You are on page 1of 3

Federal Register / Vol. 70, No.

126 / Friday, July 1, 2005 / Notices 38235

Disabled Exchange traded on the facility its members regarding what fees will minimizing potential disruptions for the
of the Disabled Exchange at the Back-up apply to transactions in the listed markets and investors under those
Exchange. The proposed rule options of a Disabled Exchange effected circumstances.17 The proposed rule also
contemplates that the Back-up Exchange on a Backup Exchange under Rule 99. provides authority for Phlx to provide a
will perform the related regulatory The footnote provides that if Phlx is the back-up trading venue should another
functions with respect to such trading Disabled Exchange, the Backup exchange be affected by a Disabling
(except as the Back-up Exchange and Exchange has agreed to apply the per Event.
the Disabled Exchange may specifically contract and per contract side fees in the The Commission likewise finds that
agree otherwise). Phlx fee schedule to transactions in the proposed change to the Exchange’s
Section (d) of proposed Rule 99 Phlx exclusively listed options traded Fee Schedule is consistent with the Act.
provides that if a Backup Exchange on the Phlx facility on the Backup By affirming that Phlx and, by mutual
initiates an enforcement proceeding Exchange.14 If any other Phlx listed agreement, the Back-up Exchange will
with respect to the trading during a options are traded on the Backup apply the per contract and per contract
backup period of singly or multiply Exchange (such as Phlx singly listed side fees normally applicable to
listed options of the Disabled Exchange options) pursuant to Phlx Rule 99, the exclusively listed options under the
by a temporary member of the Backup fee schedule of the Backup Exchange Disabled Exchange’s fee schedule, the
Exchange or exclusively listed options shall apply to such trades. The footnote Commission believes that the proposed
of the Disabled Exchange by a member contains a second paragraph stating the rule change appears to be reasonably
of the Disabled Exchange (other than a converse if Phlx is the Backup Exchange designed to minimize the disruption
member of the Backup Exchange who is under Rule 99. associated with back-up trading of such
a temporary member of the Disabled options. The proposal also clarifies that,
III. Commission’s Findings and Order
Exchange), and such proceeding is in with regard to singly listed options, the
Granting Accelerated Approval of
process upon the conclusion of the fees charged shall be those set forth in
Proposed Rule Change
backup period, the Backup Exchange the Back-up Exchange fee schedule
may transfer responsibility for such After careful consideration, the where trading occurs at a Back-up
proceeding to the Disabled Exchange Commission finds that Phlx’s proposed Exchange, or, where trading occurs at
following the conclusion of the backup rule change is consistent with the Phlx, the Phlx fee schedule.
period. This approach to the exercise of requirements of the Exchange Act and
the rules and regulations thereunder, IV. Conclusion
enforcement jurisdiction is also
consistent with past precedent.13 applicable to a national securities It is therefore ordered, pursuant to
With respect to arbitration exchange.15 In particular, the Section 19(b)(2) of the Act,18 that the
jurisdiction, proposed Section (d) Commission finds that the proposed proposed rule change (SR–Phlx–2004–
provides that arbitration of any disputes rule change is consistent with Section 65), as amended by Amendment Nos. 1,
with respect to any trading during a 6(b)(5) of the Act,16 in that it is designed 2 and 3, is hereby approved.
backup period of singly or multiply to perfect the mechanisms of a free and For the Commission, by the Division of
listed options of the Disabled Exchange open market and to protect investors Market Regulation, pursuant to delegated
or of exclusively listed options of the and the public interest. authority.19
Disabled Exchange on the Disabled In light of the heightened security Jill M. Peterson,
Exchange’s facility at the Backup risks to the financial markets since the Assistant Secretary.
Exchange will be conducted in September 11, 2001 attacks on the
[FR Doc. E5–3459 Filed 6–30–05; 8:45 am]
accordance with the rules of the Backup World Trade Centers in New York City,
BILLING CODE 8010–01–P
Exchange, unless the parties to an the Commission has worked with the
arbitration agree that it shall be national securities exchanges to develop
conducted in accordance with the rules contingency plans and emergency
procedures, suggesting measures to SOCIAL SECURITY ADMINISTRATION
of the Disabled Exchange.
The purpose of these provisions is to minimize the potential disruption and
Agency Information Collection
permit a Backup Exchange to confer its market impact that a future Disabling
Activities: Emergency Consideration
temporary enforcement jurisdiction over Event could cause. The present rule
Request
a member or member organization of the change proposal is a direct response to
Disabled Exchange back to the Disabled that effort. The Social Security Administration
Exchange once the Disabled Exchange The Commission believes that Phlx’s (SSA) publishes a list of information
resumes normal operations. proposed rule changes are reasonably collection packages that will require
designed to address the key elements clearance by the Office of Management
f. Member Preparations necessary to mitigate the effects of a and Budget (OMB) in compliance with
To ensure that members are prepared Disabling Event affecting the Exchange. Pub. L. 104–13, the Paperwork
to implement Phlx’s back-up trading Specifically, the back-up trading Reduction Act of 1995, effective October
arrangements, proposed Section (e) of arrangements contemplated by proposed 1, 1995. The information collection
Proposed Rule 99 requires Phlx Phlx Rule 99 are intended to ensure that packages that may be included in this
members to take appropriate actions as Phlx’s exclusively listed and singly notice are for new information
instructed by Phlx to accommodate listed options will have a trading venue collections.
Phlx’s back-up trading arrangements in the event that trading at Phlx is SSA is soliciting comments on the
with other exchanges and Phlx’s own prevented due to a Disabling Event, thus accuracy of the agency’s burden
back-up trading arrangements.
14 When Phlx Dell options relocated to Amex in 17 The Commission notes that it has approved the

B. Fee Schedule June 1998, Phlx fees applied to transactions in Dell basic approach set forth in the proposal of deeming
options on the Amex. See supra note 12. a portion of the Back-up Exchange’s facilities to be
The Exchange proposes to add a 15 In approving this proposal, the Commission has a facility of the Disabled Exchange. See supra note
footnote to its Fee Schedule to inform considered its impact on efficiency, competition, 12.
and capital formation. 15 U.S.C. 78c(f). 18 15 U.S.C. 78s(b)(2).
13 See supra note 12. 16 15 U.S.C. 78f(b)(5). 19 17 CFR 200.30–3(a)(12).

VerDate jul<14>2003 18:11 Jun 30, 2005 Jkt 205001 PO 00000 Frm 00146 Fmt 4703 Sfmt 4703 E:\FR\FM\01JYN1.SGM 01JYN1
38236 Federal Register / Vol. 70, No. 126 / Friday, July 1, 2005 / Notices

estimate; the need for the information; Security Blvd., Baltimore, MD 21235. questions about categories such as
its practical utility; ways to enhance its Fax: 410–965–6400. household size, income, and assets. This
quality, utility, and clarity; and on ways The information collections listed information is self-reported by
to minimize burden on respondents, below have been submitted to OMB for applicants using form OMB No. 0960–
including the use of automated expedited Emergency Clearance. SSA is 0696 (SSA–1020), and thus, SSA needs
collection techniques or other forms of requesting Emergency Consideration a way to determine if this form is being
information technology. Written from OMB by 07/15/2005. Your completed accurately and completely
comments and recommendations comments on the information and a way to validate its determination
regarding the information collection(s) collections are requested by that date. decisions. To this end, SSA will use the
should be submitted to the OMB Desk You can obtain a copy of the OMB new Medicare Quality Review system to
Officer and the SSA Reports Clearance clearance packages by calling the SSA check the accuracy of the self-reported
Officer. The information can be mailed Reports Clearance Officer at 410–965– information on form OMB No. 0960–
and/or faxed to the individuals at the 0454, or by writing to the address listed 0696. In this system, SSA will conduct
addresses and fax numbers listed below: above. phone interviews with selected
1. Medicare Subsidy Quality Review
(OMB) Office of Management and applicants and will confirm information
Case Analysis Forms—20 CFR Part
Budget, Attn: Desk Officer for SSA, such as household size, income, and
418(b)(5)—0960—NEW. Under the aegis
New Executive Building, Room of the Medicare Modernization Act of assets.
10235, 725 17th St., NW., 2003, SSA will make Medicare Part D A questionnaire and several other
Washington, DC 20503. Fax: 202– subsidy determinations and will work forms will be used as part of the
395–6974. with the Centers for Medicare and Medicare Quality Review System. The
(SSA) Social Security Administration, Medicaid Services to administer the collection instruments, their
DCFAM, Attn: Reports Clearance subsidy. The subsidy determination is descriptions, and burden information
Officer, 1333 Annex Building, 6401 based on applicants’ answers to are listed in the table below.

Average Estimated
Number of Frequency of burden per
Form number and name Description of form annual burden
respondents response response (hours)
(minutes)

SSA–9301 (Medicare Subsidy Qual- Telephone questionnaire which will 10,000 1 35 5,833
ity Review Case Analysis Ques- be administered by SSA employ-
tionnaire). ees to applicants for Medicare
Part D Subsidy. Includes ques-
tions about family size, marriage,
income, assets, etc..
SSA–9302 (Notice of Quality Review After receiving notice of the sched- 10,000 1 15 2,500
Acknowledgement Form for those uled date/time of the telephone
with Phones). questionnaire, Part D applicants
will return this form confirming
their availability for the interview
and making note of any special
needs for the call..
SSA–9303 (Notice of Quality Review Same as for SSA–9302, except 1,000 1 15 250
Acknowledgement Form for those used by participants without
without Phones). phones or whose phone numbers
are not known by SSA. On form
SSA–9303, however, participants
confirm receipt of the letter and
are asked to call SSA on a speci-
fied date..
SSA–9308 (Request for Information) Form which SSA will send to var- 20,000 1 15 5,000
ious third parties to obtain/confirm
information reported by bene-
ficiaries..
SSA–9309 (Life Insurance Form completed by insurance com- 8,000 1 15 2,000
Verification Form). panies confirming type, face
value, cash surrender value and
dividends for insurance policies of
applicants for Medicare Part D
subsidy..
SSA–8510 (Authorization to the So- Beneficiaries give their permission 10,000 1 5 833
cial Security Administration to Ob- for SSA to contact third parties to
tain Personal Information). obtain/confirm information..

Total ........................................... .......................................................... ........................ ........................ ........................ 16,416

VerDate jul<14>2003 18:11 Jun 30, 2005 Jkt 205001 PO 00000 Frm 00147 Fmt 4703 Sfmt 4703 E:\FR\FM\01JYN1.SGM 01JYN1
Federal Register / Vol. 70, No. 126 / Friday, July 1, 2005 / Notices 38237

Total Estimated Annual Burden: 4.3 percent per year since 1990. TVA described for the first solution. As part
16,416 hours. supplies bulk electricity to this area of the second solution, TVA would also
Dated: June 24, 2005. through its Davidson, Pinhook, and upgrade about 75 miles of existing 161-
Craig Hartson,
Wilson 500-kV Substations. As a result kV transmission lines. These
of the rapid population growth, the transmission lines are located in
Acting Reports Clearance Officer, Social
Security Administration.
electrical load for this area has also Davidson, Rutherford, Williamson,
grown rapidly and is expected to exceed Sumner, Wilson, Coffee, Franklin, and
[FR Doc. 05–12980 Filed 6–30–05; 8:45 am]
the capacity of the 500-kV substations Bedford Counties. The upgrade work
BILLING CODE 4191–02–P
serving the area by 2010. Several 161-kV could range from replacing the
transmission lines serving the area from conductors to completely rebuilding the
these substations are also expected to lines.
TENNESSEE VALLEY AUTHORITY become overloaded by 2010. The third potential solution involves
TVA has studied these problems and the expansion of TVA’s existing
Environmental Impact Statement for tentatively concluded that the best Pinhook 500-kV Substation in
Rutherford-Williamson-Davidson method of remedying them is to either southwest Davidson County. The
Power Supply Improvement Project construct a new 500-kV substation or substation would be expanded by
AGENCY: Tennessee Valley Authority. expand an existing 500-kV substation. adding a second bank of 500/161-kV
ACTION: Notice of intent. The solution would also require the transformers. This solution would also
construction and operation of new 500- require the upgrading of about 115 miles
SUMMARY: The Tennessee Valley kV and 161-kV transmission lines and/ of existing 161-kV transmission lines.
Authority (TVA) will prepare an or upgrades to existing transmission These transmission lines are located in
environmental impact statement (EIS) lines. Davidson, Rutherford, Maury,
addressing the proposed construction Williamson, Coffee, Franklin, and
Project Description
and operation of a new or expanded Bedford Counties.
500-kilovolt (kV) substation and TVA has three potential alternative The new 500-kV transmission line
associated transmission line upgrades in solutions. The first would involve the would likely be built using self-
middle Tennessee. The substation construction of a new 500-kV substation supporting, laced steel towers on right-
would be located in Rutherford, in southwest Rutherford County near of-way 175 feet in width. The new 161-
Williamson, or Davidson County. Other Eagleville. The substation would require kV lines would likely be built using self-
project components would be located in an area of at least 50 to 75 acres. Major supporting single-pole or H-frame steel
these counties and in other counties in substation components would include towers on right-of-way 100 feet wide.
middle Tennessee. In the EIS, TVA will four 500/161-kV transformers, two 500- The structure types, right-of-way
evaluate the potential environmental kV breakers, and nine 161-kV breakers. characteristics, and line lengths remain
impacts of the construction, operation, TVA would also add four 500-kV to be determined and could change
and maintenance of the new and breakers to its Maury 500-kV substation when additional information is
upgraded facilities. TVA will use the in north-central Maury County. gathered.
EIS process to obtain public As part of this solution, TVA would Line construction would require
involvement on this proposal. Public also construct and operate a new 500-kV removal of trees within the line right-of-
comment is invited concerning both the transmission line from its Maury 500-kV way as well as any other nearby tall
scope of the EIS and environmental Substation to the new 500-kV trees which would endanger the safe
issues that should be addressed as a part substation. This line would likely be operation of the line. Construction of
of this EIS. about 2725 to 30 miles long and would the 500-kV support structures would
be built on right-of-way purchased by require the excavation of foundations
DATES: Comments on the scope and
TVA in the 1970s for construction of the for each of the tower legs. Support
environmental issues for the EIS must
Hartsville-Maury 500-kV transmission structures for the 161-kV lines would
be postmarked or e-mailed no later than
line. This line was never completed and normally not require separate
August 8, 2005, to ensure consideration.
the portion of the right-of-way proposed foundations and the poles would be
ADDRESSES: Written comments should for the new 500-kV line has remained in embedded in drilled holes. Cranes and
be sent to Charles P. Nicholson, TVA ownership and was never cleared. other heavy equipment would be
Environmental Policy and Planning, Three 161-kV transmission lines are also needed to construct the towers and pull
Tennessee Valley Authority, Mail Stop proposed. One of these, from the new the electrical conductor into place. After
WT 9B, 400 West Summit Hill Drive, 500-kV substation to the Almaville construction, the disturbed areas would
Knoxville, Tennessee 37902–1401. Substation, would be about 7 miles long be restored, and the right-of-way would
Comments may be e-mailed to and built on vacant right-of-way owned be maintained periodically to control
cpnichol@tva.gov. by TVA. A double-circuit line about 12 the growth of tall vegetation that could
FOR FURTHER INFORMATION CONTACT: miles long would be built on new right- endanger the line. A detailed
Hugh S. Barger, Environmental of-way between the new substation and description these activities, as well as
Engineer, Transmission/Power Supply, the Christiana substation. Another line applicable and appropriate
Tennessee Valley Authority, Mail Stop about 2.5 miles long would connect the environmental protection measures, will
MR 4G–C, 1101 Market Street, Murfreesboro-Triune-E. Franklin 161-kV be provided in the EIS.
Chattanooga, Tennessee 37402–2801. transmission line to the new substation. After the completion of scoping, TVA
Telephone (423) 751–3131. E-mail may The proposed transmission lines are will begin detailed studies for siting the
be sent to hsbarger@tva.gov. located in Rutherford, Maury, and substation and routing the transmission
SUPPLEMENTARY INFORMATION: Williamson Counties. lines using maps, aerial photography
The second potential solution and other relevant data. When the
Background involves the construction and operation studies have progressed sufficiently,
The population in Murfreesboro, of a new 500-kV substation in northeast potentially affected landowners will be
Franklin, and surrounding areas of Williamson County near Brentwood. contacted directly, and additional field
Middle Tennessee has grown at a rate of The substation would be similar to that surveys will be conducted.

VerDate jul<14>2003 18:11 Jun 30, 2005 Jkt 205001 PO 00000 Frm 00148 Fmt 4703 Sfmt 4703 E:\FR\FM\01JYN1.SGM 01JYN1

You might also like