CIPUTRA ADIGRAHA
Ciputra World Jakarta
CIPUTRA
Project Address
Ref:
Date:
Section ALL
435/SPK-CAG/CW-STR/XI/2013
This Final Certificate is issued pursuant to the Contract Ref : as noted aboved and subject to the final commercial agreement.
On behalf of the Employer and in accordance with the Conditions of Contract we here by confirm that with the exception of the items as listed in the Final Account Agreement, the above
mentioned Works have been completed to the satisfaction of the
Project Manager as of the
29th November 2015 (the Date of Final Certification)
Expiry Defects Liability Period
Defects Liability Period Injection and Self Penetration Works
6 months following the issue of the Taking Over Certificate Leak Podium
dated 27th May 2015
Expiry Defects Liability Period Leak Podium
27th November 2015
The Final Certificate Issued as Instructed by the Employer
Angela Hanggi
Associate Director of PT. CIPUTRA ADIGRAHA
The Final Certificate Accepted on behalf of the Contractor
Date:
Agus Tinus
Project Manager of CV. Wibawa Perkasa
The Final Certificate Accepted on behalf of the Employer
Date:
M. Zairin
Contruction Manager PT. Jaya CM
The Final Certificate Withnessed on behalf of the Employer
Date:
Attachments:
Scope of Works included
List of Outstanding / Defective Works
As Built Drg Hardcopy & Soft Copy
Copies To:
CAG
JCM
OTHER
CONTRACTOR
REYNOLD
FILE
CIPUTRA
Ref:
Date:
Section ALL
435/SPK-CAG/CW-STR/XI/2013
Areas included in this Final Certificate all as per the attached drawings referenced
LEVEL 09
LEVEL 07
LEVEL 10
LEVEL 11
LEVEL 08
LEVEL 12
AREA P1, P2, P5, P6, 02, 03, H3, H2, P3, P4, P9, A3, A1, P7, P8, A2, RAMP
AREA P5
AREA P1, P2, P3, P4, P5, P6, P7, P8, P9, 02, 03, H2, H3, A1, A2, A3, RAMP
AREA P5, P6, P7, P8, P9, A1, A2
AREA P1, P2, P3, P4, P5, P6, P7, P8, P9, 01, 02, 03, H1, H2, H3, A1, A2, A3
AREA P6, P7, P8, P9, A2
b.
Works included in this Final Certificate as per the attached drawings as referenced above and listed as follows
INJECTION CRACKS PODIUM FLOOR AREA PARKING
c.
d.
Defective Works
Attachments:
Scope of Works included
List of Outstanding / Defective Works
As Built Drg Hardcopy & Soft Copy
For JCM
Copies To:
CAG
JCM
OTHER
CONTRACTOR
REYNOLD
FILE