Test ProjectRefrigeration and Air Conditioning

National Vocational Students Skills Competition - 2015

Test Project For Skills Refrigeration and Air Conditioning


Province Vocational Students Skills Competition - 2015

Page 1

DAFTAR ISI
Dokumen-dokumen dalam lembar soal berikut meliputi beberapa
bagian diantaranya adalah :
1. LKS2015_TPRA.doc Bagian A : Kisi-Kisi Lomba
2. LKS2015_TPRA.doc Bagian B : Petunjuk Lomba
3. LKS2015_TPRA.doc Bagian C : Soal Soal Lomba
4. LKS2015_TPRA.doc Bagian D : Gambar / Drawing
5. LKS2015_TPRA.doc Bagian E : Peralatanan Perlengkapan
6. LKS2015_TPRA.doc Bagian F : Skematik Penilaian

Test Project For Skills Refrigeration and Air Conditioning


Province Vocational Students Skills Competition - 2015

Page 2

LKS2015_TPRA.doc Bagian A

BAGIAN A
KISI-KISI LOMBA

Test Project For Skills Refrigeration and Air Conditioning


Province Vocational Students Skills Competition - 2015

Page 3

INFORMASI LOMBA
DESKRIPSI TEKNIK
A. Nama dan Deskripsi Kompetensi
1. Nama kompetensi adalah Teknik Pendingin dan Tata Udara
2. Jenis yang dikompetensikan pada Teknik Pendingin dan Tata Udara adalah perakitan dan
pengelasan, sistem pemipaan refrigerasi dan pemasangan sisten AC split
3. Peserta Lomba dipilih oleh propinsinya masing-masing.
4. Syarat peserta adalah siswa SMK yang sesuai dengan jurusan Teknik Pendingin dan Tata
Udara
5. Kompetisi dilakukan secara individual. Jumlah peserta dalam 1 team mewakili 1 SMK dan 1
team terdiri dari 1 orang.
B. Ruang Lingkup Kompetensi :
1. Peserta harus mampu :
a. Membaca gambar kerja pemipaan dan kelistrikan sistem refrigerasi dan tata udara
b. Membentuk berbagai macam pola sambungan pemipaan dan penggunaan peralatan
mekanik guna mendukung sistem refrigerasi dan tata udara.
c. Memasang AC split pada papan panel dan menguji coba hasil rakitannya,
d. Memasang sistem pemipaan refrigerasi pada display case dan menguji coba hasil
rakitannya
e. Menemukan dan menganalisa kesalahan sistem kelistrikan dan sistem refrigerasi.
2. Proyek dilaksanakan dalam 3 hari dimulai pukul 08.30 sampai pukul 17.00
C. Kerja Praktik :
1. Desain : proyek akan didesain dengan menggunakan komponen industri sesungguhnya yaitu
AC split, kompresor,evaporator, kondenser, dan alat ekspansi
2. Pemasangan : refrigerasi dan tata udara dipasang pada papan panel peraga sesuai dengan
gambar rancangan,
3. Komisioning : rancangan harus dapat difungsikan sesuai dengan instruksi/dokumentasi.
4. Tidak ada kesalahan yang disengaja dilakukan oleh peserta.
5. Troubleshooting : mencari kesalahan pada rangkaian yang kesalahannya dibuat oleh juri.
D. Pengetahuan Teori :
1. Desain rangkaian : peserta harus mengetahui fungsi komponen-komponen utama sistem tata
udara dan refrigerasi, elektrik dan aksesories lainya serta dapat menjelaskan fungsi
rangkaian,
2. Analisa teknik : peserta harus mampu menganalisa rangkaian untuk menemukan kesalahankesalahan yang terjadi pada rangkaian kontrol.
E. Material :
Disediakan oleh panitia lomba :
1. AC Split
2. Condensing Unit
3. Recovery unit
4. Sumber listrik 220 VAC
5. Bahan Utama sistem pendingin

Test Project For Skills Refrigeration and Air Conditioning


Province Vocational Students Skills Competition - 2015

Page 4

Disediakan oleh peserta :


1. Diperbolehkan membawa multi meter sendiri
2. Diperbolehkan membawa manifold gauge sendiri
3. Membawa peralatan tulis.
4. Peralatan yang diperlukan untuk perakitan dan pengelasan pipa, pemasangan air conditioner,
dan pemasangan sistem refrigerasi pada refrigerator dan display case.
F. Ruangan :
Minimal ruangan adalah 10 x 10 m dan dilengkapi dengan meja dan kursi untuk peserta, meja
untuk peralatan komponen, meja untuk juri/panitia, dan dilengkapi dengan sumber listrik 220V
G. Kriteria Penilaian :
1. Ketepatan ukuran dan kerapihan hasil kerja para peserta
2. Peralatan yang dirancang dapat bekerja sesuai dengan lembar kerja yang diberikan ,
3. Tidak melebihi waktu yang diberikan dalam merakit, realisasi, dan mencari kesalahan
(troubleshooting),
4. Waktu yang dinilai adalah waktu sebelum waktu maksimum dengan hasil pekerjaan benar.
5. Kebenaran rangkaian setelah proses trouble-shooting.

GAMBARAN UMUM SOAL LOMBA


A. Bentuk Soal
Soal yang dikompetensikan adalah perakitan sistem refrigerasi dan tata udara, bentuk detail
soal dalam bahasa Inggris.
B. Soal
1. Perakitan sistem refrigerasi
a. Merakit sistem refigerasi dan sistem kelistrikan sesuai gambar dan melakukan pengaturan
suhu sesuai menu yang ada pada sistem kontrol alat tersebut.
b. Menjalankan sistem refrigerasi dan control
2. Pemasangan sistem tata udara (unit AC) pada papan peraga :
Memasang (instalasi) unit AC sesuai dengan spesifikasi produk yang telah dibuat oleh
manufakturing, detail berupa :
a. Membangun sistem pemipaan untuk AC Split
b. Merakit sistem kelistrikan AC Split pada papan peraga sesuai gambar yang ditentukan.
c. Mencari dan menganalisa gangguan sistem kelistrikan dan mekanik yang ada pada Split
Air Conditioner
d. Melakukan proses recovery refrigeran pada unit air conditioning

Test Project For Skills Refrigeration and Air Conditioning


Province Vocational Students Skills Competition - 2015

Page 5

5. Kriteria Soal Lomba, Nilai dan Waktu


Soal Lomba
1. Refrigeration System Installation & Commissioning
2. Air-Conditioning System Installation & Commissioning

Nilai
60 poin
40 poin

Waktu
10 jam
6 jam

C. Jadual Kegiatan :
1. Hari ke 1 :
Pembukaan
. Familiarisasi peralatan,
2. Hari ke 2 :
Test Project 1: Refrigeration system installation & commisioning
3. Hari ke 3 :
Test Project 2: Air conditioning Installing & Commissioning
4. Hari ke 4 :
Penutupan

Test Project For Skills Refrigeration and Air Conditioning


Province Vocational Students Skills Competition - 2015

Page 6

LKS2015_TPRA.doc Bagian B

BAGIAN B
PETUNJUK LOMBA

PETUNJUK UNTUK PESERTA LOMBA

Test Project For Skills Refrigeration and Air Conditioning


Province Vocational Students Skills Competition - 2015

Page 7

Soal LKS ini dibuat untuk menguji peserta Lomba dalam memasang atau merakit peralatan sistem
refrigerasi dan Tata Udara (split air conditioner), termasuk melakukan proses perbaikan pada peralatan
tersebut.
A. Soal Lomba
Ada dua (2) soal lomba yang akan diujikan dengan total waktu adalah 16 jam.
1. Refrigeration System Installation & Commissioning
2. Air-Conditioning System Installation & Commissioning

60 poin
40 poin

10 jam
6 jam

B. Informasi Tambahan
Beberapa informasi tambahan berkenaan dengan lomba akan diberikan pada saat kompetisi
diantaranya adalah :
- Jadwal detail lomba.
- Persyaratan yang berhubungan dengan keselamatan dan kesehatan kerja (K3)
- Kategori peraturan dan prosedur lomba
- Dan beberapa informasi lain yang dianggap perlu untuk disampaikan
C. Alokasi Waktu Penyelesaian Soal
Setiap peserta lomba diwajibkan untuk dapat menyelesaikan soal sesuai dengan waktu yang telah
ditetapkan dan tidak diberikan penambahan nilai pada saat peserta dapat menyelesaikan soal lebih
cepat daripada waktu yang telah ditetapkan. Penambahan waktu tidak akan diberikan kepada
seluruh peserta.
Pada saat peserta telah menyelesaikan pemipaan peserta harus meminta juri menilai pekerjaannya
dengan melakukan test kebocoran kurang lebih 15 menit sebelum melanjutkan pada tahap
berikutnya, dan juga 10 menit untuk menilai hasil proses pemvakuman yang dilakukan oleh peserta.
D. Poin Pengecekan
Hal penting dalam lomba ini adalah adanya prosedur yang menghendaki setiap peserta untuk
meminta kepada juri untuk mengobservasi setiap langkah kerja yang dilakukannya. Sebagai contoh
pada saat peserta telah menyelesaikan proses pemvakuman unit, maka peserta meminta salah
seorang juri untuk melakukan observasi hasil pekerjaannya dan meminta juri untuk menandatangani
kotak proses vakum yang tersedia dalam soal. Silahkan lihat pada contoh berikut :
Proses Pemvakuman Sistem

Juri:

Test Project For Skills Refrigeration and Air Conditioning


Province Vocational Students Skills Competition - 2015

Page 8

Informasi Keselamatan (Safety)


Selama Lomba, seluruh peserta diwajibkan mengikuti dan melaksanakan aturan keselamatan yang
telah ditetapkan, yaitu :
1. Sepatu Kerja :
Diwajibkan untuk menggunakan sepatu keselamatan (Safety Shoes).
2. Pakaian Kerja :
Menggunakan baju kerja dengan bagian tangan dan kaki sepenuhnya terlindungi (trousers or
overalls).
Tubuh bagian atas selalu tertutup.
Lengan harus tertutup dengan menggunakan pakaian lengan panjang pada saat pengelasan
dan penanganan Refrigerant.
3. Pelindung Mata
Wajib mengenakan pelindung mata (Kaca Mata) putih atau Clear Glasses.
Terutama untuk pekerjaan brazing, soldering, filing, reaming, hack-sawing, drilling, grinding dan
penanganan refrigerant, dry nitrogent dan udara bertekanan., termasuk ketika sedang
mengerjakan pekerjaan kelistrikan.
4. Sarung Tangan
Harus digunakan pada saat Brazing dan penanganan refrigerants
Wajib digunakan pada saat melakukan pekerjaan kelistrikan termasuk pengujian kelistrikan.
5. Kelistrikan
Seluruh peserta wajib untuk meminta izin dari Juri pada saat ingin mengoperasikan semua
peralatan listrik kecuali peralatan kerja seperti Bor dan hand power tools lainnya.
Setiap peserta yang terindikasi tidak menggunakan peralatan keselamatan yang telah ditentukan dapat
diberhentikan aktivitasnya oleh Juri sampai peserta tersebut memenuhi persyaratan keselamatan yang
dimaksud.

Test Project For Skills Refrigeration and Air Conditioning


Province Vocational Students Skills Competition - 2015

Page 9

LKS2015_TPRA.doc Bagian C

BAGIAN C
SOAL SOAL LOMBA

Test Project For Skills Refrigeration and Air Conditioning


Province Vocational Students Skills Competition - 2015

Page 10

Competition Details - Module 1


Refrigeration System Installation and Commissioning
Maximum Time Allowed 10 hours

60 Marks

The competitor is required to position and install the supplied refrigeration equipment according to the schematic
pipe work diagram that will be supplied.
Drawing Rthat relate to this module are as follows:
R.001 (Flow Diagram) included in Test Project Section 1: Test Project Drawings
R.002 (Wiring Diagram) included in Test Project Section 1: Test Project Drawings
R.003 (Equipment Layout) included in Test Project Section 1: Test Project Drawings
R.004 (Letters COOL Layout Front) included in Test Project Section 1: Test Project Drawings
R.005 (Letters COOL Layout Rear) included in Test Project Section 1: Test Project Drawings
R.006 (Letters COOL flow direction) included in Test Project Section 1: Test Project Drawings
Components will include the following :
Major system components
Condensing unit
Evaporator koil
Refrigeration quality pipe work
Electrical components
Refrigeration system flow control and valves including
Liquid line filter drier
Sight glass
Thermostatic expansion valve with ext. equilizer
Low pressure and high pressure gauges
Pressure access valves
Refrigerant R134a
Refrigeration quality copper pipework
Electrical system component including:
Safety pressure controls
Temperature controller
Relays, contactors and associated switch gear
The competitors required to commission the system within the time limit. When you have finished commissioning
the system you are required to record the operational settings on a System Data Sheet that will be provided to
each competitor. The competitor must ask Jury to check their own commissioning records and obtain Jury
signature in the space provided in the commissioning sheet.

Test Project For Skills Refrigeration and Air Conditioning


Province Vocational Students Skills Competition - 2015

Page 11

System Design Specifications


The following system design specifications for the installation should be used for commissioning and control
setting and are as follows:
SYSTEM SPECIFICATIONS
- Refrigerant = R134a
- Maximum ambient temperature = 33C Db, 28C Wb
- Design saturated suction temperature = -15 C
- Suction line pressure drop = 1 K
CONTROL AND SAFETY SETTING
- Low Pressure Controller cut off 5K lower than design saturated suction temperature (SST).
- Low Pressure Controller cut in at -10 C.
- High Pressure cut out the system when the Condensing temperature reaches 55 C.

Install and Commission Refrigeration System


All competitors will be required to perform the following tasks to complete this module, all tasks except task 1 and
2 have an expert sign off sheet which needs to be filled in and signed prior to moving ahead on each task

1. Install Refrigeration System


All competitors will supplied with all necessary equipment and materials to complete the installation of the
refrigeration system in accordance with test project drawings and Worldskills International Standard for
Refrigeration & Air Conditioning.

2. Install Electrical System


All competitors will supplied with all necessary equipment and materials to complete the installation of the
refrigeration system in accordance with test project drawings and National skills Standard for Refrigeration & Air
Conditioning.

Test Project For Skills Refrigeration and Air Conditioning


Province Vocational Students Skills Competition - 2015

Page 12

3. Pressure Test System


Under the supervision of jury, carry out a staged pressure test of the refrigeration system in
accordance to manufacturers equipment instructions and National skills standards. The pressure test point
should not drop from the starting point in the fifteen (15) minutes after the pressure test is isolated from the
Nitrogen cylinder. If the pressure test has not been achieved, the competitor can continue to fix the leak and
achieve the pressure test, however the full mark for Pressure Test will be lost.
PLEASE FILL IN THE JURY CHECK POINT SHEET BELOW BEFORE PROCEEDING ANY FURTHER

To be filled in by Competitor
Pressure Test Value

Bar, kPa, psi =

To be filled in by JURY ONLY


Competitor Name:
Competitor province:
Pressure at Start of Test:

kPa, psi =

Starting Time:
Pressure at End of Test:

kPa, psi =

Finishing Time:
Jury 1.

Refrigeration System Pressure Test

Jury 2.
Jury 3.

Test Project For Skills Refrigeration and Air Conditioning


Province Vocational Students Skills Competition - 2015

Page 13

4. Evacuation
Under the supervision of Jury, evacuate the refrigeration system in accordance with
manufacturers instructions and National standards using the Deep Vacuum Method to hold a vacuum
of at least 1000 microns (130 Pa absolute) of mercury. The evacuation point should not rise more than
20% of the starting point in the Ten (10) minutes after the vacuum pump is isolated from the system
under test. If the evacuation below 1000 micron has not been reached within 1 Hour, the competitor can
continue to achieve the evacuation; however the full mark for Evacuation will be lost.
PLEASE FILL IN THE JURY CHECK POINT SHEET AT THE BACK OF THIS DOCUMENT BEFORE
PROCEEDING ANY FURTHER

To be filled in by JURY ONLY


Competitor Name:
Competitor Province:
Evacuation Level at Start of Test:

Micron =

Starting Time:
Evacuation Level at End of Test:

Micron =

Finishing Time:
Jury 1.

Refrigeration System Pressure Test

Jury 2.
Jury 3.

Test Project For Skills Refrigeration and Air Conditioning


Province Vocational Students Skills Competition - 2015

Page 14

5. Charging With Refrigerant


Under the supervision of Jury, charge the refrigeration system with the required
weight of refrigerant to ensure operation according to cold box specification above, and
in accordance with acceptable trade & environmental practices.

PLEASE FILL IN THE JURY CHECK POINT SHEET AT THE BACK OF THIS DOCUMENT BEFORE
PROCEEDING ANY FURTHER

To be filled in by JURY ONLY


Competitor Name:
Competitor Province:
Refrigerant Bottle Gross weight prior to charging system:

grams pounds

Refrigerant Bottle Gross weight at conclusion of competition:

Mass of Refrigerant added:

grams pounds

grams pounds
Jury 1.

Refrigeration System Pressure Test

Jury 2.
Jury 3.

Test Project For Skills Refrigeration and Air Conditioning


Province Vocational Students Skills Competition - 2015

Page 15

6. Electrical testing
Under the supervision of Jury, perform all necessary safety checks to ensure the test project is safe
to energise.
PLEASE FILL IN THE JURY CHECK POINT SHEET AT THE BACK OF THIS DOCUMENT BEFORE
PROCEEDING ANY FURTHER

To be filled in by JURY ONLY


Competitor Name:
Competitor Province:
All wiring inspected by jury prior to energising:

Yes

Electrical safety checks performed prior to energising:

Yes

Comments:
Jury 1.

Refrigeration System Pressure Test

Jury 2.
Jury 3.

7. Commission the System


Test Project For Skills Refrigeration and Air Conditioning
Province Vocational Students Skills Competition - 2015

Page 16

Competitors are to commission the system for operation in accordance with the design specifications
supplied. Please fill out the following commissioning document with the system fully operational.
Competitor Name:
Competitor Province:
Ambient Temperature .... Celsius

...... Fahrenheit :

Refrigerant Type:
Mass of Refrigerant Charge .... grams ....
Suction Pressure .... kPa

pounds :

..... psi

Discharge Pressure .... kPa

..... psi :

Condenser Subcooling .... Kelvin .... Fahrenheit Degrees


Evaporator Superheat .... Kelvin

.... Fahrenheit Degrees :

Total System Superheat ... Kelvin

... Fahrenheit Degrees :

LP Control Cut In .... kPa .... psi :


LP Control Cut Out .... kPa ... psi :
HP Control Cut Out .... kPa ... psi :
HP Control Cut In .... kPa .... psi :
Compressor Operating Current

Amps:

To be filled in by JURY ONLY


Competitor Name:
Competitor Province:
Jury 1.

Refrigeration System Pressure Test

Jury 2.
Jury 3.

Test Project For Skills Refrigeration and Air Conditioning


Province Vocational Students Skills Competition - 2015

Page 17

Competition Details - Module 2


Air Conditioning System Installation, Fault Finding,
Repair and Commissioning
Maximum Time Allowed 7 hours

40 Marks

The competitor will be issued with a split type inverter air conditioning system that includes R410A refrigerant
charge. The competitor will be required to position, install and commission the Indoor unit and Outdoor unit,
pipe work and associated wiring onto a supplied frame work. The installation of a Condensate drain is also
required.
The test module requires the installed pipe work to be Pressure tested and Evacuation tested according to
the World Skills standards within the time limit. You are then to commission the system according to the
specifications provided.
Drawing R.006 (Component Layout Drawing) refers.
The competitors required to commission the system within the time limit.
When you have finished commissioning the system; you are required to record the operational settings on a
System Data Sheet that will be supplied to you.
The competitor must ask a Jury to check their own commissioning records and obtain Jury signature in the
space provided on the commissioning sheet.

The specifications for the Air Conditioning unit are:


Cooling Mode
Room temperature setting at

+21 oC

Fan speed setting at

High Speed.

Louvre Setting

Fixed open

Evacuation Reached within 30 mins.

Air Conditioning System Set Up Observed

Jury Initials

Jury Initials

Test Project For Skills Refrigeration and Air Conditioning


Province Vocational Students Skills Competition - 2015

Page 18

AC SYSTEM COMMISSIONING REPORT


SELECT COOLING MODE AND HIGH SPEED FOR THE INDOOR FAN FOR COMMISSIONING

Competitors to fill out


Competitor Name:
Competitor Province:
What is the Fault?
The Competitor must ask Jury to observe their air conditioning unit operation and set up
and obtain a Jury initial in the box provided.
Commissioning Data
Refrigerant Type

Mass of the Refrigerant Charge

Ambient Temperature
Suction Pressure
Discharge Pressure

Gram, Ounces
C, F
kPa, psi
kPa, psi

Saturated Suction Temperature

C,

Saturated Discharge Temperature

C,
K,

F
R

C,
C,

F
F

Suction Superheat Value


Air Suction Temperature onto
Evaporator
Air Discharge Temperature off
Evaporator

Test Project For Skills Refrigeration and Air Conditioning


National Vocational Students Skills Competition - 2015

Bar
Bar

=
=
=
=
=
=
=

Page 19

Fan speed

High

Medium

Indoor coil air velocity

m/se

Ft/sec

Compressor operating current

Amp

Low

Jury to fill out:


Start Time:
Time fault identifeid:

Jury 1.

Refrigeration System Pressure Test

Jury 2.
Jury 3.

Troubleshooting, Mechanical Component Replacement,


and Commissioning Air.Conditioning System
Using specialized and selected refrigeration tools, the competitor is required to remove and
replace a component and recommission the system according to National Skill standards.
The component could be on the cold drink equipment system. The system must be returned
to correct operation within the 5 hour time limit.
Drawing R.007 (Component Layout Drawing) refers

There will be any number of component replacement tasks available and each individual task
will be kept secret in its own envelope until the time of this competition module.
The task description will be announced at the start of the module test by the Jury or the
delegated representative.
The module is designed to test the Competitors ability to recover refrigerant in an environmentally
safe way.

Competitors to fill out


Test Project For Skills Refrigeration and Air Conditioning
National Vocational Students Skills Competition - 2015

Page 20

Competitor Name:
Competitor Province:
Jury to fill out:
Start time:
Finishing time:

Refrigerant Recovery Observed

Pressure Test Observed

EvacuationTest Observed

Recommissioning Observed

Jury Initials

Jury Initials

Jury Initials

Jury Initials

LKS2014_TPRA.doc Bagian D

Test Project For Skills Refrigeration and Air Conditioning


National Vocational Students Skills Competition - 2015

Page 21

BAGIAN D
GAMBAR / DRAWING

Test Project For Skills Refrigeration and Air Conditioning


National Vocational Students Skills Competition - 2015

Page 22

Drawing R.001

Test Project For Skills Refrigeration and Air Conditioning


National Vocational Students Skills Competition - 2015

Page 23

Drawing R.002

Test Project For Skills Refrigeration and Air Conditioning


National Vocational Students Skills Competition - 2015

Page 24

Drawing R.003

Test Project For Skills Refrigeration and Air Conditioning


National Vocational Students Skills Competition - 2015

Page 25

Drawing R.004

Test Project For Skills Refrigeration and Air Conditioning


National Vocational Students Skills Competition - 2015

Page 26

Drawing R.005

Test Project For Skills Refrigeration and Air Conditioning


National Vocational Students Skills Competition - 2015

Page 27

Drawing R.006

Test Project For Skills Refrigeration and Air Conditioning


National Vocational Students Skills Competition - 2015

Page 28

Test Project For Skills Refrigeration and Air Conditioning


National Vocational Students Skills Competition - 2015

Page 29

LKS2014_TPRA.doc Bagian E

BAGIAN E
PERALATAN & PERLENGKAPAN PESERTA

Test Project For Skills Refrigeration and Air Conditioning


National Vocational Students Skills Competition - 2015

Page 30

Peralatan yang disiapkan peserta


Peralatan berikut merupakan peralatan minimum yang dibawa oleh setiap peserta lomba
dan yang akan digunakan selama lomba berlangsung, peserta diperbolehkan membawa
peralatan lain yang dianggap perlu dan membantu dalam proses mengerjakan soal lomba.
Competitor Supply
Measuring, Preparatory pahse
Writing equipment, including, pencils,
coloured
pens,
paper, highlighters
Tape measure: 5 m
Centre punch
Pipe reamer
Scribe
Set of drills: 1-10 mm
Spirit level
Tong-ammeter
Metal Rule: 300 mm
Knife
Hammer
Hacksaw
Screw drivers
Try-square
Set squares
Long nose pliers
Mechanical tasks
Tube cutter, up to 22 mm
Files: flat, half round and round
Pipe Bending Machine 6 mm
Pipe Bending Machine 10 mm
Pipe Bending Machine 12 mm
Mechanical tube benders,
Set of spanners up to 25 mm
Shifting spanners
Side cutting pliers
Steel wool
Oil can

Refrigeration
Set of gauges R-134a and R410A
Gauge manifold set R134a and R410A
Vacuum gauge, down to 50 Pascal
Scale digital balanced
Ratchet key
Schrader valve key
Allen keys imperial and metric
Vacuum pump
Digital Thermometers with at least 2 sensors
Electronic Leak Detector
Leak detection solution
Small mirror
Electrical Work
Wire Strippers
Electricians pliers
Multigrips
Electrical Crimping Tools
Megohmmeter
Multi-meter
Safety
Clothing, long sleeves, long work trousers
Emergency cloth
Safety shoes
Clear Safety glasses
Gloves

Test Project For Skills Refrigeration and Air Conditioning


National Vocational Students Skills Competition - 2015

Page 31

LKS2014_TPRA.doc Bagian F

BAGIAN F
SKEMATIK PENILAIAN

Test Project For Skills Refrigeration and Air Conditioning


National Vocational Students Skills Competition - 2015

Page 32

SKEMATIK PENILAIAN

Berikut ini adalah Rangkuman skala penilaian untuk bidang Refrigerasi & Air Conditioning
yang harus dipersiapkan oleh seluruh peserta sesuai bahasa masing-masing pada bagian
Informasi, dilakukan sebelum pelaksanaan lomba.
Gambaran teknis untuk Refrigerasi & Air Conditioning pada bagian F merupakan daftar
keterampilan yang harus dipenuhi oleh peserta lomba dan kriteria penilaian akan di berikan
untuk semua modul berikut:
Kriteria Keterampilan (Skill)

Nilai Maksimum

Component fabrication

12.50

Component and System Installation

20.00

Electrical Installation

15.00

Commissioning and Adjustment

17.50

Electrical fault find and repair

10.00

Refrigerant fault find and repair

10.00

Refrigerant Recovery & Emission Control

10.00

health and Safety

10.00

Total

100.00