Professional Documents
Culture Documents
1. Pre-Operation Checks
Check Reagent Supply.
Check the tubings and cables. Make sure they are not bent and the cord is securely plugged
into the powe outlet.
2. Power ON Sequence (switch is located on the right side of the Main Unit)
Printer (if K-DPS is connected)
Motor
Background check
Press [SAMPLE NO.] key to input sample ID # using the numeric keypad.
Remove the cap carefully, then set the sample into the manual aspiration pipette.
Results are displayed on the LCD screen and can be automatically printed out.
Press [SAMPLE NO.] key and input the sample ID number using the numeric keys.
Results are displayed on the LCD screen and can be automatically printed out.
After running all the Pre-diluted samples, change back to Manual Mode.
Weekly Maintenance
CLEAN SRV TRAY
Turn OFF the power. Wait at least 30 seconds to release the pressure and vacuum accumulated in the
pneumatic lines.
Open Front cover and set Stop Bar in position so that the cover would not close accidentally.
Remove the SRV tray by pulling it towards you.
Check the tray for dirt, wipe and rinse with water.
Reattach the tray in its original position.
Close the Front cover.
Document on the maintenance checklist.
Monthly Maintenance
CLEAN WASTE CHAMBERS
Press [SELECT] key in the Ready status. Select 7. Maintenance using the up/down keys.
Press [ENTER] key. Select 1. Clean Waste Chambers., then press [ENTER] key.
Place CELLCLEAN at sample probe, then press [START] switch to start process.
Remove CELLCLEAN when the sound beeps twice. Process would take approx. 15 minutes.
Document on the maintenance checklist.
CLEAN Transducer
Open the front cover and use the stop bar to prevent accidental closure.
Press [SELECT] key on the panel keypad.
Select 7. Maintenance using the up/down keys, then press [ENTER].
Select 2. Clean Transducer using the up/down keys.
Remove the WBC and/or RBC detector cap.
Pipet 1 mL of CELLCLEAN into each transducer chamber, replace the caps.
Close the transducer cover and close the front cover of the Main Unit.
Press the [START] switch.
Document on the maintenance checklist.
Quarterly Maintenance
CLEAN SRV
Please refer to the operator manual for quarterly and As Needed Maintenance.
DEBASISH ROY
APPLICATION
TRANSASIA BIO-MEDICAL LTD.