GROUP
ADARSH S
FT164094
NAKUL T M
FT164094
SREEJITH N
FT164094
VAISAKH S
FT164094
Table of Contents
1.
PROJECT CHARTER............................................................................................... 3
2.
PROJECT SCOPE.................................................................................................... 4
3.
4.
2.1
DELIVERABLES............................................................................................... 4
2.2
2.3
2.4
CONSTRAINTS................................................................................................ 5
FORESEEN RISKS............................................................................................ 5
3.2
UNFORESEEN RISKS....................................................................................... 6
HINDSIGHT VIEWS................................................................................................ 6
1. PROJECT CHARTER
Project Name
Prepared by
Date
Purpose
HKIA construction
Group 2
10-Oct-15
Hong Kong International Airport
Start Date
: April 1991
Hong Kong is a city in southeastern China, it was a former
British colony. Hongkong is very Vibrant and densely populated.
It has one of the major ports in Asia and also popular as a
global financial center.
Chek Lap Kok Airport was designed as a replacement for the
former Hong Kong International Airport (commonly known as
Kai Tak Airport) originally built in 1925. The old airport was built
in the densely populated Kowloon district and had only a single
runway. The location also restircted any scope of expansion. Kai
Tak was one of the world's busiest airports by 1990's, far
exceeding its annual passenger and cargo capacities. Other
reasons for constructing a new airport included sound pollution
and air traffic delays owing to congestion in the airport and
lack of sufficent parking bays.
Project Description\
Deliverables
Initiation
Synopsis
Client
: Hong Kong
Airport Authority
Collaborating Architect
: Anthony
Ng Architects Ltd. (Ground Transportation Centre only)
Project Management
Structural Engineer
Arup and Partners/Mott Connell
Quantity Surveyor
Partnership
Landscape Architect
Travers Morgan Ltd.
Lighting Engineer
Marantz Renfro Stone
: Ove
: WT
: Urbis
: Fisher
Additional Consultants
: Urbis
Travers Morgan Ltd., Fisher Marantz Renfro Stone, O'BrienKreizberg and Associates Ltd, Wilbur Smith Associates, BAA,
Mott Connell Ltd
45000 men
600 million tons of rocks
750 trucks in operations everyday
Resources
2. PROJECT SCOPE
The scope of this mega engineering project is the construction of a 35 million
passenger capacity airport capable of handling next generation aircrafts and
ever growing cargo transport.
The project aims at creating a new body of land 50 acres in size in between two
islands to create the airport and the systems of road and high speed railway
network that connects the new airport to down town Hong Kong.
2.1
DELIVERABLES
I.
II.
2.2
2.3
Standard construction and development process utilized in Chek Lap Kok Airport
Approach
1) Collection of data defining the required specifications of the Airport
2) Identifying the location for construction of the airport.
3) Submission and approval of the construction plans.
4) Estimating the risks and their probabilities of affecting the construction.
4) Estimating the time required for the construction and the time avilable
on hand.
5) Scheduling the activities with respect to the timeframe of 7 years
allocated.
6) Executing these activities as per the plans.
7) Conducting extensive tests on the airport and acquiring the required
safety standards.
8) Handing over the completed airport to the authorities.
The new airport site had to be connected with mainland with the help
of 22 miles of express highways , tunnels and bridges.
Large man-made island had to be created by connecting small
islands for the airport site.It had to be nailed to the foundation to
save it from ocean tides which could push the terminal off its
foundation.
A set of mountainous terrain, 16 miles from down town was selected.
The mountains had to be removed resulting in 200 million tons of
rocks removal by large earth movers.
Prolonged exposure to air and noise pollution from the project can
cause health problems . These health problems include higher
4. HINDSIGHT VIEWS