You are on page 1of 64

UNIVERSIDAD POLITCNICA SALESIANA

FACULTAD DE INGENIERA
ELCTRICA
Dr. CARLOS GALLARDO
Campus Kennedy
Edificio Ingeniera Elctrica
Av. Rafael Bustamante 450 y
Gonzalo Zaldumbide

DEPARTAMENTO DE
INGENIERA ELCTRICA

Quito-Ecuador
Telfono: (593-2) 3962919
(593-2) 3962920
carlos.gallardo@epn.edu.ec

TEMA :

MQUINAS ELCTRICAS II
Prof. Dr. Carlos Gallardo (Ph.D)

2014

About Me
Professional

Received B.Eng,
Eng EPS, from National Polytechnic (99).

Received M.Sc.
Sc.EPS, Aachen-Flensburg University at Germany (05).

Received M.Sc.
Sc.RE, from Carlos III University of Madrid at Spain (07).

Received M.Sc.
Sc.EE, from Carlos III University of Madrid at Spain (07).

Received Ph.
Ph.D.EE, from Carlos III University of Madrid at Spain (09).

Received PostPost-doc EE, from Iowa and Carlos III Universities, United States of America
and Spain (10).

Worked for two years as planning and operation Engineer for Spanish and German
Power System Operator (REE, EON),
Technical advisor CENACE, CONELEC, MEER, CELEC EP and MIPRO.
Have been at three Universities since 2000, doing lecturing and doing research in the
area of electric power systems (Carlos III of Madrid, Flensburg, EPN, UPS).

World Bank Technical Consultant.

Currently, Project Manager INFOENERGY company (14).


2014

Universidad Politcnica Salesiana "Dr. Carlos Gallardo"

About Me

YOUNG RESEARCHER PRIZE EUROPE


SENIOR INVESTIGATOR AWARD EEUU

2014

Universidad Politcnica Salesiana "Dr. Carlos Gallardo"

About Me

BEST LECTURER WARD SPAIN


ELECTRIC POWER SYSTEM

2014

Universidad Politcnica Salesiana "Dr. Carlos Gallardo"

About Me

2014

Universidad Politcnica Salesiana "Dr. Carlos Gallardo"

Tipos de Generacin de Energa

convencional

Plantas Nucleares

Hydropower plants

Generacin

Non-conventional

Plantas Fsiles Energa

Combustible
Carbn
Gas

Planta de almace.
Paso de rio.

Elica
Fotovoltaica
Trmica
Marea
Regulatory status:
Biomasa
Ordinary Regime
Biogas
Special Regime
Pilas combustible
Geotrmica
Energas
Renovables y
Cogeneracin

2014

Universidad Politcnica Salesiana - Dr. Carlos Gallardo

Conversin de la Energa

2014

Universidad Politcnica Salesiana - Dr. Carlos Gallardo

Fuentes no renovables de energa

Plantas fsiles de energa

Coal

Combustible
Gas
Plantas de energa nuclear

2014

Universidad Politcnica Salesiana - Dr. Carlos Gallardo

Fuentes no renovables de energa

El carbn, el combustible y la central elctrica de gas.

2014

Universidad Politcnica Salesiana - Dr. Carlos Gallardo

Fuentes Renovables de Energa

Energa hidroelctrica
Marea
Geotrmica
Solar
Fotovoltaica
Trmico
Biomasa
Biogs
Pilas de Combustible

2014

Alta penetracin del


mercado elctrico espaol en
el viento

Universidad Politcnica Salesiana - Dr. Carlos Gallardo

10

Fuentes Renovables de Energa

Energa Elica

2014

Universidad Politcnica Salesiana - Dr. Carlos Gallardo

11

Generador sncrono.
1/n ratio de la multiplicadora
Muchos usan multiplicadora 15-30 rpm
1200-1500 rpm (50 Hz)

1:n

G
Sistema de distribucin
400 V, 11 kV, 33 kV, 66 kV

Generador sncrono: arranca a velocidad constante,


acoplamiento entre la red y generador fuerte pares transitorios
en la turbina debido a la turbulencia esfuerzo mecnico
engranajes disminuye confiabilidad
- Sistemas aislados donde frecuencia cambia
2014

Universidad Politcnica Salesiana - Dr. Carlos Gallardo

12

Generador de induccin jaula de ardilla.


Generador induccin opera a una velocidad casi constante
- 2-4% vacio a plena carga velocidad constante
IG necesita Q Flujo magnetizante mquina

1:n

IG

Banco de condensadores

Sistema de distribucin
400 V, 11 kV, 33 kV, 66 kV

Cuando el sistema tiene pares transitorios varia la velocidad


Con rfagas velocidad cambia poco pares transi. reducen
Como opera VN, la energa no puede ser maximizada 4/6 polos
opera dos velocidades 1000/1500 rpm (50 Hz).
2014

Universidad Politcnica Salesiana - Dr. Carlos Gallardo

13

Generador de induccin de rotor devanado.


Resistencias en el rotor

1:n

IG
Sistema de distribucin
400 V, 11 kV, 33 kV, 66 kV
Banco de condensadores

2014

Universidad Politcnica Salesiana - Dr. Carlos Gallardo

14

Generador de induccin de rotor devanado.

Modificacin IG de velocidad fija rotor jaula por rotor devanado.


Controlando R rango de velocidades incrementa ligeramente.
C se instalan en los bornes del generador.
Operacin normal genera P no Q se considera como carga negativa.
Debido al alto crecimiento operadores requieren control V(Q) y f (P)
Con electrnica de potencia rango de velocidad se incrementa se
incrementa la captura de energa PF varia (requerim. operador)
Como control Vel cuando cambia P pares transitorios se reducen

2014

Universidad Politcnica Salesiana - Dr. Carlos Gallardo

15

Generador de induccin jaula de ardilla con


convertidor directamente conectado a la red
Invertidor en el lado Invertidor en el lado
de la red
de la mquinas
Convertidor

1:n

IG

Tiene alto grado de control pero convertidor caro


La solucin es aadir un convertidor pequeo
2014

Transformador

Universidad Politcnica Salesiana - Dr. Carlos Gallardo

16

Generador de induccin de doble alimentacin.

Transformador
Estator

1:n
Rotor

T
Convertidor

Invertidor en el rotor

2014

Invertidor en el lado de la red

Universidad Politcnica Salesiana - Dr. Carlos Gallardo

17

Generador de induccin de doble alimentacin.

Es el sistema ms utilizado preferido por los fabricantes


Mquina de induccin rotor conectado al convertidor y estator
conectado directamente a la red.
Rotor es alimentado por convertidor a la f deslizante ( 25-30% PN)
El convertidor varia la velocidad en proporcin al tamao 25-30 %
El convertidor controla la velocidad y la PF a la salida del generador
Los anillos deslizantes alimentan el convertidor del rotor.

2014

Universidad Politcnica Salesiana - Dr. Carlos Gallardo

18

Generadores conectados directamente a la red.

Similares caractersticas: Convertidor conectado directamente red.


Usan mquina sincrnica.
Generador desacoplado de la red SG no tiene problemas en la red
Pueden o no tener multiplicadora
Operan a velocidad variable
Control completo de P y Q que generan.
2014

Generador de imanes permanentes con convertidor directamente


conectado a la red (multiplicadora es opcional)

Convertidor
Rectificador

1:n PM

Inversor

~
Transformador

Resistencias de frenado
2014

Universidad Politcnica Salesiana - Dr. Carlos Gallardo

20

Generador de imanes permanentes con convertidor


directamente conectado a la red (multiplicadora es opcional)

Generador imanes permanentes campo magntico interno del rotor.


Como no hay devanado de campo no prdidas (eficiencia 90%).
La potencia se rectifica y luego se ondula para conectarse a la red.
Rectificadores pasivos mquinas pequeas
Rectificadores activos (IGBT) mquinas grandes
Control completo de P luego del condensador
Reduce prdidas del generador y armnicos
Si los devanados cortocircuitados sistema de frenado
A veces con imanes permanentes sin multiplicadora
2014

Universidad Politcnica Salesiana - Dr. Carlos Gallardo

21

Generador con devanado de campo directamente


conectado a la red

Convertidor

If

~~~
1:n SM

Rectificador

Inversor

~
Transformador

2014

Universidad Politcnica Salesiana - Dr. Carlos Gallardo

22

Generador con devanado de campo directamente


conectado a la red

Sin multiplicadora generador de velocidad baja


Con devanado de campo campo magntico puede ser controlado (i)
La corriente controla magnitud emf controlo la velocidad del gener.
Convertidor con IGBT rectifica f variable DC fijo f de la red
Control completo de P y Q en los bornes del ondulador

2014

Concepts using the Asynchronous Generator.


Depending on the particular configuration, the term
Power Converter covers different types of power
electronic components such as:

A soft starter

A frequency converter

2014

An external variable rotor resistance

A frequency converter

Concepts using the Synchronous Generator

A rectifier (Rotor Connected) for f, g and h

A frequency converter
A rectifier (Stator Connected)

A frequency converter

A frequency converter

2014

Universidad Politcnica Salesiana - Dr. Carlos Gallardo

25

Conversion Process of Mechanical


Energy to Electrical Energy using PEC

2014

Universidad Politcnica Salesiana - Dr. Carlos Gallardo

26

Tecnologa de aerogeneradores.
Tipo A: Turbina de Velocidad Fija Danish concept
-Rango de control de la velocidad: 0%
de la velocidad sincrnica

Tipo B: Turbina de Velocidad Variable, con Resistencia Variable


conectada al Rotor de la Mquina de Induccin

-Rango de control de la velocidad:


10% de la velocidad sincrnica
-Perdidas en la resistencia

27

2014

Universidad Politcnica Salesiana - Dr. Carlos Gallardo

27

Tecnologa de aerogeneradores.
Tipo C: Turbina de Velocidad Variable, con Convertidor Electrnico
Parcial, con Mquina de Induccin doblemente Alimentada, DFIG
-Rango de velocidad: 30% de la
velocidad sincrnica
-Perdidas en la electrnica reducidas

Tipo D: Turbina de Velocidad Variable, completamente conectada a la


Red a travs de un Convertidor Electrnico, FPC
-Rango de velocidad: 0 - 100% de la
velocidad sincrnica
-Perdidas en la electrnica de potencia
-Elevados costos en la electrnica

28

2014

Universidad Politcnica Salesiana - Dr. Carlos Gallardo

28

Fuentes Renovables de Energa

Plantas Hidroelctricas
2014

Universidad Politcnica Salesiana - Dr. Carlos Gallardo

29

Fuentes Renovables de Energa

Solar Fotovoltaica

2014

Universidad Politcnica Salesiana - Dr. Carlos Gallardo

30

Fuentes Renovables de Energa

Solar Termica
VTS

2014

Universidad Politcnica Salesiana - Dr. Carlos Gallardo

31

Las nuevas centrales de generacin elctrica

Estacin Termal de Ciclo Combinado

2014

Universidad Politcnica Salesiana - Dr. Carlos Gallardo

32

Las nuevas centrales de generacin elctrica

Planta de Cogeneracin de energa

2014

Universidad Politcnica Salesiana - Dr. Carlos Gallardo

33

Las plantas hbridas de energa

Marea - planta de energa elica

2014

Universidad Politcnica Salesiana - Dr. Carlos Gallardo

34

Plantas Hbridas de Energa

Planta de Energia Solar-Gas

2014

Universidad Politcnica Salesiana - Dr. Carlos Gallardo

35

Plantas Hbridas de Energa

Planta de energia Hidro-eolica

2014

Universidad Politcnica Salesiana - Dr. Carlos Gallardo

36

Atlas Elico.

2014

Escuela Politcnica Nacional "Dr. Carlos Gallardo"

37

Influencia Elica y Solar en la Matriz.

35,4 GWh/ao
Salinas 15 MW
Garca Moreno 15 MW
Huascachaca 50 MW 100,4 GWh/ao
Villonaco 16.5 MW
65,0 GWh/ao
Membrillo 43.5 MW
Huacacocha 40 MW
Fuente:
MEER

2014

Escuela Politcnica Nacional

38

Atlas Solar.

2014

Escuela Politcnica Nacional "Dr. Carlos Gallardo"

39

Proyectos Fotovoltaicos.

Potencial: 125 MW
Cndor Solar
50 MW
SHIRY I (Isofotn) 50 MW
Mitad del Mundo 25 MW

82173 MWh/Ao
43238 MWh/Ao
2014

Escuela Politcnica Nacional "Dr. Carlos Gallardo"

40

Hacia un cambio de la Matriz elctrica del Ecuador.


El PME reconoce el aporte que
debera
dar
la
energa
geotrmica en el largo plazo,
por falta de conocimiento no
est en el PlanMaestroE.
Potencial: 952 MW en 7 aos
Tufio Chiles
Chachimbiro
Chalupas
Chacana:

138 MW
113 MW
283 MW

Cahiyacu
191 MW
Jamanco127 MW
Oyacachi
100 MW
2014

Escuela Politcnica Nacional

41

Matriz elctrica del Ecuador - La generacin de electricidad.


Alta Vulnerabilidad de la matriz elctrica. En 2007, el 86% de hidroenerga
provienen de 5 plantas: Paute Molino (1075 MW) Reservorio Mazar, San
Francisco (230 MW), Agoyn (156 MW), Pucar (74 MW) Oriental y Marcel
Laniado (213 MW) Occidental.

Occidental para
compensar
Fuente: MEER

2014

Escuela Politcnica Nacional

42

Matriz Energtica del Ecuador Oferta Produccin de Electricidad.

En la planificacin no garantiza la meta 4.3.3 del PNBV sobre alcanzar un 6%


de fuentes de energa renovable diferentes de la hidroelectricidad en la
matriz elctrica, puesto que la matriz futura delineada en el PME a 2020
tendra menos del 1% de energa proveniente de fuentes elica, solar y
biomasa.
Fuente: MEER
2014

Escuela Politcnica Nacional

43

PROYECCIN DEMANDA Y ENERGA 2012-2021

2014

PLAN DE EXPANSIN DE GENERACIN 2012 - 2015

CELEC:
Jivino 40 MW
Santa Elena 40 MW
Jaramij 140 MW
Villonaco 16.5 MW
NO CELEC:
Ocaa 26 MW
Buenos Aires 1 MW

2012
27 MW Hidro
220 MW Trmico

2014

NO CELEC:
CELEC:
Baba 42 MW
SJ del Tambo 8 MW
Topo 22.8 MW

CELEC:
Mazar Dudas 21 MW
Esmeraldas II 96 MW
Machala_3 65 MW
Cuba II 60 MW
Guangopolo II 50 MW
NO CELEC:
SJ de Minas 6.4 MW
Chorrillos 4 MW
Victoria 10 MW
Sicchos 17.4 MW
Saymirin_V 7 MW

2014
2013
72.8 MW Hidro
16.5 MW Elica

65.8 MW Hidro
271 MW Trmico

CELEC:
Toachi Pilatn 253 MW
PautePaute-Sopladora 487 MW
Manduriacu 62 MW
DelsiDelsi-Tanisagua 116 MW
Quijos 50 MW
Machala CC 100 MW

2015
968 MW Hidro
100 MW Trmicos

PLAN DE EXPANSIN DE GENERACIN 2016 - 2021


CELEC:
MinasMinas-San Francisco 276
MW
NO CELEC:
COCA CODO 1500 MW

CELEC:
Geotrmico I
30 MW

CELEC:
Elico I 15 MW
Elico II 15 MW

2018
2017
2016
1776 MW
Hidro

2014

30 MW
Elica

2019
30 MW
Geotrmic

2020

2021

RESUMEN DE CAPACIDAD ADICIONAL INSTALADA SNI 2012 - 2021

2014
2012--2021
FUENTE: CONELEC Plan Maestro de Electrificacin 2012

CAMBIO DE LA MATRIZ ENERGETICA


2011

2006

2021

2014

PROYECTOS DE LA CORPORACIN

EJECUCIN DE
PROYECTOS
Continuar
con
la
construccin
de
los
proyectos de generacin a
cargo de CELEC EP
Hidroelctricos:
Hidroelctricos:
Sopladora, Minas San
Francisco, Toachi Pilatn,
Delsitanisagua,
Manduriacu,
Quijos,
Mazar Dudas
Trmicos:
Trmicos:
Termoesmeraldas
II,
Guangopolo II.

POTENCIA 1432 MW
2014

CICLO COMBINADO
180 MW.
Sustitucin de generacin
que queman combustibles
lquidos.
Ahorro monetarios al pas
por reduccin de consumo
de combustibles.
Reduccin de costos de
generacin
Estado: en proceso de
adjudicacin.
Plazo: 30 meses.

SISTEME DE
TRANSMISIN EAT 500
kV.
Evacuacin de energa de
central Coca Codo Sinclair
(1500 MW)
Abastecimiento de energa
a zona oriental (empresas
petroleras)
Posibilidad
para
interconexin
regional
elctrica a 500 kV.
(Colombia y Per)
Estado: en proceso de
evaluacin de Ofertas.
Plazo: 39 meses.

Termoesmeraldas II
Manduriacu

EJECUCIN DE
PROYECTOS ELCTRICOS
Quijos

ToachiToachi-Pilatn

PROYECTOS EN ESTUDIOS
MazarMazar-Dudas
Sopladora

MinasMinas-San Francisco
Villonaco
2014

Delsintanisagua

Proyecto
Cardenillo
Rio Zamora Santiago
Chachimbiro
Chacana
Chalpatn
Binacional
Tufio-Chiles

Potencia
(MW)

Estado

Hidroelctrico

564

Factibilidad

Hidroelctrico

3500

Prefactibilidad

Geotrmico
Geotrmico

80
53

Prefactibilidad avanzada
Prefactibilidad inicial

Geotrmico

Prefactibilidad inicial

Geotrmico

90

Prefactibilidad inicial

Tipo

PROYECTOS DE GENERACIN ELCTRICA CELEC EP: RESUMEN DE


AVANCE FSICO ( JUN 2013)
Proyecto
Sopladora
Minas San Francisco
Toachi Pilaton
Delsitanisagua
Manduriacu
Quijos
Mazar Dudas
Villonaco
Termoesmeraldas II
Guangopolo II
TOTAL PROYECTOS

2014

Monto
(USD MM)
672,19
477,03
385.5
194,93
143,96
94,58
47,5
35,66
101,4
63,78
2,216.5

Potencia
(MW)
487
270
254
120
60
50
21
16.5
96
52.4
1,432

Avance
ejecutado
33.37%
15.71%
23.13%
17.88%
32.34%
17.02%
36.58%
100.00%
78.86%
45.09%

Entrada en
operacin
abr-15
dic-15
may-15
dic-15
oct-14
dic-15
feb-14
mar-13
feb-14
jun-14

PROYECTO HIDROELECTRICO SOPLADORA


Ejecutores: CELEC EP.- HIDROPAUTE Consorcio GEZHOUBA-FOPECA.
Descripcin:
Obra de interconexin de las descargas de la central Molino
Cmara subterrnea de interconexin de la conduccin.
Tnel de descarga de la cmara de interconexin
Paso subfluvial bajo el ro Paute
3 turbinas tipo Francis de 163 MW

Esquema conceptual del proyecto.


DESCARGA
INTERMEDIA

CMARA DE
INTERCONEXIN

TNEL DE
INTERCONEXIN

CHIMENEA DE
EQUILIBRIO SUPERIOR

RO
PAUTE

Potencia (MW)
Energa Anual (GWh)

487
2770

Factor de planta (%)

65%

Inversin (USD MM)

672.2

Inicio de ejecucin

26/Abr/11

Ingreso en operacin
PASO
SUBFLUVIAL

CASA DE
MQUINAS

TNEL DE
CARGA

Plazo de ejecucin (das)

1438

% de tiempo transcurrido

52.9%

POZO DE
CARGA

TUBERIA DE
PRESIN

2014

Abr/15

RO
PAUTE
TNEL DE
DESCARGA

PROYECTO HIDROELECTRICO MINAS SAN FRANSCISCO


Ejecutores: CELEC EP.- ENERJUBONES Empresa China HARBIN ELECTRIC
Descripcin:
Presa de hormign rodillado de 54 mts.
Conduccin tipo tnel de 14 km de longitud (TBM DBM)
Chimenea de equilibrio de 70 mts de altura
3 turbinas tipo Pelton de 92 MW, casa de mquinas subterrnea

Esquema conceptual del proyecto.

2014

PROYECTO HIDROELECTRICO TOACHI PILATN


Ejecutores: CELEC EP.- HIDROTOAPI Empresas: CWE (obra civil) INTER RAO
(equipamiento)
Descripcin: 2 aprovechamientos:
Pilatn Sarapullo 48 MW
Toachi Alluriqun 205 MW
Micro central 1.4 MW

Esquema conceptual del proyecto.

2014

PROYECTO HIDROELECTRICO DELSITANISAGUA


Ejecutores: CELEC EP.- GENSUR Empresa Hydrochina
Descripcin:
Presa de hormign de 34 mts de
altura
Tnel de carga de 8 km, Da 3.3 m.
Casa de mquinas: 2 turbinas tipo
Pelton de 60 MW
Dr. CARLOS GALLARDO

Esquema conceptual del proyecto.

Campus Kennedy
Edificio Ingeniera Elctrica
Av. Rafael Bustamante 450 y
Gonzalo Zaldumbide
Quito-Ecuador
Telfono: (593-2) 3962919
(593-2) 3962920
Presa
carlos.gallardo@epn.edu.ec

2014

Conduccin
Casa de
mquinas

PROYECTO HIDROELECTRICO MANDURIACU


Ejecutores: CELEC EP.- ENERNORTE Empresa ODEBRECHT.
Descripcin:
Presa mixta de hormign de 41 mts
de altura (RCC Hormign
convencional)
Casa de mquinas: a pie de presa, 2
turbinas tipo Kaplan de 30 MW

Potencia (MW)
Energa Anual (GWh)
Factor de planta (%)
Inversin (USD MM)
Inicio de ejecucin
Ingreso en operacin
Plazo de ejecucin (das)
% de tiempo transcurrido

Esquema conceptual del proyecto.

2014

60
349
72%
143.9
1/May/12
Oct /14
975
45.2%

PROYECTO HIDROELECTRICO QUIJOS


Ejecutores: CELEC EP.- ENERNORTE Empresa China CNEEC
Descripcin:
Tneles de conduccin rio Quijos y
Papallacta para formar un solo tnel a
casa de mquinas
Casa de mquinas: a nivel de superficie,
3 turbinas tipo Pelton de 17 MW.

Esquema conceptual del proyecto.

2014

PROYECTO HIDROELECTRICO MAZAR DUDAS


Ejecutores: CELEC EP.- HIDROAZOGUES Empresa CNEEC
Descripcin:
Consiste en 3 aprovechamientos
Dudas (7.40 MW) Alazn (6.23 MW) y
San Antonio (7.19 MW)

Esquema conceptual del proyecto.

2014

PROYECTO ELICO VILLONACO


Ejecutores: CELEC EP.- GENSUR Empresa Goldwind
Descripcin:
11 aerogeneradores de 1.5 MW
Conexin a S.N.I en S/E Loja 69 kv.
Reduccin de las emisiones de CO2
(alrededor de 38 mil tonCO2/ao).

PROYECTO ELICO VILLONACO

2014

PROYECTO TERMOELECTRICO TERMOESMERALDAS II


Ejecutores: CELEC.TERMOESMERALDAS - Empresa HARBIN
ELECTRIC
Descripcin:
Motores de combustin interna, HFO
12 unidades de 8 MW.
Llegada de 6 motores al sitio de las
obras.
Por concluir las obras civiles, en
ejecucin montaje mecnico de
equipos.

2014

rea de Tanques

Potencia (MW)
Energa Anual (GWh)
Factor de planta (%)
Inversin (USD MM)
Inicio de ejecucin
Ingreso en operacin
Plazo de ejecucin (das)
% de tiempo transcurrido

96
580
70%
101.4
10/feb/12
Feb /14
730
72%

Casa de Maquinas, Motores

CENTRAL TERMOGAS MACHALA.MACHALA.- CICLO COMBINAD0


PROYECTO

Generacin actual:
Unidades 6FA 130 MW
Unidades TM2500 120 MW

Unidad

Tipo

Potencia

1ra.

Gas

70 MW

USD
(MM $)
130.6

2da.

Vapor

105 MW

98

Incremento de Generacin: 175 MW


Presupuesto USD $ 228.6 MM

2014

BENEFICIOS

EL PROYECTO

Sustitucin de generacin
que queman combustibles
lquidos.
Ahorro monetarios al pas
por reduccin de consumo
de combustibles.
Reduccin de costos de
generacin.

Presupuesto:
Presupuesto: USD 228.6
MM.
Plazo
Plazo de ejecucin: 30
meses
Etapa:
Etapa: en proceso de
suscripcin de contrato

ESTUDIOS DE PROYECTOS GEOTRMICOS


PROYECTO GEOTRMICO
Aprovechamiento del calor en la tierra
instalando plantas de generacin
elctrica en zonas donde las
temperaturas de vapor en
profundidad son mayoras a 150C.
BENEFICIOS
- Energa limpia renovable de bajo
impacto ambiental.
- Ocupacin de reas o espacios
pequeos.
- Reduccin de emisin de gases
CO2 por desplazamiento de
generacin de energa con
combustibles fsiles

E
T
A
P
A
S

Prefactibilidad
Factibilidad
Desarrollo de campo y
construccin:
2014

Estudios de geologa, geoqumica, geofsica y gradiente


trmico para construccin de modelo conceptual
Ejecucin de perforaciones exploratorias en sitios
seleccionados comprobacin del recurso geotrmico
Perforacin de pozos de produccin, instalacin de tuberas,
construccin de central de produccin de energa.

PROYECTOS GEOTRMICOS EN ESTUDIOS


PROYECTO CHACHIMBIRO
Estudios de Prefactibilidad Inicial finalizados.(Existe Modelo Geotrmico
Conceptual)
Prefactibilidad Avanzada propuesta: costo USD 4.5MM
Potencia promedio estimada 80MW

PROYECTO CHACANA
Estudiados 2 prospectos: Jamanco y Cachiyacu (Prefactibilidad Inicial finalizados).
Existe Modelo Geotrmico Conceptual para cada prospecto.
Prefactibilidad Avanzada propuesta: Al menos 1 perforacin : Jamanco: 600m de
profundidad., Cachiyacu: 900mde profundidad. COSTO: USD 4.5 MM.
Potencia promedio estimada: Jamanco 13MW y Cachiyacu 40MW

PROYECTO CHALPATAN
En ejecucin Estudios de Prefactibilidad Inicial: Geoqumica, Geofsica, Geologa y
Modelo Geotrmico Conceptual.
Fin de los estudios: junio 2013
Empresa consultora: Compaa General de Sondeos CGS (Espaa)

2014

ESTUDIOS DE PROYECTOS GEOTRMICOS


PROYECTO GEOTRMICO BINACIONAL TUFIOTUFIO-CHILESCHILES-CERRO NEGRO

Estudios iniciales-dcada de los 80 INECEL


(Ecuador), ICEL (Colombia) y OLADE.
Acuerdo Binacional: julio 2010
Convenio ISAGEN (Colombia) CELEC
(Ecuador): abril 2011
ISAGEN Administrador del Proyecto: Mayo
2012
Costo de Estudios de Prefactibilidad:
4MMUS$
Fin de Prefactibilidad: junio 2014
Avance: 40% (Socializacin, revisin de
estudios previos y cartografa)

2014

You might also like