Schedule No.

1
Preliminaries

Item

Description

Quantity

Unit

Rate

SCHEDULE NO. 1
PRELIMINARIES

1.1

MOBILISATION COSTS

Professional Indemnity Insurance

item

Office for Supervising Officer's site


representatives

item

Mobile communication devices

item

Computer Facilities

item

Contractor's workshops, offices and storage


sheds

item

Hoardings, gantries and fencings

item

Signboard

item

Temporary water supply

item

Temporary lighting and power

item

Plants and tools

item

Land Transport

item

Online Project and Document Management


System

item

Levies

item

Passenger Lifts

item

Any other items (to be inserted by the


Contractor) : -

Carried to Collection
Tender Addendum No. 2
SOR.1/1

Schedule No. 1
Preliminaries

Item
1.2

Description

Quantity

Unit

Rate

DESIGN COSTS

Contractor's Architectural Design team

item

Contractor's Interior Design team

item

Contractor's Signage Design team

item

Contractor's Structural Design team

item

Contractor's Building Services Design team

item

Architectural Design Checker

item

Structural Design Checker

item

Building Services Design Checker

item

Landscape Design Checker

item

Curtain Wall Design Checker

item

Any other items (to be inserted by the


Contractor) : -

Carried to Collection
SOR.1/2

Schedule No. 1
Preliminaries

Item
1.3

Description

Quantity

Unit

Rate

TIME RELATED COSTS

Contractor's Management Team

item

Contractor's Resident Structural Engineer

item

Contractor's Project Building Services


Co-ordinator

item

Contractor's Project Clerk of Works

item

Contractor's Project Assistant Clerk of Works

item

Contractor's Project Building Services


Inspector

item

Contractor's Project Assistant Building


Services Inspector

item

Contractor's Project Work Supervisor (BW)

item

Contractor's Project Work Supervisor (BS)

item

Contractor's Project Field Officer

item

Dispute Resolution Advisor (DRAd)

item

Carried to Collection
SOR.1/3

Schedule No. 1
Preliminaries

Item
1.3

Description

Quantity

Unit

Rate

TIME RELATED COSTS (Cont'd)

Technician apprentices and building or civil


engineering graduates

item

Technical Assistant

item

Contract Clerk

item

Office for Supervising Officer's site


representatives (excluding the provision of
technical assistant and contract clerk, pagers
and mobile phones)

item

Plants and tools

item

Fire precautions

item

Temporary lighting and power

item

Hoardings, gantries and fencings

item

Signboard

item

Online Project and Document Management


System

item

Security and Watchmen

item

Compliance with enactments and regulations

item

Photographs and videos

item

Attendance etc. on works carried out by


Government departments and utility
undertakings

item

Site safety and environmental management

item

Carried to Collection
Tender Addendum No. 2
SOR.1/4

Schedule No. 1
Preliminaries

Item
1.3

Description

Quantity

Unit

Rate

TIME RELATED COSTS (Cont'd)

Setting out

item

Land Transport

item

Latrines

item

Contractor's workshops, offices and storage


sheds

item

Traffic control

item

Temporary water supply

item

Temporary Works, scaffolding, etc.

item

Mobile communication devices

item

Passenger Lifts

item

Any other items (to be inserted by the


Contractor) : -

Carried to Collection
Tender Addendum No. 2
SOR.1/5

Schedule No. 1
Preliminaries

Item
1.4

Description

Quantity

Unit

Rate

WORK VALUE RELATED COSTS

Plants and tools

item

Samples

item

Mock-up rooms

item

Drawings provided by the Contractor

item

Sampling and testing

item

Protection

item

Temporary water supply

item

Temporary lighting and power

item

Setting out

item

Fire precautions

item

Scaffolding

item

Any other items (to be inserted by the


Contractor) : -

Carried to Collection
Tender Addendum No. 2
SOR.1/6

Schedule No. 1
Preliminaries

Item
1.5

Description

Quantity

Unit

Rate

DE-MOBILISATION COSTS

Plants and tools

item

Hoardings, gantries and fencings

item

Signboard

item

Site offices and workshops

item

Temporary water supply

item

Temporary lighting and power

item

As-built drawings, operational and


maintenance manuals and records

item

Clearance of Site on completion

item

Computer facilities

item

Online Project and Document Management


System

item

Passenger Lifts

item

Any other items (to be inserted by the


Contractor) : -

Carried to Collection
Tender Addendum No. 2
SOR.1/7