Objective
I seek to realize my goal by being a part of your esteemed organization, where in I can contribute to
its success, and pursue a career, which will help my all-round development, and is both rewarding &
intellectually satisfying.
Academic Chronicle

Course

University/ Affiliation

Institute

Post Graduation:
M.Tech Highways

Visveshwaraya Technical
University

RASTA-Center For
Road Technology.

Graduation:
B.E.Civil

Jawaharlal Nehru
Visveshwaraya Technical National College of
University
Engineering,
Shimoga

Course
Duration
(Yrs)

Year of
Passing

2010

69.5

2008

58.7

Software Skills
Operating Systems: Win 2000, XP.
Packages: AutoCAD, HDM-4, MS Office.
I am persuing MX-Road V8i.

Work Experience

Company: URS Scott Wilson India Pvt. Ltd, Bangalore


Designation: Asst. Highway Engineer.
Period: 25/11/10-Till Now.
Responsibilities: Economic Analysis using HDM-4 , Traffic Analysis (AADT, O-D),
Design of Pavement, Axle Load Survey Analysis and BBD Analysis, Quantity estimation.

Responsibilities:
Road Inventory & Condition Survey: Involved in preparation of report and site visit for road
inventory and Condition Survey of National Highways and State Highways. The survey
includes assessment of pavement condition by visual observation of pavement distresses like, cracking,
raveling, edge break, etc.

Benkelman Beam Deflection Survey: Involved in preparation of report, Overlay design and site visit for
BBD study. The deflection studies were carried as per IRC: 81, for selected good pavement stretches. The data
obtained was analyzed to determine the structural strength of the existing pavement and determine the overlay
design to cope up with the projected traffic.
Axle load Survey: Involved in site survey, VDF analysis and preparation of axle load report. The studies
started with weighing of each wheel using portable weigh pad. During survey noted heavy vehicles carrying
construction materials, goods, empty vehicles, etc. The VDF calculated for each vehicle using IRC: 37, 2011.
Traffic Studies: Involved in various traffic studies for NH and SH. The survey includes 7-Day
TVC, Origin & Destination Survey, Speed & Delay and Pedestrian Survey.
Pavement Design: Pavement design for both flexible and rigid pavement using IRC: 37, 2001
and IRC: 58, 2002.
HDM-4: Involved in data collection, Economic and Programme analysis of Karnataka State
Highway Network Improvement Strategy-ADBTA. The procedure includes, preparation of database both
network and vehicle fleet. Import the data base to HDM-4 software and calibrating the model to suit the
present road conditions. Running the model in various steps i.e. project, strategy and programme analysis.
The total length considered for analysis is 20,390Km. The roads have been prioritized based on budget
availability for Karnataka state for maintenance and Improvement of roads. Also involved in the preparation
of final report of Core Road Network for submission of ADB.
MX-Road: I know importing the survey data to MX- road, horizontal alignment design, create carriageway
edges/ paved shoulders/ earthen shoulders, vertical alignment design, apply super-elevation, generating plan
profile drawings using MX- road

Projects Handled

Technical Assistance for Karnataka State Highway Network Improvement Strategy-ADBTA

Four laning of Bhopal-Jabalpur Section of NH-12 from Km 10.420 to Km 299.714 in the State of
Madhya Pradesh.

Four laning of Dewas-Shivapuri-Gwalior Section of NH-3 from Km 15.600 to Km 566.450 in the


State of Madhya Pradesh.

Four/Six laning of Ahmedabad Udaipur Kishangharh section of NH-8, NH76 & NH-79 from
(Approx. Length 555.500) in the State of Gujarat & Rajasthan.

Re-Engineering Surveys for Four- Laning of Hoskote-Mulbagal section of NH-4 from 237.000 to Km
324.000 in the State of Karnataka.

Involved in flexible and rigid pavement design of 6-Laning of Agra-Etawah and Etawah-Chakkeri
Section of NH-2.

Four laning of Hoskote-Devanahalli-Dabaspet Section of NH-207 from Km 58.300 to Km 138.320


in the State of Karnataka

Six laning of Anadapura Anakapalli section of NH-5 from Km 682.980 to Km 741.202 in the State
of Andrapradesh.

Six Laning of Aurangabad to Barwa Adda Section of NH-2 from km 180.000 to km 400.057
in the State of Bihar and Jharkhand

4-laning of Kiratpur-Ner Chowk of NH-21 Section from km 73+200 to km 186+500 in the state of
Himachal Pradesh.

Conferences & Workshops


Participated in the various training programmes on Highways construction, Management,

Pavement Design, Traffic and Road Safety, Repairs and Rehabilitation of Bridge Structures,
Highway Design and Management softwares at RASTA, Bangalore.
Personal Profile
Name
Date of Birth
Fathers name
Sex
Marital Status
Languages Known
Nationality
Permanent Address

:
:
:
:
:
:
:
:

Madan Kumar M.S


3.04.1985
Shivanandappa M.B
Male
Single
English, Hindi and Kannada
Indian

Basaveshwara Krupa Maruti Extension, 4thCross, Navule


District- Shimoga, Karnataka- 577203.

Declaration
I hereby declare that above information furnished by me is correct and actual to the best of my knowledge.

Date :
Place: Bangalore, India

Madan Kumar M.S

You might also like