Professional Documents
Culture Documents
1 / 50
Wrtsil
18 June 2012
Doc.ID: DBAB982956
Revision: -
Status: Finalised
AGENDA
1. LNG FUEL TANK
2. LOW PRESSURE (LP) SYSTEM
3. HIGH PRESSURE (HP) SYSTEM
4. LP AND HP COMBINED SYSTEM
5. CHALLENGES
6. WHY WARTSILA HAMWORTHY
2 / 50
Wrtsil
Doc.ID: DBAB982956
Revision: -
Status: Finalised
/ 50
Wrtsil
Doc.ID: DBAB982956
Revision: -
Status: Finalised
Pressure Tank
4 / 50
Wrtsil
28 October 2011
Doc.ID: DBAB982956
Revision: -
Status: Finalised
AGENDA
1. LNG FUEL TANK
2. LOW PRESSURE (LP) SYSTEM
3. HIGH PRESSURE (HP) SYSTEM
4. LP AND HP COMBINED SYSTEM
5. CHALLENGES
6. WHY WARTSILA HAMWORTHY
5 / 50
Wrtsil
Doc.ID: DBAB982956
Revision: -
Status: Finalised
To engines
Main gas heater (MGE)
Glycol/water mixture
Wrtsil
Doc.ID: DBAB982956
Revision: -
Status: Finalised
Wrtsil
Doc.ID: DBAB982956
Revision: -
Status: Finalised
3.
4.
5.
6.
Wrtsil
Doc.ID: DBAB982956
Revision: -
Status: Finalised
1.
2.
3.
4.
5.
6.
7.
Wrtsil
Doc.ID: DBAB982956
Revision: -
Status: Finalised
1.
2.
3.
4.
5.
6.
7.
8.
9.
/ 50
Wrtsil
Doc.ID: DBAB982956
Revision: -
Status: Finalised
1.
2.
3.
4.
5.
6.
7.
8.
Wrtsil
Doc.ID: DBAB982956
Revision: -
Status: Finalised
LT - water
Product
evaporator
To GVU
Stop valve &
master valve
PBU
Tank room
LT - water heat
exchanger
/ 50
Wrtsil
Doc.ID: DBAB982956
Revision: -
Status: Finalised
Kystnr
transport
med LNG som drivstoff
/ 50
Wrtsil
Revision: -
Status: Finalised
150 m3
/ 50
Wrtsil
Doc.ID: DBAB982956
Revision: -
Status: Finalised
/ 50
Wrtsil
Doc.ID: DBAB982956
Revision: -
Status: Finalised
Tank Shell
/ 50
Wrtsil
Doc.ID: DBAB982956
Revision: -
Status: Finalised
Ready Tank
/ 50
Wrtsil
Doc.ID: DBAB982956
Revision: -
Status: Finalised
/ 50
Wrtsil
Doc.ID: DBAB982956
Revision: -
Status: Finalised
/ 50
Wrtsil
Doc.ID: DBAB982956
Revision: -
Status: Finalised
/ 50
Wrtsil
Doc.ID: DBAB982956
Revision: -
Status: Finalised
/ 50
Wrtsil
Doc.ID: DBAB982956
Revision: -
Status: Finalised
L1
L2
Type
LNGPac 105 LNGPac 145 LNGPac 194 LNGPac 239 LNGPac 284 LNGPac 280 LNGPac 308 LNGPac 339 LNGPac 402 LNGPac 440 LNGPac 465 LNGPac 520 LNGPac 527
Geometric volume
Net volume (90%)
Diameter
Tank lenght
Cold box
Total lenght
LNGPac empty weight*
LNGPac max operating weight*
Theoretical Max. Autonomy
105
145
194
239
284
280
308
339
402
440
465
520
527
100
3,5
16,7
2,5
19,2
47
94
244
130
4,0
16,9
2,5
19,4
62
127
318
175
4,3
19,1
2,7
21,8
77
164
427
215
4,3
23,1
2,7
25,8
90
198
525
256
4,3
27,1
3,0
30,1
104
231
625
252
4,8
21,3
3,0
24,3
105
233
616
277
4,8
23,4
3,0
26,4
113
252
677
305
5,0
23,5
3,0
26,5
119
271
745
362
5,0
27,5
3,0
30,5
135
316
884
396
5,6
23,8
3,0
26,8
142
340
967
418,5
5,0
31,5
3,5
35,0
152
362
1022
468
5,6
27,8
3,5
31,3
162
397
1143
474,3
5,0
35,5
3,5
39,0
168
406
1159
[m ]
[m ]
[m]
[m]
[m]
[m]
[ton]
[ton]
[MWh]
Wrtsil
Doc.ID: DBAB982956
Revision: -
Status: Finalised
/ 50
Wrtsil
Doc.ID: DBAB982956
Revision: -
Status: Finalised
/ 50
Wrtsil
Doc.ID: DBAB982956
Revision: -
Status: Finalised
AGENDA
1. LNG FUEL TANK
2. LOW PRESSURE (LP) SYSTEM
3. HIGH PRESSURE (HP) SYSTEM
4. LP AND HP COMBINED SYSTEM
5. CHALLENGES
6. WHY WARTSILA HAMWORTHY
25 / 50
Wrtsil
Doc.ID: DBAB982956
Revision: -
Status: Finalised
LNG carrier
Dual-fuel propulsion system (MAN B&W ME-GI)
Master
Template
/ 50
Wrtsil
September 2010
Doc.ID: DBAB982956
Revision: -
Status: Finalised
Page 26
Wrtsil
14 ton
Doc.ID: DBAB982956
Revision: -
Status: Finalised
Type
Suez/ Neptune
SRV Newb. SHI
Suez/ Neptune
SRV Newb. SHI
Petrobras/Guanabara FSRU Golar Winter
Shell/DUSUP, Dubai FSRU Golar Freeze
PT Nusantara Regas FSRU Golar Khannur
Petronas Melaka
JRU Jetty
Melaka
FSRU Newbuild HHI
HHI
FSRU Newbuild HHI
/ 50
Wrtsil
Owners
Delivery Capacity
Hoegh LNG
Hoegh LNG
Golar LNG Energy
Golar LNG Energy
Golar LNG Energy
Petronas
Hegh
Hegh
2008
2009
2009
2010
2011
2011
2012
2012
630 t/hr
630 t/hr
460 t/hr
460 t/hr
440 t/hr
442 t/hr
400 mmscfd
400 mmscfd
Doc.ID: DBAB982956
Revision: -
Status: Finalised
29 / 50
Wrtsil
Doc.ID: DBAB982956
Revision: -
Status: Finalised
Steam/jacket water
Brine HX
Operating P = 4
bara
PBU
Vaporizer
HP pump
Brine
loop
LNG vaporizer
Brine
pump
To gas
engine
LNG FUELTANK
T= 40C
P=300
bara
/ 50
Wrtsil
Doc.ID: DBAB982956
Revision: -
Status: Finalised
AGENDA
1. LNG FUEL TANK
2. LOW PRESSURE (LP) SYSTEM
3. HIGH PRESSURE (HP) SYSTEM
4. LP AND HP COMBINED SYSTEM
5. CHALLENGES
6. WHY WARTSILA HAMWORTHY
31 / 50
Wrtsil
Doc.ID: DBAB982956
Revision: -
Status: Finalised
LNG vaporizer
Boiler
Gen. Engine
Typical
operating
P = 4 bara
Steam/jacket water
Brine HX
Q
PBU
Vaporizer
Brine
loop
HP pump
LNG vaporizer
Brine
pump
T= 40C
Tank return
/ 50
Wrtsil
Gas to
engine
P=300 bara
Doc.ID: DBAB982956
Revision: -
Status: Finalised
BOG compressor
Gas
Heater
Auxiliary
Engines
Mist
Sep.
Forcing BOG
BOG compressor
Glycol
Pump
Glycol
Pump
Glycol
Heater
LP Vaporizer
Pulsation
damper
Gas
Main Engine
ME-GI
HP Vaporizer
HP
pump
Liquid
LP
pump
Liquid return
to tank
/ 50
Wrtsil
Vapor
Brine
Liquid
Steam
Doc.ID: DBAB982956
Revision: -
Status: Finalised
LP
pump
AGENDA
1. LNG FUEL TANK
2. LOW PRESSURE (LP) SYSTEM
3. HIGH PRESSURE (HP) SYSTEM
4. LP AND HP COMBINED SYSTEM
5. CHALLENGES
6. WHY WARTSILA HAMWORTHY
34 / 50
Wrtsil
Doc.ID: DBAB982956
Revision: -
Status: Finalised
/ 50
Wrtsil
Doc.ID: DBAB982956
Revision: -
Status: Finalised
Challenges
Utilizing available energy Optimize the energy consumption
Main challange is to optimise and reduce the energy consumption on
vessels:
Utilise Boil-off gas (energy in the gas and cold duty)
Utilise the available cold duty in the LNG as fuel:
Air-condition
Refrigeration
Cooling inlet air to engine
Cooling jacket water (normally done with sea water)
Cool or liquefy cargo with LNG (VOC, gas etc)
Wrtsil
Doc.ID: DBAB982956
Revision: -
Status: Finalised
Challenges System
Handling of Boil-off gas (BOG) from fuel tanks/Boil-off gas control
BOG
/ 50
Wrtsil
Doc.ID: DBAB982956
Revision: -
Status: Finalised
AGENDA
1. LNG FUEL TANK
2. LOW PRESSURE (LP) SYSTEM
3. HIGH PRESSURE (HP) SYSTEM
4. LP AND HP COMBINED SYSTEM
5. CHALLENGES
6. WHY WARTSILA HAMWORTHY
38 / 50
Wrtsil
Doc.ID: DBAB982956
Revision: -
Status: Finalised
39 / 50
Wrtsil
Doc.ID: DBAB982956
Revision: -
Status: Finalised
40 / 50
Wrtsil
Doc.ID: DBAB982956
Revision: -
Status: Finalised
Pump systems
Water systems
Nitrogen generation
regasification
Hamworthy Services
Service
/ 50
Wrtsil
Replacement
Upgrades
Spares
Doc.ID: DBAB982956
Training
Revision: -
Retrofit
Status: Finalised
Gas Solutions
Flow Solutions
Environmental Solutions
LPG
Svanehj
Waste Water
LNG
Singapore
Fresh Water
Gas
Recovery
Valves
Inert Gas
Ballast Water
Treatment
Exhaust Gas
Cleaning
Separation
Technology
Baltic Design
Centre
42 / 50
Wrtsil
Doc.ID: DBAB982956
Revision: -
Status: Finalised
Retrofit
Gas Solutions
Technology Portfolio
LPG marine
LNG
Gas Recovery
Separation Technology
Aftermarket
Separator Design
Commissioning
Startup support
Compact Separation
Terminals
44
Wrtsil / 50
Wrtsil
18 June 2012
Doc.ID: DBAB982956
Revision: -
Status: Finalised
No off vessels
204
4
311
35
8
3
18
9
/ 50
Wrtsil
Doc.ID: DBAB982956
Revision: -
Status: Finalised
Motor
kW
LNG Capacity
m
Engine
No
vessel
Shipowner
1620
1 x 90
RRM
NSK
2430
1 x 50
RRM
Fjord1 (Tresfjord)
5250
2 x 228
RRM
5250
1 x 150
RRM
Torghatten/ROPAX vessel
Wrtsil
November 2010
Ship type
LNG Capacity
m
Engine
No
vessel
Shipowner
Chemical Carrier
2 x 500
Wartsila
Bit Viking
Ropax
2 x 200
Wartsila
Viking Line
PSV
1 x 290
Wartsila
Harvey Gulf
Wrtsil
November 2010
Installed
base
180,000 MW
/ 50
Wrtsil
Doc.ID: DBAB982956
Revision: -
Status: Finalised
49 / 50
Wrtsil
Doc.ID: DBAB982956
Revision: -
Status: Finalised
50 / 50
Wrtsil
Doc.ID: DBAB982956
Revision: -
Status: Finalised