Professional Documents
Culture Documents
5/20/2015
5/20/2015
Kelemahan dalam
Strength Based Seismic Design
dengan Analisis Linear Elastik
1.
2.
3.
4.
5.
5/20/2015
Y = Y H2/3
y + p
y
= 1+ 3
p Lp
yH
y + p
y
=1+ 3
pL p
yH
5/20/2015
REDUNDANCY
Site coefficients
Spectral acceleration values adjusted from
Site Class effects
Redundancy factor,
5/20/2015
REDUNDANCY
FLOWCHART
use Cu Ta,x
use Cu Ta,y
USE Vx = 0.044*SDS*I*W
USE Vy = 0.044*SDS*I*W
scale to match
scale to match
5/20/2015
5/20/2015
5/20/2015
5/20/2015
10
5/20/2015
11
5/20/2015
12
5/20/2015
13
5/20/2015
14
5/20/2015
15
5/20/2015
16
5/20/2015
The use of
PERFORMANCE-BASED SEISMIC DESIGN
DAVY SUKAMTA & PARTNERS
PAKUBUWONO SIGNATURE
core wall
hinge zones
17
5/20/2015
CHICHI RECORD
3-D VIEW
Y-AXIS
X-AXIS
18
5/20/2015
Seismic Design of
Japanese Pagoda
Shin-Bashira
19
5/20/2015
HDRB
20
5/20/2015
Courtesy: Bridgestone,Japan
Base-isolated Structure
Nomor
Ragam
1
2
3
Outrigger Beam
Periode Getar
(detik)
4.233
4.160
3.454
RC core wall
Outrigger
Shear Link
Fixed-base Structure
Outrigger
Column
Structural Scheme Outrigger Floor
Nomor
Periode
Getar
Nomor
Ragam
1
2
3
(detik)
1.657
1.453
1.012
Ragam
1
2
3
Periode
Getar Faktor Partisipasi Mass (%)
(detik)
1.657
1.453
1.012
X-trans
0.00
54.97
0.01
Y-trans
58.08
0.00
0.00
Rz-rotn
0.01
0.03
65.31
Dynamic Characteristic of
Based-Isolated vs Fixed-Base Structure
1.657 sec 4.233 sec
DAVY SUKAMTA & PARTNERS
21
5/20/2015
Gap Measurement
22
5/20/2015
27-story
Base-isolated structure
PURI MATAHARI
TOWER
JAKARTA
DAVY SUKAMTA & PARTNERS
Base-isolated Structure
1.899sec
3.755sec
Fixed-based Structure
Periode
Area
Tower
7 nos.HT090x6R
9 nos.HT120x6R
10nos.HT130x6R
12nos.HT160x6R
Mode
(detik)
Ux-Trans
1.899
57.90
0.07
1.755
0.06
Uy-Trans
59.96
Rt-trans
1.11
1.308
0.01
0.50
65.13
0.00
23
5/20/2015
Fixed-Base
ETABS Model
Isolated Base
Non-linear Push-over Analysis
V=77436 kN
V=39946 kN
V=19973 kN
V=12906 kN
Direction
Fixed-Base
Isolated Base
45
40
5000
35
V=77436 kN
V=39946 kN
V=19973 kN
4000
30
25
20
ISOLATOR
DISPLACEMENT
15
3000
ISOLATOR
DISPLACEMENT
2000
ROOF DISPLACEMENT
ROOF DISPLACEMENT
V=12906 kN
10
1000
5
Direction
0
0
0
0.2
0.4
0.6
0.8
Displacement (m)
1.2
0.02
0.04
0.06
0.08
0.1
Displacement (m)
24
5/20/2015
Fema 356 CP
Fema 356 LS
Fema 356 IO
THANK YOU
25