Professional Documents
Culture Documents
MB301M
Low Voltage Equipment
General rules V4
General rules
Blokset MB301M
2
2
2
4
4
4
5
5
6
6
6. Adaptation rules
6.1 The adaptations which can be done by partner autonomously
6.2 The adaptation which can not be done by partner autonomously
7
8
Blokset MB301M
General rules
This document denes the general rules to use and manage the technical part of the MB301M transfer le.
It is included in the technical transfer le.
Each user must comply with the rules to guaranty the quality and the
international coherence of the MB301M offer.
Low Voltage Line of Business Asia Pacic (LV LoB APOD) is in charge
of management of the le.
Users are in contact with LV LoB APOD through local technical contact
(offer management or technical support engineer) for any requests or
questions
Blokset MB301M
General rules
Partners can decide some "light" adaptations (e.g. language, tools, simple
adaptation which doesn't alter the switchboard performance...) under the
supervision of SE technical support team
Countries have to contact LV LoB APOD for all other adaptations, and ask
for the validation of these local adaptations
Blokset MB301M
General rules
3.1 Issuer
3.2 Addressee
Blokset MB301M
General rules
BBV55952
reference number
02
type number
version number
transfer number
Blokset MB301M
General rules
Each document provided for the certications, will recall the former
number used in order to ensure the traceability.
Blokset MB301M
General rules
6. Adaptation rules
Why?
Increasing the connection dimensions, with due care with clearances; will have a slightly positive
effect on thermal rise. This does not
affect negatively the IEC60439-1
type tested performance
Increasing the dimensions of functional unit / busbar / power connection/cable, with due respect of rules
expressed in MB301M transfer le,
will have a slightly positive effect on
thermal rise. This does not affect
negatively the IEC60439-1 type
tested performance.
Blokset MB301M
General rules
Adaptation rules
Below mentioned cases always affect the ofcially tested MB301M performance.
As type-testing is a long and costly process, not complying with usual end-user projects dead-lines,
we thus strictly recommend to follow these rules to avoid the adaptation affecting type-test performance of MB301M
Adaptation forbidden
Why?
You must not decrease outgoing power connection size If such a change is needed, contact
your usual Schneider Electric support person