You are on page 1of 8

Welcome . . .

to our new world

Celebrating the new school additions


in the Mount Ayr Community School District

Mount Ayr
Thursday, March 25, 2010 Record News
Ringgold County’s News and Advertising Source Since 1864
122 W. Madison Street • P. O. Box 346 • Mount Ayr, IA 50854-0346
Phone 641-464-2440 • Fax 641-464-2229 • e-mail recnews@iowatelecom.net
2 -- Mount Ayr Community School District Building Edition

A note from the superintendent


“The future looks bright and our commit-
ment to the students of the Mount Ayr Com- The secondary addition will allow for in-
munity is second to none.” creased middle school physical education
and allow flexibility for increased academ-
On behalf of the Board of Education, our ic time. Our middle school students will
no longer have to walk to the elementary
entire staff, and everyone associated with
the “Vote OK” Committee, I would like to school to practice and compete. It will also
sincerely “thank” the Mount Ayr Commu- provide greater academic access for our al-
nity for their incredible support during the ternative school students who will now be
building project. served in the new addition of our secondary
The Mount Ayr Community School Dis- building.
trict evaluated its facilities in 2006 and
began a two-year campaign to modernize The elementary addition will provide
and equip our schools for the 21st century. modern fifth and sixth grade classrooms, a
Staff members were involved in the needs separate lunchroom and kitchen, a multipur-
assessment and began looking at what was pose gym, a vocal music classroom and a
needed to provide a quality education for new office area. Renovations to our existing
the students of our district. structure will provide the elementary build-
Building codes, handicapped accessibili- ing with a new art room and an early child-
ty, structural issues, plumbing and electrical hood classroom. We are very excited about
deficiencies all contributed to the need for the new “Peggy Whitson Science Lab.” The
the renovation and new facility. With the district has received over $50,000 in grant
completed project, both buildings are now money to outfit one of the most remarkable Superintendent Russ Reiter
completely heated and cooled with the use elementary science labs in the state.
of geothermal ground source heat pumps. Education is ever-changing and with the our belief that with the current facilities, we
In addition, new energy technologies were need for modern technology in the class- will be able to provide the best possible ed-
installed to make the new facilities as en- room, the district can now boast a complete ucation for all our students for many years
ergy efficient as possible. wireless capability for our one-to-one lap- into the future.
top program, computer labs and staff. It is
Mount Ayr Community School District Building Edition --3

Congratulations Mount Ayr Community Schools!


Coreslab Structures is honored to have supplied the precast concrete
products for these exciting projects!

802 Allied Road, LaPlatte, NE 68123


Phone (402) 291-0733 • Fax (402) 291-2598
www.coreslab.com
4 -- Mount Ayr Community School District Building Edition

Elementary School Addition

From top, from left: new classrooms for fifth and sixth other purposes when not needed for meals. The new sci- the school. The new art room provides much more space
grades and the early kindergarten programs are part of the ence lab, which will be named for Dr. Peggy Whitson, is for the program along withe new equipment like a kiln.
building additions. The music room and stage is separated still being assembled and is being set up with money from The teacher workroom provides space and the main office
from the multipurpose gymnasium by a partition. The new grants from several sources. Lockers are in the hallways has more space as well. New rest rooms are available in
cafeteria and kitchen are very popular and can be used for for the fifth and sixth grade students in their new section of the addition along with small locker rooms.
Mount Ayr Community School District Building Edition -- 5

Elementary School Addition

Above: The entryway


from the south door
of the new elemen-
tary addition. One of
several skylights that
help provide light to
the building. See more
pictures at left.

Middle School Addition

At left: Floor plan


of the middle school
addition. At right: Al-
ternative school room
which may also be
used for other adult
education purposes.
Turn page for more
pictures.

We provide a window on
the Mount Ayr Community
school district every week.
MARYVILLE
GLASS & LOCK
We’ve been providing area residents news about the The First Glass Place to Call
new building projects in the Mount Ayr Community 24-Hour Emergency Service
school district from day one and are pleased to see
the long effort bear fruit. To keep up on all the news Auto – Commercial – Residentiaal
from the school district, subscribe to the Mount Ayr • Auto Glass • Rock Chip Repair • Glazing of All Types
Record-News and we’ll see that you get a weekly up-
date on school activities and news. • Storm Doors and Windows • Replacement Windows • Mirrors and Table Tops

Mount Ayr – Garage Doors and Operators – Complete Locksmithing Services

Record News
Ringgold County’s News and Advertising Source Since 1864
Sales • Installations • Service
5th and Buchanan • Ph. 660-582-3131 • Toll Free 1-888-855-3131
122 W. Madison Street • P. O. Box 346 • Mount Ayr, IA 50854-0346 www.maryvilleglassandlock.com
Phone 641-464-2440 • Fax 641-464-2229 • e-mail recnews@iowatelecom.net
6 -- Mount Ayr Community School District Building Edition
Middle school additions also include the new gym, showers,
Middle School Addition hallway, concession stand and lockers.

RESIDENTIAL • COMMERCIAL
Industrial Building Demolition
COMPLETE SERVICES Office: 712-243-1535 • Fax: 712-243-1578
307 Chestnut Street • Atlantic, Iowa

FROM START TO FINISH


www.camblinmechanical.com
For three generations, Camblin’s has provided the very best in quality
mechanical installation and service at a reasonable price. We take pride in
our tradition of assembling teams of skilled craftsmen to tackle even the
PROPERTY LEFT CLEAN AND LEVEL most challenging projects in a timely, cost-effective and safe manner.
We are also proud of our commitment to new technology, such as
“design-build” and computer aided drafting. Taking advantage of the latest
technology allows our projects to flow smoothly from design and fabrication
to installation and startup.
Our unique location allows us to focus on Southwest Iowa, and also
serve clients throughout the Midwest. Whether you are just around the
corner or in another state, we have the experience, personnel and
professionalism to complete your job on time and within budget. From
industrial manufacturing facilities and apartment complexes to schools and
medical facilities, Camblin’s can get the job done in a manner reminiscent of
Locally Owned the “good old days.”
Since 1945 A lot has changed at Camblin’s since 1918, but one thing that will never
change is our commitment to quality service.

515-243-1151 • Fax 515-243-1214 Our Services:


◆ Heat Pumps
◆ Med Gas
◆ Backflow Preventers
◆ Commercial
Service Division
◆ HVAC ◆ Design/Build ◆ Preventive
Prompt - Expert Service – Free Estimates ◆ Plumbing ◆ Energy Analysis Maintenance
◆ Sheet Metal ◆ Geothermal ◆ Controls
Licensed – Bonded – Insured ◆ Service ◆ Emergency Service ◆ Green Solutions

Heat Pumps for Residental and Commercial Applications


260 NE 44th Avenue, Des Moines, Iowa 50313 Members of

www.DECARLODEMOLITION.com
Mount Ayr Community School District Building Edition -- 7

1225 Jordan Creek Parkway, Suite 200, West Des Moines, Iowa 50266 • Ph. 515-223-4518 • Website: csiresults.com

Construction Management Firm

Mount Ayr Community


mentary�/�HS�Addition��� � � � � � � �
Elementary/High
mmunity�Schools� School Addition
�Community�School�District�successfully�passed�a�bond�referendum�to�construct
SEE �
dition�and�demolish�and�older�section.�US FOR
The�referendum�was�also�used�to�fund�an
e�high�school�
◆ to�add�a�practice�
◆ gymnasium���
mmunity�Schools�was�faced�with�a�challenge�to�complete�a�multi-site�project�at�M
ol�and�Mount�Ayr�Elementary�School.��The�District�had�previously�bid�the�project
8 -- Mount Ayr Community School District Building Edition

We’re opening doors


to brand new facilities.

But the most important doors we open are those that help the
children we serve gain the tools they need to be successful in life.
That’s why we do what we do to provide excellent educational
opportunities in facilities that help us do our jobs more effectively.

We welcome you to come see our new facilities, but more


importantly, to discover the innovative ways we are providing top
quality education for every child we serve.
We’re the administration, faculty and staff of the
Mount Ayr
Community Schools
Elementary School • 607 E. Jefferson Street, Mount Ayr, IA
Middle School- High School • 1001 E. Columbus Street, Mount Ayr, IA

You might also like