Scope Of Job

Demolition

Piling

Building Work

Acticity

Plan

Man
power

Total Plan
Manhour

Plan
Weightage

Actual Days

Actual
Hour

Actual Man
Power

Awarded

0.39

Kick-Off Meeting

24

24

1.16

Engineering Design & MPK Approval

25

200

200

9.69

16

128

Procurement

14

112

112

5.43

Mobilization Labour / Equipment

16

16

0.78

Hoarding Installation

24

48

2.33

Scaffolding Erection

24

48

2.33

Dismantling Of Existing Perfume Storage

40

80

3.88

Setting Of Allignment

16

0.78

Mobilization Of Piling Equipment

16

0.78

Delivery & Arrangement of RC Piles

16

0.78

Handling / PITCHING & Driving Of RC Piles

48

48

2.33

PDA Test

0.39

Cutting Of Pile Heads

16

32

1.55

19

152

304

14.73

0.00

RC Foundation/Ground Beam/Floor Slab

Hari Raya
Gloove Trench / Sump / Curb Extension

40

80

3.88

RC Ramp / Staircase

32

64

3.10

10

80

80

3.88

40

80

3.88

Rectification Of Existing Structure


Installation Of Steel Structure

40

80

3.88

14

112

224

10.85

Louvres / Doors installation

16

32

1.55

Suspended Ceiling installation

16

32

1.55

Installation Of Roofing Sheet


Brickwall

M&E

Plan Hour (8
H)

Painting Works

16

32

1.55

Electrical Scope

13

104

208

10.08

Electrical Scope

40

80

3.88

Air Conditioning & Ducting

40

80

3.88

Inspection

0.39

Hand Over

TOTAL

1288

0.39

48

2064

100.00

Actual
ManHour

Actual
Weightage
8

5.56

5.56

128

88.89

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

144

0.00

Plan

Plan Hour (8
H)

Awarded

Kick-Off Meeting

24

Scope Of Job

Acticity

Engineering Design & MPK Approval

25

Procurement

14

112

Mobilization Labour / Equipment

16

Hoarding Installation

24

4
8
8

9 10 11 12 13 14 15 16

8
8
8

8
8

8
8

8
8

8
8

8
8

8
8

8
8

8
8

8
8
Demolition

Piling

Building Work

Scaffolding Erection

24

Dismantling Of Existing Perfume Storage

40

Setting Of Allignment

Mobilization Of Piling Equipment

Delivery & Arrangement of RC Piles

Handling / PITCHING & Driving Of RC Piles

48

PDA Test

Cutting Of Pile Heads

16

19

152

RC Foundation/Ground Beam/Floor Slab

Hari Raya

Gloove Trench / Sump / Curb Extension

40

RC Ramp / Staircase

32

10

80

Installation Of Steel Structure

40

Installation Of Roofing Sheet

40

14

112

Louvres / Doors installation

16

Suspended Ceiling installation

16

Painting Works

16

Electrical Scope

13

104

Electrical Scope

40

Air Conditioning & Ducting

40

Inspection

Hand Over

Rectification Of Existing Structure

Brickwall

M&E

TOTAL PLAN DAILY

TOTAL

0.47
0.00
0.00
0.00
0.47
0.47
0.47
0.47
0.47
0.94
0.94
0.94
1.41

0.47
0.47
0.47
0.94
1.41
1.88
2.35
2.82
3.76
4.69
5.63
7.04

SUM ACTUAL PROGRESS


1704

0.47

TOTAL PROGRESS DAILY(%)

0.00

6.10

5.63

5.16

4.69

4.23

3.76

3.29

2.82

2.35

1.88

1.41

0.94

0.47

0.00

SUM PLANNING DAILY(%)

0.00

0.47

0.47

0.47

0.47

0.47

0.47

0.47

0.47

0.47

0.47

0.47

0.47

0.47

0.00

Weightage Plan Daily

### 18 19 20 21 22 23 24 25 26### 28 29 30 31

8
8

8
8

8
8

8
8

8
8

8
8

8
8

8
8

8
8

8
8

8
8

6 63

9 10 11 12 13 14 15 16###

8
8
8
8

8 24 24 24 24 24 32 32 32 24 16 16 16 24 16 24 24 16

0.94
0.47
0.47
0.47
0.47
0.47
0.47
0.47
0.47
0.47
0.47
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

7.98
8.45
8.92
9.39
9.86
10.33
10.80
11.27
11.74
12.21
12.68
12.68
12.68
12.68
12.68
12.68
12.68
12.68
12.68
12.68
12.68
12.68
12.68
12.68
12.68
12.68
12.68
12.68
12.68
12.68
12.68
12.68

36.15

35.21

33.80

32.39

31.46

30.05

29.11

28.17

27.23

25.82

23.94

22.07

20.19

18.78

17.37

15.96

14.55

13.15

12.68

12.21

11.74

11.27

10.80

10.33

9.86

9.39

8.92

8.45

7.98

7.51

7.04

6.57

0.94

1.41

1.41

0.94

1.41

0.94

0.94

0.94

1.41

1.88

1.88

1.88

1.41

1.41

1.41

1.41

1.41

0.47

0.47

0.47

0.47

0.47

0.47

0.47

0.47

0.47

0.47

0.47

0.47

0.47

0.47

0.47

18 19 20 21 22 23 24 25 26### 28 29 30 31

6 63

9 10 11 12 13 14 15 16### 18

8
8
8

8
8

16

8 16 16 16 16 16 16 16 16 16 24 24 24 24 16 16 16 16 16 16 16 16 16 16

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

12.68
12.68
12.68
12.68
12.68
12.68
12.68
12.68
12.68
12.68
12.68
12.68
12.68
12.68
12.68
12.68
12.68
12.68
12.68
12.68
12.68
12.68
12.68
12.68
12.68
12.68
12.68
12.68
12.68
12.68
12.68
12.68

64.32

63.38

62.44

61.50

60.56

59.62

58.69

57.75

56.81

55.87

54.93

53.52

52.11

50.70

49.30

48.36

47.42

46.48

45.54

44.60

43.66

42.72

41.78

40.85

40.38

39.91

39.44

38.97

38.50

38.03

37.56

37.09

0.94

0.94

0.94

0.94

0.94

0.94

0.94

0.94

0.94

0.94

1.41

1.41

1.41

1.41

0.94

0.94

0.94

0.94

0.94

0.94

0.94

0.94

0.94

0.47

0.47

0.47

0.47

0.47

0.47

0.47

0.47

0.94

19 20 21 22 23 24 25 26### 28 29 30

6 63

9 10 11 12 13 14 15 16### 18 19 20

8
8

8
8

16 16 24 24 24 24 24 24 24

8 16

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

12.68
12.68
12.68
12.68
12.68
12.68
12.68
12.68
12.68
12.68
12.68
12.68
12.68
12.68
12.68
12.68
12.68
12.68
12.68
12.68
12.68
12.68
12.68
12.68
12.68
12.68
12.68
12.68
12.68
12.68
12.68
12.68

87.32

86.85

86.38

85.92

85.45

84.98

84.51

84.04

83.57

83.10

82.63

82.16

81.69

81.22

80.75

80.28

79.81

79.34

78.87

78.40

77.93

77.46

76.53

76.06

74.65

73.24

71.83

70.42

69.01

67.61

66.20

65.26

0.47

0.47

0.47

0.47

0.47

0.47

0.47

0.47

0.47

0.47

0.47

0.47

0.47

0.47

0.47

0.47

0.47

0.47

0.47

0.47

0.47

0.94

0.47

1.41

1.41

1.41

1.41

1.41

1.41

1.41

0.94

0.94

21 22 23 24 25 26### 28 29 30 31

5 Weightage
0.47
0.00
1.41
0.00
0.00
0.00
6.57
0.00
0.94
0.00
1.41
0.00
1.41
0.00
2.35
0.00
0.47
0.00
0.47
0.00
0.47
0.00
2.82
0.00
0.47
0.00
0.94
0.00
8.92

8
8

8
8

8
8

8 16 24 32 24 24 16 16 16

8
8 16

0.00
0.00
0.00
2.35
0.00
1.88
0.00
4.69
0.00
2.35
0.00
2.35
0.00
6.57
0.00
0.94
0.00
0.94
0.00
0.94
0.00
6.10
0.00
2.35
0.00
2.35
0.00
0.47
0.00
0.47
1,704.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

12.68
12.68
12.68
12.68
12.68
12.68
12.68
12.68
12.68
12.68
12.68
12.68
12.68
12.68
12.68
12.68

0.47

0.94

0.94

0.94

1.41

1.41

1.88

1.41

0.94

0.47

0.47

0.47

64.79

66.20

67.61

100.00

0.00

0.00

0.00

100.00 0.94

99.06

98.59

97.65

96.71

95.77

94.37

92.96

91.08

89.67

88.73

88.26

87.79

120.00

100.00

80.00

60.00

40.00

20.00

0.00

progress
Planning Chart