You are on page 1of 28

Dirk Poelman Chief Operations Officer

Operations at Barry Callebaut

Agenda
ge da
X

Operations and Supply Chain Organization


Vision
X Organization
Flow and Footprint
Continuous improvement
X One+
X Quality
X Strategic equipment sourcing
X Investments
P ocess and technology
Process
technolog development
de elopment
Sales and Operations Planning
Raw material optimization
CSR
Advantages of BC
X

X
X

X
X
X
X
X

OSCO Vision

Respond
R
d to the
h b
business
i
requirements
i
in
i
the most effective and efficient way

Strategic Pillars
X

Flow and footprint optimization to achieve


lowest cost of goods sold

Continuous improvement

Process and technology development

Sales and Operations planning

Raw material optimization


4

OSCO organization
COO

OSCO Americas

Process & Technology


Development

OSCO controlling
Project Analysis

Continuous
Improvement

Strategic
Planning

OSCO Eastern
Europe

OSCO Western
Europe

Supply Chain
Cocoa

OSCO Asia

Regional OSCO

Director HR
Central planning
Region

Supply Chain
Cocoa

QA Director

Logistic s
Region

Site manager

Production/
Department Managers

Maintenance
Manager

Supply Chain
Manager

HR Manager

QA Manager

Flow and Footprint

Truly global manufacturing footprint with 40


production facilities in 26 countries worldwide
Thimister, Belgium
Chekhov Russia
Chekhov,
Lebbeke-Wieze, Belgium
Heule-Kortrijk, Belgium

Nuth, The Netherlands


Zundert, The Netherlands

Banbury, UK
St. Albans, VT, US

St Helens, UK
Chester, UK

Kagerod,
g
Sweden

Pennsauken, NJ, US
St. Hyacinthe, Canada

Eddystone, PA, US
Robinson, IL, US
American Canyon, CA, US

+
+ +

Monterrey, Mexico
Toluca, Mexico

Louviers, France
Meulan, France
+
Dijon, France
Dbendorf, Switzerland
Verbania-Intra, Italy

Abidjan Zone,
Ivory Coast

Lodz, Poland

Norderstedt,, Germanyy

Tsukaguchi Japan
Tsukaguchi,
Zuzhou, China

San Sisto, Italy

Vic Gurb, Spain


Alicante, Spain

San Pedro,
Ivory Coast

+
Tema, Ghana

Douala I, Cameroon

Port Klang, Malaysia


Singapore, Singapore

+
+

Ilhus, Bahia, Brazil


Extrema, Minas Gerais, Brazil

Cocoa processing factory


Chocolate factory
Integrated cocoa & chocolate factory
Expansion of new lines in the last 2 years
7

Advantages of our factory footprint


X

Focused factories allow us to produce a wide range


of products with limited complexity
Cocoa:
X
Origin factories focussed on access to the beans with
limited product range
X
Cocoa sites in consuming countries focussed on
blending of different origins and service to the
customers
X
Integrated
d sites ffocussed
d on the
h cocoa requirements for
f
the chocolate

Chocolate:
X
Specialties (like white, nuts products etc.) are
centralized in a limited number of sites per region
X
S
Standard
d d products
d
are produced
d
d close
l
to the
h customers
and are used for capacity balancing

Advantages of our factory footprint


X

By operating as a network we can make full use of the economies of


scale
X
X

In a network it is easier to create back-up in case of problems


X

Not all processes are done in each site


Lines can be dedicated to specific product types

Interchangeable products

Flow and footprint optimizations


X

Footprint studies are done to determine the optimal location for capacity
extensions
Flow optimizations are implemented between regional & strategic planning

Supporting growth while staying cost leader


X

Capacity increase (compared to 2008)


+25%

+21%

Liquor
q
Pressing

+22%

Chocolate liquid

2008
X

2011

Headcount evolution (factory headcount excl consumer)


+3%
3.538

3.531

3.528

2008

2009

2010

3.185

2007

10

An efficiently utilized manufacturing


footprint in all production steps
Evolution of our capacity utilization

Cocoa grinding
Cocoa pressing

Liquid chocolate

93.7%
93.9%

92.2%

91.0%

91.1%

90.1%

79.4%

82.6%

2008/09

2009/10

88.6%
82 2%
82.2%

89.1%

81.2%

2006/07

2007/08

11

Continuous Improvement

12

Continuous improvement
One+
X

Main Objectives
X

Implementation.
X
X

Install a common process and way of working for the group


To improve the efficiency and the effectiveness
To improve transparency and interchangeability
To facility the rotation of people between sites and functions
Create a pool of people that are ready to take over line functions
Get to know the (production) processes
Get to know the plants and the people
Experts in the continuous improvement methodomogy

Supported by an external specialist (on the job training)


First focus on the plants:
Finalized 3 pilot sites (US, France and Japan)
Started with the wave 2 plants (Belgium, Malaysia & US)
Next steps: Widen the scope to other processes and other functional areas

Results achieved
X

Yearly savings of about 4 mio Euro for the 3 pilot sites

13

Continuous improvement
One+

The methodology is focussing on a set of improvement levers, to


achieve a performance driven organisation
IMPROVEMENT LEVERS
Improve process knowledge
Implement a systematic approach and usage
of tools
Close monitoring of process
performance
Systematic Root cause analysis
Implement Group Best practices
Clear ownership per process (steps)
Install common KPI system and usage
Install performance oriented management
meetings
Facilitate fact based decision making and
follow up
Ensure common view on performance, top
down & bottom-up

Mental switch towards


performance focus in a
structured and systematic way
More transparency and
predictability in results
Moving from status quo/reactiveness to pro-activeness

SUSTAINABLE
RESULTS
Financial
Operational
Cultural

Increase cross functional way of working


Boost management skills and leadership at
different levels and management
y/
with the shop
p floor
visibility/involvement
Resolve cultural and historical issues
Reinforce competences in the organisation
14

Continuous improvement
One+

Summary of progress at American Canyon


One year ago

Today

No real root cause analysis

RCAs are done several times per week

We had bad meetings but didnt know it

We know what a good meeting looks like

Managed from lagging indicators

KPIs are looked at daily & challenged

Production results not being challenged

Little visibility to hidden production losses

New team with potential, but little


structure

A better understanding of OEE and its


components
Maximizing production capacity
Better control of the operation and faster
reaction to problems

15

Continuous improvement
Quality
X

Background:
X
X

Quality requirements in the market are changing


BC wants to be leading from a quality point of view

Implementation
X

BRC certification and site audits

X
X
X

Strenghtening of the internal audit team


Sharing of issues and best practices
Training

Better separation on existing lines to avoid contamination


Investments
Increased awareness

Results:
X

29 sites are BRC certified

16

Continuous improvement
Strategic equipment sourcing

Through data analysis, interviews and workshops with the sites, the following
main levers that will drive the savings for the technical spend were identified:
Proposed levers
X Create spend transparency.
X Central repository for spend-data & siteneeds
X Launch centrally led sourcing initiatives (focus
on common categories across sites).
sites)
X Increase Low Cost Country Sourcing lever for
technical goods.
X Leverage
g best practices
p
& technical knowledge
g
between sites.
X Incl revisiting & standardization of
technical specs.
X Evolve towards partnerships with key
suppliers.

Advantages
X Full spend in scope Leverage global
buying power
X Spend consolidation and supplier reduction
and maximize synergies across all
sites/countries
i
/
i
X Realize significant benefits for standard
goods with high volumes across the
p y
company
X Standardize throughout the company and
realize TCO benefits (rather than focus on
transactional cost)

X Ability to tackle processes behind purchases

Results achieved in 2010/11: Average 11% reduction on equipments in


scope.
17

Continuous improvement
Investments
X

Different types of investments in the plants


X

Capacity
p
y extensions: about 20 40% depending
p
g on requirements
q
New factories
New production lines
Upgrading
pg
g of existing
g lines (new
(
technology)
gy)
Replacements: about 20 25%
Replacement of outdated equipments
Upgrading of equipments and lines
Cost reduction: about 20 - 25%
Automation
Energy saving projects
Efficiency improvements
Quality improvements: about 10%
Plants and production lines
Products
Analysis equipment
Health and safety improvements: about 5%
18

Investments support the growth of our


business
In CHFm

Additional growth
IT

5%

4%

Upgrade / efficiency gains


on existing sites
Maintenance

250

3%

3%

3%

CAPEX as % of sales

170
153

144

145

2008/09

2009/10

115

2005/06

2006/07

2007/08

FY
2010/11
19

Process & Technology


Development

20

Engineering
X

Main focus: Doing more with existing equipment


Some examples:
X High speed refining
X Continuous conching and Salvator conching
X High efficient hydraulic groups for presses

Making production processes more energy efficient


Some examples:
X New bean breaker 20 25% reduction in gas consumption for
roasting
X Heating,
Heating cooling,
cooling heat recuperation etc
etc.
X Output improvements as mentioned above

Improving
p
gp
process y
yields

Low investment greenfield plant


X
X

Compact design
Modular build-up
21

Sales & Operations Planning

22

Sales and Operations planning


X

Main objectives:
X
X
X

E h
Enhancement
t off the
th regional
i
l S&OP processes
X
X

Improved communication
Better forecasting

Global S&OP
X
X
X
X

Achieve the required internal and external service levels (98% OTIF)
Manage capacity utilization (80-85% for chocolate 90-95% for cocoa)
Reduce the stock coverage year-on-year

Align interregional flows


Report global inventory evolution and capacity utilization
Improved visibility to prevent unexpected regional demand
Coordinate the planning aspects on projects for global accounts

Results
X
X

Stock coverage has improved by 10% over the last 3 years


Service levels have been stable or improved

23

Raw Material Optimization

24

Raw material saving projects


X

Main Objectives
X

X
X
X

Implementation
X

Recipe improvements: Work with R&D to reduce the


costs of the materials
Better control and improvement of the yields in the
plants
l t
Reduction of waste and rework
Reduction of overweight
T
Transport
t optimization
ti i ti

Cross functional project teams are working under the


lead of the regional OSCO managers

Results achieved
X

Projects in Americas and Europe resulted in an


annual saving of more than 14 Mio CHF

25

CSR

Energy Savings & CO2 reduction

26

CSR in Operations

Energy savings and CO2 reduction


X

Target:
X
Reduce the CO2 emissions from the plants and owned DCs by 20% per ton over the
next 4 years
Results at the end of year 2:
X
Energy consumption per ton has been reduced by 11,8%
Main actions taken: Examples
p
X
Awareness

Process optimization

Target setting and translation into bonus targets for key people
Introduction of KPIs with monthly reporting
Introduction of an energy management system
One of the key topics in the continuous improvement program
Output improvement on existing equipments and lines
O
Optimized
d shut-down
h d
procedures
d
Right sizing of equipments
Free cooling
Insulation

Technology

Installation of new breakers on the roasting lines to reduce gas consumption by 25%
New hydraulic groups on presses
Economizers on boilers and roasters

BC Competitive Advantages
X

Footprint and size:


X
X
X
X

Process know how:


X
X

Experienced people in all operations areas


Constantly searching for new ways to make our
products and to improve our efficiency

State of the art equipment


X
X

Economies of scale
Better capacity balancing
Backward integration (flow optimization)
Skill levels

Reliability and effectiveness


In line with the latest quality standards

Flexibility combined with cost efficiency:


X
X

Focussed factories
Line dedication

You might also like