FIDIC

CLAUSE 18.1
Engineer ask the contractor to carryout boreholes / exploratory excavation otherwise not mentioned i
Activity will be considered as variation from original work and will be dealt with provisions mentioned
51
CLAUSE 20.1
Engineer issues a Taking-Over Certificate(for whole or part of the work) - Responibility for care of that
passes to the employer.

CLAUSE 20.2
Damage to work for reasons other than those mention in cl 20.4 contractor is liable and the En-in-ch w
ensure rectification is carried out.

CLAUSE 20.3
Damages due to causes listed in clause 20.4 shall be bourn by the employer. Engineer shall calculate
extra amount needed to rectify the damage/defects and add to the contract price as laid down in clau
when the contractor rectify the damage as needed.

CLAUSE 21
Engineer should ensure that contractor has insured his machinery/labour as required in the contract.
CLAUSE 22
Engineer should ensure that contractor has indemnify the Employer from responsibility of death/injury
workmen/labour at site.

CLAUSE 23
Engineer should ensure that insurance by contractor is of the min. value mentiioned in the appendix o
contract.

CLAUSE 24
Engineer should ensure that contractor has proper insurance for accidents at site and has indemnify t
Employer from responsibility of death/injury of his workmen/labour at site.

CLAUSE 25
Enigineer should check that contractor has obtained necessary insurances. Recovered any premium p
employer for contractor's insurance from the contract bills.

CLAUSE 26
Engineer should ensure that contractor compliances with statutes and regulations.
CLAUSE 27.1
Engineer is to be informed on discovery of any artifact/mineral/fossil etc. and follow his instruction. De
suffered on such case can be eased on the contractor by providing extension of time by the engineer
clause 44, also extra cost incured by the contractor could be added to the contract price by the Engin

Clause 28.1
Employer in not indemnified against infringement of patent rights ariseing from the contractor compli
with the design or Specification provided by the Engineer.

CLAUSE 30.3
Engineer to be informed immediately by the contractor if there is some damage to road/bridges conne
the site on account of movement of material/machinery transport by the contractor to the work.
Engineer shall determine if damage is due to nonformity of caution by the contractor as per clause 30
then determine the penalty amount which shall be deducted from the contractor for payment to be m
the defaulted authority.

CLAUSE 31.1
Engineer to ensure the main contractor provide justified opporinuity/space to any other contractor app
by employer on site

CLAUSE 31.2
Engineer can ask main contractor to share resource with other contractor (and pay if any extra cost bo
him inaccordance with clause 52)

CLAUSE 33.1
Contractor to clear from site all temopary works/materials and equiptments before the Engineer issue
Taking-Over-Certificate.

CPWD
CLAUSE 12
Engineer-in-charge has power to make variation in items of BOQ. Time extension and extra contract p
him.

CLAUSE8
En-in-ch will issue final completon certificate if the work is of the required qualitiy and specification an
removed all temporary materials/machinery/structure from the site.
CLAUSE 17
Contractor liable to pay damages during the defect liability period which starts from the dt. of issue of

CLAUSE 17
Contractor liable to pay for damages cause by his workers/or due to poor construction during defect l

CLAUSE 5.2
Coontractor can request En-in-ch(schedule F) for time extension if cause of delay mention in cl 5.2 are
CLAUSE 43
En-in-ch can pay compensation for damaged work / machinery damaged in site in case of damage to
NA
NA

NA

NA

NA
NA

NA

NA

NA

NA

NA

CLAUSE8
En-in-ch will issue final completon certificate if the work is of the required qualitiy and specification an
removed all temporary materials/machinery/structure from the site.