CONCEPT DESIGN
Initial Considerations
Preliminary Design
Air Mixing
Prefiltration
Heat Recovery
Cooling Coils
Ultraviolet Cleaning
Systems
Moisture Carryover,
Condensate Removal,
and Drains
Supply Fans
Return Fans
Humidifiers
Final Filtration
Noise Control
Vibration Control
Airflow Monitors
Dehumidification
Equipment
System Redundancy
DUCTWORK
General Design
Consideration
Duct Cleaning
ROOM AIR
DISTRIBUTION
Room distribution
design approach
Air Exchange Rates and
Ventilation
Supply Air Diffusers
General
System Effect
Belt Losses
Humidifier types
Humidifier location
Humidifier control
Pressure losses
Pressure Class
Fittings
Access
Elbows
Flexible ductwork
The designer should work with equipment vendors to confirm sizes and determine
equipment weights for the structural engineer.
Many AHU components may require emergency power in order to maintain space conditions
for critical areas, provide smoke ventilation, or maintain critical pressurization control. These
requirements must be identified early and provided to the electrical engineer to ensure that
provisions for sufficient emergency power are incorporated into the design.
Include any critical control components, such as pneumatic-control air compressors, control
panels, and powered control devices.
Think through the control sequence to ensure that all necessary components have been
included in the airhandling system.
Determine AHU zones for all floors.
Locate duct chases for supply, return, and exhaust risers.
Develop details of chase layouts and confirm that there is sufficient room for ductwork to
exit and connect to horizontal mains on the floor.
Plan for piping or other systems that may share chase space.
Provide sufficient space for installation and service access for any required fire/smoke
dampers at the chase exit points.
Develop preliminary AHU equipment schedules and configuration plans and sections. This
effort should include all needed components and sections with sizes and approximate
weights.
Include locations of all AHUs and other major equipment.
Identify service clearances.
Work with the electrical engineer to ensure that sufficient space is provided for electrical
components such as motor control centers, starters, disconnects, or variable speed drives.
Identify the type of zone control to be used for individual spaces (e.g., variable-air-volume
[VAV] reheat, constant-volume [CV] reheat, dual duct, etc.).
Determine the approximate number of zone control devices (terminal boxes) and how many
spaces will share a box/zone.
Develop preliminary piping risers for steam, condensate, chilled water, and hot water.
Determine the paths that major routes will take to the various equipment components, and
work with the building designer to plan for the necessary space and chases for pipe runs.
Add rigging devices (e.g., rails, lifts, winches) to assist with motor, fan or other large
component removal and replacement
Install grease-fitting extensions to the exterior of the casing to allow service without entering
the unit
Provide inspection windows and adequate lighting (consider putting lighting on timers to
prevent unnecessary usage and premature burnout).
Provide pressure and temperature test ports in each section with a means for ease of
opening and closing.
Designers should consider specifying on-site leakage testing of AHUs. Although such testing
can be done at the factory, shipping and site assembly of some components may introduce
an opportunity for additional leakage. An on-site test can verify that the finished product
meets the desired leakage specification.
Locate the outdoor air intakes atleast a distance of 30 ft. away from potential contaminant
sources, such as boiler and generator stacks, laboratory exhaust vents, plumbing vents,
cooling towers, ambulance waiting and vehicle parking areas, loading docks, and helipads.
Locate outdoor air intakes at a minimum of 8 feet [2.4 m] above grade (10 ft [3 m] according
to some codes and criteria) to avoid taking in grass clippings, leaves, bird feathers, or other
debris (often wet) that can clog intake louvers, screens, and filters and provide a reservoir
for microbial growth.
Locate outdoor air intakes well above roof level (a minimum of 3 ft [0.9 m] according to most
codes) to avoid intake of debris from the roof.
Ensure that all intakes are equipped with a factory-fabricated louver designed to exclude
wind driven precipitation and a bird screen to exclude birds or small mammals
Avoid placing an intake near horizontal surfaces, such as a shelf or ledge, that can cause
rain splash to penetrate horizontally through the louver or can become a dangerous microbe
growth source as a result of collected bird droppings or other organic debris.
In severe climates or where percentage of outdoor air intake is high, consider factory
fabricated air blenders. They generate additional pressure drop and increase AHU length.
Consider the criticality of the AHU when sizing cooling coils based on preconditioning from
heat recovery systems. Failure or poor performance of the heat recovery system may
compromise space conditions.
Provide access panels or doors for cleaning and combing (straightening bent fins) the
upstream and downstream of all coils. The panel door must be large enough to enable a
maintenance personto access and work on the entire face of the coil.
Coils must be constructed of noncorrosive metals, typically copper tubing with aluminum
fins.
Consider specifying other noncorrosive components, such as stainlesssteel headers, drain
pans, coil casings, and coil frames.
Consider the air vent discharge location and direction of automatic and manual air vents so
that entrained water does not leak into the AHU during air bleeding.
To enable necessary testing and balancing of the coil, ensure that pressure gages and
thermometers (or ports for these instruments), flow measurement devices and manual
balancing valves are provided on the piping connections.
Upstream and downstream air temperature sensors or sensor ports are also beneficial for
unit performance monitoring and troubleshooting.
Pressure and temperature ports on pipe inlets and outlets can also be useful for monitoring
and troubleshooting.
Differential air pressure gages across coils can be helpful in indentifying fouled coil fins that
require cleaning.
Provide isolation valves and unions to facilitate coil replacement.
Use caution in locating coils relative to the suction or discharge of the fan; if located too
close, an uneven velocity distribution across the coil face can result in loss of capacity,
moisture carryover, or freeze-up problems. Generally, the flow distribution across the coil
face should not vary more than 10%.
Many energy codes and standards are now requiring significant reductions in fan power. To
accomplish this, pressure drops must be reduced by lowering air velocities, thereby
decreasing friction loss in the AHU, ductwork, and fittings. To meet some of the latest energy
codes or standards, design velocities as low as 250 fpm [1.3 m/s] may be necessary.
Coils shoould not exceed 6 rows and/or 10-12 fins per inch.
If additonal coils are required, the cooling coil should besplit into two separate coils (in the
direction of airflow)
Make both upstream and downstream faces of the cooling coil accessible to a maintenance
worker using a power washer.
Air velocity through the cooling coil should be limited to a maximum of 450 to 550 fpm (2.3
to 2.8 m/s)
Access doors should be fitted with interlocks which will turn off the the UV in the event the
door is opened.
Post precaution labels near access doors to any equipment with UV systems.
If UV devices are purchased seperately, consult AHU manufaturer ensure that all
components and materials exposed to UV will not sustain significant damage over time.
Provide positively draining pans constructed of non-corrosive material (e.g. stainless steel)
Pans should reach entirely beneath the coil and extend approximately 12 in. (300 mm) from
the discharge face.
The pan should be at least 2 in. (50 mm) deep, with a drain pipe located so that the bottom
of the pipe is flush with the bottom of the pan.
For coils sucjected to nnegative pressure (draw through type) the trap should be 2 in plus
static pressure In the pan
For coils subjected to positive pressure (blow through type) should be 1 in minimum.
Select fans such that their normal operating point is not within the surge range.
Attenuate fan-generated noise that may be transmitted through the distribution system to
occupied spaces. Airfoil-bladed centrifugal fans and plenum-style fan arrangements tend to
be less noisy.
When final filters or coils are located downstream of the fan discharge, a discharge air
diffuser may be required (depending upon conditions and type of fan) to equalize the outlet
velocity profile and avoid excessive pressure losses or velocities in the downstream
components.
Generally provide draw through arrangement as the heat generated from the fan motor
provides "free" reheat option.
Reduce system effects by avoiding hard bends, poorly designed turning vanes, improperly
designed branch flows and abrupt AHU inlets or discharge takeoffs.
Make the building designer/ architect aware that inadequate AHU mechanical room space
and shaft location can create problems and reduce system performance and energy
efficiency.
Belt losses can be up to 3-5% of total motor output is often not included in fan power
information published in manufacturers' catalogs.
Same as supply fans
ASHRAE Std. 170 steam injection type humidifiers for healthcare facilities.
Take care to ensure only dry steam is supplied to the steam injector.
Consult manufacturers recommendations for appropriate condensate trapping and drainage
provisions and ensure that appropriate details and instructions are communicated via
construction drawings.
When saturated dry steam is injected into the airstream, a portion of the steam is
immediately condensed and forms a mist or vapor trailof water particles. Unless a suitable
expanse of downstream duct or AHU casing is provided to allow for reevaporation, the mist
will impinge on downstream equipment and cause water buildup. Filters, exposed insulating
materials, and even sheet metal can easily become microbe growth sites in these
circumstances, and fans and other steel AHU and ductwork components will quickly rust.
The distance required for reevaporation is a function of air temperature, relative humidity,
velocity, casing or duct dimensions, and the design of the humidifier components; it can
vary from a few inches (several mm) to more than 12 ft [3.6 m].
Provide sidewall takeoff and add flexible ductwork with atleast one elbow at final diffuser or
grille connection
If further attenuation is required, use packed type liners.
Provide proper transitions in the ductwork, as improper transitions cause pressure loss
across sound attenuators several times the catalog value.
Do not locate air handlers, chillers, pumps, compressors, or other moving equipment directly
over highly sensitive areas, such as operating rooms.
Select fans for stable operation, and provide smooth duct transitions to avoid fan, which can
introduce vibration .
Coordinate with the structural engineer so that the structure supporting moving equipment
is designed to limit transmission of vibration.
Consider inertia pads for larger equipment or when equipment is near highly sensitive areas
Provide airflow monitoring array in the return and supply airstreams for VAV systems to
enable differential supply/reutrn fan flow control.
Provide airflow monitoring array to monitor flow of outdoor air.
Provide straight upstream ductwork and smoothly transitioning discharge arrangement to
facilitate a uniform entering velocity profile.
Ensure that the device is able to measure low flow velocities.
When excessive dehumidified air is required considerconsider special DX systems that are
designed to operate in reheat mode.
Ensure that treated air continues to flow to critical areas when system is down for repair, by
providing dual units operating in parallel.
Be careful of published pressre losses, as they often correspond to specific idealized inlet or
connection arrangements that may not be possible in actual building connections.
Show or specify pressure class for supply, return and exhaust ducts.
Ensure that specifications or drawings include provisions for the necessary fittings to enable
testing and balancing.
Splitters (when allowed and permitted) and balancing dampers must be shown or detailed
wherever required.
Provide suitable ductwork configurations to enable accurate pitot traverses in main and
branch ductwork.
Access openings should be provided where required for system maintenance and inspection.
Duct access doors should be provided at fire and smoke dampers, on both sides of ductmounted coils, at humidifiers, and as required by the client or codes to facilitate duct
cleaning.
Whenever allowed by space conditions, use long-radius elbows to minimize pressure losses
and improve performance and cleanliness.
Square elbows with turning vanes should be avoided, especially in exhaust and return
systems, because they collect dust and debris, leading to reduced airflow performance.
Use of flexible ductwork should be limited because of its higher pressure losses, particularly
when crimped or coiled, and its greater susceptibility to abuse or damage.
Limit flexible duct connections to a maximum length of 5 to 6 ft [1.5 to 1.8 m].
Always prefer ducted return over plenum return
Prefer external duct insulation over internal or lined insulation.
If internal insulation is used, the insulation should be covered with polyester film or other
material to prevent fibers from entering the airstream.
With externally insulated ductwork, the designer must consider acoustics and use measures
other than liner to reduce duct noise. Reducing duct velocities to provide better acoustics,
rather than relying on lined ductwork, will also help with energy code compliance.
Ductwork should be shipped to site adequately covered or wrapped to prevent dust and dirt
buildup.
Ductwork stored on site should be stored in a dry area.
Stored ductwork should be wrapped or covered to prevent buildup of construction dust and
dirt.
Ductwork should be stored on pallets or other means to keep materials off the floor.
Once installed, ductwork should be cleaned, wiped, and inspected for dust; completed
sections should be sealed with plastic or other means to keep out construction dust.
Air-handling systems should not be run until filters are in place and construction work is
complete to the point that dusty operations (e.g., gypsum board sanding) are no longer
occuring.
If air-handling systems must be operated during construction activities, all return inlets
should be covered with filter material to prevent dust from entering the return duct system.
All materials in the MRI scan room must be nonferrous. Aluminum ductwork is typically used.
Be careful to make sure that not only the ductworkbut all duct componentsare of
nonferrous construction. Screws and connectors must be aluminum, brass, or other
nonferrous metals. The metal helix used in flexible ductwork must be
aluminum or other nonferrous metal
All ductwork and into the room must pass through an RF shield.
Coordinate with the magnetic shield designer to determine where duct penetrations will be
located and what size ducts are required.
MRI machines also require specially constructed and insulated quench vent ducting to the
outdoors.
Most hospitals are required to conduct frequent testing of fire and smoke dampers to comply
with accrediting agencies. For this reason, the designer should select duct routes that
minimize the number of dampers required.
Maintain sufficient clearance and access for testing and resetting of dampers.
Develop a room-by-room airflow summary chart and ensure the airflow rates meet cooling
loads, required air change rates and makeup air requirements.
Follow ANSI/ASHRAE/ASHE Standard 170 for ventilation and ACH rates
Remarks