Nr
COMPONENT
STEP
Preliminary activities
HAZARD
Circuit Preparation
Installation of blinds
Fall down
CAUSE
Activity at height
Health Back
problems
Reviewed: ALR
13.01.05
PREVENTIVE MEASURE
Test procedure
Circuit identification
Competent person in charge of the operation
People advised to avoid the risky area.
Cold works permit procedure to be followed.
Toolbox talks to be conducted for the crew before start of
activity.
Proper supervision to be in place.
Proper Scaffoldings/ working platforms to be provided for
access.
Scafftag system to be followed.
Full fall protection to be assured by using safety harnesses
Isolate area underneath
Competent people for the job.
Use of PPE
Limit the weight handled to no more than 25 kg per person
Approved By:
CONSORTIUM
ASTALDI ARABIA &
NASSER S. AL.HAJRI CO. LTD.
ORYX GTL PROJECT RAS LAFFAN
AS-AL
Pressurising
Body Injuries
Breaking of the
Component/temporary
piping.
People injured by
pressurised water.
Checks during
pressuring
Body damage
De-pressuring
Body damage
Health uneasiness
from water
Equipment damage
Slip/ fall
People invested by
pressurized water.
Build up of vacuum while
depressurising.
Flooding the nearby area
Reviewed: ALR
Approved By:
CONSORTIUM
ASTALDI ARABIA &
NASSER S. AL.HAJRI CO. LTD.
ORYX GTL PROJECT RAS LAFFAN
AS-AL
Dismantling of the
circuit
See preparation
See preparation
Emergency response
See preparation
Follow the emergency procedure.
In emergency contact
Safety Manager
533 7314
Technip HSE Manager
535 8624
RLIC Emergency
474 8888
Male Nurse
560 2147
Reviewed: ALR