LNG FUEL SUPPLY SYSTEM

1 / 50

Wrtsil

18 June 2012

WCN FGES/ Barry Yang

Doc.ID: DBAB982956

Revision: -

Status: Finalised

AGENDA
1. LNG FUEL TANK
2. LOW PRESSURE (LP) SYSTEM
3. HIGH PRESSURE (HP) SYSTEM
4. LP AND HP COMBINED SYSTEM
5. CHALLENGES
6. WHY WARTSILA HAMWORTHY

2 / 50

Wrtsil

Doc.ID: DBAB982956

Revision: -

Status: Finalised

Many new designs alternatives are emerging

/ 50

Wrtsil

Doc.ID: DBAB982956

Revision: -

Status: Finalised

Pressure Tank

4 / 50

Wrtsil

28 October 2011

Wrtsil SOx Scrubber / M Lehikoinen

Doc.ID: DBAB982956

Revision: -

Status: Finalised

AGENDA
1. LNG FUEL TANK
2. LOW PRESSURE (LP) SYSTEM
3. HIGH PRESSURE (HP) SYSTEM
4. LP AND HP COMBINED SYSTEM
5. CHALLENGES
6. WHY WARTSILA HAMWORTHY

5 / 50

Wrtsil

Doc.ID: DBAB982956

Revision: -

Status: Finalised

Base case: Pressurized tank


1.
2.
3.

Cylindrical pressurized tank


Tank pressure created by PBU
MGE for gas consumers

To engines
Main gas heater (MGE)
Glycol/water mixture

Operating pressure: 5 bar(g)


Design pressure: 10 bar(g)

Pressure Build up Unit


(PBU)
Glycol/water mixture

Simple and Proven = Concept used by Wrtsil


/ 50

Wrtsil

Doc.ID: DBAB982956

Revision: -

Status: Finalised

Pressurized tank + centrifugal pump


1.
2.
To engines
3.

Cylindrical pressurized tank


Tank pressure created by
centrifugal pump and PBU
(no bottom connection)
MGE for gas consumers

Main gas heater (MGE)


Glycol/water mixture

Operating pressure: 5 bar(g)


Maximum pressure: 10 bar(g)

Pressure Build up Unit


(PBU)
Glycol/water mixture

Increased complexity identical tank pressure


/ 50

Wrtsil

Doc.ID: DBAB982956

Revision: -

Status: Finalised

Pressurized tank + centrifugal pump + pressure control


1.
2.
To engines
Main gas heater (MGE)
Glycol/water mixture

Cylindrical pressurized tank


Gas pressure created by centrifugal
pump
LNG evaporated in MGE
Buffer tank and pressure control
system required
Gas can be directly consumed from
gas phase via MGE
Limited saving in tank pressure
rating

3.
4.
5.
6.

Operating pressure: 1-5 bar(g)


Design pressure:
7-9 bar(g)

Higher complexity reduced tank pressure


/ 50

Wrtsil

Doc.ID: DBAB982956

Revision: -

Status: Finalised

Pressurized tank + centrifugal pump + pressure control


+ compressor
To engines
Main gas heater (MGE)
Glycol/water mixture

1.
2.
3.
4.
5.
6.

Operating pressure: 1-5 bar(g)


Design pressure:
3 bar(g)

7.

Cylindrical pressurized tank


Gas pressure created by centrifugal
pump
LNG evaporated in MGE
Buffer tank and pressure control
system required
Gas compressor + heater to handle
NBOG
Gas can be directly consumed from
gas phase via MGE
Small saving in tank pressure rating

Maximum complexity low tank pressure


/ 50

Wrtsil

Doc.ID: DBAB982956

Revision: -

Status: Finalised

Pressurized tank + centrifugal pump + pressure control


+ compressor + rectangular tank
To engines
Main gas heater (MGE)
Glycol/water mixture

Operating pressure: 1-5 bar(g)


Design pressure:
0,7 bar(g)

1.
2.
3.
4.
5.
6.
7.
8.
9.

/ 50

Wrtsil

Cylindrical pressurized tank


Gas pressure created by centrifugal
pump
LNG evaporated in MGE
Buffer tank and pressure control
system required
Gas can be directly consumed from
gas phase via MGE
Small saving in tank pressure rating
Increased cost of steel structure
Full secondary barrier and
monitoring system required
Gas Combustion Unit required?

Doc.ID: DBAB982956

Revision: -

Status: Finalised

Membrane tank + centrifugal pump + pressure control


+ compressor + rectangular tank
To engines
Main gas heater (MGE)
Glycol/water mixture

1.
2.

Cylindrical pressurized tank


Gas pressure created by centrifugal
pump
LNG evaporated in MGE
Buffer tank and pressure control
system required
Gas compressor + heater to handle
NBOG
Gas can be directly consumed from
gas phase via MGE
Full secondary barrier and
monitoring system required
Gas Combustion Unit required

3.
4.
5.
6.

Operating pressure: 0 bar(g)


Design pressure:
0 bar(g)

7.
8.

Industry standard for 135-210 000 m3 LNGC


/ 50

Wrtsil

Doc.ID: DBAB982956

Revision: -

Status: Finalised

LNGPac Simplified P&ID


LNG
Gas
Anti - freeze heating media
Bunkering station

LT - water

Product
evaporator

To GVU
Stop valve &
master valve

PBU

Tank room
LT - water heat
exchanger

/ 50

Wrtsil

Doc.ID: DBAB982956

Revision: -

Status: Finalised

LNG Fuel Tank System


Ship Integration and Interface

Cooling medium from/to Engine


Room
Fuel gas (NG) to Engine Room
Bunkering lines
Relief and depressuring lines
Tank Room
LNG/NG system

Kystnr
transport
med LNG som drivstoff
/ 50
Wrtsil

Ventilation air supply/discharge


Tank Room
Double barrier piping

Instrument air supply


Nitrogen supply
Control and monitoring system
Valves
Instruments (pressure
transmitter, gas detector etc.)
November 2010
Doc.ID: DBAB982956

Revision: -

Status: Finalised

Tank Room Arrangement RoPax Vessel

150 m3

/ 50

Wrtsil

Doc.ID: DBAB982956

Revision: -

Status: Finalised

Tank Room Arrangement RoPax Vessel

/ 50

Wrtsil

Doc.ID: DBAB982956

Revision: -

Status: Finalised

Tank Shell

/ 50

Wrtsil

Doc.ID: DBAB982956

Revision: -

Status: Finalised

Ready Tank

/ 50

Wrtsil

Doc.ID: DBAB982956

Revision: -

Status: Finalised

LNG Fuel Tank Skid

/ 50

Wrtsil

Doc.ID: DBAB982956

Revision: -

Status: Finalised

Tank Room Arrangement

/ 50

Wrtsil

Doc.ID: DBAB982956

Revision: -

Status: Finalised

Typical Tank oom Arrangement - Tresfjord

/ 50

Wrtsil

Doc.ID: DBAB982956

Revision: -

Status: Finalised

LNG Fuel Tank System - Tresfjord

/ 50

Wrtsil

Doc.ID: DBAB982956

Revision: -

Status: Finalised

LNGPac typical dimensions


Preliminary: information in this drawing is subject to change without notice

L1
L2
Type

LNGPac 105 LNGPac 145 LNGPac 194 LNGPac 239 LNGPac 284 LNGPac 280 LNGPac 308 LNGPac 339 LNGPac 402 LNGPac 440 LNGPac 465 LNGPac 520 LNGPac 527

Geometric volume
Net volume (90%)
Diameter
Tank lenght
Cold box
Total lenght
LNGPac empty weight*
LNGPac max operating weight*
Theoretical Max. Autonomy

105

145

194

239

284

280

308

339

402

440

465

520

527

100
3,5
16,7
2,5
19,2
47
94
244

130
4,0
16,9
2,5
19,4
62
127
318

175
4,3
19,1
2,7
21,8
77
164
427

215
4,3
23,1
2,7
25,8
90
198
525

256
4,3
27,1
3,0
30,1
104
231
625

252
4,8
21,3
3,0
24,3
105
233
616

277
4,8
23,4
3,0
26,4
113
252
677

305
5,0
23,5
3,0
26,5
119
271
745

362
5,0
27,5
3,0
30,5
135
316
884

396
5,6
23,8
3,0
26,8
142
340
967

418,5
5,0
31,5
3,5
35,0
152
362
1022

468
5,6
27,8
3,5
31,3
162
397
1143

474,3
5,0
35,5
3,5
39,0
168
406
1159

[m ]
[m ]
[m]
[m]
[m]
[m]
[ton]
[ton]
[MWh]

* Includes an estimate of the process skid


/ 50

Wrtsil

Doc.ID: DBAB982956

Revision: -

Status: Finalised

LNG Fuel Tank System Containerized solution

/ 50

Wrtsil

Doc.ID: DBAB982956

Revision: -

Status: Finalised

LNG Fuel Tank System Containerized solution

/ 50

Wrtsil

Doc.ID: DBAB982956

Revision: -

Status: Finalised

AGENDA
1. LNG FUEL TANK
2. LOW PRESSURE (LP) SYSTEM
3. HIGH PRESSURE (HP) SYSTEM
4. LP AND HP COMBINED SYSTEM
5. CHALLENGES
6. WHY WARTSILA HAMWORTHY

25 / 50

Wrtsil

Doc.ID: DBAB982956

Revision: -

Status: Finalised

LNG carrier
Dual-fuel propulsion system (MAN B&W ME-GI)

Master
Template
/ 50
Wrtsil

September 2010
Doc.ID: DBAB982956

Revision: -

Status: Finalised

Page 26

HP Fuel Supply Skid 300 bar NG delivery


1x100% capacity (4 ton/hr LNG)

Typical dimensions: 3,8 x 3,3 x 1,9 m (L x W x H)


Equipment weights:
/ 50

Wrtsil

14 ton
Doc.ID: DBAB982956

Revision: -

Status: Finalised

LNG Regasification plants - (105bar NG delivery)


Project
1.
2.
3.
4.
5.
6.
7.
8.

Type

Suez/ Neptune
SRV Newb. SHI
Suez/ Neptune
SRV Newb. SHI
Petrobras/Guanabara FSRU Golar Winter
Shell/DUSUP, Dubai FSRU Golar Freeze
PT Nusantara Regas FSRU Golar Khannur
Petronas Melaka
JRU Jetty
Melaka
FSRU Newbuild HHI
HHI
FSRU Newbuild HHI

Heating media: Steam


Intermediate: Water/Glycol

/ 50

Wrtsil

Owners

Delivery Capacity

Hoegh LNG
Hoegh LNG
Golar LNG Energy
Golar LNG Energy
Golar LNG Energy
Petronas
Hegh
Hegh

2008
2009
2009
2010
2011
2011
2012
2012

630 t/hr
630 t/hr
460 t/hr
460 t/hr
440 t/hr
442 t/hr
400 mmscfd
400 mmscfd

Heating media: Seawater


Intermediate: Propane with phase-change

Doc.ID: DBAB982956

Revision: -

Status: Finalised

High pressure, special material

29 / 50

Wrtsil

Doc.ID: DBAB982956

Revision: -

Status: Finalised

LNG Fuel Tank System - Overview


BUNKERING
STATION

Vacuum insulated fuel tank (pressure vessel)


TANK ROOM

Steam/jacket water
Brine HX
Operating P = 4
bara

PBU
Vaporizer

HP pump

Brine
loop
LNG vaporizer

Brine
pump

To gas
engine

LNG FUELTANK

T= 40C
P=300
bara
/ 50

Wrtsil

Doc.ID: DBAB982956

Revision: -

Status: Finalised

AGENDA
1. LNG FUEL TANK
2. LOW PRESSURE (LP) SYSTEM
3. HIGH PRESSURE (HP) SYSTEM
4. LP AND HP COMBINED SYSTEM
5. CHALLENGES
6. WHY WARTSILA HAMWORTHY

31 / 50

Wrtsil

Doc.ID: DBAB982956

Revision: -

Status: Finalised

LNG Fuel Tank System - Overview


BUNKERING
STATION

Main Engine and Auxiliary Engine + Vacuum insulated fuel tank


TANK ROOM

LNG vaporizer

Boiler

Gen. Engine

Typical
operating
P = 4 bara

Steam/jacket water
Brine HX

Q
PBU
Vaporizer

Brine
loop
HP pump

LNG vaporizer

Brine
pump

LNG FUEL TANK

T= 40C

Tank return

/ 50

Wrtsil

Gas to
engine

P=300 bara
Doc.ID: DBAB982956

Revision: -

Status: Finalised

LNG Fuel Gas Supply System (LP and HP)

BOG compressor

Gas
Heater

Auxiliary
Engines

Mist
Sep.

Boil off Gas

Forcing BOG

BOG compressor

Glycol
Pump

Glycol
Pump

Glycol
Heater

LP Vaporizer

Pulsation
damper
Gas

Main Engine
ME-GI

HP Vaporizer

HP
pump

Liquid
LP
pump

Liquid return
to tank

/ 50

Wrtsil

Vapor

Brine

Liquid

Steam
Doc.ID: DBAB982956

Revision: -

Status: Finalised

LP
pump

AGENDA
1. LNG FUEL TANK
2. LOW PRESSURE (LP) SYSTEM
3. HIGH PRESSURE (HP) SYSTEM
4. LP AND HP COMBINED SYSTEM
5. CHALLENGES
6. WHY WARTSILA HAMWORTHY

34 / 50

Wrtsil

Doc.ID: DBAB982956

Revision: -

Status: Finalised

Standards and Requirements to be Followed:

1970s : Gas Tank & Code Development Era


IGC - International Code for the Construction and Equipment of Ships
Carrying Liquefied Gases in Bulk:
IMO Interim Guidelines on Safety for Natural Gas Fuelled Engine
Installations in Ships
Local requirement/Flag state requirement
Class requirement/class guidelines
DNV Rules Part 6 Chapter 13 Gas Fuelled Engine Installations

/ 50

Wrtsil

Doc.ID: DBAB982956

Revision: -

Status: Finalised

Challenges
Utilizing available energy Optimize the energy consumption
Main challange is to optimise and reduce the energy consumption on
vessels:
Utilise Boil-off gas (energy in the gas and cold duty)
Utilise the available cold duty in the LNG as fuel:
Air-condition
Refrigeration
Cooling inlet air to engine
Cooling jacket water (normally done with sea water)
Cool or liquefy cargo with LNG (VOC, gas etc)

Important to look at the complete energy


balance of the vessel!
/ 50

Wrtsil

Doc.ID: DBAB982956

Revision: -

Status: Finalised

Challenges System
Handling of Boil-off gas (BOG) from fuel tanks/Boil-off gas control
BOG

/ 50

LNG fuel Tank


(A, B or C?)

Vent Not an alternative!


Pressure build up in tank (C-tank)
Fuel gas for engine (LP/HP/BOG-compressor)
Boil-off gas reliquefaction system (full/partial)
Boil-off gas recondenser vessel in operation
Gas-combustion unit (GCU)/flare/dump condenser
Utilise the boil-off gas for heating purpose (e.g. boiler)
Production of electricity in an auxillary engine/gas engine

Wrtsil

Doc.ID: DBAB982956

Revision: -

Status: Finalised

AGENDA
1. LNG FUEL TANK
2. LOW PRESSURE (LP) SYSTEM
3. HIGH PRESSURE (HP) SYSTEM
4. LP AND HP COMBINED SYSTEM
5. CHALLENGES
6. WHY WARTSILA HAMWORTHY

38 / 50

Wrtsil

Doc.ID: DBAB982956

Revision: -

Status: Finalised

HAMWORTHY IS NOW PART OF THE WRTSIL FAMILY

39 / 50

Wrtsil

Doc.ID: DBAB982956

Revision: -

Status: Finalised

Wartsila product portfolio

40 / 50

Wrtsil

Doc.ID: DBAB982956

Revision: -

Status: Finalised

Hamworthy product portfolio

Oil & Gas systems

Pump systems

Water systems

Inert gas systems

Gas recovery systems

Deepwell cargo pump systems

Ballast water management

Exhaust gas cleaning

LNG fuel systems

Engine room pumps

Black and grey water management

Inert gas generation

LNG reliquefaction and

Oil and gas pumping

Fresh water generation

Nitrogen generation

regasification

Pump room systems

High pressure compressors


Vacuum toilet systems

LPG and ethylene reliquefaction


Oil and water separation
Ship design and consultancy
VOC recovery

Hamworthy Services
Service
/ 50

Wrtsil

Replacement

Upgrades

Spares
Doc.ID: DBAB982956

Training
Revision: -

Retrofit
Status: Finalised

Two new business units within SP


Wrtsil Ship Power

Flow and Gas Solutions

Gas Solutions

Flow Solutions

Environmental Solutions

Water and Inert


Gas Systems

LPG

Svanehj

Waste Water

LNG

Singapore

Fresh Water

Gas
Recovery

Valves

Inert Gas

Ballast Water
Treatment

Exhaust Gas
Cleaning

Separation
Technology
Baltic Design
Centre

42 / 50

Wrtsil

Doc.ID: DBAB982956

Revision: -

Status: Finalised

Retrofit

Gas Solutions
Technology Portfolio
LPG marine

LNG

Gas Recovery

Separation Technology

Aftermarket

Separator Design

Commissioning

LPG cargo handling system

BOG reliquefaction plants

VOC recovery systems

Cargo heaters & vaporizers

LNG regasification plants

Zero Flare solutions

VIEC /VIEC-LW Internals

Startup support

Small scale LNG plants

HC Blanket Gas and Recovery

Interface level and Profilers

Project life time support

LNG Fuel gas systems

Flare Gas Recovery and ignition

Reliquefaction & coling plants

ShipCargo Tank design


43 and
Wrtsil

Compact Separation

Our focus area

Anti flaring solutions


Offshore liquefaction F LNG
LPG FPSO

LPG & LNG re-liquefaction

Small scale Liquefaction Plants

Terminals

Floating re-gasification systems

44
Wrtsil / 50

Wrtsil

18 June 2012

Presentation name / Eirik Melaaen

Doc.ID: DBAB982956

Revision: -

Status: Finalised

Gas system reference


Selected Liquid Gas Systems References
Equipment type
LPG Reliquefaction Plants
LPG Cooling Plants (offshore)
LPG Heaters & Vaporizers
LNG Reliquefaction Plants
LNG Regasification Plants
LNG Liquefaction Plants (onshore)
LNG Heat Exchangers
VOC Recovery Systems

No off vessels
204
4
311
35
8
3
18
9

48 years of gas system delivery references


of liquid gas cargo handling systems
systems and process design
hardware design/manufacture/assembly
naval architecture (ships integration)
installation, commissioning & start-up

/ 50

Wrtsil

Doc.ID: DBAB982956

Revision: -

Status: Finalised

LNG fuel supply Hamworthy Reference

Motor
kW

LNG Capacity
m

Engine

No
vessel

Shipowner

1620

1 x 90

RRM

NSK

2430

1 x 50

RRM

Fjord1 (Tresfjord)

5250

2 x 228

RRM

Sea cargo/RoRo vessel

5250

1 x 150

RRM

Torghatten/ROPAX vessel

Kystnr transport med LNG som drivstoff


46

Wrtsil

November 2010

LNG fuel supply Wartsila Reference

Ship type

LNG Capacity
m

Engine

No
vessel

Shipowner

Chemical Carrier

2 x 500

Wartsila

Bit Viking

Ropax

2 x 200

Wartsila

Viking Line

PSV

1 x 290

Wartsila

Harvey Gulf

Kystnr transport med LNG som drivstoff


47

Wrtsil

November 2010

70 countries, 160 locations, 7000 field service EXPERTS

Installed
base
180,000 MW

/ 50

Wrtsil

Wrtsil Services global network


Widest range of offering and expertise

Services external presentation

Doc.ID: DBAB982956

Revision: -

Status: Finalised

Wartsila Hamworthy Ltd.

49 / 50

Wrtsil

Doc.ID: DBAB982956

Revision: -

Status: Finalised

THANK YOU FOR YOUR


ATTENTION!
Barry Yang (

Sales Director, China


Flow & Gas / Environmental Solutions
Ship Power, Wrtsil China Ltd
Mob: 13801724719
Email: barry.yang@wartsila.com

50 / 50

Wrtsil

Doc.ID: DBAB982956

Revision: -

Status: Finalised