ELEMENTAL COST BREAKDOWN FOR FLATS

Project:

ABC N9999

S/No. Elemental Classification

Unit

QTY

excavation (pilecap)

m3

331

excavation (ground slab)

m3

368

excavation (ground beam)

m3

85

earth removal (pilecap)

m3

265

earth removal (ground slab)

m3

368

earth removal (ground beam)

m3

85

backfilling (pilecap)

m3

66

Embankment (For the whole building)

m3

10231

Concrete G40

m3

265

Precast Formwork Panel

m2

519

Rebar

kg

10709

40mm thk lean conc

m2

221

Concrete G40

m3

49

Formwork

m2

265

Rebar

kg

29270

Concrete G40

m3

85

Formwork

m2

575

Rebar

kg

12434

40mm thk lean conc

m2

145

150mm thk h/core

m2

145

m3

215

1 Site Preparation
Site Clearance
Earthworks (Excavation,Disposal,Backfilling etc.)

Soil Investigation
2 Substructure
Piling
Foundation (Pilecap & stump)
Pilecap

40 kg/m3

RC column stump

598 kg/m3

Ground beams
Ground beam

146 kg/m3

Ground slab

155 kg/m3

Concrete G40
Rebar

kg

66

A9 Wire Mesh

m2

480

D13 Wire Mesh

m2

1482

40mm thk lean conc

m2

807

150mm thk h/core

m2

807

Concrete G40

m3

676

Formwork

m2

4935

Rebar

kg

221814

Column (precast)

m3

1813

Concrete G40

m3

80

Formwork

m2

299

Rebar

kg

18475

3 Superstructure
Columns & Structural walls
Columns
RC column (cast in situ)

328 kg/m3

Structural walls
RC wall stump

232 kg/m3

RC wall (cast in situ)

206 kg/m3

Concrete G40

m3

196

Formwork

m2

1578

Rebar

kg

40392

Wall (precast)

m3

2268

Topping G40

m3

1136

Concrete G40

m3

1239

Formwork

m2

8110

Rebar

kg

76602

A10 mesh

m2

19538

A9 mesh

m2

19787

70mm thk Precast prestressed plank(PS)

m2

7246

90mm thk Precast prestressed plank(PS)

m2

4181

70mm thk Non-Precast prestressed plank(NPS)

m2

2462

Concrete G40

m3

800

Formwork

m2

7089

Rebar

kg

183900

Precast Beam(2nd to 34th sty)

m3

1310

m2

16337

Upper Floor
Slabs
Precast Slab (2nd to 34th sty)

124 kg/m3

Beams
RC Beam(2nd to 34th sty)

230 kg/m3

Precast / RC
Precast faade
Precast Feature Wall
Precast concrete

m3

33

Precast Panel

m2

786

Vertical fin (Con)

m3

80

Vertical fin (Fmk)

m2

429

Vertical fin (Rebar)

kg

11950

Precast refuse chute

no

34

Concrete G40

m3

74

Formwork

m2

492

Rebar

kg

11081

100thk precast wall(FW)

m2

813

100thk precast parapet at corridor

m2

2045

Domestic water 4 ring tank

no

Wet riser 4 ring tank

no

Concrete G40

m3

22

Formwork

m2

193

Rebar

kg

4946

RC ledge (A/C)

150 kg/m3

150 kg/m3

Precast tank

Roof
Roof Structure
Roof Beam

229 kg/m3

Precast beam

m3

42

Topping G40

m3

36

Concrete G40

m3

53

Formwork

m2

347

Rebar

kg

2432

A9 mesh

m2

828

A10 mesh

m2

562

70mm thk Precast prestressed plank(PS)

m2

247

90mm thk Precast prestressed plank(PS)

m2

116

70mm thk Non-Precast prestressed plank(NPS)

m2

78

Concrete G40

m3

10

Formwork

m2

113

Rebar

kg

3446

Concrete G40

m3

16

Formwork

m2

127

Rebar

kg

4059

Concrete G40

m3

77

Formwork

m2

599

Rebar

kg

12504

Concrete G40

m3

21

Formwork

m2

143

A9 Wire mesh

m2

352

Concrete G40

m3

11

Formwork

m2

112

Rebar

kg

2674

Precast fascia parapet with coping

m2

422

Precast screen wall (PSW2)

m2

Roof Slabs

113 kg/m3

Roof at WATER TANK Level


RC col

351 kg/m3

RC Wall

255 kg/m3

RC Beam

162 kg/m3

RC slab

82 kg/m3

RC fascia stump

250 kg/m3

Water Tank Screen Wall Support

114 kg/m3

Concrete G40

m3

11

Formwork

m2

164

Rebar

kg

1274

Concrete G40

m3

92

Formwork

m2

607

Rebar

kg

11571

no

138

Staircase
Staircase Structure
RC staircase

126 kg/m3