CALCULATION SUMMARY

Project Name : Sodimac Open Plaza Cajamarca

Project Location: Sistema 1

Drawing No. :

City: Lima, Peru

Design Areas
Design Area
Name

Sistema 1

Calc. Mode
(Model)

Demand (HW)

Occupancy

Area of
Total Water Pressure @
Application
Source

Min.
Density

Min.
Pressure

Min.
Flow

Calculated
Heads

Hose
Streams

Margin To
Source

(ft)

(gpm)

(psi)

(gpm/ft)

(psi)

(gpm)

(gpm)

(psi)

1500

896.4

156.1

0.26

33.7

65

500

50.1

File: D:\lchavez\Data\LCHAVEZ 2010\Lchavez\Actual 2014\Sodimac Cajamarca\Calculo\Sistema 1.tyc3


Date 26/06/2014

Copyright 2002-2012 Tyco Fire Protection Products

Page 1

HYDRAULIC CALCULATIONS
for
Job Information
Project Name : Sodimac Open Plaza Cajamarca
Contract No. :

City: Lima, Peru

Project Location: Sistema 1

Date: 26/06/2014

Contractor Information
Name of Contractor: Engineering Services SAC
Address: Av. Juan de la Fuente 960-Miraflores

City: Lima, Per

Phone Number: 445-8215

E-mail: www.essacweb.com

Name of Designer: L. Chavez


Authority Having Jurisdiction: CGBVP

Design
Remote Area Name

Sistema 1

Remote Area Location

Red General

Occupancy Classification
Density (gpm/ft)

0.26

Area of Application (ft)

1500

Coverage per Sprinkler (ft)

250

Number of Calculated Sprinklers

In-Rack Demand (gpm)

Special Heads
Hose Streams (gpm)

500

Total Water Required (incl. Hose Streams) (gpm)

896.4

Required Pressure at Source (psi)

106

Type of System

Wet

Volume - Entire System (gal)

1114.2 gal

Water Supply Information


Date

DD/MM/YYYY

Location
Source

W1

Notes

File: D:\lchavez\Data\LCHAVEZ 2010\Lchavez\Actual 2014\Sodimac Cajamarca\Calculo\Sistema 1.tyc3


Date 26/06/2014

Copyright 2002-2012 Tyco Fire Protection Products

Page 2

Job : Sodimac Open Plaza Cajamarca

Node Labels:
Pipe Labels:

Pressure (Total) [psi]


Off

Diagram for Design Area : Sistema 1

File: D:\lchavez\Data\LCHAVEZ 2010\Lchavez\Actual 2014\Sodimac Cajamarca\Calculo\Sistema 1.tyc3


Date 26/06/2014

Copyright 2002-2012 Tyco Fire Protection Products

Page 3

Job : Sodimac Open Plaza Cajamarca

Hydraulic Analysis for : Sistema 1


Calculation Info
Calculation Mode
Hydraulic Model
Fluid Name
Fluid Weight, (lb/ft)
Fluid Dynamic Viscosity, (lbs/ft)

Demand
Hazen-Williams
Water @ 60F (15.6C)
N/A for Hazen-Williams calculation.
N/A for Hazen-Williams calculation.

Water Supply Parameters


Supply 1 : W1

Flow (gpm)
0
1499.7
2249.7

Pressure (psi)
160
150
136

Hoses
Inside Hose Flow / Standpipe Demand (gpm)

500

Outside Hose Flow (gpm)

Additional Outside Hose Flow (gpm)


Other (custom defined) Hose Flow (gpm)

Total Hose Flow (gpm)

500

Sprinklers
Ovehead Sprinkler Flow (gpm)

396.4

InRack Sprinkler Flow (gpm)

Other (custom defined) Sprinkler Flow (gpm)

Total Sprinkler Flow (gpm)

396.4

Required Margin of Safety (psi)

W1 - Pressure (psi)

106

W1 - Flow (gpm)

896.4

Demand w/o System Pump(s)

N/A

Other

File: D:\lchavez\Data\LCHAVEZ 2010\Lchavez\Actual 2014\Sodimac Cajamarca\Calculo\Sistema 1.tyc3


Date 26/06/2014

Copyright 2002-2012 Tyco Fire Protection Products

Page 4

Job : Sodimac Open Plaza Cajamarca

Hydraulic Analysis for : Sistema 1


System Demand
200

180

S1
160
S2

S3

140

132.692

Pressure, psi

120
D2

100

80

60

40

D1
20

0
0

700

800

900

1000

1100

1200

1300

1400

1500

1600

1700

1800

1900

2000

2100

2200

2300

2400

Flow, gpm

File: D:\lchavez\Data\LCHAVEZ 2010\Lchavez\Actual 2014\Sodimac Cajamarca\Calculo\Sistema 1.tyc3


Date 26/06/2014

Copyright 2002-2012 Tyco Fire Protection Products

Page 5

Job : Sodimac Open Plaza Cajamarca

Hydraulic Analysis for : Sistema 1


Graph Labels
Label

Values

Description

Flow (gpm)
0

Pressure (psi)
160
150

S1

Supply point #1 - Static

S2

Supply point #2

1499.7

S3

Supply point #3

2249.7

136

D1

Elevation Pressure

16.6

D2

System Demand

896.4

106

Curve Intersections & Safety Margins


Intersection

Curve Name

Pressure (psi)
154

Supply

Safety Margin

Flow (gpm)
1130.9

Pressure (psi)
50.1

@ Flow (gpm)
896.4

Open Heads
Required
Head Ref.

Head Type

Coverage

K-Factor

(ft)

Calculated

Density

Flow

Pressure

Density

Flow

Pressure

(gpm/psi)

(gpm/ft)

(gpm)

(psi)

(gpm/ft)

(gpm)

(psi)

T01

Overhead
Sprinkler

250

11.2

0.26

65

33.7

0.265

66.2

34.9

T02

Overhead
Sprinkler

250

11.2

0.26

65

33.7

0.26

65

33.7

T03

Overhead
Sprinkler

250

11.2

0.26

65

33.7

0.266

66.6

35.3

T04

Overhead
Sprinkler

250

11.2

0.26

65

33.7

0.266

66.5

35.2

T05

Overhead
Sprinkler

250

11.2

0.26

65

33.7

0.261

65.3

34

T06

Overhead
Sprinkler

250

11.2

0.26

65

33.7

0.267

66.9

35.6

File: D:\lchavez\Data\LCHAVEZ 2010\Lchavez\Actual 2014\Sodimac Cajamarca\Calculo\Sistema 1.tyc3


Date 26/06/2014

Copyright 2002-2012 Tyco Fire Protection Products

Page 6

Job name: Sodimac Open Plaza Cajamarca

Sheet number:___________________

PIPE INFORMATION
Node 1
Node 2

Elev 1
Elev 2

(ft)

T02
052

11.48
10.5

052
053

10.5
10.5

053
028

K-Factor 1 Flow added(q)* Nominal ID


Fittings
K-Factor 2 Total flow (Q) Actual ID
quantity x (name) = length

(gpm/psi)

(gpm)

11.2

(in)

(ft)

C Factor total (Pt)


Pf per ft elev (Pe)
frict (Pf)
(psi)

NOTES

(psi)

32 1x(us.Tee-Br)=6
1.38

0.98
6
6.98

120
0.3026

33.7
0.4
2.1

-29.4
35.6

32
1.38

17.5
0
17.5

120
0.0993

36.2
0
1.7

10.5
10.5

66.6
102.2

32 1x(us.Tee-Br)=6
1.38

24.45
6
30.45

120
0.6993

38
0
21.3

028
027

10.5
10.5

-5.3
96.8

65
2.469

13.53
0
13.53

120
0.0372

59.2
0
0.5

027
026

10.5
10.5

102.6
199.5

65
2.469

13.53
0
13.53

120
0.142

59.8
0
1.9

026
025

10.5
10.5

-0.9
198.6

65
2.469

13.53
0
13.53

120
0.1408

61.7
0
1.9

025
024

10.5
10.5

0.3
198.8

65
2.469

13.53
0
13.53

120
0.1412

63.6
0
1.9

024
023

10.5
10.5

1.4
200.2

65
2.469

13.53
0
13.53

120
0.143

65.5
0
1.9

023
022

10.5
10.5

2.9
203.1

65
2.469

13.53
0
13.53

120
0.1468

67.4
0
2

022
021

10.5
10.5

5
208.1

65
2.469

13.54
0
13.54

120
0.1536

69.4
0
2.1

021
020

10.5
10.5

7.9
216

65
2.469

15.79
0
15.79

120
0.1645

71.5
0
2.6

020
019

10.5
10.5

12
228

65
2.469

18.04
0
18.04

120
0.1819

74.1
0
3.3

019
018

10.5
10.5

17.7
245.7

65 1x(us.Tee-Br)=12
2.469

15.25
12
27.25

120
0.2089

77.4
0
5.7

018
146

10.5
10.5

150.7
396.4

100 1x(us.90)=10
4.026

4.06
10
14.06

120
0.0468

83.1
0
0.7

146
147

10.5
-13.12

0
396.4

100 1x(us.Tee-Br)=20
4.026

23.62
20
43.62

120
0.0468

83.7
10.2
2

147
148

-13.12
-13.12

500
896.4

200
8.071

2.62
0
2.62

120
0.0072

96
0
0.0

148
149

-13.12
-13.12

0
896.4

200
8.071

2.62
0
2.62

120
0.0072

96
0
0.0

149
150

-13.12
-13.12

0
896.4

200 1x(us.90)=18
8.071

2.3
18
20.3

120
0.0072

96
0
0.1

150
151

-13.12
10.33

0
896.4

200 1x(us.90)=18
8.071

23.46
18
41.46

120
0.0072

96.2
-10.2
0.3

2006 National Fire Protection Association

65
65

(ft)

L
F
T

Page 7

Job name: Sodimac Open Plaza Cajamarca

Sheet number:___________________

PIPE INFORMATION
Node 1
Node 2

Elev 1
Elev 2

(ft)

K-Factor 1 Flow added(q)* Nominal ID


Fittings
K-Factor 2 Total flow (Q) Actual ID
quantity x (name) = length

(gpm/psi)

(gpm)

(in)

(ft)

L
F
T

C Factor total (Pt)


Pf per ft elev (Pe)
frict (Pf)

(ft)

(psi)

(psi)

151
152

10.33
10.33

0
896.4

200 1x(us.90)=18
8.071

5.74
18
23.74

120
0.0072

86.3
0
0.2

152
153

10.33
10.33

0
896.4

200 1x(us.90)=18
8.071

15.55
18
33.55

120
0.0072

86.5
0
0.2

153
154

10.33
10.33

0
896.4

200 1x(us.90)=18
8.071

47.18
18
65.18

120
0.0072

86.7
0
0.5

154
155

10.33
10.33

0
896.4

200 1x(us.90)=18
8.071

31.24
18
49.24

120
0.0072

87.2
0
0.4

155
156

10.33
10.33

0
896.4

200 1x(us.90)=18
8.071

22.58
18
40.58

120
0.0072

87.6
0
0.3

156
157

10.33
10.33

0
896.4

200 1x(us.90)=18
8.071

4.08
18
22.08

120
0.0072

87.8
0
0.2

157
158

10.33
-14.76

0
896.4

200 1x(us.90)=18
8.071

25.1
18
43.1

120
0.0072

88
10.9
0.3

158
159

-14.76
-14.76

0
896.4

200 1x(us.90)=18
8.071

28.31
18
46.31

120
0.0072

99.2
0
0.3

159
160

-14.76
-26.9

0
896.4

200 1x(us.90)=18
8.071

12.14
18
30.14

120
0.0072

99.5
5.3
0.2

160
161

-26.9
-26.9

0
896.4

200 1x(us.90)=18
8.071

4.43
18
22.43

120
0.0072

105
0
0.2

161
162

-26.9
-14.76

0
896.4

200 1x(us.90)=18
8.071

12.14
18
30.14

120
0.0072

105.2
-5.3
0.2

162
163

-14.76
-14.76

0
896.4

200 1x(us.90)=18
8.071

11.88
18
29.88

120
0.0072

100.1
0
0.2

163
164

-14.76
-14.76

0
896.4

200 1x(us.90)=18
8.071

9.1
18
27.1

120
0.0072

100.3
0
0.2

164
165

-14.76
-26.9

0
896.4

200 1x(us.90)=18
8.071

12.14
18
30.14

120
0.0072

100.5
5.3
0.2

165
W1

-26.9
-26.9

0
896.4

200
8.071

3.28
0
3.28

120
0.0072

106
0
0.0

T05
102

11.48
10.5

32 1x(us.Tee-Br)=6
1.38

0.98
6
6.98

120
0.3051

34
0.4
2.1

102
101

10.5
10.5

-29.6
35.7

32
1.38

17.5
0
17.5

120
0.1

36.5
0
1.7

101
027

10.5
10.5

66.9
102.6

32 1x(us.Tee-Br)=6
1.38

24.45
6
30.45

120
0.7047

38.3
0
21.5

T01
051

11.48
10.5

66.2
66.2

32 1x(us.Tee-Br)=6
1.38

0.98
6
6.98

120
0.3128

34.9
0.4
2.2

11.2

11.2

2006 National Fire Protection Association

65.3
65.3

NOTES

Page 8

Job name: Sodimac Open Plaza Cajamarca

Sheet number:___________________

PIPE INFORMATION
Node 1
Node 2

Elev 1
Elev 2

(ft)

K-Factor 1 Flow added(q)* Nominal ID


Fittings
K-Factor 2 Total flow (Q) Actual ID
quantity x (name) = length

(gpm/psi)

(gpm)

(in)

051
049

10.5
10.5

29.4
95.6

049
003

10.5
10.5

5.3
100.9

003
004

10.5
10.5

004
005

(ft)

(ft)

C Factor total (Pt)


Pf per ft elev (Pe)
frict (Pf)
(psi)

120
0.6176

37.5
0
21.7

65
2.469

13.53
0
13.53

120
0.0402

59.3
0
0.5

96
196.9

65
2.469

13.53
0
13.53

120
0.1387

59.8
0
1.9

10.5
10.5

0.9
197.8

65
2.469

13.53
0
13.53

120
0.1399

61.7
0
1.9

005
006

10.5
10.5

-0.3
197.6

65
2.469

13.53
0
13.53

120
0.1395

63.6
0
1.9

006
007

10.5
10.5

-1.4
196.2

65
2.469

13.53
0
13.53

120
0.1377

65.5
0
1.9

007
008

10.5
10.5

-2.9
193.3

65
2.469

13.53
0
13.53

120
0.134

67.3
0
1.8

008
009

10.5
10.5

-5
188.3

65
2.469

13.54
0
13.54

120
0.1276

69.1
0
1.7

009
010

10.5
10.5

-7.9
180.4

65
2.469

15.79
0
15.79

120
0.1179

70.9
0
1.9

010
011

10.5
10.5

-12
168.4

65
2.469

18.04
0
18.04

120
0.1037

72.7
0
1.9

011
012

10.5
10.5

-17.7
150.7

65
2.469

15.99
0
15.99

120
0.0845

74.6
0
1.4

012
013

10.5
10.5

-26.9
123.7

65
2.469

13.94
0
13.94

120
0.0586

76
0
0.8

013
014

10.5
10.5

-22.7
101

65 1x(us.90)=6
2.469

3.69
6
9.69

120
0.0403

76.8
0
0.4

014
015

10.5
10.5

0
101

65 1x(us.90)=6
2.469

89.88
6
95.88

120
0.0403

77.2
0
3.9

015
016

10.5
10.5

0
101

65
2.469

3.69
0
3.69

120
0.0403

81
0
0.1

016
017

10.5
10.5

22.7
123.7

65
2.469

13.94
0
13.94

120
0.0586

81.2
0
0.8

017
018

10.5
10.5

26.9
150.7

65 1x(us.Tee-Br)=12
2.469

0.74
12
12.74

120
0.0845

82
0
1.1

T04
001

11.48
10.5

001
003

10.5
10.5

2006 National Fire Protection Association

NOTES

(psi)

29.2
6
35.2

11.2

32 1x(us.Tee-Br)=6
1.38

L
F
T

66.5
66.5

32 1x(us.Tee-Br)=6
1.38

0.98
6
6.98

120
0.3155

35.2
0.4
2.2

29.6
96

32 1x(us.Tee-Br)=6
1.38

29.2
6
35.2

120
0.6234

37.9
0
21.9

Page 9

Job name: Sodimac Open Plaza Cajamarca

Sheet number:___________________

PIPE INFORMATION
Node 1
Node 2

Elev 1
Elev 2

(ft)

K-Factor 1 Flow added(q)* Nominal ID


Fittings
K-Factor 2 Total flow (Q) Actual ID
quantity x (name) = length

(gpm/psi)

(gpm)

(in)

(ft)

L
F
T

C Factor total (Pt)


Pf per ft elev (Pe)
frict (Pf)

(ft)

(psi)

(psi)

T03
053

11.48
10.5

11.2

66.6
66.6

32 1x(us.Tee-Br)=6
1.38

0.98
6
6.98

120
0.3162

35.3
0.4
2.2

T06
101

11.48
10.5

11.2

66.9
66.9

32 1x(us.Tee-Br)=6
1.38

0.98
6
6.98

120
0.3188

35.6
0.4
2.2

his1
649

10.99
-13.12

500
500

100 1x(us.90)=10
4.026

24.11
10
34.11

120
0.072

83.1
10.4
2.5

649
147

-13.12
-13.12

0
500

200
8.071

1.97
0
1.97

120
0.0024

96
0
0

052
051

10.5
10.5

0
29.4

32
1.38

18.74
0
18.74

120
0.0695

36.2
0
1.3

028
029

10.5
10.5

0
5.3

65
2.469

13.53
0
13.53

120
0.0002

59.2
0
0

029
030

10.5
10.5

-0.9
4.4

65
2.469

13.53
0
13.53

120
0.0001

59.3
0
0

030
031

10.5
10.5

-0.8
3.7

65
2.469

13.53
0
13.53

120
0.0001

59.3
0
0

031
032

10.5
10.5

-0.6
3

65
2.469

13.53
0
13.53

120
0.0001

59.3
0
0

032
033

10.5
10.5

-0.5
2.5

65
2.469

13.53
0
13.53

120
0.0000

59.3
0
0

033
034

10.5
10.5

-0.4
2.1

65
2.469

13.53
0
13.53

120
0.0000

59.3
0
0

034
035

10.5
10.5

-0.4
1.7

65
2.469

15.78
0
15.78

120
0.0000

59.3
0
0

035
036

10.5
10.5

-0.3
1.4

65
2.469

17.4
0
17.4

120
0.0000

59.3
0
0

036
037

10.5
10.5

-0.3
1.1

65
2.469

16.77
0
16.77

120
0

59.3
0
0

037
038

10.5
10.5

-0.2
0.9

65 1x(us.90)=6
2.469

7.4
6
13.4

120
0

59.3
0
0

038
039

10.5
10.5

0
0.9

65 1x(us.90)=6
2.469

89.88
6
95.88

120
0

59.3
0
0

039
040

10.5
10.5

0
0.9

65
2.469

7.4
0
7.4

120
0

59.3
0
0

040
041

10.5
10.5

0.2
1.1

65
2.469

16.77
0
16.77

120
0

59.3
0
0

041
042

10.5
10.5

0.3
1.4

65
2.469

17.4
0
17.4

120
0.0000

59.3
0
0

2006 National Fire Protection Association

NOTES

Page 10

Job name: Sodimac Open Plaza Cajamarca

Sheet number:___________________

PIPE INFORMATION
Node 1
Node 2

Elev 1
Elev 2

(ft)

K-Factor 1 Flow added(q)* Nominal ID


Fittings
K-Factor 2 Total flow (Q) Actual ID
quantity x (name) = length

(gpm/psi)

(gpm)

(in)

(ft)

L
F
T

C Factor total (Pt)


Pf per ft elev (Pe)
frict (Pf)

(ft)

(psi)

(psi)

042
043

10.5
10.5

0.3
1.7

65
2.469

15.78
0
15.78

120
0.0000

59.3
0
0

043
044

10.5
10.5

0.4
2.1

65
2.469

13.53
0
13.53

120
0.0000

59.3
0
0

044
045

10.5
10.5

0.4
2.5

65
2.469

13.53
0
13.53

120
0.0000

59.3
0
0

045
046

10.5
10.5

0.5
3

65
2.469

13.53
0
13.53

120
0.0001

59.3
0
0

046
047

10.5
10.5

0.6
3.7

65
2.469

13.53
0
13.53

120
0.0001

59.3
0
0

047
048

10.5
10.5

0.8
4.4

65
2.469

13.53
0
13.53

120
0.0001

59.3
0
0

048
049

10.5
10.5

0.9
5.3

65
2.469

13.53
0
13.53

120
0.0002

59.3
0
0

026
004

10.5
10.5

0
0.9

89.88
12
101.88

120
0.0001

61.7
0
0.0

102
001

10.5
10.5

0
29.6

18.74
0
18.74

120
0.0703

36.5
0
1.3

005
025

10.5
10.5

0
0.3

32 2x(us.Tee-Br)=12
1.38

89.88
12
101.88

120
0.0000

63.6
0
0

006
024

10.5
10.5

0
1.4

32 2x(us.Tee-Br)=12
1.38

89.88
12
101.88

120
0.0002

65.5
0
0.0

007
023

10.5
10.5

0
2.9

32 2x(us.Tee-Br)=12
1.38

89.88
12
101.88

120
0.0009

67.3
0
0.1

008
022

10.5
10.5

0
5

32 2x(us.Tee-Br)=12
1.38

89.88
12
101.88

120
0.0026

69.1
0
0.3

009
021

10.5
10.5

0
7.9

32 2x(us.Tee-Br)=12
1.38

89.88
12
101.88

120
0.0061

70.9
0
0.6

010
020

10.5
10.5

0
12

32 2x(us.Tee-Br)=12
1.38

89.88
12
101.88

120
0.0133

72.7
0
1.4

011
019

10.5
10.5

0
17.7

32 2x(us.Tee-Br)=12
1.38

89.88
12
101.88

120
0.0272

74.6
0
2.8

012
017

10.5
10.5

0
26.9

32 2x(us.Tee-Br)=12
1.38

89.88
12
101.88

120
0.0592

76
0
6

013
016

10.5
10.5

0
22.7

32 2x(us.Tee-Br)=12
1.38

89.88
12
101.88

120
0.0432

76.8
0
4.4

029
048

10.5
10.5

0
0.9

32 2x(us.Tee-Br)=12
1.38

89.88
12
101.88

120
0.0001

59.3
0
0.0

2006 National Fire Protection Association

32 2x(us.Tee-Br)=12
1.38
32
1.38

NOTES

Page 11

Job name: Sodimac Open Plaza Cajamarca

Sheet number:___________________

PIPE INFORMATION
Node 1
Node 2

Elev 1
Elev 2

(ft)

K-Factor 1 Flow added(q)* Nominal ID


Fittings
K-Factor 2 Total flow (Q) Actual ID
quantity x (name) = length

(gpm/psi)

(gpm)

(in)

(ft)

L
F
T
(ft)

C Factor total (Pt)


Pf per ft elev (Pe)
frict (Pf)
(psi)

(psi)

030
047

10.5
10.5

0
0.8

32 2x(us.Tee-Br)=12
1.38

89.88
12
101.88

120
0.0001

59.3
0
0

031
046

10.5
10.5

0
0.6

32 2x(us.Tee-Br)=12
1.38

89.88
12
101.88

120
0.0001

59.3
0
0

032
045

10.5
10.5

0
0.5

32 2x(us.Tee-Br)=12
1.38

89.88
12
101.88

120
0.0000

59.3
0
0

033
044

10.5
10.5

0
0.4

32 2x(us.Tee-Br)=12
1.38

89.88
12
101.88

120
0.0000

59.3
0
0

034
043

10.5
10.5

0
0.4

32 2x(us.Tee-Br)=12
1.38

89.88
12
101.88

120
0.0000

59.3
0
0

035
042

10.5
10.5

0
0.3

32 2x(us.Tee-Br)=12
1.38

89.88
12
101.88

120
0.0000

59.3
0
0

036
041

10.5
10.5

0
0.3

32 2x(us.Tee-Br)=12
1.38

89.88
12
101.88

120
0.0000

59.3
0
0

037
040

10.5
10.5

0
0.2

32 2x(us.Tee-Br)=12
1.38

89.88
12
101.88

120
0

59.3
0
0

NOTES

Discharge shown for flowing nodes only

2006 National Fire Protection Association

Page 12

CALCULATION SUMMARY

Project Name : Sodimac Open Plaza Cajamarca

Project Location: Sistema 1

Drawing No. :

City: Lima, Peru

Design Areas
Design Area
Name

Sistema 2

Calc. Mode
(Model)

Demand (HW)

Occupancy

Area of
Total Water Pressure @
Application
Source

Min.
Density

Min.
Pressure

Min.
Flow

Calculated
Heads

Hose
Streams

Margin To
Source

(ft)

(gpm)

(psi)

(gpm/ft)

(psi)

(gpm)

(gpm)

(psi)

2000

2011.1

141

0.74

13.5

92.6

16

500

18.8

File: D:\lchavez\Data\LCHAVEZ 2010\Lchavez\Actual 2014\Sodimac Cajamarca\Calculo\Sistema 2.tyc3


Date 26/06/2014

Copyright 2002-2012 Tyco Fire Protection Products

Page 1

HYDRAULIC CALCULATIONS
for
Job Information
Project Name : Sodimac Open Plaza Cajamarca
Contract No. :

City: Lima, Peru

Project Location: Sistema 1

Date: 26/06/2014

Contractor Information
Name of Contractor: Engineering Services SAC
Address: Av. Juan de la Fuente 960-Miraflores

City: Lima, Per

Phone Number: 445-8215

E-mail: www.essacweb.com

Name of Designer: L. Chavez


Authority Having Jurisdiction: CGBVP

Design
Remote Area Name

Sistema 2

Remote Area Location

Red General

Occupancy Classification
Density (gpm/ft)

0.74

Area of Application (ft)

2000

Coverage per Sprinkler (ft)

125

Number of Calculated Sprinklers

16

In-Rack Demand (gpm)

Special Heads
Hose Streams (gpm)

500

Total Water Required (incl. Hose Streams) (gpm)

2011.1

Required Pressure at Source (psi)

122.2

Type of System

Wet

Volume - Entire System (gal)

2055.7 gal

Water Supply Information


Date

DD/MM/YYYY

Location
Source

W1

Notes

File: D:\lchavez\Data\LCHAVEZ 2010\Lchavez\Actual 2014\Sodimac Cajamarca\Calculo\Sistema 2.tyc3


Date 26/06/2014

Copyright 2002-2012 Tyco Fire Protection Products

Page 2

Job : Sodimac Open Plaza Cajamarca

Node Labels:
Pipe Labels:

Pressure (Total) [psi]


Off

Diagram for Design Area : Sistema 2

File: D:\lchavez\Data\LCHAVEZ 2010\Lchavez\Actual 2014\Sodimac Cajamarca\Calculo\Sistema 2.tyc3


Date 26/06/2014

Copyright 2002-2012 Tyco Fire Protection Products

Page 3

Job : Sodimac Open Plaza Cajamarca

Hydraulic Analysis for : Sistema 2


Calculation Info
Calculation Mode
Hydraulic Model
Fluid Name
Fluid Weight, (lb/ft)
Fluid Dynamic Viscosity, (lbs/ft)

Demand
Hazen-Williams
Water @ 60F (15.6C)
N/A for Hazen-Williams calculation.
N/A for Hazen-Williams calculation.

Water Supply Parameters


Supply 1 : W1

Flow (gpm)
0
1499.7
2249.7

Pressure (psi)
160
150
136

Hoses
Inside Hose Flow / Standpipe Demand (gpm)

500

Outside Hose Flow (gpm)

Additional Outside Hose Flow (gpm)


Other (custom defined) Hose Flow (gpm)

Total Hose Flow (gpm)

500

Sprinklers
Ovehead Sprinkler Flow (gpm)

1511.1

InRack Sprinkler Flow (gpm)

Other (custom defined) Sprinkler Flow (gpm)

Total Sprinkler Flow (gpm)

1511.1

Required Margin of Safety (psi)

W1 - Pressure (psi)

122.2

W1 - Flow (gpm)

2011.1

Demand w/o System Pump(s)

N/A

Other

File: D:\lchavez\Data\LCHAVEZ 2010\Lchavez\Actual 2014\Sodimac Cajamarca\Calculo\Sistema 2.tyc3


Date 26/06/2014

Copyright 2002-2012 Tyco Fire Protection Products

Page 4

Job : Sodimac Open Plaza Cajamarca

Hydraulic Analysis for : Sistema 2


System Demand
200

180

S1
160
S2

S3

140

132.692
D2

Pressure, psi

120

100

80

60

40

D1
20

0
0

700

800

900

1000

1100

1200

1300

1400

1500

1600

1700

1800

1900

2000

2100

2200

2300

2400

Flow, gpm

File: D:\lchavez\Data\LCHAVEZ 2010\Lchavez\Actual 2014\Sodimac Cajamarca\Calculo\Sistema 2.tyc3


Date 26/06/2014

Copyright 2002-2012 Tyco Fire Protection Products

Page 5

Job : Sodimac Open Plaza Cajamarca

Hydraulic Analysis for : Sistema 2


Graph Labels
Label

Values

Description

Flow (gpm)
0

Pressure (psi)
160
150

S1

Supply point #1 - Static

S2

Supply point #2

1499.7

S3

Supply point #3

2249.7

136

D1

Elevation Pressure

16.6

D2

System Demand

2011.1

122.2

Curve Intersections & Safety Margins


Intersection

Curve Name

Pressure (psi)
137.8

Supply

Safety Margin

Flow (gpm)
2166.5

Pressure (psi)
18.8

@ Flow (gpm)
2011.1

Open Heads
Required
Head Ref.

Head Type

Coverage

K-Factor

(ft)

Calculated

Density

Flow

Pressure

Density

Flow

Pressure

(gpm/psi)

(gpm/ft)

(gpm)

(psi)

(gpm/ft)

(gpm)

(psi)

P01

Overhead
Sprinkler

125

25.2

0.74

92.6

13.5

0.761

95.1

14.2

P02

Overhead
Sprinkler

125

25.2

0.74

92.6

13.5

0.762

95.2

14.3

P03

Overhead
Sprinkler

125

25.2

0.74

92.6

13.5

0.765

95.6

14.4

P04

Overhead
Sprinkler

125

25.2

0.74

92.6

13.5

0.774

96.8

14.7

P05

Overhead
Sprinkler

125

25.2

0.74

92.6

13.5

0.74

92.6

13.5

P06

Overhead
Sprinkler

125

25.2

0.74

92.6

13.5

0.742

92.7

13.5

P07

Overhead
Sprinkler

125

25.2

0.74

92.6

13.5

0.745

93.1

13.7

P08

Overhead
Sprinkler

125

25.2

0.74

92.6

13.5

0.754

94.3

14

P09

Overhead
Sprinkler

125

25.2

0.74

92.6

13.5

0.74

92.6

13.5

P10

Overhead
Sprinkler

125

25.2

0.74

92.6

13.5

0.742

92.7

13.5

P11

Overhead
Sprinkler

125

25.2

0.74

92.6

13.5

0.745

93.1

13.7

P12

Overhead
Sprinkler

125

25.2

0.74

92.6

13.5

0.754

94.3

14

P13

Overhead
Sprinkler

125

25.2

0.74

92.6

13.5

0.761

95.1

14.2

P14

Overhead
Sprinkler

125

25.2

0.74

92.6

13.5

0.762

95.3

14.3

File: D:\lchavez\Data\LCHAVEZ 2010\Lchavez\Actual 2014\Sodimac Cajamarca\Calculo\Sistema 2.tyc3


Date 26/06/2014

Copyright 2002-2012 Tyco Fire Protection Products

Page 6

P15

Overhead
Sprinkler

125

25.2

0.74

92.6

13.5

0.766

95.7

14.4

P16

Overhead
Sprinkler

125

25.2

0.74

92.6

13.5

0.776

97

14.8

File: D:\lchavez\Data\LCHAVEZ 2010\Lchavez\Actual 2014\Sodimac Cajamarca\Calculo\Sistema 2.tyc3


Date 26/06/2014

Copyright 2002-2012 Tyco Fire Protection Products

Page 7

Job name: Sodimac Open Plaza Cajamarca

Sheet number:___________________

PIPE INFORMATION
Node 1
Node 2

Elev 1
Elev 2

(ft)

K-Factor 1 Flow added(q)* Nominal ID


Fittings
K-Factor 2 Total flow (Q) Actual ID
quantity x (name) = length

(gpm/psi)

(gpm)

25.2

(in)

P09
652

11.48
10.83

652
653

10.83
10.83

-0.4
92.2

653
569

10.83
10.83

569
568

32 1x(us.Tee-Br)=6
1.38

(ft)

C Factor total (Pt)


Pf per ft elev (Pe)
frict (Pf)
(psi)

NOTES

(psi)

0.66
6
6.66

120
0.5822

13.5
0.3
3.9

50
2.067

11.73
0
11.73

120
0.0807

17.6
0
0.9

95.1
187.2

50 1x(us.Tee-Br)=10
2.067

74.07
10
84.07

120
0.3001

18.6
0
25.2

10.83
10.83

80.2
267.4

100
4.026

10.1
0
10.1

120
0.0226

43.8
0
0.2

568
567

10.83
10.83

187.9
455.3

100
4.026

9.01
0
9.01

120
0.0605

44.1
0
0.5

567
566

10.83
10.83

189.3
644.7

100
4.026

11.27
0
11.27

120
0.1152

44.6
0
1.3

566
565

10.83
10.83

192.6
837.3

100
4.026

13.53
0
13.53

120
0.187

45.9
0
2.5

565
564

10.83
10.83

32.5
869.7

100
4.026

13.53
0
13.53

120
0.2007

48.4
0
2.7

564
563

10.83
10.83

40.4
910.1

100
4.026

13.53
0
13.53

120
0.2183

51.1
0
3

563
562

10.83
10.83

49.4
959.5

100
4.026

13.53
0
13.53

120
0.2407

54.1
0
3.3

562
561

10.83
10.83

59.4
1019

100
4.026

13.53
0
13.53

120
0.2691

57.4
0
3.6

561
015

10.83
10.83

70.6
1089.6

100
4.026

4.62
0
4.62

120
0.3046

61
0
1.4

015
016

10.83
10.83

421.6
1511.1

150 1x(us.90)=14
6.065

155.37
14
169.37

120
0.0759

62.4
0
12.9

016
017

10.83
10.83

0
1511.1

150 1x(us.90)=14
6.065

98.67
14
112.67

120
0.0759

75.3
0
8.6

017
018

10.83
-13.12

0
1511.1

150 1x(us.Tee-Br)=30
6.065

23.95
30
53.95

120
0.0759

83.8
10.4
4.1

018
019

-13.12
-13.12

500
2011.1

200
8.071

2.62
0
2.62

120
0.032

98.3
0
0.1

019
020

-13.12
-13.12

0
2011.1

200 1x(us.90)=18
8.071

2.3
18
20.3

120
0.032

98.4
0
0.7

020
021

-13.12
10.33

0
2011.1

200 1x(us.90)=18
8.071

23.46
18
41.46

120
0.032

99
-10.2
1.3

021
022

10.33
10.33

0
2011.1

200 1x(us.90)=18
8.071

5.74
18
23.74

120
0.032

90.2
0
0.8

2006 National Fire Protection Association

92.6
92.6

(ft)

L
F
T

Page 8

Job name: Sodimac Open Plaza Cajamarca

Sheet number:___________________

PIPE INFORMATION
Node 1
Node 2

Elev 1
Elev 2

(ft)

K-Factor 1 Flow added(q)* Nominal ID


Fittings
K-Factor 2 Total flow (Q) Actual ID
quantity x (name) = length

(gpm/psi)

(gpm)

(in)

(ft)

L
F
T
(ft)

C Factor total (Pt)


Pf per ft elev (Pe)
frict (Pf)
(psi)

(psi)

022
023

10.33
10.33

0
2011.1

200 1x(us.90)=18
8.071

15.55
18
33.55

120
0.032

90.9
0
1.1

023
024

10.33
10.33

0
2011.1

200 1x(us.90)=18
8.071

47.18
18
65.18

120
0.032

92
0
2.1

024
025

10.33
10.33

0
2011.1

200 1x(us.90)=18
8.071

31.24
18
49.24

120
0.032

94.1
0
1.6

025
026

10.33
10.33

0
2011.1

200 1x(us.90)=18
8.071

22.58
18
40.58

120
0.032

95.7
0
1.3

026
027

10.33
10.33

0
2011.1

200 1x(us.90)=18
8.071

4.08
18
22.08

120
0.032

97
0
0.7

027
028

10.33
-14.76

0
2011.1

200 1x(us.90)=18
8.071

25.1
18
43.1

120
0.032

97.7
10.9
1.4

028
029

-14.76
-14.76

0
2011.1

200 1x(us.90)=18
8.071

28.31
18
46.31

120
0.032

109.9
0
1.5

029
030

-14.76
-26.9

0
2011.1

200 1x(us.90)=18
8.071

12.14
18
30.14

120
0.032

111.4
5.3
1

030
031

-26.9
-26.9

0
2011.1

200 1x(us.90)=18
8.071

4.43
18
22.43

120
0.032

117.7
0
0.7

031
032

-26.9
-14.76

0
2011.1

200 1x(us.90)=18
8.071

12.14
18
30.14

120
0.032

118.4
-5.3
1

032
033

-14.76
-14.76

0
2011.1

200 1x(us.90)=18
8.071

11.88
18
29.88

120
0.032

114.1
0
1

033
034

-14.76
-14.76

0
2011.1

200 1x(us.90)=18
8.071

9.1
18
27.1

120
0.032

115
0
0.9

034
035

-14.76
-26.9

0
2011.1

200 1x(us.90)=18
8.071

12.14
18
30.14

120
0.032

115.9
5.3
1

035
W1

-26.9
-26.9

0
2011.1

200
8.071

3.28
0
3.28

120
0.032

122.1
0
0.1

P05
651

11.48
10.83

0.66
6
6.66

120
0.5822

13.5
0.3
3.9

651
650

10.83
10.83

0.4
93

50
2.067

11.44
0
11.44

120
0.082

17.6
0
0.9

650
609

10.83
10.83

95.1
188

50 1x(us.Tee-Br)=10
2.067

71.84
10
81.84

120
0.3024

18.6
0
24.8

609
610

10.83
10.83

-80.2
107.8

100
4.026

10.1
0
10.1

120
0.0042

43.3
0
0.0

610
611

10.83
10.83

188
295.8

100
4.026

9.01
0
9.01

120
0.0272

43.4
0
0.2

25.2

2006 National Fire Protection Association

92.6
92.6

32 1x(us.Tee-Br)=6
1.38

NOTES

Page 9

Job name: Sodimac Open Plaza Cajamarca

Sheet number:___________________

PIPE INFORMATION
Node 1
Node 2

Elev 1
Elev 2

(ft)

K-Factor 1 Flow added(q)* Nominal ID


Fittings
K-Factor 2 Total flow (Q) Actual ID
quantity x (name) = length

(gpm/psi)

(gpm)

(in)

(ft)

L
F
T

C Factor total (Pt)


Pf per ft elev (Pe)
frict (Pf)

(ft)

(psi)

(psi)

611
008

10.83
10.83

188.3
484.2

100
4.026

11.27
0
11.27

120
0.0678

43.6
0
0.8

008
009

10.83
10.83

189.7
673.8

100
4.026

13.53
0
13.53

120
0.1251

44.4
0
1.7

009
010

10.83
10.83

-32.5
641.4

100
4.026

13.53
0
13.53

120
0.1142

46.1
0
1.5

010
011

10.83
10.83

-40.4
601

100
4.026

13.53
0
13.53

120
0.1012

47.6
0
1.4

011
012

10.83
10.83

-49.4
551.6

100
4.026

13.53
0
13.53

120
0.0864

49
0
1.2

012
013

10.83
10.83

-59.4
492.2

100
4.026

13.53
0
13.53

120
0.0699

50.2
0
0.9

013
014

10.83
10.83

-70.6
421.6

100 1x(us.90)=10
4.026

4.62
10
14.62

120
0.0525

51.1
0
0.8

014
015

10.83
10.83

0
421.6

100 1x(us.Tee-Br)=20
4.026

180.49
20
200.49

120
0.0525

51.9
0
10.5

P10
636

11.48
10.83

0.66
6
6.66

120
0.584

13.5
0.3
3.9

636
637

10.83
10.83

-0.1
92.6

50
2.067

11.73
0
11.73

120
0.0815

17.7
0
1

637
568

10.83
10.83

95.3
187.9

50 1x(us.Tee-Br)=10
2.067

74.07
10
84.07

120
0.302

18.7
0
25.4

P06
635

11.48
10.83

0.66
6
6.66

120
0.584

13.5
0.3
3.9

635
634

10.83
10.83

0.1
92.8

50
2.067

11.44
0
11.44

120
0.0818

17.7
0
0.9

634
610

10.83
10.83

95.2
188

50 1x(us.Tee-Br)=10
2.067

71.84
10
81.84

120
0.3023

18.6
0
24.7

P07
619

11.48
10.83

93.1
93.1

32 1x(us.Tee-Br)=6
1.38

0.66
6
6.66

120
0.5891

13.7
0.3
3.9

619
618

10.83
10.83

-0.5
92.7

50
2.067

11.44
0
11.44

120
0.0816

17.9
0
0.9

618
611

10.83
10.83

95.6
188.3

50 1x(us.Tee-Br)=10
2.067

71.84
10
81.84

120
0.3033

18.8
0
24.8

P11
620

11.48
10.83

0.66
6
6.66

120
0.5891

13.7
0.3
3.9

620
621

10.83
10.83

11.73
0
11.73

120
0.0831

17.9
0
1

25.2

25.2

25.2

25.2

2006 National Fire Protection Association

92.7
92.7

92.7
92.7

93.1
93.1
0.5
93.6

32 1x(us.Tee-Br)=6
1.38

32 1x(us.Tee-Br)=6
1.38

32 1x(us.Tee-Br)=6
1.38
50
2.067

NOTES

Page 10

Job name: Sodimac Open Plaza Cajamarca

Sheet number:___________________

PIPE INFORMATION
Node 1
Node 2

Elev 1
Elev 2

(ft)

K-Factor 1 Flow added(q)* Nominal ID


Fittings
K-Factor 2 Total flow (Q) Actual ID
quantity x (name) = length

(gpm/psi)

(gpm)

95.7
189.3

C Factor total (Pt)


Pf per ft elev (Pe)
frict (Pf)

(ft)

(psi)

74.07
10
84.07

120
0.3064

18.8
0
25.8

0.66
6
6.66

120
0.6026

14
0.3
4

50
2.067

11.44
0
11.44

120
0.082

18.3
0
0.9

50 1x(us.Tee-Br)=10
2.067

71.84
10
81.84

120
0.3074

19.2
0
25.2

0.66
6
6.66

120
0.6026

14
0.3
4

50
2.067

11.73
0
11.73

120
0.0865

18.3
0
1

50 1x(us.Tee-Br)=10
2.067

74.07
10
84.07

120
0.3163

19.3
0
26.6

(in)

(ft)

L
F
T

(psi)

621
567

10.83
10.83

P08
733

11.48
10.83

733
001

10.83
10.83

-1.4
92.9

001
008

10.83
10.83

96.8
189.7

P12
732

11.48
10.83

732
731

10.83
10.83

1.4
95.7

731
566

10.83
10.83

97
192.6

P01
650

11.48
10.83

25.2

95.1
95.1

32 1x(us.Tee-Br)=6
1.38

0.66
6
6.66

120
0.6118

14.2
0.3
4.1

P13
653

11.48
10.83

25.2

95.1
95.1

32 1x(us.Tee-Br)=6
1.38

0.66
6
6.66

120
0.612

14.2
0.3
4.1

P02
634

11.48
10.83

25.2

95.2
95.2

32 1x(us.Tee-Br)=6
1.38

0.66
6
6.66

120
0.6134

14.3
0.3
4.1

P14
637

11.48
10.83

25.2

95.3
95.3

32 1x(us.Tee-Br)=6
1.38

0.66
6
6.66

120
0.6141

14.3
0.3
4.1

P03
618

11.48
10.83

25.2

95.6
95.6

32 1x(us.Tee-Br)=6
1.38

0.66
6
6.66

120
0.6185

14.4
0.3
4.1

P15
621

11.48
10.83

25.2

95.7
95.7

32 1x(us.Tee-Br)=6
1.38

0.66
6
6.66

120
0.6198

14.4
0.3
4.1

P04
001

11.48
10.83

25.2

96.8
96.8

32 1x(us.Tee-Br)=6
1.38

0.66
6
6.66

120
0.6321

14.7
0.3
4.2

P16
731

11.48
10.83

25.2

97
97

32 1x(us.Tee-Br)=6
1.38

0.66
6
6.66

120
0.6345

14.8
0.3
4.2

his1
362

10.99
-13.12

500
500

100 1x(us.90)=10
4.026

24.11
10
34.11

120
0.072

85.4
10.4
2.5

362
361

-13.12
-13.12

0
500

200
8.071

1.97
0
1.97

120
0.0024

98.3
0
0

361
018

-13.12
-13.12

0
500

200
8.071

2.62
0
2.62

120
0.0024

98.3
0
0

652
651

10.83
10.83

0
0.4

50
2.067

11.4
0
11.4

120
0

17.6
0
0

25.2

25.2

2006 National Fire Protection Association

94.3
94.3

94.3
94.3

50 1x(us.Tee-Br)=10
2.067
32 1x(us.Tee-Br)=6
1.38

32 1x(us.Tee-Br)=6
1.38

NOTES

Page 11

Job name: Sodimac Open Plaza Cajamarca

Sheet number:___________________

PIPE INFORMATION
Node 1
Node 2

Elev 1
Elev 2

(ft)

K-Factor 1 Flow added(q)* Nominal ID


Fittings
K-Factor 2 Total flow (Q) Actual ID
quantity x (name) = length

(gpm/psi)

(gpm)

(in)

(ft)

L
F
T

C Factor total (Pt)


Pf per ft elev (Pe)
frict (Pf)

(ft)

(psi)

(psi)

609
608

10.83
10.83

0
80.2

100
4.026

11.18
0
11.18

120
0.0024

43.3
0
0.0

608
607

10.83
10.83

-13
67.2

100
4.026

11.18
0
11.18

120
0.0017

43.4
0
0.0

607
606

10.83
10.83

-12.4
54.8

100 1x(us.90)=10
4.026

3.27
10
13.27

120
0.0012

43.4
0
0.0

606
605

10.83
10.83

0
54.8

100 1x(us.90)=10
4.026

56.66
10
66.66

120
0.0012

43.4
0
0.1

605
604

10.83
10.83

0
54.8

100 1x(us.90)=10
4.026

2.07
10
12.07

120
0.0012

43.5
0
0.0

604
603

10.83
10.83

0
54.8

100 1x(us.90)=10
4.026

2.3
10
12.3

120
0.0012

43.5
0
0.0

603
602

10.83
10.83

0
54.8

100 1x(us.90)=10
4.026

1.06
10
11.06

120
0.0012

43.5
0
0.0

602
601

10.83
10.83

0
54.8

100 1x(us.90)=10
4.026

2.3
10
12.3

120
0.0012

43.5
0
0.0

601
600

10.83
10.83

0
54.8

100
4.026

8.3
0
8.3

120
0.0012

43.5
0
0

600
599

10.83
10.83

-8.2
46.6

100
4.026

13.66
0
13.66

120
0.0009

43.6
0
0.0

599
598

10.83
10.83

-7.4
39.2

100
4.026

10.64
0
10.64

120
0.0006

43.6
0
0

598
597

10.83
10.83

-6.8
32.4

100 1x(us.90)=10
4.026

7.63
10
17.63

120
0.0005

43.6
0
0

597
590

10.83
10.83

0
32.4

100 1x(us.90)=10
4.026

70.38
10
80.38

120
0.0005

43.6
0
0.0

590
589

10.83
10.83

0
32.4

100 1x(us.90)=10
4.026

2.3
10
12.3

120
0.0005

43.6
0
0

589
588

10.83
10.83

0
32.4

100 1x(us.90)=10
4.026

1.06
10
11.06

120
0.0005

43.6
0
0

588
587

10.83
10.83

0
32.4

100 1x(us.90)=10
4.026

2.3
10
12.3

120
0.0005

43.6
0
0

587
581

10.83
10.83

0
32.4

100 1x(us.90)=10
4.026

47.59
10
57.59

120
0.0005

43.6
0
0.0

581
580

10.83
10.83

0
32.4

100
4.026

7.63
0
7.63

120
0.0005

43.7
0
0

580
579

10.83
10.83

6.8
39.2

100
4.026

10.64
0
10.64

120
0.0006

43.7
0
0

2006 National Fire Protection Association

NOTES

Page 12

Job name: Sodimac Open Plaza Cajamarca

Sheet number:___________________

PIPE INFORMATION
Node 1
Node 2

Elev 1
Elev 2

(ft)

K-Factor 1 Flow added(q)* Nominal ID


Fittings
K-Factor 2 Total flow (Q) Actual ID
quantity x (name) = length

(gpm/psi)

(gpm)

(in)

(ft)

L
F
T

C Factor total (Pt)


Pf per ft elev (Pe)
frict (Pf)

(ft)

(psi)

(psi)

579
578

10.83
10.83

7.4
46.6

100
4.026

13.66
0
13.66

120
0.0009

43.7
0
0.0

578
577

10.83
10.83

8.2
54.8

100 1x(us.90)=10
4.026

8.92
10
18.92

120
0.0012

43.7
0
0.0

577
576

10.83
10.83

0
54.8

100 1x(us.90)=10
4.026

2.3
10
12.3

120
0.0012

43.7
0
0.0

576
575

10.83
10.83

0
54.8

100 1x(us.90)=10
4.026

1.06
10
11.06

120
0.0012

43.7
0
0.0

575
574

10.83
10.83

0
54.8

100 1x(us.90)=10
4.026

2.3
10
12.3

120
0.0012

43.7
0
0.0

574
573

10.83
10.83

0
54.8

100 1x(us.90)=10
4.026

1.46
10
11.46

120
0.0012

43.7
0
0.0

573
572

10.83
10.83

0
54.8

100 1x(us.90)=10
4.026

4.79
10
14.79

120
0.0012

43.8
0
0.0

572
571

10.83
10.83

0
54.8

100
4.026

3.27
0
3.27

120
0.0012

43.8
0
0

571
570

10.83
10.83

12.4
67.2

100
4.026

11.18
0
11.18

120
0.0017

43.8
0
0.0

570
569

10.83
10.83

13
80.2

100
4.026

11.18
0
11.18

120
0.0024

43.8
0
0.0

009
565

10.83
10.83

0
32.5

50 2x(us.Tee-Br)=20
2.067

180.49
20
200.49

120
0.0117

46.1
0
2.3

010
564

10.83
10.83

0
40.4

50 2x(us.Tee-Br)=20
2.067

180.49
20
200.49

120
0.0175

47.6
0
3.5

011
563

10.83
10.83

0
49.4

50 2x(us.Tee-Br)=20
2.067

180.49
20
200.49

120
0.0254

49
0
5.1

012
562

10.83
10.83

0
59.4

50 2x(us.Tee-Br)=20
2.067

180.49
20
200.49

120
0.0358

50.2
0
7.2

013
561

10.83
10.83

0
70.6

50 2x(us.Tee-Br)=20
2.067

180.49
20
200.49

120
0.0493

51.1
0
9.9

636
635

10.83
10.83

0
0.1

50
2.067

11.4
0
11.4

120
0

17.7
0
0

619
620

10.83
10.83

0
0.5

50
2.067

11.4
0
11.4

120
0

17.9
0
0

733
732

10.83
10.83

0
1.4

50
2.067

11.4
0
11.4

120
0.0000

18.3
0
0

608
570

10.83
10.83

0
13

180.49
20
200.49

120
0.0022

43.4
0
0.4

2006 National Fire Protection Association

50 2x(us.Tee-Br)=20
2.067

NOTES

Page 13

Job name: Sodimac Open Plaza Cajamarca

Sheet number:___________________

PIPE INFORMATION
Node 1
Node 2

Elev 1
Elev 2

(ft)

K-Factor 1 Flow added(q)* Nominal ID


Fittings
K-Factor 2 Total flow (Q) Actual ID
quantity x (name) = length

(gpm/psi)

(gpm)

(in)

(ft)

L
F
T
(ft)

C Factor total (Pt)


Pf per ft elev (Pe)
frict (Pf)
(psi)

(psi)

607
571

10.83
10.83

0
12.4

50 2x(us.Tee-Br)=20
2.067

180.49
20
200.49

120
0.002

43.4
0
0.4

600
578

10.83
10.83

0
8.2

50 2x(us.Tee-Br)=20
2.067

119.04
20
139.04

120
0.0009

43.6
0
0.1

599
579

10.83
10.83

0
7.4

50 2x(us.Tee-Br)=20
2.067

119.04
20
139.04

120
0.0007

43.6
0
0.1

598
580

10.83
10.83

0
6.8

50 2x(us.Tee-Br)=20
2.067

119.04
20
139.04

120
0.0006

43.6
0
0.1

NOTES

Discharge shown for flowing nodes only

2006 National Fire Protection Association

Page 14

CALCULATION SUMMARY

Project Name : Sodimac Open Plaza Cajamarca

Project Location: Sistema 1

Drawing No. :

City: Lima, Peru

Design Areas
Design Area
Name

Sistema 3

Calc. Mode
(Model)

Demand (HW)

Occupancy

Area of
Total Water Pressure @
Application
Source

Min.
Density

Min.
Pressure

Min.
Flow

Calculated
Heads

Hose
Streams

Margin To
Source

(ft)

(gpm)

(psi)

(gpm/ft)

(psi)

(gpm)

(gpm)

(psi)

2799.99

2003.8

141.1

0.556

13.5

92.6

20

500

17.7

File: D:\lchavez\Data\LCHAVEZ 2010\Lchavez\Actual 2014\Sodimac Cajamarca\Calculo\Sistema 3.tyc3


Date 26/06/2014

Copyright 2002-2012 Tyco Fire Protection Products

Page 1

HYDRAULIC CALCULATIONS
for
Job Information
Project Name : Sodimac Open Plaza Cajamarca
Contract No. :

City: Lima, Peru

Project Location: Sistema 1

Date: 26/06/2014

Contractor Information
Name of Contractor: Engineering Services SAC
Address: Av. Juan de la Fuente 960-Miraflores

City: Lima, Per

Phone Number: 445-8215

E-mail: www.essacweb.com

Name of Designer: L. Chavez


Authority Having Jurisdiction: CGBVP

Design
Remote Area Name

Sistema 3

Remote Area Location


Occupancy Classification
Density (gpm/ft)

0.556

Area of Application (ft)

2799.99

Coverage per Sprinkler (ft)

166.67

Number of Calculated Sprinklers

20

In-Rack Demand (gpm)

Special Heads
Hose Streams (gpm)

500

Total Water Required (incl. Hose Streams) (gpm)

2003.8

Required Pressure at Source (psi)

123.4

Type of System

Wet

Volume - Entire System (gal)

1884.1 gal

Water Supply Information


Date

DD/MM/YYYY

Location
Source

W1

Notes

File: D:\lchavez\Data\LCHAVEZ 2010\Lchavez\Actual 2014\Sodimac Cajamarca\Calculo\Sistema 3.tyc3


Date 26/06/2014

Copyright 2002-2012 Tyco Fire Protection Products

Page 2

Job : Sodimac Open Plaza Cajamarca

Node Labels:
Pipe Labels:

Off
Size

Diagram for Design Area : Sistema 3

File: D:\lchavez\Data\LCHAVEZ 2010\Lchavez\Actual 2014\Sodimac Cajamarca\Calculo\Sistema 3.tyc3


Date 26/06/2014

Copyright 2002-2012 Tyco Fire Protection Products

Page 3

Job : Sodimac Open Plaza Cajamarca

Hydraulic Analysis for : Sistema 3


Calculation Info
Calculation Mode
Hydraulic Model
Fluid Name
Fluid Weight, (lb/ft)
Fluid Dynamic Viscosity, (lbs/ft)

Demand
Hazen-Williams
Water @ 60F (15.6C)
N/A for Hazen-Williams calculation.
N/A for Hazen-Williams calculation.

Water Supply Parameters


Supply 1 : W1

Flow (gpm)
0
1499.7
2249.7

Pressure (psi)
160
150
136

Hoses
Inside Hose Flow / Standpipe Demand (gpm)

500

Outside Hose Flow (gpm)

Additional Outside Hose Flow (gpm)


Other (custom defined) Hose Flow (gpm)

Total Hose Flow (gpm)

500

Sprinklers
Ovehead Sprinkler Flow (gpm)

1503.8

InRack Sprinkler Flow (gpm)

Other (custom defined) Sprinkler Flow (gpm)

Total Sprinkler Flow (gpm)

1503.8

Required Margin of Safety (psi)

W1 - Pressure (psi)

123.4

W1 - Flow (gpm)

2003.8

Demand w/o System Pump(s)

N/A

Other

File: D:\lchavez\Data\LCHAVEZ 2010\Lchavez\Actual 2014\Sodimac Cajamarca\Calculo\Sistema 3.tyc3


Date 26/06/2014

Copyright 2002-2012 Tyco Fire Protection Products

Page 4

Job : Sodimac Open Plaza Cajamarca

Hydraulic Analysis for : Sistema 3


System Demand
200

180

S1
160
S2

S3

140

132.692
D2

Pressure, psi

120

100

80

60

40

D1
20

0
0

700

800

900

1000

1100

1200

1300

1400

1500

1600

1700

1800

1900

2000

2100

2200

2300

2400

Flow, gpm

File: D:\lchavez\Data\LCHAVEZ 2010\Lchavez\Actual 2014\Sodimac Cajamarca\Calculo\Sistema 3.tyc3


Date 26/06/2014

Copyright 2002-2012 Tyco Fire Protection Products

Page 5

Job : Sodimac Open Plaza Cajamarca

Hydraulic Analysis for : Sistema 3


Graph Labels
Label

Values

Description

Flow (gpm)
0

Pressure (psi)
160
150

S1

Supply point #1 - Static

S2

Supply point #2

1499.7

S3

Supply point #3

2249.7

136

D1

Elevation Pressure

16.6

D2

System Demand

2003.8

123.4

Curve Intersections & Safety Margins


Intersection

Curve Name

Pressure (psi)
138.2

Supply

Safety Margin

Flow (gpm)
2149

Pressure (psi)
17.7

@ Flow (gpm)
2003.8

Open Heads
Required
Head Ref.

Head Type

Coverage

K-Factor

(ft)

Calculated

Density

Flow

Pressure

Density

Flow

Pressure

(gpm/psi)

(gpm/ft)

(gpm)

(psi)

(gpm/ft)

(gpm)

(psi)

1064

Overhead
Sprinkler

100

0.3

30

14.1

0.344

34.4

18.5

1065

Overhead
Sprinkler

100

0.3

30

14.1

0.338

33.8

17.8

1066

Overhead
Sprinkler

100

0.3

30

14.1

0.331

33.1

17.1

1067

Overhead
Sprinkler

100

0.3

30

14.1

0.324

32.4

16.4

986

Overhead
Sprinkler

100

0.3

30

14.1

0.339

33.9

17.9

987

Overhead
Sprinkler

100

0.3

30

14.1

0.333

33.3

17.3

988

Overhead
Sprinkler

100

0.3

30

14.1

0.326

32.6

16.6

989

Overhead
Sprinkler

100

0.3

30

14.1

0.319

31.9

15.9

R07

Overhead
Sprinkler

166.67

25.2

0.556

92.6

13.5

0.7

116.6

21.4

R08

Overhead
Sprinkler

166.67

25.2

0.556

92.6

13.5

0.7

116.6

21.4

R09

Overhead
Sprinkler

166.67

25.2

0.556

92.6

13.5

0.7

116.7

21.5

R10

Overhead
Sprinkler

166.67

25.2

0.556

92.6

13.5

0.703

117.2

21.6

R11

Overhead
Sprinkler

166.67

25.2

0.556

92.6

13.5

0.608

101.4

16.2

R12

Overhead
Sprinkler

166.67

25.2

0.556

92.6

13.5

0.566

94.3

14

File: D:\lchavez\Data\LCHAVEZ 2010\Lchavez\Actual 2014\Sodimac Cajamarca\Calculo\Sistema 3.tyc3


Date 26/06/2014

Copyright 2002-2012 Tyco Fire Protection Products

Page 6

R13

Overhead
Sprinkler

166.67

25.2

0.556

92.6

13.5

0.556

92.6

13.5

R14

Overhead
Sprinkler

166.67

25.2

0.556

92.6

13.5

0.556

92.7

13.5

R15

Overhead
Sprinkler

166.67

25.2

0.556

92.6

13.5

0.569

94.8

14.1

R16

Overhead
Sprinkler

166.67

25.2

0.556

92.6

13.5

0.569

94.9

14.2

R17

Overhead
Sprinkler

166.67

25.2

0.556

92.6

13.5

0.624

104.1

17

R18

Overhead
Sprinkler

166.67

25.2

0.556

92.6

13.5

0.58

96.7

14.7

File: D:\lchavez\Data\LCHAVEZ 2010\Lchavez\Actual 2014\Sodimac Cajamarca\Calculo\Sistema 3.tyc3


Date 26/06/2014

Copyright 2002-2012 Tyco Fire Protection Products

Page 7

Job name: Sodimac Open Plaza Cajamarca

Sheet number:___________________

PIPE INFORMATION
Node 1
Node 2

Elev 1
Elev 2

(ft)

K-Factor 1 Flow added(q)* Nominal ID


Fittings
K-Factor 2 Total flow (Q) Actual ID
quantity x (name) = length

(gpm/psi)

(gpm)

25.2

(in)

R13
050

11.48
10.17

050
049

10.17
10.17

-16.6
76

049
048

10.17
10.17

048
047

32 1x(us.Tee-Br)=6
1.38

(ft)

C Factor total (Pt)


Pf per ft elev (Pe)
frict (Pf)
(psi)

NOTES

(psi)

1.31
6
7.31

120
0.5826

13.5
0.6
4.3

50
2.067

11.59
0
11.59

120
0.0565

18.3
0
0.7

94.3
170.3

50
2.067

11.15
0
11.15

120
0.2518

19
0
2.8

10.17
10.17

101.4
271.7

50 1x(us.Tee-Br)=10
2.067

1.8
10
11.8

120
0.5981

21.8
0
7.1

047
002

10.17
10.17

374.3
646

100
4.026

13.53
0
13.53

120
0.1157

28.8
0
1.6

002
003

10.17
10.17

281
927

100
4.026

13.53
0
13.53

120
0.2258

30.4
0
3.1

003
004

10.17
10.17

-42.8
884.1

100
4.026

13.53
0
13.53

120
0.2069

33.5
0
2.8

004
005

10.17
10.17

-34
850.1

100
4.026

13.53
0
13.53

120
0.1924

36.3
0
2.6

005
006

10.17
10.17

-25.9
824.2

100
4.026

13.53
0
13.53

120
0.1817

38.9
0
2.5

006
007

10.17
10.17

-18.1
806.1

100
4.026

13.1
0
13.1

120
0.1743

41.3
0
2.3

007
008

10.17
10.17

-9.8
796.3

100
4.026

13.21
0
13.21

120
0.1704

43.6
0
2.3

008
009

10.17
10.17

-56.1
740.2

100
4.026

12.03
0
12.03

120
0.1489

45.9
0
1.8

009
010

10.17
10.17

-56.7
683.5

100
4.026

12.03
0
12.03

120
0.1284

47.7
0
1.5

010
011

10.17
10.17

-59.9
623.5

100
4.026

12.47
0
12.47

120
0.1084

49.2
0
1.4

011
012

10.17
10.17

-65.8
557.8

100 1x(us.90)=10
4.026

3.77
10
13.77

120
0.0881

50.6
0
1.2

012
013

10.17
10.17

0
557.8

100 1x(us.Tee-Br)=20
4.026

152.29
20
172.29

120
0.0881

51.8
0
15.2

013
934

10.17
10.17

946
1503.8

150 1x(us.90)=14
6.065

32.96
14
46.96

120
0.0752

67
0
3.5

934
935

10.17
10.17

0
1503.8

150 1x(us.90)=14
6.065

108.19
14
122.19

120
0.0752

70.5
0
9.2

935
936

10.17
10.17

0
1503.8

150 1x(us.90)=14
6.065

31.7
14
45.7

120
0.0752

79.7
0
3.4

2006 National Fire Protection Association

92.6
92.6

(ft)

L
F
T

Page 8

Job name: Sodimac Open Plaza Cajamarca

Sheet number:___________________

PIPE INFORMATION
Node 1
Node 2

Elev 1
Elev 2

(ft)

K-Factor 1 Flow added(q)* Nominal ID


Fittings
K-Factor 2 Total flow (Q) Actual ID
quantity x (name) = length

(gpm/psi)

(gpm)

(in)

(ft)

L
F
T

C Factor total (Pt)


Pf per ft elev (Pe)
frict (Pf)

(ft)

(psi)

(psi)

936
937

10.17
10.17

0
1503.8

150 1x(us.90)=14
6.065

18.68
14
32.68

120
0.0752

83.1
0
2.5

937
938

10.17
-13.12

0
1503.8

150 1x(us.Tee-Br)=30
6.065

23.29
30
53.29

120
0.0752

85.6
10.1
4

938
939

-13.12
-13.12

500
2003.8

200 1x(us.90)=18
8.071

2.3
18
20.3

120
0.0318

99.7
0
0.6

939
940

-13.12
10.33

0
2003.8

200 1x(us.90)=18
8.071

23.46
18
41.46

120
0.0318

100.3
-10.2
1.3

940
941

10.33
10.33

0
2003.8

200 1x(us.90)=18
8.071

5.74
18
23.74

120
0.0318

91.5
0
0.8

941
942

10.33
10.33

0
2003.8

200 1x(us.90)=18
8.071

15.55
18
33.55

120
0.0318

92.2
0
1.1

942
943

10.33
10.33

0
2003.8

200 1x(us.90)=18
8.071

47.18
18
65.18

120
0.0318

93.3
0
2.1

943
944

10.33
10.33

0
2003.8

200 1x(us.90)=18
8.071

31.24
18
49.24

120
0.0318

95.4
0
1.6

944
945

10.33
10.33

0
2003.8

200 1x(us.90)=18
8.071

22.58
18
40.58

120
0.0318

96.9
0
1.3

945
946

10.33
10.33

0
2003.8

200 1x(us.90)=18
8.071

4.08
18
22.08

120
0.0318

98.2
0
0.7

946
947

10.33
-14.76

0
2003.8

200 1x(us.90)=18
8.071

25.1
18
43.1

120
0.0318

98.9
10.9
1.4

947
948

-14.76
-14.76

0
2003.8

200 1x(us.90)=18
8.071

28.31
18
46.31

120
0.0318

111.2
0
1.5

948
949

-14.76
-26.9

0
2003.8

200 1x(us.90)=18
8.071

12.14
18
30.14

120
0.0318

112.7
5.3
1

949
950

-26.9
-26.9

0
2003.8

200 1x(us.90)=18
8.071

4.43
18
22.43

120
0.0318

118.9
0
0.7

950
951

-26.9
-14.76

0
2003.8

200 1x(us.90)=18
8.071

12.14
18
30.14

120
0.0318

119.6
-5.3
1

951
952

-14.76
-14.76

0
2003.8

200 1x(us.90)=18
8.071

11.88
18
29.88

120
0.0318

115.3
0
1

952
953

-14.76
-14.76

0
2003.8

200 1x(us.90)=18
8.071

9.1
18
27.1

120
0.0318

116.2
0
0.9

953
954

-14.76
-26.9

0
2003.8

200 1x(us.90)=18
8.071

12.14
18
30.14

120
0.0318

117.1
5.3
1

954
W1

-26.9
-26.9

0
2003.8

200
8.071

3.28
0
3.28

120
0.0318

123.3
0
0.1

2006 National Fire Protection Association

NOTES

Page 9

Job name: Sodimac Open Plaza Cajamarca

Sheet number:___________________

PIPE INFORMATION
Node 1
Node 2

Elev 1
Elev 2

(ft)

K-Factor 1 Flow added(q)* Nominal ID


Fittings
K-Factor 2 Total flow (Q) Actual ID
quantity x (name) = length

(gpm/psi)

(gpm)

25.2

(in)

R14
051

11.48
10.17

051
027

10.17
10.17

16.6
109.3

50 1x(us.Tee-Br)=10
2.067

027
026

10.17
10.17

358.1
467.4

026
025

10.17
10.17

025
024

(ft)

(psi)

13.5
0.6
4.3

142.27
10
152.27

120
0.1107

18.4
0
16.9

100
4.026

13.53
0
13.53

120
0.0635

35.2
0
0.9

109.4
576.8

100
4.026

13.53
0
13.53

120
0.0938

36.1
0
1.3

10.17
10.17

42.8
619.6

100
4.026

13.53
0
13.53

120
0.1071

37.4
0
1.4

024
023

10.17
10.17

34
653.6

100
4.026

13.53
0
13.53

120
0.1182

38.8
0
1.6

023
022

10.17
10.17

25.9
679.5

100
4.026

13.53
0
13.53

120
0.1271

40.4
0
1.7

022
021

10.17
10.17

18.1
697.6

100
4.026

13.1
0
13.1

120
0.1334

42.1
0
1.7

021
020

10.17
10.17

9.8
707.4

100 1x(us.90)=10
4.026

4.41
10
14.41

120
0.1369

43.9
0
2

020
019

10.17
10.17

0
707.4

100 1x(us.90)=10
4.026

22.85
10
32.85

120
0.1369

45.8
0
4.5

019
018

10.17
10.17

0
707.4

100
4.026

8.8
0
8.8

120
0.1369

50.3
0
1.2

018
017

10.17
10.17

56.1
763.6

100
4.026

12.03
0
12.03

120
0.1577

51.5
0
1.9

017
016

10.17
10.17

56.7
820.3

100
4.026

12.03
0
12.03

120
0.1801

53.4
0
2.2

016
015

10.17
10.17

59.9
880.2

100
4.026

12.47
0
12.47

120
0.2052

55.6
0
2.6

015
014

10.17
10.17

65.8
946

100 1x(us.90)=10
4.026

3.77
10
13.77

120
0.2345

58.2
0
3.2

014
013

10.17
10.17

0
946

100 1x(us.Tee-Br)=20
4.026

3.71
20
23.71

120
0.2345

61.4
0
5.6

R12
049

11.48
10.17

25.2

94.3
94.3

32 1x(us.Tee-Br)=6
1.38

1.31
6
7.31

120
0.6028

14
0.6
4.4

R15
800

11.48
10.17

25.2

94.8
94.8

32 1x(us.Tee-Br)=6
1.38

1.31
6
7.31

120
0.6085

14.1
0.6
4.4

800
801

10.17
10.17

11.59
0
11.59

120
0.0625

19.2
0
0.7

50
2.067

NOTES

(psi)

120
0.5838

-14.5
80.3

32 1x(us.Tee-Br)=6
1.38

C Factor total (Pt)


Pf per ft elev (Pe)
frict (Pf)

1.31
6
7.31

2006 National Fire Protection Association

92.7
92.7

(ft)

L
F
T

Page 10

Job name: Sodimac Open Plaza Cajamarca

Sheet number:___________________

PIPE INFORMATION
Node 1
Node 2

Elev 1
Elev 2

(ft)

K-Factor 1 Flow added(q)* Nominal ID


Fittings
K-Factor 2 Total flow (Q) Actual ID
quantity x (name) = length

(gpm/psi)

(gpm)

(in)

(ft)

L
F
T

C Factor total (Pt)


Pf per ft elev (Pe)
frict (Pf)

(ft)

(psi)

11.15
0
11.15

120
0.2702

19.9
0
3

(psi)

801
001

10.17
10.17

96.7
176.9

50
2.067

001
002

10.17
10.17

104.1
281

50 1x(us.Tee-Br)=10
2.067

1.8
10
11.8

120
0.6364

22.9
0
7.5

R16
799

11.48
10.17

32 1x(us.Tee-Br)=6
1.38

1.31
6
7.31

120
0.6095

14.2
0.6
4.5

799
026

10.17
10.17

142.27
10
152.27

120
0.1109

19.2
0
16.9

R18
801

11.48
10.17

25.2

96.7
96.7

1.31
6
7.31

120
0.6308

14.7
0.6
4.6

989
083

-0.89
-1.43

31.9
31.9

25 1x(us.90)=2
1.049

0.54
2
2.54

120
0.3079

15.9
0.2
0.8

083
079

-1.43
-1.43

0
31.9

25 1x(us.Tee-Br)=5
1.049

3.05
5
8.05

120
0.3079

16.9
0
2.5

079
078

-1.43
-1.43

65.9
97.8

50
2.067

7.55
0
7.55

120
0.0901

19.4
0
0.7

078
068

-1.43
-1.43

33.9
131.7

50 1x(us.Tee-Br)=10
2.067

35.9
10
45.9

120
0.1563

20.1
0
7.2

068
067

-1.43
9.84

133.6
265.3

65 1x(us.90)=6
2.469

11.27
6
17.27

120
0.2408

27.3
-4.9
4.2

067
066

9.84
9.84

0
265.3

100 1x(us.90)=10
4.026

2.79
10
12.79

120
0.0223

26.5
0
0.3

066
065

9.84
9.84

0
265.3

100 1x(us.Tee-Br)=20
4.026

15.47
20
35.47

120
0.0223

26.8
0
0.8

065
064

9.84
9.84

0
265.3

100 1x(us.90)=10
4.026

20.09
10
30.09

120
0.0223

27.6
0
0.7

064
046

9.84
10.17

0
265.3

100 1x(us.Tee-Br)=20
4.026

0.33
20
20.33

120
0.0223

28.3
-0.1
0.5

046
047

10.17
10.17

109
374.3

100
4.026

6.28
0
6.28

120
0.0421

28.6
0
0.3

1067
209

-3.07
-3.63

32.4
32.4

25 1x(us.90)=2
1.049

0.56
2
2.56

120
0.3165

16.4
0.2
0.8

209
205

-3.63
-3.63

0
32.4

25 1x(us.Tee-Br)=5
1.049

3.05
5
8.05

120
0.3165

17.4
0
2.5

205
204

-3.63
-3.63

66.9
99.2

50
2.067

7.55
0
7.55

120
0.0926

20
0
0.7

204
089

-3.63
-3.63

34.4
133.6

50 1x(us.Tee-Br)=10
2.067

35.9
10
45.9

120
0.1607

20.7
0
7.4

25.2

94.9
94.9
14.5
109.4

2006 National Fire Protection Association

50 1x(us.Tee-Br)=10
2.067
32 1x(us.Tee-Br)=6
1.38

NOTES

Page 11

Job name: Sodimac Open Plaza Cajamarca

Sheet number:___________________

PIPE INFORMATION
Node 1
Node 2

Elev 1
Elev 2

(ft)

089
068

-3.63
-1.43

988
082

-0.89
-1.43

082
081

K-Factor 1 Flow added(q)* Nominal ID


Fittings
K-Factor 2 Total flow (Q) Actual ID
quantity x (name) = length

(gpm/psi)

(gpm)

(in)

0
133.6
8

(ft)

65
2.469

L
F
T

C Factor total (Pt)


Pf per ft elev (Pe)
frict (Pf)

(ft)

(psi)

(psi)

2.2
0
2.2

120
0.0676

28.1
-1
0.1

32.6
32.6

25 1x(us.90)=2
1.049

0.54
2
2.54

120
0.3208

16.6
0.2
0.8

-1.43
-1.43

0
32.6

25 1x(us.90)=2
1.049

3.05
2
5.05

120
0.3208

17.7
0
1.6

081
080

-1.43
-1.43

0
32.6

50
2.067

5.19
0
5.19

120
0.0118

19.3
0
0.1

080
079

-1.43
-1.43

33.3
65.9

50
2.067

0.98
0
0.98

120
0.0434

19.4
0
0.0

R11
048

11.48
10.17

25.2

101.4
101.4

1.31
6
7.31

120
0.6892

16.2
0.6
5

1066
208

-3.07
-3.63

33.1
33.1

25 1x(us.90)=2
1.049

0.56
2
2.56

120
0.3298

17.1
0.2
0.8

208
207

-3.63
-3.63

0
33.1

25 1x(us.90)=2
1.049

3.05
2
5.05

120
0.3298

18.2
0
1.7

207
206

-3.63
-3.63

0
33.1

50
2.067

5.19
0
5.19

120
0.0121

19.9
0
0.1

206
205

-3.63
-3.63

33.8
66.9

50
2.067

0.98
0
0.98

120
0.0446

19.9
0
0.0

987
080

-0.89
-1.43

33.3
33.3

25 1x(us.Tee-Br)=5
1.049

0.54
5
5.54

120
0.3325

17.3
0.2
1.8

R17
001

11.48
10.17

25.2

104.1
104.1

32 1x(us.Tee-Br)=6
1.38

1.31
6
7.31

120
0.7232

17
0.6
5.3

1065
206

-3.07
-3.63

33.8
33.8

25 1x(us.Tee-Br)=5
1.049

0.56
5
5.56

120
0.3418

17.8
0.2
1.9

986
078

-0.89
-1.43

33.9
33.9

25 1x(us.Tee-Br)=5
1.049

0.54
5
5.54

120
0.3442

17.9
0.2
1.9

1064
204

-3.07
-3.63

34.4
34.4

25 1x(us.Tee-Br)=5
1.049

0.56
5
5.56

120
0.3538

18.5
0.2
2

R07
044

11.48
10.17

25.2

116.6
116.6

32 1x(us.Tee-Br)=6
1.38

1.31
6
7.31

120
0.8928

21.4
0.6
6.5

044
045

10.17
10.17

-7.6
109

100 1x(us.90)=10
4.026

1.8
10
11.8

120
0.0043

28.5
0
0.1

045
046

10.17
10.17

0
109

100
4.026

7.26
0
7.26

120
0.0043

28.6
0
0.0

R08
043

11.48
10.17

1.31
6
7.31

120
0.8928

21.4
0.6
6.5

25.2

2006 National Fire Protection Association

116.6
116.6

32 1x(us.Tee-Br)=6
1.38

32 1x(us.Tee-Br)=6
1.38

NOTES

Page 12

Job name: Sodimac Open Plaza Cajamarca

Sheet number:___________________

PIPE INFORMATION
Node 1
Node 2

Elev 1
Elev 2

(ft)

K-Factor 1 Flow added(q)* Nominal ID


Fittings
K-Factor 2 Total flow (Q) Actual ID
quantity x (name) = length

(gpm/psi)

(gpm)

(in)

(ft)

L
F
T

C Factor total (Pt)


Pf per ft elev (Pe)
frict (Pf)

(ft)

(psi)

(psi)

043
042

10.17
10.17

7.6
124.2

100
4.026

11.59
0
11.59

120
0.0055

28.5
0
0.1

042
041

10.17
10.17

116.7
240.9

100
4.026

12.03
0
12.03

120
0.0186

28.6
0
0.2

041
028

10.17
10.17

117.2
358.1

100 1x(us.90)=10
4.026

142.27
10
152.27

120
0.0388

28.8
0
5.9

028
027

10.17
10.17

0
358.1

100
4.026

13.53
0
13.53

120
0.0388

34.7
0
0.5

R09
042

11.48
10.17

25.2

116.7
116.7

32 1x(us.Tee-Br)=6
1.38

1.31
6
7.31

120
0.8947

21.5
0.6
6.5

R10
041

11.48
10.17

25.2

117.2
117.2

32 1x(us.Tee-Br)=6
1.38

1.31
6
7.31

120
0.9015

21.6
0.6
6.6

his1
955

10.99
-13.12

500
500

100 1x(us.90)=10
4.026

24.11
10
34.11

120
0.072

86.7
10.4
2.5

955
938

-13.12
-13.12

0
500

200
8.071

7.22
0
7.22

120
0.0024

99.7
0
0.0

050
051

10.17
10.17

0
16.6

50
2.067

12.03
0
12.03

120
0.0034

18.3
0
0.0

003
025

10.17
10.17

0
42.8

50 2x(us.Tee-Br)=20
2.067

178.85
20
198.85

120
0.0195

33.5
0
3.9

004
024

10.17
10.17

0
34

50 2x(us.Tee-Br)=20
2.067

178.85
20
198.85

120
0.0127

36.3
0
2.5

005
023

10.17
10.17

0
25.9

50 2x(us.Tee-Br)=20
2.067

178.85
20
198.85

120
0.0077

38.9
0
1.5

006
022

10.17
10.17

0
18.1

50 2x(us.Tee-Br)=20
2.067

178.85
20
198.85

120
0.004

41.3
0
0.8

007
021

10.17
10.17

0
9.8

50 2x(us.Tee-Br)=20
2.067

178.85
20
198.85

120
0.0013

43.6
0
0.3

008
018

10.17
10.17

0
56.1

50 2x(us.Tee-Br)=20
2.067

156
20
176

120
0.0323

45.9
0
5.7

009
017

10.17
10.17

0
56.7

50 2x(us.Tee-Br)=20
2.067

156
20
176

120
0.0329

47.7
0
5.8

010
016

10.17
10.17

0
59.9

50 2x(us.Tee-Br)=20
2.067

156
20
176

120
0.0364

49.2
0
6.4

011
015

10.17
10.17

0
65.8

50 2x(us.Tee-Br)=20
2.067

156
20
176

120
0.0432

50.6
0
7.6

800
799

10.17
10.17

0
14.5

50
2.067

12.03
0
12.03

120
0.0026

19.2
0
0.0

2006 National Fire Protection Association

NOTES

Page 13

Job name: Sodimac Open Plaza Cajamarca

Sheet number:___________________

PIPE INFORMATION
Node 1
Node 2

Elev 1
Elev 2

(ft)

044
043

K-Factor 1 Flow added(q)* Nominal ID


Fittings
K-Factor 2 Total flow (Q) Actual ID
quantity x (name) = length

(gpm/psi)

(gpm)

10.17
10.17

(in)

0
7.6

100
4.026

(ft)

L
F
T

C Factor total (Pt)


Pf per ft elev (Pe)
frict (Pf)

(ft)

(psi)

11.15
0
11.15

120
0.0000

NOTES

(psi)

28.5
0
0

Discharge shown for flowing nodes only

2006 National Fire Protection Association