Date:
8-Nov-15
Santa Rita
FN No.
Code
Designation
Fault
Measures
Repair note
Sub status
Priority
Assigned to
00USX
Please rectify
20MBP33CF101
Please check/adjust
Note: C&I informed.
2321
10UBA63
for replacement
Within 1 Week
2318
20BZL03GW021
LIGHTING PANEL
Within 1 Week
40SAC63AH081
For checking
Within 2 days
Code
Designation
Fault
Measures
50PAB31AA301
CONDR DP I-V
For rectification
964
01GMB10CL001
For checking
Under investigation
Within 2 days
963
50MBN12CF001
For checking
Under investigation
Within 1 Week
965
50MBQ10CP001
For checking
Under investigation
Within 1 Week
ALAMANO RB
961
60MBN60CP512
For replacement.
Under investigation
Within 1 Week
ADELANTAR JH
959
60PGB40AA002
For checking.
Under investigation
Within 1 Week
ALAMANO RB
60BAA02
H2 VENT CUBICLE
For checking.
Fault
Measures
Mechanical
2319
Within 1 Week
C&I
2320
Under investigation
Immediate
LLAGAS RA
Electrical
2317
San Lorezo
FN No.
Repair note
Sub status
Priority
Assigned to
TEY HM
Mechanical
962
C&I
PANUNCILLON MP
Electrical
960
Immediate
7-Nov-15
Santa Rita
FN No.
Code
Designation
Repair note
Sub status
Priority
Assigned to
Mechanical
2313
00PUS03AP001
SWF PMP A
For rectification
Immediate
TEY HM
2314
40LBF10AP002
MAIN PMP 2
For checking
Immediate
CRUZ ALEX G DE LA
00BZL11GP001
For replacement.
Within 1 Week
For checking
Immediate
Electrical
2316
2315
00EKT
San Lorenzo
FN No.
Code
Designation
Fault
Measures
Repair note
Sub status
Priority
Assigned to
Scheduled
Within 1 Week
CRUZ ALEX G DE LA
Mechanical
50LBA10AA001
958
50LBB40AA601
For repair
Immediate
CRUZ ALEX G DE LA
50LBF10AA151
For re-installation.
Immediate
CRUZ ALEX G DE LA
956
50HAD50CL001
IP DRM LEVEL 1
venting of impulse lines of CL001 and CL002 was done, CL003 has a correct
reading. for monitoring . (mike) 7Nov15
Under monitoring
Immediate
MACALALAD MC
953
50MBN23AA501
FO PREM UNLOADING V
For rectification.
5/2 way valve was replaced, no more leak on the breather. (mike/rolly/tawin) 7
Nov15
Work completed
Immediate
MACALALAD MC
HP MS SAMP SOL-V
Under investigation
Within 2 weeks
PEREZ SM
Sub status
Priority
Assigned to
957
C&I
954
50QUB32AA010
6-Nov-15
Santa Rita
FN No.
Code
Designation
Fault
Measures
Repair note
00SCA11AT002
OIL SEP/RCVR
Duplicate FN
Within 1 Week
TEY HM
2310
40CYE
For checking.
Under investigation
Within 1 Week
CORTUNA WP
2309
40CYZ01CB010
Under investigation
Within 1 Week
CORTUNA WP
40MAW20CT002A
For checking
Within 1 Week
BAUTISTA JE
Priority
Assigned to
Immediate
LACSAMANA EA
Mechanical
2311
Mechanical
Mechanical
2308
Code
Designation
Fault
Measures
50MB
GAS TURBINE
For retightening.
Repair note
Sub status
Mechanical
952
950
50MBP33AA401
PG DRN VLV 1
To be rectified.
948
50PCB11AP001
Immediate
LACSAMANA EA
Reviewed
Within 1 Week
USON SL
Under investigation
Within 1 Week
CORTUNA WP
Under investigation
Immediate
BARRION RM
Work completed
Immediate
ALAMANO RB
replaced with new spare valve w/locking device. done. FN can be closed
`11/06/2015 -- Oel
Mechanical
946
01GCK80CQ001
951
50MBM13CR101
FLAME MON 1
For checking.
To be checked.
949
50MBP40AA501
947
50MBU36AA151
for replecement
Work completed
Within 1 Week
QUESADA NK
835
60PCB10CP001
SCW FLTR DP
To be checked.
In progress
Within 2 days
CORTUNA WP
50MBM12GT013
IGNTR
For checking.
Immediate
MENDOZA MJ
Mechanical
945