TEST TEMPLATES: Default test templates are factory configured tests, providing the user the
capacitytojustselecttheappropriatetemplateandstartthetest,howeverallthesetesttemplates,
configurationandconditions,canbemodifiedbytheoperatortotheirownconvenience,andcan
also create their own test templates. In every test template it is always possible to return to the
defaultconfiguration.
1.
General:Defaultscreen.GeneralTemplate,itallowsselectingand
controllinganyoutputvalue.Thiscanbealsoselecteddirectlyonthe
OptionsButton,besidestheTestTemplateslisting.
PossibilitytochoosetheOutputSource(HighcurrentPassThrough
SecondaryorAuxiliarySecondarycurrentorvoltageorHighVoltage
sourcethroughHVunit)
2. CircuitBreaker:Measurestriptimebydetectingzerocurrentstop
condition.ClassicalapplicationfortriptimetestingofMCB,MCCB,ACB,
etc,bothintermsofitsthermalelementanditsmagneticor
instantaneouselement.
InjectionbyPassThroughSecondary(mainAmmeter,Io)
Timerascountdown
TimerstopsbyZeroCurrent
3.
OvercurrentRelay:Throughinjectionofafaultcurrentthroughthe
primaryoftheCT,checkcorrectoperationoftheprotection,theeffective
tripofthebreaker,andverifythecompleteprimary/secondary/primary
loop.
InjectionbyPassThroughSecondary(mainAmmeter,Io)
Timerascountdown
TimerstopsbyBinaryInputactivation
BinaryinputasDrycontact,NormallyOpen
Page 2 of 12
4. Current Transformer (CT): Measures CT Turn ratio, polarity and angle error.
Withsametemplate,determineconnectedburdeninVAatthetestcurrent,
inimpedanceandthepowerfactoroftheburden.
Injection in Primary and measuring in secondary with the ammeter and
voltmeter.RatiometerdisplayedasIo/A1and/orratioerror,ifnominalratio
oftheCTentered.
InjectionbyPassThroughSecondary(mainAmmeter,Io)
Timerascountdown
Meters:
Ammeter(A1)
Voltmeter(V2)
Phaseangle(A1Io),(V2A1)
Calculatedparameters:
CTTurnRatio(Io/A1in)
Ratioerror
Burden,Z(V2A1)
ApparentPowerinVA,S(V2A1)
Cos(V2A1)
5/6.RogowskiCT/LowPowerCT:MeasuresCTratio,polarityandangleerror
ofRogowskitransformers,oralsolowpowerCT.
InjectionbyPassThroughSecondary(mainAmmeter,Io)
Meters:
LowsignalVoltmeter(V1)
Phase(polarity)betweenprimaryandsecondaryofthe
Transformer(V1Io)
Calculatedparameters:
CTturnratio(Io/V1)
7.ACresistance:measurestheresistanceofconnections,contactsand
otherelementswithaverylowinduction,calculatedbyinjecting
highcurrentandmeasuringvoltagedropintheelementterminals.
InjectionbyPassThroughSecondary(mainAmmeter,Io),countdowntimer.
Meters:
LowsignalVoltmeter(V1)
Phasebetweencurrentinjected
andmeasuredvoltage(V1Io)
Calculatedparameters:
Cos(V1Io)
ImpedanceZ(V1Io)
ResistanceR(V1Io)
Page 3 of 12
8.GroundGrid:Byinjectinghighcurrentandmeasuringwiththelowlevelsignal
voltmeter,itispossibletodetecttheexistenceofanyexcessivestress(bador
erodedcontact)inthegroundgrid.C15configurationatleastforgridtest.
Cablecrosssectionabout4050mm,winding10turnsintheequipment.
InjectionbyPassThroughSecondary(mainAmmeter,Io)
Timeraschronometer.Stopconditionbypushbutton.
Meters:LowsignalVoltmeter(V1)
9.CTBurden:BurdenconnectedmustbelowerthanratedCTburden,andsothis
templateenableustodetermineiftheCTissuitableornotforthisburden.By
injectingcurrentthroughsecondary,calculatesimpedance,powerandpowerfactor
oftheload.Currenttobeinjectedintotheburdenisthenominalsecondarycurrent
oftheCT,thatis,either1Aor5A.
Injectionthroughauxiliarysecondary(current)
Timeraschronometer.Stopconditionbypushbutton.
Meters:
Ammeter(A1)
Voltmeter(V2)
Phaseangle(V2A1)
Calculatedparameters:
Burden,Z(V2A1)
ApparentPowerinVA,S(V2A1)
Cos(V2A1)
10. CT, Voltage method: Calculates the CT turn ratio and polarity, by injecting
Voltage,forthecaseswhereisnotpossibletodirectlyinjectprimarycurrent
into the CT, for whatever reason, being this template an alternative.
Disconnectingtheload,itisperformedapplyingvoltageonitssecondaryside
withtheauxiliaryoutputofRaptor,andmeasuringthesecondaryvoltagewith
thevoltmeterandtheprimaryvoltagewiththelowsignalvoltmeter.
Injectionthroughauxiliarysecondary(Voltage)
Timeraschronometer.Stopbypushbutton.
Meters:
Voltmeter(V2)
LowLevelVoltmeter(V1)
Phaseanglebetween(V2V1)
Calculatedparameters:
CTturnratio(V2/V1)
Page 4 of 12
12. VT burden: Calculate impedance, power and power factor of the load,
disconnectingthesecondaryoftheVT,andapplyingvoltagetotheloadfromthe
auxiliary voltage output of Raptor, and measuring with the ammeter and
voltmeter.
Injectionthroughauxiliarysecondary(voltage)
Timeraschronometer
Stopconditionbypushbutton
Meters:
Ammeter(A1)
Voltmeter(V2)
Phaseangleof(V2A1)
Calculatedparameters:
BurdenZ(V2A1)
ApparentPowerinVA,S(V2A1)
Cos(V2A1)
13.ShortcircuitedPT:Templatetocarryoutshortcircuitedimpedancetestsin
PT. Several data are got with this template, injecting current in one winding,
shortingtheother,andmeasuringwiththeammeterandvoltmeter.
Injectionthroughauxiliarysecondary(current)
Timeraschronometer.Stopconditionbypushbutton
Meters:
Ammeter(A1)
Voltmeter(V2)
Phaseangle(V2A1)
Calculatedparameters:
Cos(V2A1)
PTshortcircuitImpedanceZ(V2A1)
PTreactancelossesX(V2A1)
ResistanceR(V2A1)
Page 5 of 12
14.PTratio:Measuresthevoltageratiobetweentheprimarywindingandthe
relativesecondarywindingofaPT.IfthePTisthreephase,ameasurementmust
carry out in each phase. If the neutral is not accessible in either of the two
windings, inject between two phases (H1H2) and measure on the Low side in
agreementwiththecalculationandconnectiondiagramrequired,dependingon
thePTconnectiongroup.
Injectionthroughauxiliarysecondary(Voltage)
Timeraschronometer
Stopconditionbypushbutton
Calculatedparameters:
Voltageratio(Vo/V2)
15. Polarity Test: Specific template to be used with the optional accessory
Raptor Polarity Tester (Raptor PT), to check polarity and correct wiring of all
secondary circuits, while the Raptor is injecting a special polarized signal from
theprimaryofthetransformers.
Injectionthroughanyoutputbutalreadysetaspolarized.
Calculatedparameters:
ImpedanceZ
ReactanceX
ResistanceR
Phaseangle(AhvVhv)
Cos(Ahv,Vhv)
Page 6 of 12
17. HV Voltage Transformer: Using the high voltage ouput of the HV unit,
checks VT turn ratio, polarity, primary/secondary phase angle, and burden by
applyingvoltagetotheprimary,andmeasuringsecondaryvoltage.
InjectionthroughHV.
Timeraschronometer.Stopconditionbypushbutton.
Meters:
Voltmeter(V2)
Ammeter(A1)
Phase(V2A1),(V2Vhv)
Calculatedparameters:
ApparentPowerinVA,S
ImpedanceZ
Cos(V2A1)
VTturnratio(Vhv/V2)
18. HV noload PT: measures the voltages ratio in distribution and power
transformers, using the high voltage output of the Raptor HV. Injection in
primarybetweentwophasesorphaseandneutral.
InjectionthroughHV.
Timeraschronometer.Stopconditionbypushbutton.
Meters:
Voltmeter(V2)
Ammeter(Ahv)
Phase(V2Vhv),(Ahv,Vhv)
Calculatedparameters:
MagnetizationImpedanceZ
MagnetizationReactanceX
Cos(AhvVhv)
Voltagesratio(Vhv/V2)
Page 7 of 12
New Template: the user can copy, edit and change the test templates; it is also
possible to create new Test Templates, with the type of hardware meters and
calculated parameters desired in the screen, the type and configuration of the
output source, start and stop time conditions, etc.., and save them with a new
name.
Recloser:
This function is designed to verify, in a very simple manner, the correct operation of an integrated
RECLOSER;thatis,adevicethatincludetheMVcircuitbreaker,theprotectionCTs,theprotectionrelay
with recloser function and the total control of the system. These devices are found more and more
frequentlyinMediumVoltageDistributioncircuits.
Theresultsshownincludetriptimeandreclosingtimeofeachoneofthereclosingcyclesthatthedevice
carriesout.Itdoesnotrequireanytypeofconfigurationbytheoperator.
.
TheautomatictestoftheRaptorprovidesasimplewaytoperformafunctionaltestoftheseimportant
devices.Thisinvolves,undersimulatedfaultconditions,theoperationoftheprotectiverelaysandcircuit
breakers, verifying the number and sequence of operations of the recloser until lockout. This primary
injection testing of the recloser, makes a reliable diagnostic of the recloser status and is quicker and
easierthanthetestperformedthroughasecondaryinjectionintheelectroniccontrol,enablingtocheck
the entire system, including the breaker, CTs, relays, control cables and wiring. It is also possible to
programthetotaltesttimetoadapttothedifferentreclosingtimesofthesesystems.
Page 8 of 12
CTMagnetizationCurveandKneePoint:
Automatictest,usingtheIECstandardcriteria,forobtainingtheCTmagnetizationcurveandkneepoint.
ItisperformedbyapplyingvoltagetothesecondaryoftheCT,(auxiliaryoutputfromtheRAPTOR),and
measuring with the voltmeter and ammeter. The test is fully automatic, including the final core
demagnetization,andonlyrequiresleavingopentheCTprimary. Note: ThistestislimitedbytheMaster
outputvoltageof200V.Thisvoltage issufficientformeasuringCTs(20%saturatedabovenominal)but
limitedforprotectionCT'swherevoltagemayeventuallyneedmorethan1000Vtosaturate,andfor
thoseitisusedtheHVunit
Page 9 of 12
Page 10 of 12
Step and Touch Voltage: For measuring the step & touch voltage characteristics of the protective
earthinginstallationsinsubstationsandotherelectricalfacilities,theRaptorHVisrequiredbyusingits
voltageoutputinthe1000VrangeandthemeasurementcapabilitiesoftheRaptorMasterunit.This
FunctionrequirestheuseoftheoptionalStep&Touchaccessorieskit.
Step voltage: The measurement is performed between two
groundpointsatadistanceof1masshownonFig.The25kg
measuring probes/electrodes simulates the feet. The voltage
between the probes is measured by a voltmeter with an
internalresistanceof1kthatsimulatesthebodyresistance.
NOTE:Thispaperisnotintendedasausermanual,butasummaryofmainfunctionsincludedbydefaultintheRaptor
System for purchase evaluation. At the time of using the equipment, always consult the appropriate user manual,
especiallyregardingsafetyprecautionsanddangersactionswhichmustbecarefullyobserved.
Page 11 of 12
RAPTORTESTTEMPLATES&ACCESSORIES
DefaultTestTemplates
&Functions
GeneralTestTemplate
CircuitBreaker
OvercurrentRelay
ACResistance
GroundGrid
RAPTOR
CXX
RAPTORHV
CurrentTransformer(CT)
Ratio,burden,polarity
RogowskiCT/LowPower
CT
CTBurden
CT,Voltagemethod
CTMagnetization
CTMagnetizationHV
WithstandVoltage
VoltageTransformer(VT)
Ratio,burden,polarity
VTburden
VTHV
WithstandVoltage
PTRatio
PTRatioHV
ShortcircuitedPT
ShortcircuitedPTHV
WithstandVoltage
*Options
*Options
*Options
*Options
cable40/50mm
MinimumC15
Polaritytest
Step&TouchVoltage
Recloser
TrainofPulses
PulsesRamp
Accessories
PolarityTester
Step&Touchkit
ForCTs
*Options
*Options
ForVTs
*Options
*Options
*Options
*Options
*Options
*Options
*Options
*Options
*Options
ForPTs
*Options
*Options
*Options
*Options
*Options
*Options
*Options
*Options
*Optionsforallconfigurations:
RAPTORSL
RAPTORHV
Ultraflexiblehighcurrentcables
Groupingplates
HighCurrentClamps
4mextensionforHH
PolarityTester
HardTransportCase
WarningLampforHV
EmergencyStopforHV
Step&Touchkit
Page 12 of 12
EUROPEAN OFFICE
EUROSMC S. A.
5840 POLIGONO INDUSTRIAL P-29, C/BURIL 69,
28400, COLLADO VILLALBA, MADRID, SPAIN
TEL:+34 91 849 8980
sales@eurosmc.com
support@eurosmc.com
USA OFFICE
NORAMSMC INC.
SOUTH MEMORIAL DRIVE - SUITE 208
TULSA OK7 74145 - USA
TEL: +1 918 622 5725
sales@noramsmc.com
latinam@eurosmc.com
ASIAN OFFICE
EUROSMC S. A.
UNIT A, 15/F, CHARMHILL CENTRE, 50
HILLWOOD RD, TSIM SHA TSUI, KOWLOON,
HONG KONG SAR
TEL: +852 3590 2499
asia@eurosmc.com
www.smcint.com
PRIMARYINJECTIONTESTSETS
MULTIFUNTIONALPRIMARYTESTSYSTEM
SECONDARYINJECTIONTESTSETS
UNIVERSALRELAYTESTSYSTEM
SINGLE/3PHASERELAYTESTING
AUTOMATIONRELAYTESTINGSOFTWARE
ELECTRICALMEASUREMENT
CIRCUITBREAKERANALYZERS
PHASEANGLEMETERS
DIGITALMICROOHMETERS
IEC61850GOOSESNIFFER
TRANSFORMERMAINTENANCE
TRANSFORMERTESTEQUIPMENT
SUBSTATIONTESTSETS
MCBTESTING