Professional Documents
Culture Documents
1
Sanchez Eduardo
1,500
Departament
o de
Produccin
A
MATERIA PRIMA
Dcto.
Importe
Fecha
2-Jan
Producto:
Modelo:
Caractersticas:
Fecha
MANO DE OBRA
No. De Horas Valor Hora
Importe
Fecha
100
10.50
2-Jan
70
1.7
119.00
2-Jan
1.76
1,500
2,640.00
101
3.56
5-Feb
90
2.4
216.00
5-Feb
405.58
1,500
608,370.00
4-Feb
50
1.7
85.00
4-Feb
3.03
1,500
4,545.00
CORTE
Subtotal A
B
5-Feb
Subtotal B
C
4-Feb
102
Subtotal C
TOTAL
CONCEPTOS
14.06
420.00
LIQUIDACIN
DEPARTAMENTOS DE PRODUCCIN
COSTO TOTAL
COSTO
UNITARIO
10.50
3.56
14.06
0.01
119.00
216.00
85.00
420.00
0.28
Costo Primo
129.50
216.00
85.00
434.06
0.29
2,640.00
608,370.00
4,545.00
615,555.00
410.37
2,769.50
608,586.00
4,630.00
615,989.06
410.66
616,423.12
410.95
1,500.00
615,555.00
LIBRO DIARI
FECHA
1/3/2012
1/16/2012
1/28/2012
2/15/2012
2/15/2012
2/15/2012
2/15/2012
2/15/2012
TOTAL =
NIFORMES S.A."
IO
______
Folio No.
PARCIAL
TOTAL =
DEBE
HABER
EMPRESA UNIFORME
MAYORIZACIN
Inventario Materia Prima Directa
FECHA
DESCRIPCIN
TOTAL ------>
Proveedores por Pagar
FECHA
DESCRIPCIN
TOTAL ------>
Inventario Produccin en Proceso MPD (DP1)
FECHA
DESCRIPCIN
TOTAL ------>
Inventario Produccin en Proceso MPD (DP2)
FECHA
DESCRIPCIN
TOTAL ------>
Inventario Produccin en Proceso MOD (DP1)
FECHA
DESCRIPCIN
TOTAL ------>
Inventario Produccin en Proceso MOD (DP2)
FECHA
DESCRIPCIN
FECHA
DESCRIPCIN
TOTAL ------>
Inventario Produccin en Proceso CIF (DP1)
FECHA
DESCRIPCIN
TOTAL ------>
Inventario Produccin en Proceso CIF (DP2)
FECHA
DESCRIPCIN
DESCRIPCIN
TOTAL ------>
CIF Aplicados
FECHA
DESCRIPCIN
TOTAL ------>
Inventario Artculos Trminados
FECHA
DESCRIPCIN
TOTAL ------>
COD.: __________
SALDO
MOVIMIENTO
ASIENTO No.
DEBE
HABER
DEUDOR /
ACREEDOR
VALOR $
-1-
Deudor
-2-
Acreedor
-3-
Acreedor
TOTAL ------>
COD.: __________
SALDO
MOVIMIENTO
ASIENTO No.
DEBE
Deudor
HABER
DEUDOR /
ACREEDOR
VALOR $
-1-
Acreedor
TOTAL ------>
COD.: __________
SALDO
DEBE
HABER
-2-8TOTAL ------>
MOVIMIENTO
DEBE
HABER
HABER
Nulo
DEUDOR /
ACREEDOR
Deudor
Acreedor
Nulo
DEUDOR /
ACREEDOR
VALOR $
-4-8TOTAL ------>
COD.: __________
SALDO
MOVIMIENTO
ASIENTO No.
Deudor
Acreedor
VALOR $
-3-8TOTAL ------>
COD.: __________
SALDO
DEUDOR /
ACREEDOR
VALOR $
Deudor
Acreedor
Nulo
COD.: __________
SALDO
ASIENTO No.
DEBE
HABER
-5-8TOTAL ------>
MOVIMIENTO
DEBE
HABER
MOVIMIENTO
DEBE
-7-8-
HABER
414.97 414.97
HABER
Nulo
DEUDOR /
ACREEDOR
Nulo
Acreedor
Acreedor
0 Acreedor
COD.: __________
SALDO
MOVIMIENTO
DEBE
Deudor
Acreedor
DEUDOR /
ACREEDOR
VALOR $
CIF Aplicados
HABER
DEUDOR /
ACREEDOR
VALOR $
-6-7-
- Acreedor
0.00 Acreedor
TOTAL ------>
0.00
Artculos Trminados
DEBE
0.00 Acreedor
COD.: __________
SALDO
MOVIMIENTO
HABER
DEUDOR /
ACREEDOR
VALOR $
-8-
TOTAL ------>
TOTAL ------>
ASIENTO No.
Deudor
Acreedor
-4-5-
ASIENTO No.
COD.: __________
SALDO
MOVIMIENTO
DEBE
DEUDOR /
ACREEDOR
414.97
414.97
414.97
Nulo
VALOR $
414.97
TOTAL ------>
COD.: __________
SALDO
Deudor
Acreedor
VALOR $
-6-8TOTAL ------>
COD.: __________
SALDO
DEUDOR /
ACREEDOR
VALOR $
Deudor
Deudor
Fecha de elaboracin:
Elaborado por:
PRESUPUESTO
CONCEPTO
HISTRICO
Ao 2015
PROYECTADO
Ao 2016
Variables
Departamentos de Produccin
P1
P2
Departamentos de Servicios
P3
S1
COMBUSTIBLE
8,300.00
8,300.00
3,320.00
2,942.73
2,037.27
ENERGIA ELECTRICA
3,500.00
3,956.70
438.66
644.70
1,212.30
72,727.20
72,727.20
3,636.36
4,581,813.60
23,272.70
TOTAL
S2
8,300.00
679.27
981.77
3,956.70
4,608,722.66
-
Fijos
ARRIENDO FABRICA
9,500.00
9,500.00
2,089.51
2,915.60
1,943.73
1,020.46
1,530.69
SEFURO DE FABRICA
6,500.00
6,500.00
3,638.06
1,940.30
582.09
145.52
194.03
6,500.00
10,000.00
10,000.00
4,411.76
2,941.18
1,176.47
882.35
588.24
10,000.00
8,700.00
9,098.75
2,001.26
2,792.46
1,861.64
977.36
1,466.04
9,098.75
350.00
350.00
70.00
70.00
70.00
70.00
70.00
350.00
9,500.00
TOTAL 1
119,577.20
120,432.65
19,605.62
4,596,060.56
32,156.20
3,774.96
4,830.76
4,656,428.11
S1
1,415.61
1,415.61
943.74
3,774.96
S2
1,811.54
1,811.54
1,207.69
4,830.76
Departamentos de Servicios
TOTAL 1
3,227.15
3,227.15
2,151.43
8,605.73
TOTAL 2
22,832.77
4,599,287.71
34,307.64
4,665,033.84
12960
1.76
11340
405.58
11340
3.03
8%
DATOS DE LA
PRODUCCIN
Departamentos
MPI
utilizada
por dpto.
2015
Produccin al
2016
Departamento Prod.1
12,000 unidades
12960
5%
Departamento Prod.2
10,500 unidades
11340
63%
Departamento Prod.3
10,500 unidades
11340
32%
33000
35640
DEp APOYO 1
DEP. APOYO 2
TOTAL
100%
9,500.00 anuales
2. Combustible
Ao 2015
$
8300 gl anuales
1.00 Precio por galn
Para el 2016:
3. Energa Elctrica
Ao 2015
Fracccin Bsica
Consumo Kw
Precio por kw/h a diciembre =
Kw consumidos en el ao =
Kw consumidos en el mes =
Para el 2016:
4. MPI
INCREMENTO de
- Hasta Junio
-Desde Junio
MPI 2015 =
Mes
Valor
ABRIL
70%
13650
JULIO
30%
5850
Total $
19500
5. Seguro de Fbrica
Ao 2015
6,500.00
6. Guardiana
Ao 2015
8700 anuales
725 mensuales
Ao 2016
5% desde fecbrero
1 meses
5% 11 meses
incremento
hasta febrero
desde febrero
Para el prorrateo:
Departamento
Nivel de Riesgo
Personal
dp.1
15
dp.2
10
dp.3
apoyo 1
apoyo 2
TOTAL:
34
5. Alimentacin
Ao 2015
$ 10,000.00
DATOS DE LA EMPRESA
rea en M2
Horas / Mquina
86
220
15
120
195
10
80
135
42
63
391
550
8,300.00
$
$
$
350.00
3,500.00
0.09
38,888.89 kw
3,240.74 kw
esde Junio
$
$
$
1,458.33
2,495.37
3,953.70
34
total
esde fecbrero
$
$
$
725.00
8,373.75
9,098.75
Riesgo
75
40
12
3
4
134
36.3636
Kw / Hora
Inspecciones
de Control de
Calidad
Realizadas
3,300.00
4,850.00
9,120.00
5,110.00
7,385.71
29,765.71
232.72704