INSTALACIONES SANITARIAS
PROYECTO
PROPIETARIO
ELABORADO
TACNA PERU
AGOSTO 2014.
USO
CANTIDAD
350.00
350.00
3.00
3.00
3.00
3.00
3.00
3.00
3.00
3.00
3.00
DOTACION
(lt/da)
2.00
2.00
850.00
850.00
850.00
850.00
850.00
850.00
850.00
850.00
850.00
TOTAL (lts/dia)
SUB TOTAL
(lt/da)
700.00
700.00
2,550.00
2,550.00
2,550.00
2,550.00
2,550.00
2,550.00
2,550.00
2,550.00
2,550.00
24,350.00
Cd = 24,350.00 lts/da
Cd = 0.282 lps.
TANQUE ELEVADO :
De igual manera la capacidad del tanque elevado se estipula con una
capacidad mnima de 1/3 del Consumo diario :
Vte = 1/3 * 24,350 lts.
Vte = 8,117 lts = 8.12 m3. Se consider 10.00 m3.
El control de encendido y apagado del sistema de bombeo, se realizar
automticamente mediante control elctrico de niveles.
CALCULO DE TUBERIAS DE DISTRIBUCION
Los dimetros de las tuberas de distribucin se calcularn con el mtodo
Hunter (Mtodo de Gastos Probables), para ello determinamos los gastos
probables por departamento y por piso.
CALCULO DE UNIDADES DE GASTO/PISO PARA EL CALCULO DE TUBERIAS DE
DISTRIBUCION
INODOROS
DUCHAS
LAVATORIO
LAVADERO
DPTO 01
UNIDAD
DE GASTO
2.0
2.0
2.0
2.0
1.5
2.0
1.0
3.0
U.H.
3.0
4.0
2.0
6.0
DPTO 02
UNIDAD
DE GASTO
2.0
2.0
3.0
2.0
1.5
2.0
1.0
3.0
U.H.
3.0
4.0
3.0
6.0
DPTO 03
UNIDAD
DE GASTO
U.H.
4.0
2.0
4.0
2.0
1.5
6.0
2.0
4.0
1.0
4.0
3.0
6.0
UNIDADES DE
GASTO/DPTO
Litros/seg.
POR DPTO
15.00
0.46
16.00
0.75
20.00
0.54
Litros/seg.
POR PISO
1.75
MONTANTE 1 (lts/seg)
MONTANTE 2 (lts/seg)
MONTANTE 3 (lts/seg)
1ER
0.23
0.23
2DO
0.46
0.69
0.46
3ER
0.46
1.15
0.46
0.92
0.54
1.08
4TO
0.46
1.61
0.46
1.38
0.54
1.62
5TO
0.46
2.07
0.46
1.84
0.54
2.16
6TO
0.46
2.53
0.46
2.3
0.54
2.7
7MO
0.46
2.99
0.46
2.76
0.54
3.24
0.54
8VO
0.46
3.45
0.46
3.22
0.54
3.78
9NO
0.46
3.91
0.46
3.68
0.54
4.32
10MO
0.46
4.37
0.46
4.14
0.54
4.86
T.E.
L=5.00m
3
H=3.00 m
Q=4.37+4.14+4.86=13.37lts/seg.
h = 0.12 m/m
L = 7.80 m.
v = 3 m/seg.
T= 0.94m.
OK.
2.80m
2.80m
2.80m
2.80m
2.80m
2.80m
2.80m
2.80m
2
10mo Niv.
Q=4.86lt/seg
h=0.12m/m
T=0.34m
Ps=(2.06+2.80)-0.39=4.47mca OK
Ps=(4.47+2.80)-0.34=6.93mca OK
9no Niv.
Q=4.32lt/seg
8vo Niv.
Q=3.78lt/seg
h=0.34m/m
T=0.95m
Ps=(6.93+2.80)-0.95=8.78mca OK
7mo Niv.
Q=3.24lt/seg
h=0.26m/m
T=0.73m
Ps=(8.78+2.80)-0.73=10.85mca OK
6to Niv.
Q=2.70lt/seg
h=1.27m/m
T=3.55m
Ps=(10.85+2.80)-3.55=10.10mca OK
5to Niv.
Q=2.16lt/seg
h=0.88m/m
T=2.46m
Ps=(10.10+2.80)-2.46=10.44mca OK
4to Niv.
Q=1.62lt/seg
h=0.49m/m
T=1.38m
Ps=(10.44+2.80)-1.38=11.86mca OK
h=0.84m/m
T=2.35m
Ps=(11.86+2.80)-2.35=12.31mca OK
Q=0.54lt/seg
h=0.28m/m
T=0.79m
Ps=(12.31+2.80)-0.79=14.32mca OK
h=0.14m/m
T=0.39m
2do Niv.
2.80m
1er Niv.