2140 Federal Register / Vol. 70, No.

8 / Wednesday, January 12, 2005 / Notices

DEPARTMENT OF ENERGY Commission, unless the Commission or protest must serve a copy of that
orders otherwise. document on the Applicant. Anyone
Federal Energy Regulatory If the project is not subject to Section filing an intervention or protest on or
Commission 15 of the FPA, notice is hereby given before the intervention or protest date
that Mosinee Paper Corporation is need not serve motions to intervene or
[Project No. 2207] authorized to continue operation of the protests on persons other than the
Mosinee Project No. 2207 until such Applicant.
Mosinee Paper Corporation; Notice of time as the Commission acts on its The Commission encourages
Authorization for Continued Project application for subsequent license. electronic submission of protests and
Operation
Magalie R. Salas,
interventions in lieu of paper using the
January 6, 2005. ‘‘eFiling’’ link at http://www.ferc.gov.
Secretary.
On December 18, 2002, Mosinee Persons unable to file electronically
[FR Doc. E5–100 Filed 1–11–05; 8:45 am] should submit an original and 14 copies
Paper Corporation, licensee for the
BILLING CODE 6717–01–P of the protest or intervention to the
Mosinee Project No. 2207, filed an
application for a new or subsequent Federal Energy Regulatory Commission,
license pursuant to the Federal Power 888 First Street, NE., Washington, DC
DEPARTMENT OF ENERGY
Act (FPA) and the Commission’s 20426.
regulations thereunder. Project No. 2207 Federal Energy Regulatory This filing is accessible on-line at
is located on the Wisconsin River in Commission http://www.ferc.gov, using the
Marathon County, Wisconsin. ‘‘eLibrary’’ link and is available for
The license for Project No. 2207 was [Docket No. RP05–144–000] review in the Commission’s Public
issued for a period ending December 31, Reference Room in Washington, DC.
National Fuel Gas Supply Corporation; There is an ‘‘eSubscription’’ link on the
2004. Section 15(a)(1) of the FPA, 16 Notice of Tariff Filing
U.S.C. 808(a)(1), requires the Web site that enables subscribers to
Commission, at the expiration of a January 5, 2005. receive e-mail notification when a
license term, to issue from year to year Take notice that on December 30, document is added to a subscribed
an annual license to the then licensee 2004, National Fuel Gas Supply docket(s). For assistance with any FERC
under the terms and conditions of the Corporation (National) tendered for Online service, please e-mail
prior license until a new license is filing as part of its FERC Gas Tariff, FERCOnlineSupport@ferc.gov, or call
issued, or the project is otherwise Fourth Revised Volume No. 1, Seventy (866) 208–3676 (toll free). For TTY, call
disposed of as provided in section 15 or Second Revised Sheet No. 9, to become (202) 502–8659.
any other applicable section of the FPA. effective January 1, 2005. Magalie R. Salas,
If the project’s prior license waived the National states that Article II, Sections Secretary.
applicability of section 15 of the FPA, 1 and 2 of the settlement provide that
[FR Doc. E5–76 Filed 1–11–05; 8:45 am]
then, based on section 9(b) of the National will recalculate the maximum
BILLING CODE 6717–01–P
Administrative Procedure Act, 5 U.S.C. Interruptible Gathering (IG) rate semi-
558(c), and as set forth at 18 CFR annually and monthly. National further
16.21(a), if the licensee of such project states that section 2 of Article II
DEPARTMENT OF ENERGY
has filed an application for a subsequent provides that the IG rate will be the
license, the licensee may continue to recalculated monthly rate, commencing Federal Energy Regulatory
operate the project in accordance with on the first day of the following month, Commission
the terms and conditions of the license if the result is an IG rate more than 2
after the minor or minor part license cents above or below the IG rate as
[Docket Nos. ER04–433–000, ER04–433–
expires, until the Commission acts on calculated under Section 1 of Article II. 001, ER4–432–000, ER04–432–001]
its application. If the licensee of such a National indicates that the recalculation
project has not filed an application for produced an IG rate of $0.76 per dth. In New England Power Pool; Bangor
a subsequent license, then it may be addition, National explains that Article Hydro-Electric Company, et al.; Notice
required, pursuant to 18 CFR 16.21(b), III, section 1 states that any overruns of of Extension of Time
to continue project operations until the the Firm Gathering service provided by
Commission issues someone else a National shall be priced at the January 5, 2005.
license for the project or otherwise maximum IG rate. On December 8, 2004, ISO New
orders disposition of the project. Any person desiring to intervene or to England Inc. (ISO) filed a motion for an
If the project is subject to section 15 protest this filing must file in extension of time to file the intra-zone
of the FPA, notice is hereby given that accordance with Rules 211 and 214 of deliverability compliance filing required
an annual license for Project No. 2207 the Commission’s Rules of Practice and by the Commission’s order issued
is issued to Mosinee Paper Corporation Procedure (18 CFR 385.211 and November 8, 2004, in the above-
for a period effective January 1, 2005 385.214). Protests will be considered by docketed proceeding. 109 FERC
through December 31, 2005, or until the the Commission in determining the ¶ 61,155 (2004). In the motion, the ISO
issuance of a new license for the project appropriate action to be taken, but will requests that the compliance filing date
or other disposition under the FPA, not serve to make protestants parties to be extended to allow New England
whichever comes first. If issuance of a the proceeding. Any person wishing to Power Pool stakeholders to reach a
new license (or other disposition) does become a party must file a notice of consensus concerning a workable
not take place on or before January 1, intervention or motion to intervene, as methodology for determining eligibility
2006, notice is hereby given that, appropriate. Such notices, motions, or for locational installed capacity
pursuant to 18 CFR 16.18(c), an annual protests must be filed in accordance payments.
license under section 15(a)(1) of the with the provisions of section 154.210 Upon consideration, notice is hereby
FPA is renewed automatically without of the Commission’s regulations (18 CFR given that an extension of time for filing
further order or notice by the 154.210). Anyone filing an intervention the intra-zone deliverability compliance

VerDate jul<14>2003 17:37 Jan 11, 2005 Jkt 205001 PO 00000 Frm 00032 Fmt 4703 Sfmt 4703 E:\FR\FM\12JAN1.SGM 12JAN1