, ARIYALUR PROJECT
ELECTRICAL DEPARTMENT
CHECKS TO BE PERFORMED BEFORE CHARGING THE MCC
Date:-___________
MCC No. & Name:-
Charged from ___________________________ PCC
10 Control Transformer
11 Relay settings PCC Side (Outgoing
Feeder)
Checked By: -
(Checked By)
(HOD ELECTRICAL)
DALMIA CEMENT (BHARAT) LTD., ARIYALUR PROJECT
ELECTRICAL DEPARTMENT
CHECKS TO BE PERFORMED BEFORE CHARGING INDIVIDUAL PCC PANEL
Date:-___________
Panel No.
Application :-
11 Control Transformer
Checked By: -
(Checked By)
(HOD ELECTRICAL)
DALMIA CEMENT (BHARAT) LTD., ARIYALUR PROJECT
ELECTRICAL DEPARTMENT
CHECKS TO BE PERFORMED BEFORE CHARGING 11KV HT PANEL
Date:-___________
Panel No.
Application :-
Checked By: -
(Checked By)
(HOD ELECTRICAL)
DALMIA CEMENT (BHARAT) LTD., ARIYALUR PROJECT
(ELECTRICAL DEPARTMENT)
CHECKS TO BE PERFORMED BEFORE CHARGING HV / MV MOTORS
Equipment No. :-
Date :-
Motor Name Plate Details
Make:- Voltage:- Ambient Temp.:-
Type:- KW / HP:- Bearing DE Side:-
Sr. No. :- RPM :- Bearing NDE Side:-
Duty:- FLC:- Motor Weight:-
Protection:- HZ:- Lubrication:-
Insl. Class:- Connection :-
Application :-
Type of Motor:-
Motor KW / RPM :- Voltage Rating:-
Motor Control from Load Centre:-
Size of Cable laid (Whatever applicable):-
1. HT Panel to Stator :-
2. Rotor to Starter :-
3. HT Panel to Transformer :-
4. Transformer to Drive Panel :-
5. Drive Panel to Motor :-
Application :-
Type of Motor:-
Motor KW / RPM :- Voltage Rating:-
Motor Control from Load Centre / MCC :-
Feeder Details:-
MCCB Rating:-
Contactor Rating:-
Size of Cable laid (Whatever applicable):-
1. MCC to Motor :-
2. Transformer to Drive Panel :-
3. Drive Panel to Motor :-
Checked By: -
Electrical Deptt.
Checks found satisfactory & released to Mechanical for Coupling etc.
Charged & DOR Checked by :- (Mech. Deptt.) (HOD ELECTRICAL)