Professional Documents
Culture Documents
Power Part
Course G740
ABB Ltd
Page 1
Power part
Objectives
Protection functions
ABB Ltd
Page 2
Power part
Drive topology
Input transformer(s)
3-ph.
MV
MCB
supply
6 secondaries
10phase shift
6,10
5dv/dt
Phase 3
Phase 2
Phase 1
H-bridge inverter
on each phase,
with a common
star point
23
INU1,INU2,INU3
ABB Ltd
Page 3
Power part
Drive topology
L_P
x1L1
x1L2
x1L3
36-pulse
Rectifier
DC-Link
x=3
MR
x2L1
x2L2
x2L3
L3
x=1
L_N1
L1
INU3
H-bridge inverter
on each phase,
with a common
star point
NP
- DC
Star
Point
+DC
IGCT with
RC diode
Motor
L2
Phase
x=2
Rectifier L_N
L_P1
5-level
Inverter
and dv/dt Filter
L3
+DC
INU2
NP
- DC
L2
L1
+DC
INU1
NP
- DC
Inverter
Star Point
126
The rectifier provides the DC voltage: DC+, DC- and the Neutral Point NP.
The rectifier of each phase module (INU1, INU2, INU3) is supplied by two
secondaries, 30phase shift, but the overall phase shift between the six
secondaries is 10. 3010
The DC link, equipped with DC link capacitors and Grounding Switch (not
figured out here).
3
ABB Ltd
Page 4
Power part
L_P1
L_N1
L_N
L_P
L_P1
Phase module V
(=INU 2)
MR
L_N1
L_N
L_P
ACS 5000 Training -RevC2
ABB Ltd - 5 -
Phase module W
(=INU 3)
MR
L_P1
Phase module U
(=INU 1)
MR
L_N
L_N1
DC
DC12
-20
+25
diode bridge
phase 3
0
+15
+20
+5
diode bridge
phase 2
-20
-5
0
-15
+20
-25
ABB Ltd
diode bridge
phase 1
Page 5
Power part
(=COU/TEU)
(=INU3)
(=INU2)
(=INU1)
ABB Ltd
Modularity:
Page 6
Power part
Phase module
Rectifier stack
ABB Ltd
Grounding
switch
Inverter stack
IGCT Power
Supply (IPS)
Page 8
Power part
Rectifier
Inverter
di/dt+
Clamping
resistors
ABB Ltd
du/dt Filter
Resistor
du/dt Filter
Coil
Clamping
resistors
Output CT
Page 9
Power part
Diode rectifier
DC+
31236
1L1
1L2
1L3
NP
2L1
2L2
2L3
DCRectifier
All DC bus current flows through both bridges due to the series
connection.
ABB Ltd
Page 11
Power part
Charging
+A13 -Q1002
charging
transformer
3ph Charging
Transformer
+A15
u1
u2
-K1091
HV Relay
v1
v2
HV Relay
-K1092
w1
w2
-K1093
HV Relay
DC
(NP1)
DC(NP1)
DC
(NP2)
DC(NP2)
DC
(NP3)
DC(NP3)
LV
LVRelay
Relay
n2
Common
rail (INU)
Common
Rail
-T1091
ABB Ltd
Page 15
Power part
Charging sequence
MAX
20 s
Values
5400 VDC
5000 VDC
DC VOLTAGE
Charging sequence:
RDY ON
At the beginning Main Circuit Breaker (MCB) is off (drive status: RDY ON).
Pre-charging the DC link (capacitors) is done by using charging circuit
(charging transformer). The capacitors are charged before the converter is
connected to the main power source to avoid excessive inrush currents
(drive status: Charging).
The voltage of the DC link will rise to a defined limit (DC charging level:
5000 V). At this limit the HV relay will be opened.
MCB closing level (should be at least 100 V less than value DC charging
level) => MCB closing is enabled.
MCB100V
ABB Ltd
Page 16
Power part
Discharging
In ACS 5000 Air Cooled the discharging can be done either with
balancing resistors or with optional BCU (Braking Chopper Unit).
When the DC link voltage reaches 1000 V, the drive performs a firing
through to discharge the DC link quicker. 1000V
ABB Ltd
Page 17
Power part
Grounding switch
-Q7271
L_P
NP
DC-
L_N
-Q7271
-Q7271
PE
Because in ACS 5000 there are three physical GND switches, there are in
total three feedback signals available from the GND switches. This means
three GND switch closed and three GND switch open status signals.
GND switch status signals are connected in series both for the open and
closed status. Drive status GND switch closed is reached only if all three
GND switches are closed. Drive status GND switch open is reached only
if all three GND switches are open.
If trying to ground the drive, all three GND switches need to be closed
before drive is physically grounded. If one or two of the GND switches are
not closed, drive grounded status will not be reached.
If trying to open the closed GND switches, all three switches need to be
opened before drive not grounded status will be reached. If only one or
two GND switches are opened, application SW will be in DCGround
unknown status. DCGround unknown
ABB Ltd
Page 19
Power part
-C72502/U
-C72501/U
Hard and soft coupled capacitor bank are located in the right side of each
phase module.
C7250
1
C7250
2
Rectifier / inverter
stack
ABB Ltd
Page 21
Power part
3CR
To the motor
phase (MPh)
ABB Ltd
Page 22
Power part
RC-IGCT
NP diode
NP
ABB Ltd
Balancing
resistor
Clamping
diode
Page 23
Power part
ABB Ltd
Page 27
Power part
1
NPD1
VDC
NPD2
Output (CR or
motor phase)
Output
connected to
Current path:
1+2
DC+
1+2
2+3
NP
NPD1+2 or
3
4
ABB Ltd
IGCTs
ON
NP
3+NPD2
3+4
DC-
3+4
DC(-)
Page 29
Power part
DC(+)
V21
V11
V22
V12
VDC
2
NP
VDC
CR
Motor
MPh
NP
phase
output
VDC
V23
V13
V24
V14
DC(-)
CR
(Inverter star point)
Phase to CR voltages:
Voltage levels
VMPh-CR
MPh
CR
VMPh-C
Vectors
+VDC/2
+VDC/2
+VDC
+2
+2
-VDC/2
-1
-1
-VDC/2
VDC
-2
-2
0
0
+1
+1
ABB Ltd
Page 30
Power part
VDC
2
L1
VDC
VDC
2
CR
VDC
2
L2
VDC
ACS 5000 Training -RevC2
ABB Ltd - 31 -
VDC
2
Combining the 5 levels for motor phase and CR for each phase,
phase to phase voltages will have the values:
Note: Switching vectors L1 and L2 as in the previous page.
Vector
Voltage
Vector Voltage
Voltage
L1
L1-CR
L2
L2-CR
L1 - L2
+2
VDC
-2
-VDC
2 x VDC
+2
VDC
-1
-1/2 x VDC
3/2 x VDC
+2
VDC
VDC
+1
1/2 x VDC
1/2 x VDC
-1
-1/2 x VDC
-1/2 x VDC
-2
-VDC
-VDC
-2
-VDC
-1
-1/2 x VDC
-3/2 x VDC
-2
-VDC
+2
VDC
-2 x VDC
ABB Ltd
Page 31
Power part
Current
ABB Ltd
Page 32
Power part
MOTOR
ABB Ltd
Page 33
Power part
MOTOR
ABB Ltd
Page 34
Power part
MOTOR
ABB Ltd
Page 35
Power part
MOTOR
ABB Ltd
Page 36
Power part
MOTOR
ABB Ltd
Page 37
Power part
MOTOR
ABB Ltd
Page 38
Power part
-5000 V
ABB Ltd
-10000 V
Page 39
Power part
ABB Ltd
Page 40
Power part
ABB Ltd
Page 41
Power part
=COU
AMC board
=INU 1_3
PEC-INT board
IPS
IPS
CVMI
HVD
VLSCD
DC
AC
ACS 5000 Training -RevC2
ABB Ltd - 43 -
EAF
AC
DC
VLSCD
Note: A fourth EAF board is located in the Terminal Unit (TEU), behind
the swing frame of the control cabinet. This board is used for ground
fault monitoring.
ABB Ltd
Page 43
Power part
Control HW
+A21
+A22
+A23
HVD
INT
COU / TEU
EAF
Voltage
sub-print
CVMI
Phase modules
Page 44
Power part
ABB Ltd
Page 45
Power part
RC-IGCT firing
VLSCD (DC+)
VLSCD (DC-)
FT-Loop (DC+)
FT-Loop (DC-)
Link_D
PPCS Channels:
CVMI communication
ABB Ltd
Link_C
Link_B
PEC-INT communication
FT link
Link_A
Aux power supply
Page 48
Power part
ABB Ltd
Page 51
Power part
In parallel to every INU di/dt choke a Voltage Level Short Circuit Detection
(VLSCD) board is installed. The VLSCD board is a passive board, which detects the
voltage appearing across the di/dt chokes during the commutation of the IGCTs.
During this time a fiber optic signal is sent to control (Phase INT board).
VLSCD
VLSCD
AC
+DC
+DC
NPNP
Phase
PHASE
INT
next phase
DC
-DC
-DC
VLSCD
VLSCD
Phase INT
VLSCD
di/dt+
di/dt-
ABB Ltd
Page 55
Power part
/EAF
The only setting element on the board is the DIL switch. The selectable
detection levels are (the voltage over Rn):
Switch setting
1
OFF
OFF
OFF
ON
2
OFF
OFF
ON
OFF
3
OFF
ON
OFF
OFF
Switching
threshold
4
ON
OFF
OFF
OFF
500 V
660 V
825 V
1150 V
ABB Ltd
Page 61
Power part
Cooling
The air cooling unit feeds the cooling air to the main power
components and transfers the heat out of the cubicle.
Standard converter cooling fan:
3.5 MVA 2 fans
ABB Ltd
Page 62
Power part
The converter activates the cooling fans when charging the DC link.
After a certain delay it begins to sample the air supervision. After a
MCB off command the cooling fans run for a defined cooling down
time.