You are on page 1of 2

IWO Work Order Ref No.

: 15-017119

IWO Work Order Ref No. 15-017119


Requestor Details
Employee No.:
Name:
Immediate Superior:
Position:

930462
DIMAY HAROLD KING M.
Gan, Florencio Clinth
SUPERVISOR

Email Address:
Office Location:
Contact Number:
Team(s):

HMDimay@smart.com.ph
09473370609
WAPM

Work Order Details


Work Order Ref No.:
Pre-WO Ref. No.:
Request Status:
Title:
Nature of Request:
Environment:
Preferred Start Date of Activity:
Preferred End Date of Activity:
Requires CMC Approval:

15-017119

Change Element/Platform:
Major Activity:
Sub-Activity:
Specific Activity:
Vendor:

Access-RF
Creation/Construction
Hardware

No. of Elements Affected:


Network Equipments Affected:
Systems Affected:

Products or Services Affected:

Description:

Justification:
Proposed Risk Mitigation / Work-around:

Date Routed:
Parent WorkOrder Ref No.:
For Implementation Completion
S-NCR SWAP Project|Las Pinas|SubCluster 5 Implementation
Normal
Source of Request:
Prod
Point Person:
04/20/2015 00:00
Impact of Request:
05/04/2015 23:59
Est. Duration of Downtime:
No
Monitoring Period:

Resource Affected:

3rd party Vendor


Harold King Dimay
Service Affecting
Hours: 8
Minutes:
1 Day

SMM
2G 1800

ERICSSON, NOKIA

347 Zapote 2G 900/1800 3G 850/2100 FD LTE 2100


<br />355 Pamplona 2G 900/1800 3G 850/2100 FD LTE 2100
<br />G0677 Las Pinas-Quirino 2G 1800
<br />W71 Aguinaldo-Alabang-Zapote (SMART pole) 2G 1800
<br />
<br />06LPS904XSTARMALPINAS
<br />01LPS003PAMPLONA
Nokia 2G 900/1800
<br />Nokia 3G 850/2100
<br />Nokia FD-LTE 2100
S-NCR SWAP Project|Las Pinas|Cluster 5|Delivery/Installation/Power
Tapping/Commissioning/Intagration/Cutover/Antenna & Feeder
Swap/Walktest/Drivetest/Optimization/PAT
<br />
<br />Please see attachments for the complete documentations
<br />
<br />Please include Paul Tauson as approver
SNCR Swap Project Phase 1
-Spare Hardware will be on site upon scheduled activity
<br />-Advanced core/BSC/RNC/OSS creation will be requested
<br />-Advanced installation will be implemented upon availability of equipment at warehouse
<br /> -Support from TOC/TMC to ensure the Transmission readiness upon cutover activity.
<br /> -Support from NOC Config for FT scheduling

With SRI Update:


With TAMIT Update:

No
No

Scheduled CMC Presentation:


Approved Start Date of Activity:

09/08/2015 17:27

Actual Implementation Dates(per


Implementing Team):

Team
NCC NOC
TXBRO
WAPM

Implemented With Issues:

Regions Affected:

04/20/2015 09:36

Approved End Date of Activity:


Actual Start Date Actual End Date
of Activity
of Activity
07/02/2015 00:00 07/31/2015 23:59
05/04/2015 00:00 09/30/2015 23:59

09/15/2015 22:00
Shared
Folder/Path

Last Updated
07/25/2015 21:37
09/08/2015 17:20

No

Generated: 09/08/2015 20:16

IWO Work Order Ref No.: 15-017119


IPCarf Ref No. (For IP Request):
EMRF Ref No. (For Power Request):
CNSR Ref No.:
PPM No.:

Access Pass Details


Site:

Region

Facility:
List of Person(s):
Hazardous Condition:
Safety Arrangements:
Required PPE:

Site Number

SMM

00H42

SMM

00H77

SMM

G5798

SMM

G9932

Site Name
Manuyo Dos

Specific Location
Marquez Street, Manuyo
Dos, Paranaque City
RFC Mall - Pamplona Dos RFC Mall, Alabang-Zapote
reloc
Road, Las Pias City
SUN-Las Pinas-Star Mall C V Starr Ave, Brgy
Pamplona Dos, Las Pinas
City, Metro Manila
SUN PAMPLONA
Villafuerte Bldg 297 GP
Alabang-Zapote rd
Pamplona Las Pinas

N/A
N/A
N/A

Request Actors
Employee No.
Name
609
Gan, Florencio Clinth
930560
14549
930107

Cruz, Florentino
GARCIA RAYNAN P.
TUASON PAUL G.

930458
940000

CNCC PROJECT STAFF


164 Response Monitoring

Date/Time In:
Remarks on Safety & Security:

Department
Network Contract
Management
BUILD
TOC
NOC
Command Center
and Special
Operations
(CCSO)

Team
WAPM
WAPM
Secretariat-CNCC
FO12 SMM
Secretariat-CNCC
164 Hotline

Role
Endorser1

Action
Endorsed

Last Updated
04/20/2015 10:59

Endorser2
Secretariat
Invited
Approver Team
Scheduler
Reviewer

Endorsed
Approved
Approved

04/20/2015 16:05
04/21/2015 13:32
04/21/2015 13:30

Scheduled
Assessed

09/08/2015 17:27
04/21/2015 14:34

Date/Time Activity Completed:

Guard on Duty
Signature over printed name

Generated: 09/08/2015 20:16

You might also like