DAFTAR ISI
Dokumen-dokumen dalam lembar soal berikut meliputi beberapa
bagian diantaranya adalah :
1. LKS2015_TPRA.doc Bagian A : Kisi-Kisi Lomba
2. LKS2015_TPRA.doc Bagian B : Petunjuk Lomba
3. LKS2015_TPRA.doc Bagian C : Soal Soal Lomba
4. LKS2015_TPRA.doc Bagian D : Gambar / Drawing
5. LKS2015_TPRA.doc Bagian E : Peralatanan Perlengkapan
6. LKS2015_TPRA.doc Bagian F : Skematik Penilaian
Page 2
LKS2015_TPRA.doc Bagian A
BAGIAN A
KISI-KISI LOMBA
Page 3
INFORMASI LOMBA
DESKRIPSI TEKNIK
A. Nama dan Deskripsi Kompetensi
1. Nama kompetensi adalah Teknik Pendingin dan Tata Udara
2. Jenis yang dikompetensikan pada Teknik Pendingin dan Tata Udara adalah perakitan dan
pengelasan, sistem pemipaan refrigerasi dan pemasangan sisten AC split
3. Peserta Lomba dipilih oleh propinsinya masing-masing.
4. Syarat peserta adalah siswa SMK yang sesuai dengan jurusan Teknik Pendingin dan Tata
Udara
5. Kompetisi dilakukan secara individual. Jumlah peserta dalam 1 team mewakili 1 SMK dan 1
team terdiri dari 1 orang.
B. Ruang Lingkup Kompetensi :
1. Peserta harus mampu :
a. Membaca gambar kerja pemipaan dan kelistrikan sistem refrigerasi dan tata udara
b. Membentuk berbagai macam pola sambungan pemipaan dan penggunaan peralatan
mekanik guna mendukung sistem refrigerasi dan tata udara.
c. Memasang AC split pada papan panel dan menguji coba hasil rakitannya,
d. Memasang sistem pemipaan refrigerasi pada display case dan menguji coba hasil
rakitannya
e. Menemukan dan menganalisa kesalahan sistem kelistrikan dan sistem refrigerasi.
2. Proyek dilaksanakan dalam 3 hari dimulai pukul 08.30 sampai pukul 17.00
C. Kerja Praktik :
1. Desain : proyek akan didesain dengan menggunakan komponen industri sesungguhnya yaitu
AC split, kompresor,evaporator, kondenser, dan alat ekspansi
2. Pemasangan : refrigerasi dan tata udara dipasang pada papan panel peraga sesuai dengan
gambar rancangan,
3. Komisioning : rancangan harus dapat difungsikan sesuai dengan instruksi/dokumentasi.
4. Tidak ada kesalahan yang disengaja dilakukan oleh peserta.
5. Troubleshooting : mencari kesalahan pada rangkaian yang kesalahannya dibuat oleh juri.
D. Pengetahuan Teori :
1. Desain rangkaian : peserta harus mengetahui fungsi komponen-komponen utama sistem tata
udara dan refrigerasi, elektrik dan aksesories lainya serta dapat menjelaskan fungsi
rangkaian,
2. Analisa teknik : peserta harus mampu menganalisa rangkaian untuk menemukan kesalahankesalahan yang terjadi pada rangkaian kontrol.
E. Material :
Disediakan oleh panitia lomba :
1. AC Split
2. Condensing Unit
3. Recovery unit
4. Sumber listrik 220 VAC
5. Bahan Utama sistem pendingin
Page 4
Page 5
Nilai
60 poin
40 poin
Waktu
10 jam
6 jam
C. Jadual Kegiatan :
1. Hari ke 1 :
Pembukaan
. Familiarisasi peralatan,
2. Hari ke 2 :
Test Project 1: Refrigeration system installation & commisioning
3. Hari ke 3 :
Test Project 2: Air conditioning Installing & Commissioning
4. Hari ke 4 :
Penutupan
Page 6
LKS2015_TPRA.doc Bagian B
BAGIAN B
PETUNJUK LOMBA
Page 7
Soal LKS ini dibuat untuk menguji peserta Lomba dalam memasang atau merakit peralatan sistem
refrigerasi dan Tata Udara (split air conditioner), termasuk melakukan proses perbaikan pada peralatan
tersebut.
A. Soal Lomba
Ada dua (2) soal lomba yang akan diujikan dengan total waktu adalah 16 jam.
1. Refrigeration System Installation & Commissioning
2. Air-Conditioning System Installation & Commissioning
60 poin
40 poin
10 jam
6 jam
B. Informasi Tambahan
Beberapa informasi tambahan berkenaan dengan lomba akan diberikan pada saat kompetisi
diantaranya adalah :
- Jadwal detail lomba.
- Persyaratan yang berhubungan dengan keselamatan dan kesehatan kerja (K3)
- Kategori peraturan dan prosedur lomba
- Dan beberapa informasi lain yang dianggap perlu untuk disampaikan
C. Alokasi Waktu Penyelesaian Soal
Setiap peserta lomba diwajibkan untuk dapat menyelesaikan soal sesuai dengan waktu yang telah
ditetapkan dan tidak diberikan penambahan nilai pada saat peserta dapat menyelesaikan soal lebih
cepat daripada waktu yang telah ditetapkan. Penambahan waktu tidak akan diberikan kepada
seluruh peserta.
Pada saat peserta telah menyelesaikan pemipaan peserta harus meminta juri menilai pekerjaannya
dengan melakukan test kebocoran kurang lebih 15 menit sebelum melanjutkan pada tahap
berikutnya, dan juga 10 menit untuk menilai hasil proses pemvakuman yang dilakukan oleh peserta.
D. Poin Pengecekan
Hal penting dalam lomba ini adalah adanya prosedur yang menghendaki setiap peserta untuk
meminta kepada juri untuk mengobservasi setiap langkah kerja yang dilakukannya. Sebagai contoh
pada saat peserta telah menyelesaikan proses pemvakuman unit, maka peserta meminta salah
seorang juri untuk melakukan observasi hasil pekerjaannya dan meminta juri untuk menandatangani
kotak proses vakum yang tersedia dalam soal. Silahkan lihat pada contoh berikut :
Proses Pemvakuman Sistem
Juri:
Page 8
Page 9
LKS2015_TPRA.doc Bagian C
BAGIAN C
SOAL SOAL LOMBA
Page 10
60 Marks
The competitor is required to position and install the supplied refrigeration equipment according to the schematic
pipe work diagram that will be supplied.
Drawing Rthat relate to this module are as follows:
R.001 (Flow Diagram) included in Test Project Section 1: Test Project Drawings
R.002 (Wiring Diagram) included in Test Project Section 1: Test Project Drawings
R.003 (Equipment Layout) included in Test Project Section 1: Test Project Drawings
R.004 (Letters COOL Layout Front) included in Test Project Section 1: Test Project Drawings
R.005 (Letters COOL Layout Rear) included in Test Project Section 1: Test Project Drawings
R.006 (Letters COOL flow direction) included in Test Project Section 1: Test Project Drawings
Components will include the following :
Major system components
Condensing unit
Evaporator koil
Refrigeration quality pipe work
Electrical components
Refrigeration system flow control and valves including
Liquid line filter drier
Sight glass
Thermostatic expansion valve with ext. equilizer
Low pressure and high pressure gauges
Pressure access valves
Refrigerant R134a
Refrigeration quality copper pipework
Electrical system component including:
Safety pressure controls
Temperature controller
Relays, contactors and associated switch gear
The competitors required to commission the system within the time limit. When you have finished commissioning
the system you are required to record the operational settings on a System Data Sheet that will be provided to
each competitor. The competitor must ask Jury to check their own commissioning records and obtain Jury
signature in the space provided in the commissioning sheet.
Page 11
Page 12
To be filled in by Competitor
Pressure Test Value
kPa, psi =
Starting Time:
Pressure at End of Test:
kPa, psi =
Finishing Time:
Jury 1.
Jury 2.
Jury 3.
Page 13
4. Evacuation
Under the supervision of Jury, evacuate the refrigeration system in accordance with
manufacturers instructions and National standards using the Deep Vacuum Method to hold a vacuum
of at least 1000 microns (130 Pa absolute) of mercury. The evacuation point should not rise more than
20% of the starting point in the Ten (10) minutes after the vacuum pump is isolated from the system
under test. If the evacuation below 1000 micron has not been reached within 1 Hour, the competitor can
continue to achieve the evacuation; however the full mark for Evacuation will be lost.
PLEASE FILL IN THE JURY CHECK POINT SHEET AT THE BACK OF THIS DOCUMENT BEFORE
PROCEEDING ANY FURTHER
Micron =
Starting Time:
Evacuation Level at End of Test:
Micron =
Finishing Time:
Jury 1.
Jury 2.
Jury 3.
Page 14
PLEASE FILL IN THE JURY CHECK POINT SHEET AT THE BACK OF THIS DOCUMENT BEFORE
PROCEEDING ANY FURTHER
grams pounds
grams pounds
grams pounds
Jury 1.
Jury 2.
Jury 3.
Page 15
6. Electrical testing
Under the supervision of Jury, perform all necessary safety checks to ensure the test project is safe
to energise.
PLEASE FILL IN THE JURY CHECK POINT SHEET AT THE BACK OF THIS DOCUMENT BEFORE
PROCEEDING ANY FURTHER
Yes
Yes
Comments:
Jury 1.
Jury 2.
Jury 3.
Page 16
Competitors are to commission the system for operation in accordance with the design specifications
supplied. Please fill out the following commissioning document with the system fully operational.
Competitor Name:
Competitor Province:
Ambient Temperature .... Celsius
...... Fahrenheit :
Refrigerant Type:
Mass of Refrigerant Charge .... grams ....
Suction Pressure .... kPa
pounds :
..... psi
..... psi :
Amps:
Jury 2.
Jury 3.
Page 17
40 Marks
The competitor will be issued with a split type inverter air conditioning system that includes R410A refrigerant
charge. The competitor will be required to position, install and commission the Indoor unit and Outdoor unit,
pipe work and associated wiring onto a supplied frame work. The installation of a Condensate drain is also
required.
The test module requires the installed pipe work to be Pressure tested and Evacuation tested according to
the World Skills standards within the time limit. You are then to commission the system according to the
specifications provided.
Drawing R.006 (Component Layout Drawing) refers.
The competitors required to commission the system within the time limit.
When you have finished commissioning the system; you are required to record the operational settings on a
System Data Sheet that will be supplied to you.
The competitor must ask a Jury to check their own commissioning records and obtain Jury signature in the
space provided on the commissioning sheet.
+21 oC
High Speed.
Louvre Setting
Fixed open
Jury Initials
Jury Initials
Page 18
Ambient Temperature
Suction Pressure
Discharge Pressure
Gram, Ounces
C, F
kPa, psi
kPa, psi
C,
C,
K,
F
R
C,
C,
F
F
Bar
Bar
=
=
=
=
=
=
=
Page 19
Fan speed
High
Medium
m/se
Ft/sec
Amp
Low
Jury 1.
Jury 2.
Jury 3.
There will be any number of component replacement tasks available and each individual task
will be kept secret in its own envelope until the time of this competition module.
The task description will be announced at the start of the module test by the Jury or the
delegated representative.
The module is designed to test the Competitors ability to recover refrigerant in an environmentally
safe way.
Page 20
Competitor Name:
Competitor Province:
Jury to fill out:
Start time:
Finishing time:
EvacuationTest Observed
Recommissioning Observed
Jury Initials
Jury Initials
Jury Initials
Jury Initials
LKS2014_TPRA.doc Bagian D
Page 21
BAGIAN D
GAMBAR / DRAWING
Page 22
Drawing R.001
Page 23
Drawing R.002
Page 24
Drawing R.003
Page 25
Drawing R.004
Page 26
Drawing R.005
Page 27
Drawing R.006
Page 28
Page 29
LKS2014_TPRA.doc Bagian E
BAGIAN E
PERALATAN & PERLENGKAPAN PESERTA
Page 30
Refrigeration
Set of gauges R-134a and R410A
Gauge manifold set R134a and R410A
Vacuum gauge, down to 50 Pascal
Scale digital balanced
Ratchet key
Schrader valve key
Allen keys imperial and metric
Vacuum pump
Digital Thermometers with at least 2 sensors
Electronic Leak Detector
Leak detection solution
Small mirror
Electrical Work
Wire Strippers
Electricians pliers
Multigrips
Electrical Crimping Tools
Megohmmeter
Multi-meter
Safety
Clothing, long sleeves, long work trousers
Emergency cloth
Safety shoes
Clear Safety glasses
Gloves
Page 31
LKS2014_TPRA.doc Bagian F
BAGIAN F
SKEMATIK PENILAIAN
Page 32
SKEMATIK PENILAIAN
Berikut ini adalah Rangkuman skala penilaian untuk bidang Refrigerasi & Air Conditioning
yang harus dipersiapkan oleh seluruh peserta sesuai bahasa masing-masing pada bagian
Informasi, dilakukan sebelum pelaksanaan lomba.
Gambaran teknis untuk Refrigerasi & Air Conditioning pada bagian F merupakan daftar
keterampilan yang harus dipenuhi oleh peserta lomba dan kriteria penilaian akan di berikan
untuk semua modul berikut:
Kriteria Keterampilan (Skill)
Nilai Maksimum
Component fabrication
12.50
20.00
Electrical Installation
15.00
17.50
10.00
10.00
10.00
10.00
Total
100.00
Page 33