You are on page 1of 15

BILL OF QUANT

Project
Sub-Contractor
Work Item
Refferesi

:
:
:
:

AMMONIA - UREA PROJECT


FIRE FIGHTING SYSTEM
Basic Drawing
RFQ
Scope of work & Supply of FIRE FIGHTING SYSTEM 201485-Z04-RD

NO.

DESCRIPTION

Unit

Quantity

MATERIAL/EQUIPME

a
A

ENGINEERING AND DESIGN


1
2

3
4

Basic design
(Loading data, Dimension, & General Arrangement Drawing)
Detail specification
(Include but not limited to : Data sheet, Technical specification, Detail drawing, Calculation and Plant Model
3D with PDMS)
Shop Drawing & As build Drawing
Civil work design input
Fondation

Ls

1.00

Ls

1.00

Ls

1.00

Ls

1.00

SUB TOTAL A
B

SUPPLY EQUIPMENT (incl. The following items but not limited to)
1
2
3
4
5

Outdoor hydrant with monitor


Outdoor hydrant
Complete with Hose, cabinet and accessories
Indoor hydrant
Water sprinkler
Portable Fire Extinguisher

6
7
8
9
10

Alarm Check valve 4"


Alarm Check valve 6"
Alarm Check valve 8"
Deluge Valve electric Pilot 8"
Water Nozzle

NA
67.00
171.00
1,277.00
NA
2.00
3.00
1.00
3.00
90.00

Instrument & Control (Incl. The following item but not limited to)

1 to 15

Ex Woks at
Factory

FOB

NO.

DESCRIPTION

Unit

Quantity

MATERIAL/EQUIPME

a
1
2
3

Field Instrument
Cable
Junction box

NA
NA
NA

Piping (Incl. The following item but not limited to)


Piping (Incl. The following item but not limited to)
For detail requirement of piping refer to Chapter 11.4.4 Piping specification)
1
Pipe
2
Valve
3
Fitting
4
Pipe support
5
Accessories

NA
NA
NA
NA
NA

SUB TOTAL B
C

DELIVERY AND TRANSPORTATION


1
2
3

Internal protection from moisture (desiccant, etc.) and outer surface protection
Ocean freight or air freight
Inland transportation up to Site

NA
NA
NA

SUB TOTAL C
D

INSURANCE AND TAXES (include the following items but not limited to)
1

Insurance
Vendor shall be follow insurance requirement as per Attachemnt 2 Appendix I Insurance
2
Tax, duties, etc.
Obtaining import tax exemption certificates
Import tax and etc for non-commercial goods
Personal Income taxes
Any other tax. duties, fees, charges. etc. to be imposed on
Securities
Advance payment bond
Performance bond
Guarantee bond
Permits / licenses
SUB TOTAL D
E

CONSTRUCTION PREPARATION (incl. The following items but not limited to)

2 to 15

NA

NA
NA
NA
NA
NA

NA

Ex Woks at
Factory

FOB

NO.

DESCRIPTION

Unit

Quantity

MATERIAL/EQUIPME

a
E.1
1

3
4

5
E.2
1

E.3
1
2
3
4
5
6
7

General
Preparation of site erection procedure
Manufacturer's erection procedure
Heavy cargo transport and on-bed procedure
Equipment storage preservation procedure
Erector's erection procedures for various works
Welding procedures
Field test/commissioning procedures and reports
Overall commissioning procedure
Field test and commissioning procedures for individual system and or equipment
Reliability & Trial operation procedures
Reporting of commissioning and test results
Damage witnessing and official report issues
Administrative procedures related to visas and work permits
Visa
Expatriate quota
Temporary work permit and resident permit
Prepare installation manual
Apparatus and materials for testing & commissioning
Mechanical works
Standard equipment and facilities
Special test equipment (to be specified by the supplier)
For welding (NDT)
For paint (film thickness)
Supporting structure and hanger
Instrument for calibration
Instrumentation and control works
Standard equipment and facilities
Special test equipment (to be specified by the supplier)
Temporary material for instrumentation for commissioning
On-site activities (after received cargoes at site storage yard)
Unloading work
Unpacking, inspection and reporting
Protection and storage for construction equipment and materials
Inventory control
Site transportation and handling
Checking of foundations and embedded materials and anchor bolts, including their level and lines
Remedy of the foundations including embedded materials and anchor bolts

3 to 15

NA

NA

NA
NA

NA

NA

NA

NA
NA
NA
NA
NA
NA
NA

Ex Woks at
Factory

FOB

NO.

DESCRIPTION

Unit

Quantity

MATERIAL/EQUIPME

a
8
9

Chipping of foundations
Installation of anchor bolts and other embedded materials
Block-out type
Direct buried into foundation
10
Grouting works
11
Ground assembly. fabrication, erection and installation of plant equipment and materials delivered to the site
12
Welding works
13
Piping work, including instrument tubing work
14
Insulation and cladding work
15
Cabling and cable connection works, including grounding works, for both electrical and I&C works
16
Commissioning and testing
Planning, scheduling, management and coordination
Furnishing assistant labor for commissioning, operations and performance test
Commissioning of each individual equipment. sub-system and system, including supply of start-up engineer
Performance Tests
Test reports
17
Removing of temporary facilities & etc. from site
18
Cleaning of site
19
Remedy of defects during warranty period
20
Final inspection, prior to Final Acceptance
SUB TOTALE
F

NA
NA
NA
NA

NA
NA
NA
NA
NA
NA
NA

INSTALLATION, PRE-COMMISSIONING, COMMISSIONING & PERFORMANCE TEST


1
For all supplied equipment as per item B
SUB TOTAL G

NA
NA
NA
NA
NA
NA
NA

INSPECTION AND TESTING


1
Recommended and/or required test equipment as mentioned in the Specification
2
Schedule test
3
Shop Inspection, test & report including at sub vendor
4
Site Inspection and Testing
5
Hydrotest / Pressure test
6
Code stamp (as required)
7
Depnaker certificate (as required)
SUB TOTAL J

NA
NA

NA

PAINTING
1

Shop painting

m2

4 to 15

NA

Ex Woks at
Factory

FOB

NO.

DESCRIPTION

Unit

Quantity

MATERIAL/EQUIPME

a
2
Site painting & touch-up painting
SUB TOTAL H
I

m2

NA

OTHERS
1
2

HAZOP review (if required)


Spare parts & consumable material
Spare parts for erection & commissioning
Spare parts for 2 years operation (OPTIONAL)
3
Special tools
4
Laydown area for material storage outside project area (OPTIONAL)
5
Dewatering
6
Area preparation inside project area, instead of existing condition (ex. For heavy lifting, etc)
7
Training for operator
8
Temporary site facility (incl. The following items but not limited to)
Subcontractor office with furniture
Construction facility
Warehouse and workshop
Water and Power supply (OPTIONAL)
Testing material
Shelter for workers
Safety device for workers
Vendor security at site
SUB TOTAL I
TOTAL (A+B+C...+M)

5 to 15

NA
NA
NA
NA
NA
NA
NA
NA
NA

Ex Woks at
Factory

FOB

BILL OF QUANTITY

Unit Price *)
Amount *)
MATERIAL/EQUIPMENT
Fabrication
CnF

CIF

Franco at Site

Erection/Ins
tall
g

TOTAL
Material+Install

Material

Fabrication

Install

Total

h=e+f+g

i=a*e

j=a*f

k=a*g

j=a*h

4,627.14

310,018.57
205,418.88
36,649.90

1,201.28
28.70

8,390.04
13,786.02
6,241.10
54,018.18
2,700.00
-

4,195.02
4,595.34
6,241.10
18,006.06
30.00

6 to 15

Unit Price *)
Amount *)
MATERIAL/EQUIPMENT
Fabrication
CnF

CIF

Franco at Site

Erection/Ins
tall
g

TOTAL
Material+Install

Material

Fabrication

Install

Total

h=e+f+g

i=a*e

j=a*f

k=a*g

j=a*h

7 to 15

637,222.69

Unit Price *)
Amount *)
MATERIAL/EQUIPMENT
Fabrication
CnF

CIF

Franco at Site

Erection/Ins
tall
g

TOTAL
Material+Install

Material

Fabrication

Install

Total

h=e+f+g

i=a*e

j=a*f

k=a*g

j=a*h

8 to 15

Unit Price *)
Amount *)
MATERIAL/EQUIPMENT
Fabrication
CnF

CIF

Franco at Site

Erection/Ins
tall
g

TOTAL
Material+Install

Material

Fabrication

Install

Total

h=e+f+g

i=a*e

j=a*f

k=a*g

j=a*h

9 to 15

Unit Price *)
Amount *)
MATERIAL/EQUIPMENT
Fabrication
CnF

CIF

Franco at Site

Erection/Ins
tall
g

TOTAL
Material+Install

Material

Fabrication

Install

Total

h=e+f+g

i=a*e

j=a*f

k=a*g

j=a*h

10 to 15

637,222.69

*) Currency : Please defined

REMARKS

11 to 15

REMARKS

12 to 15

REMARKS

13 to 15

REMARKS

14 to 15

REMARKS

15 to 15

You might also like