperature

- All fittings and accessories


are provided

.Yes/No

8.2.1.8- Flame & flammable gas monitoring system


- Complete system for continuous
detection and alarming of combustible
and toxic gases is provided
- Type of sensor

...Yes/No
..

8.2.1.9- Instruments Accessories


- Material

..

- Where conditions for steady


instruments reading are unobtainable
on pressure lines due to pulsations, a
snuffer or pulsation damper is
provided

..Yes/No

Section 8

Doc No.: TA-143-D00-G-TD006

16-Sep-07

Rev 0

NISCO

DR & Material Handling Plant Project

TARA TARH

Engineering & Technological Co.

Baft Steel Complex

Plant Specification and Data Sheets

Page 132 of 144

- Where instruments are used for the


measurement of fluids which are
corrosive, seal pots are used.

..Yes/No

- Where in piping containing liquid


with considerable amounts of
entrained solids which may block
lines settling chambers are used.

.Yes/No

- Instrument valves:
- Isolating valves

Yes/No

- Test and drain valves

Yes/No

8.2.1.10- Temp monitoring


Reduction gas temp at furnace entry

Yes/No

Reduction gas temp at furnace exit

Yes/No

Cooling gas temp at furnace entry

Yes/No

Cooling gas temp at furnace exit

Yes/No

Top gas temp at fuel gas mixer entry

Yes/No

Combustion air temp at reformer


entry

Yes/No

Heating media temp at recuperator


entry

Yes/No

Exhaust gas temp from recuperator


Yes/No

8.2.1.11- Vibration Monitoring

Section 8

a. Type and location of pick-up

b. No. of pick-up

Doc No.: TA-143-D00-G-TD006

16-Sep-07

Rev 0

NISCO

DR & Material Handling Plant Project

TARA TARH

Engineering & Technological Co.

Baft Steel Complex

Plant Specification and Data Sheets

Page 133 of 144

8.2.2- Instrument Installation


- Applicable standard for instrument
installation

8.2.3- Cabling
- Adaptable box between flexible cables
of field devices and permanent armored
cables

Yes/No

8.2.4- Measuring Points


a. Analog measuring points:
- Number of pressure measuring point

- Number of temperature measuring point

- Number of level measuring point

- Number of flow measuring point

b. Number of Discrete measuring points

8.3- CONTROL SYSTEM


8.3.1- General
- Type of main control system

..DCS/PLC

- Type of Aux. plant control system

..DCS/PLC

(if different from main)

Section 8

Doc No.: TA-143-D00-G-TD006

16-Sep-07

Rev 0

NISCO

DR & Material Handling Plant Project

TARA TARH

Engineering & Technological Co.

Baft Steel Complex

Plant Specification and Data Sheets

Page 134 of 144

a. Programmable Logic Controller (PLC)


- Manufacturer of PLC

- Type & model of PLC

- Type & model of CPU

- For which main or Aux. plants PLC


has been proposed

- Modular design of PLC

... Yes/No

- CPU and BUS redundancy

... Yes/No

- Self diagnostic capability

... Yes/No

- CPU functions, all function


according to part 2.3.2.2, of
engineering standard (Annex IV)

... Yes/No

- Memory capacity

- I/O units general features

- Type of input signals

- HMI of PLC (CRT/LCD or


conventional panel)

- Programming device

... Yes/No

b. Distributed control system (DCS)

Section 8

- Manufacturer of DCS

- Type and model of DCS

- Number of operator stations

Doc No.: TA-143-D00-G-TD006

16-Sep-07

Rev 0

NISCO

DR & Material Handling Plant Project

Engineering & Technological Co.

Baft Steel Complex

Section 8

TARA TARH

Plant Specification and Data Sheets

Page 135 of 144

- Number of shift engineer stations

- Number of engineer and diagnostic


stations

- Programming device

.Yes/No

- Redundancy:

.Yes/No

- Main control system

.... Yes/No

- Data communication system

.Yes/No

- HMI parallel redundancy

.... Yes/No

- Power supply

.Yes/No

- Capability of DCS of being


expanded for control and
monitoring of future expansion

.Yes/No

- Spare I/O capacity

- Installed I/O capacity

- Diagnostic for hardware and


software

..Yes/No

- Operating temperature range

..

- Operating humidity range

..

- Facilities for emergency shut down


of the plant

..Yes/No

- Facilities for monitoring station


common auxiliaries in remote

..Yes/No

Doc No.: TA-143-D00-G-TD006

16-Sep-07

Rev 0

NISCO

DR & Material Handling Plant Project

TARA TARH

Engineering & Technological Co.

Baft Steel Complex

Plant Specification and Data Sheets

Page 136 of 144

8.3.2- System Hardware:


a. Data communication
- Data communication standard

- Reliable communication by data


protection methods and
acknowledgement of individual
message

.Yes/No

- Redundancy of data communication


system

..Yes/No

b. Control stations:
- Independence of control modules
from each other

..Yes/No

- Set point and output ramping speeds


to be adjustable through engineering
station or portable maintenance tools

..Yes/No

- Final element fail safe position in case ..Yes/No


of control station failure
- Control stations redundancy

..Yes/No

- Variety of used control modules (No.


of different types to be used).

..

c. I/O modules variety and functions:


- 4-20 mA inputs/output

..Yes/No

- 1-5 V inputs/outputs

..Yes/No

Section 8

Doc No.: TA-143-D00-G-TD006

16-Sep-07

Rev 0

NISCO

DR & Material Handling Plant Project

TARA TARH

Engineering & Technological Co.

Baft Steel Complex

Plant Specification and Data Sheets

Page 137 of 144

- Thermocouple input with cold


junction compensation

.Yes/No

- RTD input

..Yes/No

- Pulse input

..Yes/No

- Dry contact

..Yes/No

- BCD signal

..Yes/No

- Direct digital signals from smart


transmitters

..Yes/No

- Serial I/O link & type of them

..Yes/No

- Square root extracting

..Yes/No

- Noise suppression filtering

..Yes/No

- Open or grounded thermocouple


detection

..Yes/No

- Wire break monitoring

..Yes/No

- Short circuit proof

..Yes/No

- Valid-invalid input

..Yes/No

- Over range protection

..Yes/No

- Electrical isolation

..Yes/No

- Independent interface modules for serial ..Yes/No


link, with MIS & other systems
- Analogue input scan time

.... ms

- Digital input scan time

.... ms

d. HMI:

Section 8

Doc No.: TA-143-D00-G-TD006

16-Sep-07

Rev 0

NISCO

DR & Material Handling Plant Project

TARA TARH

Engineering & Technological Co.

Baft Steel Complex

Plant Specification and Data Sheets

Page 138 of 144

Operator stations (OS):

- CRT/LCD resolution

- Type of OS

- Number of OS/unit

- Data storage type and capacity

e. Engineering station (ES):


- CRT/LCD resolution

- Access to all modules of the system by


engineering work station

... Yes/No

- Type of ES

- No. of engineering stations

- Modifying configuration data, creating


new video pages or modifying old ones

... Yes/No

- Portable configuration device is also


available

-VCD/DVD writer for E.S. are provided

.... Yes/No

- Printer type

- Color graphic capabilities of printers

- Printers manufacturer and model No.

- No. of hard copiers

Section 8

Doc No.: TA-143-D00-G-TD006

16-Sep-07

Rev 0

NISCO
Baft Steel Complex

DR & Material Handling Plant Project

TARA TARH

Engineering & Technological Co.

Plant Specification and Data Sheets

- Type of hard copiers

Page 139 of 144

f. Computers and monitors (for HMI & ES)

- Manufacturer

- Country of origin

- CPU type & speed


- Hard disk, RAM and video RAM type
& size

.
.
.
Yes/No

- Mouse or track ball provided

Yes/No

- CD-ROM /DVD-ROM provided

- Monitor type & size

g. Alarm system:

- Standard of alarm system sequence

h. Power supply:
- Power supply redundancy

... Yes/No

- Monitoring of breakers and failure


alarm

... Yes/No

8.3.3- System Software:


- Modular software

... Yes/No

- Management and diagnostic routines

... Yes/No

Section 8

Doc No.: TA-143-D00-G-TD006

16-Sep-07

Rev 0

NISCO

DR & Material Handling Plant Project

TARA TARH

Engineering & Technological Co.

Baft Steel Complex

Plant Specification and Data Sheets

Page 140 of 144

- Real time operating system and data


base

... Yes/No

- HMI operating system

...............

- ES operating system

...............

8.3.3.1- Control software:


- Mathematical functions

... Yes/No

- Logic functions

... Yes/No

- Continues control

... Yes/No

- PID algorithm modification

... Yes/No

- Control loop modes and cascade test


and set

... Yes/No

- Automatic adjusting of set points

... Yes/No

8.3.4- Monitoring and DAS Functions:


- Indication of analog and digital
controlled or non controlled variables

... Yes/No

- Manipulation of control set point and


alarm setting values

... Yes/No

- Performing hourly, shift end, daily and


monthly average and historical trends
and logs

... Yes/No

- System diagnostic reporting

... Yes/No

- Menu display

... Yes/No

Section 8

Doc No.: TA-143-D00-G-TD006

16-Sep-07

Rev 0

NISCO

DR & Material Handling Plant Project

TARA TARH

Engineering & Technological Co.

Baft Steel Complex

Plant Specification and Data Sheets

Page 141 of 144

- Over view display

... Yes/No

- Group display

... Yes/No

- Detail display

... Yes/No

- Trend group display

... Yes/No

- Single trend display

... Yes/No

- Interactive color dynamic control


configuration, process and logic
graphic display

... Yes/No

- Alarm summary display

... Yes/No

- Alarm processing and display

... Yes/No

- System self diagnostic display

... Yes/No

- System hardware status display

... Yes/No

- Real time trend and curve display

... Yes/No

- Report display

... Yes/No

- Log sheet display

... Yes/No

- Guide message display

... Yes/No

- Help message display

... Yes/No

- Logs and reports

... Yes/No

- The graphic display of variables by bargraph which shows deviation value

... Yes/No

- Presenting the alarm signals for each


... Yes/No
variable at the bottom side of the screen
and showing deviation indication

Section 8

Doc No.: TA-143-D00-G-TD006

16-Sep-07

Rev 0

NISCO
Baft Steel Complex

DR & Material Handling Plant Project

TARA TARH

Engineering & Technological Co.

Plant Specification and Data Sheets

Page 142 of 144

- Measured value for each analog


variable on graphic display

... Yes/No

- Status of equipment such as pumps,


on/off valves on graphic display

... Yes/No

- Analog and discrete variable alarm on


graphic display

... Yes/No

- Commands for turning ON or OFF the


pumps, valves, etc. in operator display

... Yes/No

- Setting controller set points and


manipulating of process variables in
manual mode in operator display

... Yes/No

- The graphic is programmed based on an


international standard such as ISA
S5.1,S5.3,S5.5 for instrument and
equipment symbols

... Yes/No

- Alarm message with tag identification


and time tag and description

... Yes/No

- No of different alarm priorities

... Yes/No

- Alarm summary display provided

... Yes/No

- Group printing

... Yes/No

- Event printing

... Yes/No

- Sequence reporting

... Yes/No

- Sequence of events reporting

... Yes/No

- Periodic logging

... Yes/No

Section 8

Doc No.: TA-143-D00-G-TD006

16-Sep-07

Rev 0

NISCO

DR & Material Handling Plant Project

TARA TARH

Engineering & Technological Co.

Baft Steel Complex

Plant Specification and Data Sheets

Page 143 of 144

- Shift engineer station functions same as


operator station

... Yes/No

- Modifying the scaling and tuning


parameters of controllers by
engineering station

... Yes/No

- Modifying configuration during system


operation without interference to other
device or loops by engineering station

... Yes/No

8.4- ANALYZER SYSTEM


- Manufacturer

- Type

- Sensitivity

- Accuracy

- Time of analysis

- Auto calibration facility

.Yes/No

8.5- TV CAMERA SYSTEM


- Manufacturer

- Type

- Focus

- Zoom

- Water cooling jacket and air purge are


provided

.Yes/No

Section 8

Doc No.: TA-143-D00-G-TD006

16-Sep-07

Rev 0

NISCO
Baft Steel Complex

DR & Material Handling Plant Project

TARA TARH

Engineering & Technological Co.

Plant Specification and Data Sheets

Page 144 of 144

8.6- COMMUNICATION TO MANAGEMENT INFORMATION SYSTEM


- All Hardware and software requirements for
communication to MIS system are provided .. Yes/No

8.7- OTHER REQUIREMENTS


8.7.1- Documentation
- List of documentation is attached

... Yes/No

8.7.2- Test and repair requirements


- Complete set of special tools shall be
submitted for engineer approval

. Yes/No

8.7.3- Test
- Factory test shall be done and test report ... Yes/No
will be delivered for engineer approvals

8.7.4- Training
-According to section 11.4 of engineering ... Yes/No