You are on page 1of 3

NRL ISBL UPGRADATION PROJECT

Project document #: 14089-03310-N-300, Title: Electrical documents for construction of Unit 310
S.No

Doc# 14089-03310-N-303

Doc# 14089-03310-N-302

Notes.
1) Any co-ordination required between vendor and licensor will be carried out by HUALU.
2) All vendor drawings provided, must be compatible with AUTOCAD 2008.
3) Any deviation/non-compliance from the requirements of the relevant part of the ITB/IFP and project specification par
codes and standards be specifically indicated to NRL at this stage for review and approval. Hualu will be responsible f
at any stage and not approved by NRL.
4) Comments /approval by NRL does not relieve Hualu of any of its responsibilities or obligations under the Contract. H
mistakes or non-compliance whenever it is identified.
5) Absence of comments, by NRL, on any aspect of Hualus document shall not relieve Hualu of the responsibility for n

NRL ISBL UPGRADATION PROJECT


Project document #: 14089-03310-N-300, Title: Electrical documents for construction of Unit 310
Comments

Doc# 14089-03310-N-303
As per NRL Understanding, some insulation to be provided for the 310 Tanks. HUALU to confirm.
Trucks are shown here but no system for Truck earhthing is mentioned here. HUALU to clarify.
Doc# 14089-03310-N-302
All standard of STP Electrical Grounding ST-6200 should be included as reference here.
As per ITB Document # 2302-00-PDS-6000-01-0 Sheet 25 OF 28,
"The conductive parts of LV motors (including cable boxes) shall be connected to grounding
system by means of a specific 35 sqmm earthing conductor connected to the frame and to
the cable box. "
However, HUALU has used 25mm2 here. HUALU to clarify.
As per ITB Document # 2302- 310- PDS- 6210-01-0 Sheet 7 OF 11,
"The shells of storage tanks shall be grounded at a minimum of two points on the opposite sides of the
tank. Each point shall be bonded to the area ground grid or to a minimum 35 mm ground conductor."
However, HUALU has used 25mm2 here. HUALU to clarify.
HUALU to explain point # 22 in detail. Furthermore, explain the functional grounding system.

Notes.
1) Any co-ordination required between vendor and licensor will be carried out by HUALU.
2) All vendor drawings provided, must be compatible with AUTOCAD 2008.
3) Any deviation/non-compliance from the requirements of the relevant part of the ITB/IFP and project specification particularly
codes and standards be specifically indicated to NRL at this stage for review and approval. Hualu will be responsible for revert
at any stage and not approved by NRL.
4) Comments /approval by NRL does not relieve Hualu of any of its responsibilities or obligations under the Contract. Hualu is
mistakes or non-compliance whenever it is identified.
5) Absence of comments, by NRL, on any aspect of Hualus document shall not relieve Hualu of the responsibility for non- com

Date: 30-10-2015
NRL Reference: To Be Updated
HUALU REPLY

NRL Further Comments

cification particularly those included in KT ,UOP and STP packages,applicable


esponsible for reverting back any of such deviations/non- compliances noticed

e Contract. Hualu is responsible for redoing of work, at its cost, to remove any

nsibility for non- compliant items that may be identified later by NRL.

You might also like