Federal Register / Vol. 71, No.

1 / Tuesday, January 3, 2006 / Notices 105

Energy Limited, 3400, 205–5th Avenue, parties. A party must submit 14 copies date as indicated below. Anyone filing
SW., Calgary, Alberta T2P 2V7 or call of filings made with the Commission an intervention or protest must serve a
(403) 770–4824. and must mail a copy to the applicant copy of that document on the Applicant.
Specifically, Regent and Sword and to every other party in the Anyone filing an intervention or protest
request the Commission to issue an proceeding. Only parties to the on or before the intervention or protest
order: (1) Transferring Regent’s NGA proceeding can ask for court review of date need not serve motions to intervene
section 3 authorization to Sword for the Commission orders in the proceeding. or protests on persons other than the
operation and maintenance of facilities The Commission strongly encourages Applicant.
for the importation of natural gas from electronic filings of comments, protests, The Commission encourages
the Province of Alberta, Canada, into and interventions via the internet in lieu electronic submission of protests and
Glacier County, Montana; and (2) of paper. See 18 CFR 385.2001(a)(1)(iii) interventions in lieu of paper using the
authorizing the assignment of Regent’s and the instructions on the ‘‘eFiling’’ link at http://www.ferc.gov.
March 19, 2003, Presidential Permit for Commission’s Web site (http:// Persons unable to file electronically
the operation and maintenance of www.ferc.gov) under the ‘‘e-Filing’’ link. should submit an original and 14 copies
facilities at the Alberta, Canada/ Comment Date: January 17, 2006. of the protest or intervention to the
Montana import point. Federal Energy Regulatory Commission,
The import facilities consist of (1) a Magalie R. Salas, 888 First Street, NE., Washington, DC.
gas meter station in LSD 8–4–1–16 W4M Secretary. 20426.
in the Province of Alberta; (2) a 4-inch [FR Doc. E5–8174 Filed 12–30–05; 8:45 am] This filing is accessible on-line at
(114.3 mm) diameter pipeline located BILLING CODE 6717–01–P http://www.ferc.gov, using the
directly south of this meter station ‘‘eLibrary’’ link and is available for
across the Canada-United States border review in the Commission’s Public
at Section 1 T37N R5W, extending a DEPARTMENT OF ENERGY Reference Room in Washington, DC.
distance of approximately 2,300 feet. There is an ‘‘eSubscription’’ link on the
The pipeline crosses the International Federal Energy Regulatory Web site that enables subscribers to
Boundary for a distance of 30 feet (the Commission receive e-mail notification when a
Coutts Gas Export Pipeline) and [Docket No. RP06–150–000] document is added to a subscribed
interconnects with a 4-inch (114.3 mm) docket(s). For assistance with any FERC
diameter pipeline (the Connector Sea Robin Pipeline Company, LLC; Online service, please e-mail
Pipeline) operated by Regent Resources Notice of Flowthrough Crediting FERCOnlineSupport@ferc.gov, or call
Inc., a Montana incorporated company Mechanism (866) 208–3676 (toll free). For TTY, call
that is a wholly owned subsidiary of (202) 502–8659.
Regent Resources Ltd. The Connector December 27, 2005. Comment Date: 5 p.m. Eastern Time
Pipeline connects with an existing Take notice that on December 20, January 3, 2006.
North Western-operated gathering 2005, Sea Robin Pipeline Company, LLC
(Sea Robin) submitted its Annual Magalie R. Salas,
system in northern Montana at SE. 1⁄4
Flowthrough Crediting Mechanism Secretary.
Section 8, Township 37N, Range 4W
downstream of the North Western- Filing. Sea Robin states that this filing [FR Doc. E5–8182 Filed 12–30–05; 8:45 am]
operated North Moulton compressor was made pursuant to section 22 of the BILLING CODE 6717–01–P

station. general terms and conditions of Sea


Regent and Sword state that the Robin’s FERC Gas Tariff, which requires
border facilities will remain in place the crediting of certain amounts DEPARTMENT OF ENERGY
and operation following the requested received as a result of resolving monthly
Federal Energy Regulatory
transfer and assignment. Regent and imbalances between its gas and
Commission
Sword also state that there are no liquefiables shippers and under its
current third party service agreements operational balancing agreements as [Docket No. CP02–60–008]
associated with the Regent pipeline, described in section 6 of its Tariff, and
although Sword would be prepared to to accumulate amounts received as a Trunkline LNG Company, LLC; Notice
offer transportation services to any other result of imposing scheduling penalties of Compliance Filing
shipper. as described in section 7 of its Tariff. December 27, 2005.
There are two ways to become Sea Robin further states copies of this Take notice that on December 15,
involved in the Commission’s review of filing are being served on all 2005, Trunkline LNG Company, LLC
this project. First, any person wishing to jurisdictional customers, applicable (Trunkline LNG) submitted a
obtain legal status by becoming a party state regulatory agencies and parties to compliance filing pursuant to the
to the proceedings for this project this proceeding. Commission’s orders issued on August
should, on or before the comment date, Any person desiring to intervene or to 27, 2002, December 18, 2002, and
file with the Federal Energy Regulatory protest this filing must file in October 27, 2003 in Docket Nos. CP02–
Commission, 888 First Street, NE., accordance with Rules 211 and 214 of 60–000, CP02–60–001 and CP02–60–
Washington, DC 20426, a motion to the Commission’s Rules of Practice and 003, respectively.
intervene in accordance with the Procedure (18 CFR 385.211 and Trunkline LNG states that the
requirements of the Commission’s Rules 385.214). Protests will be considered by compliance filing includes tariff sheets
of Practice and Procedure (18 CFR the Commission in determining the to place Rate Schedules FTS–2 and
385.214 or 385.211) and the Regulations appropriate action to be taken, but will ITS–2 in service upon completion of the
under the NGA (18 CFR 157.10). A not serve to make protestants parties to Amended Expansion Project.
bjneal on PROD1PC70 with NOTICES

person obtaining party status will be the proceeding. Any person wishing to Trunkline LNG states that copies of
placed on the service list maintained by become a party must file a notice of the filing were served on parties on the
the Secretary of the Commission and intervention or motion to intervene, as official service list.
will receive copies of all documents appropriate. Such notices, motions, or Any person desiring to protest this
filed by the applicant and by all other protests must be filed on or before the filing must file in accordance with Rule