Metal Lead

Km 6/10 - 7/700
Metal Lead
Cart Track 0/0 - 0/2
Kamanaichenpalayam - Annur 16/6 - 13/2
NH 319/0 - 317/4
Karanampattai - Rasagoundenpalayam Road 0/0 - 4/190
Venkittapuram - Kalipalayam Road 9/0 - 7/700
Working Mailage Km 6/10 - 7/700

In plains

TOTAL
(or)

0.20 Km
3.40 Km
1.60 Km
4.19 Km
1.30 Km
0.35 Km
11.04 Km
11.00 Km

Bitumen Lead to Mid Point

Km 6/10 - 7/700
Bitumen Lead to Mid Point
From Refinery to Tamil nadu border
ATPPC 99/6 - 40/0
Kamanaichenpalayam - Annur 0/0 - 13/2
NH 319/0 - 317/4
Karanampattai - Rasagoundenpalayam Road 0/0 - 4/190
Venkittapuram - Kalipalayam Road 9/0 - 7/700
Working Mailage Km 6/10 - 7/700

Bitumen to CMP Lead

Km 6/10 - 7/700
Bitumen to CMP Lead
From Refinery to Tamil nadu border
ATPPC 99/6 - 28/4
Palladam four Road to Vadugapalayam 0/ 0 - 0/6
Palladam Avinashi Pulliampatti 0/0 - 8/0
CT to CMP Site

CMP to Site Lead

In plains
146.75 Km
59.60 Km
13.20 Km
1.60 Km
4.19 Km
1.30 Km
0.35 Km
TOTAL A
226.99 Km
(or)
227.00 Km

In plains
146.75 Km
71.20 Km
0.60 Km
8.00 Km
0.20 Km
TOTAL
226.75 Km
(or)
227.00 Km

Km 6/10 - 7/700
CMP to Site Lead

In plains

Cart Track 0/0 - 0/2

0.20 Km

Km 19/6 of avinashi cochin road to Valaithottathu Ayyankoil 6/4 - 9/8


Palladam - Boomalur Road 11/0 - 7/0
Km 2/0 - of Palladam Boomalur road to Kalivelampatti

3.40 Km
9.00 Km
1.60 Km

Km 310/4 of Naigai Coodalore- Mysore Road to Semmipalayam (via)


Kalivelampatti Km 1/6 - 4/2
Venkittapuram - Kalipalayam Road 7/0
Working Mailage Km 6/10 - 7/700
TOTAL A

2.60 Km
0.00 Km
0.35 Km
17.15 Km

(or)

17.00 Km

Emulsion Lead (Irungattukottai)


Km 6/10 - 7/700
Sipcot Road Km 0/0 - 2/0
Irrunkattukottai to Ranipettai road km 112/4 - 34/8
Krishnagiri Ranipettai Road Km 145/4 - 49/2
Salem Thiruppattur - Vaniyambadi road Km 124/8 - 0/0
Salem Ulunderpet Road km 8/4 - 5/6
Seelanayakkanpatti Bye pass (NH Bye pass) Km 0/0 - 8/2
Salem - Madurai Road 207/6 - 205/2
NH 47 Km 0/0 - 77/0
Perundurai Town road KM 0/0 -7/1 (SH U111)
NH 47 Km 84/6 - 90/8
Tirupur-Vijayamangalam Road 0/0 - 24/4(SH-19A)
Avinashi-Tirupur-Palladam-Pollachi-Cochin(via) Meenkarai road km 12/227/300
Nagai - Gudalur - Mysore 306/250 - 310/4
Km 310/4 of NGM Semmipalayam (via) Kalivelampatti 0/0 - 4/2
Working Mailage Km 6/10 - 7/700
TOTAL
(or)
Bitumen Lead (Manali)
Km 6/10 - 7/700
TPP Road 2/6 - 1/6
Manali to Mathur Road 0/0 - 5/7
Madhavaram hills Road 0/0 - 4/6
NH 5 Km 11/0 - 11/5
Chennai Byepass km 0/0 - 32/2
Pulal to Thambaram Total Distance
Chennai Bye pass Road joints at Km 28/0 of GST Road (NH 45)
NH 45 Km 28/0 - 197/4
NH 68 Km 134/2 - 5/6
Seelanayakkanpatti Bye pass (NH Bye pass) Km 0/0 - 8/2
Salem - Madurai Road 207/6 - 205/2
NH 47 Km 0/0 - 77/0
Perundurai Town road KM 0/0 -7/1 (SH U111)
NH 47 Km 84/6 - 90/8
Tirupur-Vijayamangalam Road 0/0 - 24/4(SH-19A)
Avinashi-Tirupur-Palladam-Pollachi-Cochin(via) Meenkarai road km 12/227/300
Nagai - Gudalur - Mysore 306/250 - 310/4
Km 310/4 of NGM Semmipalayam (via) Kalivelampatti 0/0 - 4/2
Working Mailage Km 6/10 - 7/700
TOTAL
(or)

In plains
2.00
77.60
96.20
124.80
2.80
8.20
2.40
77.00
7.10
6.20
24.40

Km
Km
Km
Km
Km
Km
Km
Km
Km
Km
Km

15.10 Km
4.15 Km
4.20 Km
0.35 Km
452.50 Km
453.00 Km

In plains
1.00 Km
5.70 Km
4.60 Km
0.50 Km
32.20 Km
44.00 Km
169.40
128.60
8.20
2.40
77.00
7.10
6.20
24.60

Km
Km
Km
Km
Km
Km
Km
Km

15.10 Km
4.15 Km
4.20 Km
0.35 Km
491.30 Km
491.00 Km
38.00

Metal Lead
Km 7/700 - 8/2
Metal Lead
Cart Track 0/0 - 0/2
Kamanaichenpalayam - Annur 16/6 - 13/2
NH 319/0 - 317/4
Karanampattai - Rasagoundenpalayam Road 0/0 - 4/190
Venkittapuram - Kalipalayam Road 9/0 - 8/2
Working Mailage Km 7/700 - 8/2

In plains

TOTAL
(or)

0.20 Km
3.40 Km
1.60 Km
4.19 Km
0.80 Km
0.25 Km
10.44 Km
10.00 Km

Bitumen Lead to Mid Point

Km 7/700 - 8/2
Bitumen Lead to Mid Point
From Refinery to Tamil nadu border
ATPPC 99/6 - 40/0
Kamanaichenpalayam - Annur 0/0 - 13/2
NH 319/0 - 317/4
Karanampattai - Rasagoundenpalayam Road 0/0 - 4/190
Venkittapuram - Kalipalayam Road 9/0 - 8/2
Working Mailage Km 7/700 - 8/2

Bitumen to CMP Lead

Km 7/700 - 8/2
Bitumen to CMP Lead
From Refinery to Tamil nadu border
ATPPC 99/6 - 28/4
Palladam four Road to Vadugapalayam 0/ 0 - 0/6
Palladam Avinashi Pulliampatti 0/0 - 8/0
CT to CMP Site

CMP to Site Lead

In plains
146.75 Km
59.60 Km
13.20 Km
1.60 Km
4.19 Km
0.80 Km
0.25 Km
TOTAL A
226.39 Km
(or)
226.00 Km

In plains
146.75 Km
71.20 Km
0.60 Km
8.00 Km
0.20 Km
TOTAL
226.75 Km
(or)
227.00 Km

Km 7/700 - 8/2
CMP to Site Lead

In plains

Cart Track 0/0 - 0/2

0.20 Km

Km 19/6 of avinashi cochin road to Valaithottathu Ayyankoil 6/4 - 9/8


Palladam - Boomalur Road 11/0 - 7/0
Km 2/0 - of Palladam Boomalur road to Kalivelampatti

3.40 Km
9.00 Km
1.60 Km

Km 310/4 of Naigai Coodalore- Mysore Road to Semmipalayam (via)


Kalivelampatti Km 1/6 - 4/2
Venkittapuram - Kalipalayam Road 7/0 - 7/700
Working Mailage Km 7/700 - 8/2
TOTAL A

2.60 Km
0.70 Km
0.25 Km
17.75 Km

(or)

18.00 Km

Emulsion Lead (Irungattukottai)


Km 7/700 - 8/2
Sipcot Road Km 0/0 - 2/0
Irrunkattukottai to Ranipettai road km 112/4 - 34/8
Krishnagiri Ranipettai Road Km 145/4 - 49/2
Salem Thiruppattur - Vaniyambadi road Km 124/8 - 0/0
Salem Ulunderpet Road km 8/4 - 5/6
Seelanayakkanpatti Bye pass (NH Bye pass) Km 0/0 - 8/2
Salem - Madurai Road 207/6 - 205/2
NH 47 Km 0/0 - 77/0
Perundurai Town road KM 0/0 -7/1 (SH U111)
NH 47 Km 84/6 - 90/8
Tirupur-Vijayamangalam Road 0/0 - 24/4(SH-19A)
Avinashi-Tirupur-Palladam-Pollachi-Cochin(via) Meenkarai road km 12/227/300
Nagai - Gudalur - Mysore 306/250 - 310/4
Km 310/4 of NGM Semmipalayam (via) Kalivelampatti 0/0 - 4/2
Venkittapuram - Kalipalayam Road 7/0 - 7/700
Working Mailage Km 7/700 - 8/2
TOTAL
(or)
Bitumen Lead (Manali)
Km 7/700 - 8/2
TPP Road 2/6 - 1/6
Manali to Mathur Road 0/0 - 5/7
Madhavaram hills Road 0/0 - 4/6
NH 5 Km 11/0 - 11/5
Chennai Byepass km 0/0 - 32/2
Pulal to Thambaram Total Distance
Chennai Bye pass Road joints at Km 28/0 of GST Road (NH 45)
NH 45 Km 28/0 - 197/4
NH 68 Km 134/2 - 5/6
Seelanayakkanpatti Bye pass (NH Bye pass) Km 0/0 - 8/2
Salem - Madurai Road 207/6 - 205/2
NH 47 Km 0/0 - 77/0
Perundurai Town road KM 0/0 -7/1 (SH U111)
NH 47 Km 84/6 - 90/8
Tirupur-Vijayamangalam Road 0/0 - 24/4(SH-19A)
Avinashi-Tirupur-Palladam-Pollachi-Cochin(via) Meenkarai road km 12/227/300
Nagai - Gudalur - Mysore 306/250 - 310/4
Km 310/4 of NGM Semmipalayam (via) Kalivelampatti 0/0 - 4/2
Venkittapuram - Kalipalayam Road 7/0 - 7/700
Working Mailage Km 7/700 - 8/2
TOTAL
(or)

In plains
2.00
77.60
96.20
124.80
2.80
8.20
2.40
77.00
7.10
6.20
24.40

Km
Km
Km
Km
Km
Km
Km
Km
Km
Km
Km

15.10 Km
4.15 Km
4.20 Km
0.70 Km
0.25 Km
453.10 Km
453.00 Km

In plains
1.00 Km
5.70 Km
4.60 Km
0.50 Km
32.20 Km
44.00 Km
169.40
128.60
8.20
2.40
77.00
7.10
6.20
24.60

Km
Km
Km
Km
Km
Km
Km
Km

15.10 Km
4.15 Km
4.20 Km
0.70 Km
0.25 Km
491.90 Km
492.00 Km
39.00

Metal Lead
Km 8/2 - 8/4
Metal Lead
Cart Track 0/0 - 0/2
Kamanaichenpalayam - Annur 16/6 - 13/2
NH 319/0 - 317/4
Karanampattai - Rasagoundenpalayam Road 0/0 - 4/190
Venkittapuram - Kalipalayam Road 9/0 - 8/4
Working Mailage Km 8/2 - 8/4

In plains

TOTAL
(or)

0.20 Km
3.40 Km
1.60 Km
4.19 Km
0.60 Km
0.10 Km
10.09 Km
10.00 Km

Bitumen Lead to Mid Point

Km 8/2 - 8/4
Bitumen Lead to Mid Point
From Refinery to Tamil nadu border
ATPPC 99/6 - 40/0
Kamanaichenpalayam - Annur 0/0 - 13/2
NH 319/0 - 317/4
Karanampattai - Rasagoundenpalayam Road 0/0 - 4/190
Venkittapuram - Kalipalayam Road 9/0 - 8/4
Working Mailage Km 8/2 - 8/4

Bitumen to CMP Lead

Km 8/2 - 8/4
Bitumen to CMP Lead
From Refinery to Tamil nadu border
ATPPC 99/6 - 28/4
Palladam four Road to Vadugapalayam 0/ 0 - 0/6
Palladam Avinashi Pulliampatti 0/0 - 8/0
CT to CMP Site

CMP to Site Lead

In plains
146.75 Km
59.60 Km
13.20 Km
1.60 Km
4.19 Km
0.60 Km
0.10 Km
TOTAL A
226.04 Km
(or)
226.00 Km

In plains
146.75 Km
71.20 Km
0.60 Km
8.00 Km
0.20 Km
TOTAL
226.75 Km
(or)
227.00 Km

Km 8/2 - 8/4
CMP to Site Lead

In plains

Cart Track 0/0 - 0/2

0.20 Km

Km 19/6 of avinashi cochin road to Valaithottathu Ayyankoil 6/4 - 9/8


Palladam - Boomalur Road 11/0 - 7/0
Km 2/0 - of Palladam Boomalur road to Kalivelampatti

3.40 Km
9.00 Km
1.60 Km

Km 310/4 of Naigai Coodalore- Mysore Road to Semmipalayam (via)


Kalivelampatti Km 1/6 - 4/2
Venkittapuram - Kalipalayam Road 7/0 - 8/2
Working Mailage Km 8/2 - 8/4
TOTAL A

2.60 Km
1.20 Km
0.10 Km
18.10 Km

(or)

18.00 Km

Emulsion Lead (Irungattukottai)


Km 8/2 - 8/4
Sipcot Road Km 0/0 - 2/0
Irrunkattukottai to Ranipettai road km 112/4 - 34/8
Krishnagiri Ranipettai Road Km 145/4 - 49/2
Salem Thiruppattur - Vaniyambadi road Km 124/8 - 0/0
Salem Ulunderpet Road km 8/4 - 5/6
Seelanayakkanpatti Bye pass (NH Bye pass) Km 0/0 - 8/2
Salem - Madurai Road 207/6 - 205/2
NH 47 Km 0/0 - 77/0
Perundurai Town road KM 0/0 -7/1 (SH U111)
NH 47 Km 84/6 - 90/8
Tirupur-Vijayamangalam Road 0/0 - 24/4(SH-19A)
Avinashi-Tirupur-Palladam-Pollachi-Cochin(via) Meenkarai road km 12/227/300
Nagai - Gudalur - Mysore 306/250 - 310/4
Km 310/4 of NGM Semmipalayam (via) Kalivelampatti 0/0 - 4/2
Venkittapuram - Kalipalayam Road 7/0 - 8/2
Working Mailage Km 8/2 - 8/4
TOTAL
(or)
Bitumen Lead (Manali)
Km 8/2 - 8/4
TPP Road 2/6 - 1/6
Manali to Mathur Road 0/0 - 5/7
Madhavaram hills Road 0/0 - 4/6
NH 5 Km 11/0 - 11/5
Chennai Byepass km 0/0 - 32/2
Pulal to Thambaram Total Distance
Chennai Bye pass Road joints at Km 28/0 of GST Road (NH 45)
NH 45 Km 28/0 - 197/4
NH 68 Km 134/2 - 5/6
Seelanayakkanpatti Bye pass (NH Bye pass) Km 0/0 - 8/2
Salem - Madurai Road 207/6 - 205/2
NH 47 Km 0/0 - 77/0
Perundurai Town road KM 0/0 -7/1 (SH U111)
NH 47 Km 84/6 - 90/8
Tirupur-Vijayamangalam Road 0/0 - 24/4(SH-19A)
Avinashi-Tirupur-Palladam-Pollachi-Cochin(via) Meenkarai road km 12/227/300
Nagai - Gudalur - Mysore 306/250 - 310/4
Km 310/4 of NGM Semmipalayam (via) Kalivelampatti 0/0 - 4/2
Venkittapuram - Kalipalayam Road 7/0 - 8/2
Working Mailage Km 8/2 - 8/4
TOTAL
(or)

In plains
2.00
77.60
96.20
124.80
2.80
8.20
2.40
77.00
7.10
6.20
24.40

Km
Km
Km
Km
Km
Km
Km
Km
Km
Km
Km

15.10 Km
4.15 Km
4.20 Km
1.20 Km
0.10 Km
453.45 Km
453.00 Km

In plains
1.00 Km
5.70 Km
4.60 Km
0.50 Km
32.20 Km
44.00 Km
169.40
128.60
8.20
2.40
77.00
7.10
6.20
24.60

Km
Km
Km
Km
Km
Km
Km
Km

15.10 Km
4.15 Km
4.20 Km
1.20 Km
0.10 Km
492.25 Km
492.00 Km
39.00

Metal Lead
Km 8/4 - 9/0
Metal Lead
Cart Track 0/0 - 0/2
Kamanaichenpalayam - Annur 16/6 - 13/2
NH 319/0 - 317/4
Karanampattai - Rasagoundenpalayam Road 0/0 - 4/190
Venkittapuram - Kalipalayam Road 9/0
Working Mailage Km 8/4 - 9/0

In plains

TOTAL
(or)

0.20 Km
3.40 Km
1.60 Km
4.19 Km
0.00 Km
0.30 Km
9.69 Km
10.00 Km

Bitumen Lead to Mid Point

Km 8/4 - 9/0
Bitumen Lead to Mid Point
From Refinery to Tamil nadu border
ATPPC 99/6 - 40/0
Kamanaichenpalayam - Annur 0/0 - 13/2
NH 319/0 - 317/4
Karanampattai - Rasagoundenpalayam Road 0/0 - 4/190
Venkittapuram - Kalipalayam Road 9/0
Working Mailage Km 8/4 - 9/0

Bitumen to CMP Lead

Km 8/4 - 9/0
Bitumen to CMP Lead
From Refinery to Tamil nadu border
ATPPC 99/6 - 28/4
Palladam four Road to Vadugapalayam 0/ 0 - 0/6
Palladam Avinashi Pulliampatti 0/0 - 8/0
CT to CMP Site

CMP to Site Lead

In plains
146.75 Km
59.60 Km
13.20 Km
1.60 Km
4.19 Km
0.00 Km
0.30 Km
TOTAL A
225.64 Km
(or)
226.00 Km

In plains
146.75 Km
71.20 Km
0.60 Km
8.00 Km
0.20 Km
TOTAL
226.75 Km
(or)
227.00 Km

Km 8/4 - 9/0
CMP to Site Lead

In plains

Cart Track 0/0 - 0/2

0.20 Km

Km 19/6 of avinashi cochin road to Valaithottathu Ayyankoil 6/4 - 9/8


Palladam - Boomalur Road 11/0 - 7/0
Km 2/0 - of Palladam Boomalur road to Kalivelampatti

3.40 Km
9.00 Km
1.60 Km

Km 310/4 of Naigai Coodalore- Mysore Road to Semmipalayam (via)


Kalivelampatti Km 1/6 - 4/2
Venkittapuram - Kalipalayam Road 7/0 - 8/4
Working Mailage Km 8/4 - 9/0
TOTAL A

2.60 Km
1.40 Km
0.30 Km
18.50 Km

(or)

19.00 Km

Emulsion Lead (Irungattukottai)


Km 8/4 - 9/0
Sipcot Road Km 0/0 - 2/0
Irrunkattukottai to Ranipettai road km 112/4 - 34/8
Krishnagiri Ranipettai Road Km 145/4 - 49/2
Salem Thiruppattur - Vaniyambadi road Km 124/8 - 0/0
Salem Ulunderpet Road km 8/4 - 5/6
Seelanayakkanpatti Bye pass (NH Bye pass) Km 0/0 - 8/2
Salem - Madurai Road 207/6 - 205/2
NH 47 Km 0/0 - 77/0
Perundurai Town road KM 0/0 -7/1 (SH U111)
NH 47 Km 84/6 - 90/8
Tirupur-Vijayamangalam Road 0/0 - 24/4(SH-19A)
Avinashi-Tirupur-Palladam-Pollachi-Cochin(via) Meenkarai road km 12/227/300
Nagai - Gudalur - Mysore 306/250 - 310/4
Km 310/4 of NGM Semmipalayam (via) Kalivelampatti 0/0 - 4/2
Venkittapuram - Kalipalayam Road 7/0 - 8/4
Working Mailage Km 8/4 - 9/0
TOTAL
(or)
Bitumen Lead (Manali)
Km 8/4 - 9/0
TPP Road 2/6 - 1/6
Manali to Mathur Road 0/0 - 5/7
Madhavaram hills Road 0/0 - 4/6
NH 5 Km 11/0 - 11/5
Chennai Byepass km 0/0 - 32/2
Pulal to Thambaram Total Distance
Chennai Bye pass Road joints at Km 28/0 of GST Road (NH 45)
NH 45 Km 28/0 - 197/4
NH 68 Km 134/2 - 5/6
Seelanayakkanpatti Bye pass (NH Bye pass) Km 0/0 - 8/2
Salem - Madurai Road 207/6 - 205/2
NH 47 Km 0/0 - 77/0
Perundurai Town road KM 0/0 -7/1 (SH U111)
NH 47 Km 84/6 - 90/8
Tirupur-Vijayamangalam Road 0/0 - 24/4(SH-19A)
Avinashi-Tirupur-Palladam-Pollachi-Cochin(via) Meenkarai road km 12/227/300
Nagai - Gudalur - Mysore 306/250 - 310/4
Km 310/4 of NGM Semmipalayam (via) Kalivelampatti 0/0 - 4/2
Venkittapuram - Kalipalayam Road 7/0 - 8/4
Working Mailage Km 8/4 - 9/0
TOTAL
(or)

In plains
2.00
77.60
96.20
124.80
2.80
8.20
2.40
77.00
7.10
6.20
24.40

Km
Km
Km
Km
Km
Km
Km
Km
Km
Km
Km

15.10 Km
4.15 Km
4.20 Km
1.40 Km
0.30 Km
453.85 Km
454.00 Km

In plains
1.00 Km
5.70 Km
4.60 Km
0.50 Km
32.20 Km
44.00 Km
169.40
128.60
8.20
2.40
77.00
7.10
6.20
24.60

Km
Km
Km
Km
Km
Km
Km
Km

15.10 Km
4.15 Km
4.20 Km
1.40 Km
0.30 Km
492.65 Km
493.00 Km
39.00

NAME OF WORK: RESTORATION TO VENKITTAPURAM - KALIPALAYAM ROAD KM 6/1


(ODR)

Estimate Amount:R
SI.
No.

Description

Length
(m)

No.

Width
(m)

Excavation for Roadway and drainage Excavation including removal and satisfacto
of all materias necessary for the construction of roadway and side drains in accordan
specifications and the lines, grades and cross sections shown in the drawings or as in
the Engineer, as per MORTH Specification.
Km 7/0 - 9/0
Road Crossing at 7/300 (i)
Road Crossing at 7/300 (ii)
Km 7/600 - 7/700
2

x
x
x
x

1
1
1
1

685.00
25.00
20.00
100.00

2.00
2.00
2.00
2.00

Gravel Filling including cost and conveyance including labour charges for fillin
watering tamping under opumum moisture content to get the maximum density all
charges etc., complete With a lead of 1Km
Road Crossing at 7/300 (i)
Road Crossing at 7/300 (ii)
Km 7/600 - 7/700

1
1
1
1

1
1
1

x
x
x

1
1
1

25.00
20.00
100.00

2.00
2.00
1.75

Granular Sub-base with Graded Material (Table:- 400-1) - Plant Mix Method Cons
granular sub-base by providing close graded Material, mixing in a mechanical mix pla
carriage of mixed Material to work site, spreading in uniform layers with motor
prepared surface and compacting with vibratory power roller to achieve the desir
complete as per clause 401 of MORTH Specification- for grading- V Material
Road Crossing at 7/300 (i)
Road Crossing at 7/300 (ii)
Km 7/600 - 7/700

1
1
1

x
x
x

1
1
1

25.00
20.00
100.00

2.00
2.00
1.75

Wet Mix Macadam (Table 400-13) Providing, laying, spreading and compacting gr
aggregate to wet mix macadam specification including premixing the Material with wa
in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform
paver in sub- base / base course on well prepared surface and compacting with vibrato
achieve the desired density, Complete as per clause 406 of MORTH Specification.
Road Crossing at 7/300 (i)
Road Crossing at 7/300 (ii)
Km 7/600 - 7/700
5

1
1
1

25.00
20.00
100.00

2.00
2.00
1.75

1
1
1

x
x
x

1
1
1

25.00
20.00
100.00

2.00
2.00
1.75

Tack coat - Providing and applying tack coat with bitumen emulsion (RS-I t
emulsion pressure distributor at the rate of 0.25 kg per sqm on the
bituminous/granular surface cleaned with mechanical broom as per clause 503
Specification- over granular surfaces treated with primer
Road Crossing at 7/300 (i)
Road Crossing at 7/300 (ii)
Km 7/600 - 7/700

x
x
x

Prime coat Providing and applying primer coat with bitumen emulsion (SS-I type) o
surface of granular Base including clearing of road surface and spraying primer at
0.70 kg/sqm using mechanical means as per clause 502 of MORTH Specification over

Road Crossing at 7/300 (i)


Road Crossing at 7/300 (ii)
Km 7/600 - 7/700
6

1
1
1

1
1
1

x
x
x

1
1
1

25.00
20.00
100.00

2.00
2.00
1.75

Tack coat - Providing and applying tack coat with bitumen emulsion (RS-I t
emulsion pressure distributor at the rate of 0.20 kg per sqm on the
bituminous/granular surface cleaned with mechanical broom as per clause 503
Specification - over bituminous surfaces
Km 7/600 - 7/700

100.00

2.00

Providing and Laying 50mm thick Bituminous Macadam using course aggregate
bitumen which shall consist of construction in a single course base/binder course co
the specfication on a previously prepared base.(using Mini Hot Mix Plant and Pow
including cost of material, labour charges, rentals for machinery, fuel and all other
charges etc., complete as per clause 504 MORTH Rev-5 (Mix-in-place method)

Road Crossing at 7/300 (i)


Road Crossing at 7/300 (ii)
Km 7/600 - 7/700

1
1
1

x
x
x

1
1
1

25.00
20.00
100.00

2.00
2.00
1.75

Bituminous Concrete (Table 500-17) Providing and laying bituminous concrete wi


plant using crushed aggregates of specified grading, premixed with bituminous binder
Grade-30) at percentage specified by Job Mix Formula of mix and filler, transporting t
to work site, laying with a hydrostatic paver finisher to the required grade,
alignment,rolled as per clause 501.6 and 501.7 to achieve the desired compaction as
No. 507 of MORTH Specification complete in all respects - Grading II

Road Crossing at 7/300 (i)


Road Crossing at 7/300 (ii)
Km 7/600 - 7/700
10

1
1
1

x
x
x

1
1
1

25.00
20.00
100.00

2.00
2.00
3.75

Excavation for Roadway and drainage Excavation including removal and satisfacto
of all materias necessary for the construction of roadway and side drains in accordan
specifications and the lines, grades and cross sections shown in the drawings or as in
the Engineer, as per MORTH Specification. Formation of embankment using Box
including Compaction by power roller
Km 7/600 - 7/700

100.00

1.50

11

Excavation for Roadway and drainage Excavation including removal and satisfacto
of all materias necessary for the construction of roadway and side drains in accordan
specifications and the lines, grades and cross sections shown in the drawings or as in
the Engineer, as per MORTH Specification. Formation of embankment using Grave
Compaction by power roller
Km 6/10
Km 7/0 - 7/6

1
1

x
x

1
1

85.00
600.00

Assistant Divisional Engineer, (H)


,Palladam Sub Division
Palladam

2.00
2.00
Assistant Engineer, (H)
,Palladam Section
Palladam

ALAYAM ROAD KM 6/10 - 7/700


Estimate Amount:Rs.4,50,400
Depth
(m)

Quantity

g removal and satisfactory disposal


side drains in accordance with the
in the drawings or as indicated by

0.30
0.90
0.90
0.90

411.00
45.00
36.00
180.00
672.00

abour charges for filling inlayers,


he maximum density all incidental
0.50
0.50
0.50

25.00
20.00
87.50
132.50

Plant Mix Method Construction of


in a mechanical mix plant at OMC,
orm layers with motor grader on
ler to achieve the desired density,
ng- V Material
0.20
0.20
0.20

10.00
8.00
35.00
53.00

ding and compacting graded stone


ing the Material with water at OMC
o site, laying in uniform layers with
d compacting with vibratory roller to
RTH Specification.
0.15
0.15
0.15

7.50
6.00
26.25
39.75

n emulsion (SS-I type) on prepared


and spraying primer at the rate of
MORTH Specification over WMM

50.00
40.00
175.00
265.00

men emulsion (RS-I type) using


kg per sqm on the prepared
om as per clause 503 of MORTH
50.00
40.00
175.00
265.00

men emulsion (RS-I type) using


kg per sqm on the prepared
om as per clause 503 of MORTH
200.00
200.00

using course aggregate and VG30


e base/binder course confirming to
Hot Mix Plant and Power Roller)
inery, fuel and all other incidental
n-place method)

0.05
0.05
0.05

2.50
2.00
8.75
13.25

bituminous concrete with hot mix


with bituminous binder (Viscosity
and filler, transporting the hot mix
o the required grade, level and
e desired compaction as per clause
ding II

0.03
0.03
0.03

1.50
1.20
11.25
13.95

g removal and satisfactory disposal


side drains in accordance with the
in the drawings or as indicated by
mbankment using Box cut earth

0.15

22.50
22.50

g removal and satisfactory disposal


side drains in accordance with the
in the drawings or as indicated by
mbankment using Gravel including

0.30
0.30
Assistant Engineer, (H)
,Palladam Section
Palladam

51.00
360.00
411.00

NAME OF WORK: RESTORATION TO VENKITTAPURAM - KALIPALAYAM ROAD KM 6/10


ABSTRACT ESTIMATE
SI.
No

Description of Work

Quantity

Excavation
for
Roadway
and
drainage
Excavation including removal and satisfactory
disposal of all materias necessary for the
construction of roadway and side drains in
accordance with the specifications and the lines,
grades and cross sections shown in the drawings
or as indicated by the Engineer, as per MORTH
Specification.

672.00 m3

Gravel Filling including cost and conveyance


including labour charges for filling inlayers,
watering tamping under opumum moisture
content to get the maximum density all incidental
charges etc., With a lead of 1 Km

132.50 m3

Granular Sub-base with Graded Material (Table:400-1) - Plant Mix Method Construction of
granular sub-base by providing close graded
Material, mixing in a mechanical mix plant at
OMC, carriage of mixed Material to work site,
spreading in uniform layers with motor grader on
prepared surface and compacting with vibratory
power roller to achieve the desired density,
complete as per clause 401 of MORTH
Specification- for grading- V Material

53.00 m3

Estimate A

SI.
No

Description of Work

Quantity

4
Wet Mix Macadam (Table 400-13) Providing,
laying, spreading and compacting graded stone
aggregate to wet mix macadam specification
including premixing the Material with water at
OMC in mechanical mix plant carriage of mixed
Material by tipper to site, laying in uniform layers
with paver in sub- base / base course on well
prepared surface and compacting with vibratory
roller to achieve the desired density, Complete as
per clause 406 of MORTH Specification.

39.75 m3

Prime coat Providing and applying primer coat


with bitumen emulsion (SS-I type) on prepared
surface of granular Base including clearing of road
surface and spraying primer at the rate of 0.70
kg/sqm using mechanical means as per clause
502 of MORTH Specification over WMM

265.00 m2

Tack coat - Providing and applying tack coat with


bitumen emulsion (RS-I type) using emulsion
pressure distributor at the rate of 0.25 kg per
sqm on the prepared bituminous/granular
surface cleaned with mechanical broom as per
clause 503 of MORTH Specification- over
granular surfaces treated with primer

265.00 m2

Tack coat - Providing and applying tack coat with


bitumen emulsion (RS-I type) using emulsion
pressure distributor at the rate of 0.20 kg per
sqm on the prepared bituminous/granular surface
cleaned with mechanical broom as per clause 503
of MORTH Specification - over bituminous
surfaces

200.00 m2

SI.
No

Description of Work

Quantity

8
Providing and Laying 50mm thick Bituminous
Macadam using course aggregate and VG30
bitumen which shall consist of construction in a
single course base/binder course confirming to
the specfication on a previously prepared base.
(using Mini Hot Mix Plant and Power Roller)
including cost of material, labour charges, rentals
for machinery, fuel and all other incidental
charges etc., complete as per clause 504 MORTH
Rev-5 (Mix-in-place method)

13.25 m3

Bituminous Concrete (Table 500-17) Providing


and laying bituminous concrete with hot mix
plant using crushed aggregates of specified
grading, premixed with bituminous binder
(Viscosity Grade-30) at percentage specified by
Job Mix Formula of mix and filler, transporting
the hot mix to work site, laying with a hydrostatic
paver finisher to the required grade, level and
alignment,rolled as per clause 501.6 and 501.7 to
achieve the desired compaction as per clause No.
507 of MORTH Specification complete in all
respects - Grading II

13.95 m3

SI.
No
11

Description of Work

Quantity

Excavation
for
Roadway
and
drainage
Excavation including removal and satisfactory
disposal of all materias necessary for the
construction of roadway and side drains in
accordance with the specifications and the lines,
grades and cross sections shown in the drawings
or as indicated by the Engineer, as per MORTH
Specification. Formation of embankment using
Box cut earth including Compaction by power
roller

22.50 m3

Excavation
for
Roadway
and
drainage
Excavation including removal and satisfactory
disposal of all materias necessary for the
construction of roadway and side drains in
accordance with the specifications and the lines,
grades and cross sections shown in the drawings
or as indicated by the Engineer, as per MORTH
Specification. Formation of embankment using
Gravel including Compaction by power roller
with a lead of 1km

411.00 m3

12

Total
13 Provision for Labour Welfare Fund 1%

14 Provision for Quality Control Charges and centage


Charges
Contingencies

GRAND TOTAL

PALAYAM ROAD KM 6/10 - 7/700 (ODR)

ATE

Estimate Amount:Rs.4,50,400

Rate

Amount

50.60/m3

34003

205.05/m3

27169

1155.35/m3

61234

Rate

Amount

1353.32/m3

53794

61.67/m3

16343

11.93/m3

3161

14.52/m3

2904

Rate

Amount

4911.30/m3

65075

6673.78/m3

93099

Rate

Amount

12.85/m3

289

205.05/m3

84276

441347

4504

4413
136
GRAND TOTAL

450400

NAME OF WORK: RESTORATION TO VENKITTAPURAM - KALIPALAYAM ROAD KM 7/


(ODR)

Estimate Amount: Rs.8


SI.
No.

Description

Length
(m)

No.

Width
(m)

Excavation for Roadway and drainage Excavation including removal and satisfacto
of all materias necessary for the construction of roadway and side drains in accordan
specifications and the lines, grades and cross sections shown in the drawings or as in
the Engineer, as per MORTH Specification.
Km 7/700 - 7/900
Km 7/900 - 8/100
Km 8/100 - 8/2
2

x
x
x

1
1
1

200.00
200.00
100.00

2.00
2.00
2.00

Gravel Filling including cost and conveyance including labour charges for fillin
watering tamping under opumum moisture content to get the maximum density all
charges etc., complete With a lead of 1Km
Km 7/900 - 8/100
Km 8/100 - 8/2

1
1
1

1
1

x
x

1
1

200.00
100.00

2.50
1.50

Granular Sub-base with Graded Material (Table:- 400-1) - Plant Mix Method Cons
granular sub-base by providing close graded Material, mixing in a mechanical mix pla
carriage of mixed Material to work site, spreading in uniform layers with motor
prepared surface and compacting with vibratory power roller to achieve the desir
complete as per clause 401 of MORTH Specification- for grading- V Material
Km 7/900 - 8/100
Km 8/100 - 8/2

1
1

x
x

1
1

200.00
100.00

2.50
1.50

Wet Mix Macadam (Table 400-13) Providing, laying, spreading and compacting gr
aggregate to wet mix macadam specification including premixing the Material with wa
in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform
paver in sub- base / base course on well prepared surface and compacting with vibrato
achieve the desired density, Complete as per clause 406 of MORTH Specification.

Km 7/900 - 8/100
Km 8/100 - 8/2
5

1
1

200.00
100.00

2.50
1.50

1
1

x
x

1
1

200.00
100.00

2.50
1.50

Tack coat - Providing and applying tack coat with bitumen emulsion (RS-I t
emulsion pressure distributor at the rate of 0.25 kg per sqm on the
bituminous/granular surface cleaned with mechanical broom as per clause 503
Specification- over granular surfaces treated with primer
Km 7/900 - 8/100
Km 8/100 - 8/2

x
x

Prime coat Providing and applying primer coat with bitumen emulsion (SS-I type) o
surface of granular Base including clearing of road surface and spraying primer at
0.70 kg/sqm using mechanical means as per clause 502 of MORTH Specification over

Km 7/900 - 8/100
Km 8/100 - 8/2
6

1
1

1
1

x
x

1
1

200.00
100.00

2.50
1.50

Tack coat - Providing and applying tack coat with bitumen emulsion (RS-I t
emulsion pressure distributor at the rate of 0.20 kg per sqm on the
bituminous/granular surface cleaned with mechanical broom as per clause 503
Specification - over bituminous surfaces
Km 7/900 - 8/100
Km 8/100 - 8/2

1
1

x
x

1
1

200.00
100.00

1.25
2.25

Providing and Laying 50mm thick Bituminous Macadam using course aggregate
bitumen which shall consist of construction in a single course base/binder course co
the specfication on a previously prepared base.(using Mini Hot Mix Plant and Pow
including cost of material, labour charges, rentals for machinery, fuel and all other
charges etc., complete as per clause 504 MORTH Rev-5 (Mix-in-place method)
Km 7/900 - 8/100
Km 8/100 - 8/2

1
1

x
x

1
1

200.00
100.00

2.50
1.50

Bituminous Concrete (Table 500-17) Providing and laying bituminous concrete wi


plant using crushed aggregates of specified grading, premixed with bituminous binder
Grade-30) at percentage specified by Job Mix Formula of mix and filler, transporting t
to work site, laying with a hydrostatic paver finisher to the required grade,
alignment,rolled as per clause 501.6 and 501.7 to achieve the desired compaction as
No. 507 of MORTH Specification complete in all respects - Grading II

Km 7/900 - 8/100
Km 8/100 - 8/2
10

1
1

x
x

1
1

200.00
100.00

3.75
3.75

Excavation for Roadway and drainage Excavation including removal and satisfacto
of all materias necessary for the construction of roadway and side drains in accordan
specifications and the lines, grades and cross sections shown in the drawings or as in
the Engineer, as per MORTH Specification. Formation of embankment using Box
including Compaction by power roller
Km 7/900 - 8/100
Km 8/100 - 8/2

1
1

x
x

1
1

200.00
100.00

1.50
1.50

11

Excavation for Roadway and drainage Excavation including removal and satisfacto
of all materias necessary for the construction of roadway and side drains in accordan
specifications and the lines, grades and cross sections shown in the drawings or as in
the Engineer, as per MORTH Specification. Formation of embankment using Gravel
Compaction by power roller with a lead of 1 Km
Km 7/700 - 7/900

200.00

Assistant Divisional Engineer, (H)


,Palladam Sub Division
Palladam

2.00
Assistant Engineer, (H)
,Palladam Section
Palladam

PALAYAM ROAD KM 7/700 - 8/2


Estimate Amount: Rs.8,62,500/Depth
(m)

Quantity

g removal and satisfactory disposal


side drains in accordance with the
in the drawings or as indicated by

0.30
0.90
0.90

120.00
360.00
180.00
660.00

abour charges for filling inlayers,


he maximum density all incidental
0.50
0.50

250.00
75.00
325.00

Plant Mix Method Construction of


in a mechanical mix plant at OMC,
orm layers with motor grader on
ler to achieve the desired density,
ng- V Material
0.20
0.20

100.00
30.00
130.00

ding and compacting graded stone


ing the Material with water at OMC
o site, laying in uniform layers with
d compacting with vibratory roller to
RTH Specification.

0.15
0.15

75.00
22.50
97.50

n emulsion (SS-I type) on prepared


and spraying primer at the rate of
MORTH Specification over WMM

500.00
150.00
650.00

men emulsion (RS-I type) using


kg per sqm on the prepared
om as per clause 503 of MORTH
500.00
150.00
650.00

men emulsion (RS-I type) using


kg per sqm on the prepared
om as per clause 503 of MORTH
250.00
225.00
475.00

using course aggregate and VG30


e base/binder course confirming to
Hot Mix Plant and Power Roller)
inery, fuel and all other incidental
n-place method)
0.05
0.05

25.00
7.50
32.50

bituminous concrete with hot mix


with bituminous binder (Viscosity
and filler, transporting the hot mix
o the required grade, level and
e desired compaction as per clause
ding II

0.03
0.03

22.50
11.25
33.75

g removal and satisfactory disposal


side drains in accordance with the
in the drawings or as indicated by
mbankment using Box cut earth

0.15
0.15

45.00
22.50
67.50

g removal and satisfactory disposal


side drains in accordance with the
in the drawings or as indicated by
bankment using Gravel including

0.30
Assistant Engineer, (H)
,Palladam Section
Palladam

120.00
120.00

NAME OF WORK: RESTORATION TO VENKITTAPURAM - KALIPALAYAM ROAD KM 7/70


ABSTRACT ESTIMATE
SI.
No

Description of Work

Quantity

Excavation
for
Roadway
and
drainage
Excavation including removal and satisfactory
disposal of all materias necessary for the
construction of roadway and side drains in
accordance with the specifications and the lines,
grades and cross sections shown in the drawings
or as indicated by the Engineer, as per MORTH
Specification.

660.00 m3

Gravel Filling including cost and conveyance


including labour charges for filling inlayers,
watering tamping under opumum moisture
content to get the maximum density all incidental
charges etc., With a lead of 1 Km

325.00 m3

Granular Sub-base with Graded Material (Table:400-1) - Plant Mix Method Construction of
granular sub-base by providing close graded
Material, mixing in a mechanical mix plant at
OMC, carriage of mixed Material to work site,
spreading in uniform layers with motor grader on
prepared surface and compacting with vibratory
power roller to achieve the desired density,
complete as per clause 401 of MORTH
Specification- for grading- V Material

130.00 m3

Estimate Amo

SI.
No

Description of Work

Quantity

4
Wet Mix Macadam (Table 400-13) Providing,
laying, spreading and compacting graded stone
aggregate to wet mix macadam specification
including premixing the Material with water at
OMC in mechanical mix plant carriage of mixed
Material by tipper to site, laying in uniform layers
with paver in sub- base / base course on well
prepared surface and compacting with vibratory
roller to achieve the desired density, Complete as
per clause 406 of MORTH Specification.

97.50 m3

Prime coat Providing and applying primer coat


with bitumen emulsion (SS-I type) on prepared
surface of granular Base including clearing of road
surface and spraying primer at the rate of 0.70
kg/sqm using mechanical means as per clause
502 of MORTH Specification over WMM

650.00 m2

Tack coat - Providing and applying tack coat with


bitumen emulsion (RS-I type) using emulsion
pressure distributor at the rate of 0.25 kg per
sqm on the prepared bituminous/granular
surface cleaned with mechanical broom as per
clause 503 of MORTH Specification- over
granular surfaces treated with primer

650.00 m2

Tack coat - Providing and applying tack coat with


bitumen emulsion (RS-I type) using emulsion
pressure distributor at the rate of 0.20 kg per
sqm on the prepared bituminous/granular surface
cleaned with mechanical broom as per clause 503
of MORTH Specification - over bituminous
surfaces

475.00 m2

SI.
No

Description of Work

Quantity

8
Providing and Laying 50mm thick Bituminous
Macadam using course aggregate and VG30
bitumen which shall consist of construction in a
single course base/binder course confirming to
the specfication on a previously prepared base.
(using Mini Hot Mix Plant and Power Roller)
including cost of material, labour charges, rentals
for machinery, fuel and all other incidental
charges etc., complete as per clause 504 MORTH
Rev-5 (Mix-in-place method)

32.50 m3

Bituminous Concrete (Table 500-17) Providing


and laying bituminous concrete with hot mix
plant using crushed aggregates of specified
grading, premixed with bituminous binder
(Viscosity Grade-30) at percentage specified by
Job Mix Formula of mix and filler, transporting
the hot mix to work site, laying with a hydrostatic
paver finisher to the required grade, level and
alignment,rolled as per clause 501.6 and 501.7 to
achieve the desired compaction as per clause No.
507 of MORTH Specification complete in all
respects - Grading II

33.75 m3

SI.
No
11

Description of Work

Quantity

Excavation
for
Roadway
and
drainage
Excavation including removal and satisfactory
disposal of all materias necessary for the
construction of roadway and side drains in
accordance with the specifications and the lines,
grades and cross sections shown in the drawings
or as indicated by the Engineer, as per MORTH
Specification. Formation of embankment using
Box cut earth including Compaction by power
roller

67.50 m3

Excavation
for
Roadway
and
drainage
Excavation including removal and satisfactory
disposal of all materias necessary for the
construction of roadway and side drains in
accordance with the specifications and the lines,
grades and cross sections shown in the drawings
or as indicated by the Engineer, as per MORTH
Specification. Formation of embankment using
Gravel including Compaction by power roller
with a lead of 1km

120.00 m3

12

Total
13 Provision for Labour Welfare Fund 1%

14 Provision for Quality Control Charges and Centage


Charges
Contingencies

GRAND TOTAL

PALAYAM ROAD KM 7/700 - 8/2 (ODR)

ATE

Estimate Amount: Rs.8,62,500/-

Rate

Amount

50.60/m3

33396

205.05/m3

66641

1159.75/m3

150768

Rate

Amount

1353.32/m3

131949

61.67/m3

40086

11.93/m3

7755

14.52/m3

6897

Rate

Amount

4900.54/m3

159268

6673.78/m3

225240

Rate

Amount

12.85/m3

867

205.05/m3

24606

847473

8625

6275
127
GRAND TOTAL

862500

NAME OF WORK: RESTORATION TO VENKITTAPURAM - KALIPALAYAM ROAD KM


(ODR)

Estimate Amount: Rs.4


SI.
No.

Description

Length
(m)

No.

Width
(m)

Excavation for Roadway and drainage Excavation including removal and satisfacto
of all materias necessary for the construction of roadway and side drains in accordan
specifications and the lines, grades and cross sections shown in the drawings or as in
the Engineer, as per MORTH Specification.
Km 8/2 - 8/300
Km 8/300 - 8/4
2

x
x

1
1

100.00
100.00

2.00
2.00

Gravel Filling including cost and conveyance including labour charges for fillin
watering tamping under opumum moisture content to get the maximum density all
charges etc., complete With a lead of 1Km
Km 8/2 - 8/300
Km 8/300 - 8/4

1
1

1
1

x
x

1
1

100.00
100.00

1.30
1.30

Granular Sub-base with Graded Material (Table:- 400-1) - Plant Mix Method Cons
granular sub-base by providing close graded Material, mixing in a mechanical mix pla
carriage of mixed Material to work site, spreading in uniform layers with motor
prepared surface and compacting with vibratory power roller to achieve the desir
complete as per clause 401 of MORTH Specification- for grading- V Material
Km 8/2 - 8/300
Km 8/300 - 8/4

1
1

x
x

1
1

100.00
100.00

1.30
1.30

Wet Mix Macadam (Table 400-13) Providing, laying, spreading and compacting gr
aggregate to wet mix macadam specification including premixing the Material with wa
in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform
paver in sub- base / base course on well prepared surface and compacting with vibrato
achieve the desired density, Complete as per clause 406 of MORTH Specification.
Km 8/2 - 8/300

100.00

1.30

Km 8/300 - 8/4
5

100.00

1.30

1
1

x
x

1
1

100.00
100.00

1.30
1.30

Tack coat - Providing and applying tack coat with bitumen emulsion (RS-I t
emulsion pressure distributor at the rate of 0.25 kg per sqm on the
bituminous/granular surface cleaned with mechanical broom as per clause 503
Specification- over granular surfaces treated with primer
Km 8/2 - 8/300
Km 8/300 - 8/4

Prime coat Providing and applying primer coat with bitumen emulsion (SS-I type) o
surface of granular Base including clearing of road surface and spraying primer at
0.70 kg/sqm using mechanical means as per clause 502 of MORTH Specification over

Km 8/2 - 8/300
Km 8/300 - 8/4
6

1
1

x
x

1
1

100.00
100.00

1.30
1.30

Tack coat - Providing and applying tack coat with bitumen emulsion (RS-I t
emulsion pressure distributor at the rate of 0.20 kg per sqm on the
bituminous/granular surface cleaned with mechanical broom as per clause 503
Specification - over bituminous surfaces
Km 8/2 - 8/300
Km 8/300 - 8/4

1
1

x
x

1
1

100.00
100.00

2.45
2.45

Providing and Laying 50mm thick Bituminous Macadam using course aggregate
bitumen which shall consist of construction in a single course base/binder course co
the specfication on a previously prepared base.(using Mini Hot Mix Plant and Pow
including cost of material, labour charges, rentals for machinery, fuel and all other
charges etc., complete as per clause 504 MORTH Rev-5 (Mix-in-place method)
Km 8/2 - 8/300
Km 8/300 - 8/4

1
1

x
x

1
1

100.00
100.00

1.30
1.30

Bituminous Concrete (Table 500-17) Providing and laying bituminous concrete wi


plant using crushed aggregates of specified grading, premixed with bituminous binder
Grade-30) at percentage specified by Job Mix Formula of mix and filler, transporting t
to work site, laying with a hydrostatic paver finisher to the required grade,
alignment,rolled as per clause 501.6 and 501.7 to achieve the desired compaction as
No. 507 of MORTH Specification complete in all respects - Grading II

Km 8/2 - 8/300
Km 8/300 - 8/4
10

1
1

x
x

1
1

100.00
100.00

3.75
3.75

Excavation for Roadway and drainage Excavation including removal and satisfacto
of all materias necessary for the construction of roadway and side drains in accordan
specifications and the lines, grades and cross sections shown in the drawings or as in
the Engineer, as per MORTH Specification. Formation of embankment using Box
including Compaction by power roller
Km 8/2 - 8/300
Km 8/300 - 8/4

1
1

x
x

1
1

Assistant Divisional Engineer, (H)


,Palladam Sub Division
Palladam

100.00
100.00

1.50
1.50

Assistant Engineer, (H)


,Palladam Section
Palladam

IPALAYAM ROAD KM 8/2 - 8/4


Estimate Amount: Rs.4,05,500/Depth
(m)

Quantity

g removal and satisfactory disposal


side drains in accordance with the
in the drawings or as indicated by

0.90
0.90

180.00
180.00
360.00

abour charges for filling inlayers,


he maximum density all incidental
0.50
0.50

65.00
65.00
130.00

Plant Mix Method Construction of


in a mechanical mix plant at OMC,
orm layers with motor grader on
ler to achieve the desired density,
ng- V Material
0.20
0.20

26.00
26.00
52.00

ding and compacting graded stone


ing the Material with water at OMC
o site, laying in uniform layers with
d compacting with vibratory roller to
RTH Specification.
0.15

19.50

0.15

19.50
39.00

n emulsion (SS-I type) on prepared


and spraying primer at the rate of
MORTH Specification over WMM

130.00
130.00
260.00

men emulsion (RS-I type) using


kg per sqm on the prepared
om as per clause 503 of MORTH
130.00
130.00
260.00

men emulsion (RS-I type) using


kg per sqm on the prepared
om as per clause 503 of MORTH
245.00
245.00
490.00

using course aggregate and VG30


e base/binder course confirming to
Hot Mix Plant and Power Roller)
inery, fuel and all other incidental
n-place method)
0.05
0.05

6.50
6.50
13.00

bituminous concrete with hot mix


with bituminous binder (Viscosity
and filler, transporting the hot mix
o the required grade, level and
e desired compaction as per clause
ding II

0.03
0.03

11.25
11.25
22.50

g removal and satisfactory disposal


side drains in accordance with the
in the drawings or as indicated by
mbankment using Box cut earth

0.15
0.15

Assistant Engineer, (H)


,Palladam Section
Palladam

22.50
22.50
45.00

NAME OF WORK: RESTORATION TO VENKITTAPURAM - KALIPALAYAM ROAD KM 8/2 ABSTRACT ESTIMATE


SI.
No

Description of Work

Quantity

Excavation
for
Roadway
and
drainage
Excavation including removal and satisfactory
disposal of all materias necessary for the
construction of roadway and side drains in
accordance with the specifications and the lines,
grades and cross sections shown in the drawings
or as indicated by the Engineer, as per MORTH
Specification.

360.00 m3

Gravel Filling including cost and conveyance


including labour charges for filling inlayers,
watering tamping under opumum moisture
content to get the maximum density all incidental
charges etc., With a lead of 1 Km

130.00 m3

Granular Sub-base with Graded Material (Table:400-1) - Plant Mix Method Construction of
granular sub-base by providing close graded
Material, mixing in a mechanical mix plant at
OMC, carriage of mixed Material to work site,
spreading in uniform layers with motor grader on
prepared surface and compacting with vibratory
power roller to achieve the desired density,
complete as per clause 401 of MORTH
Specification- for grading- V Material

52.00 m3

Estimate Amo

SI.
No

Description of Work

Quantity

4
Wet Mix Macadam (Table 400-13) Providing,
laying, spreading and compacting graded stone
aggregate to wet mix macadam specification
including premixing the Material with water at
OMC in mechanical mix plant carriage of mixed
Material by tipper to site, laying in uniform layers
with paver in sub- base / base course on well
prepared surface and compacting with vibratory
roller to achieve the desired density, Complete as
per clause 406 of MORTH Specification.

39.00 m3

Prime coat Providing and applying primer coat


with bitumen emulsion (SS-I type) on prepared
surface of granular Base including clearing of road
surface and spraying primer at the rate of 0.70
kg/sqm using mechanical means as per clause
502 of MORTH Specification over WMM

260.00 m2

Tack coat - Providing and applying tack coat with


bitumen emulsion (RS-I type) using emulsion
pressure distributor at the rate of 0.25 kg per
sqm on the prepared bituminous/granular
surface cleaned with mechanical broom as per
clause 503 of MORTH Specification- over
granular surfaces treated with primer

260.00 m2

Tack coat - Providing and applying tack coat with


bitumen emulsion (RS-I type) using emulsion
pressure distributor at the rate of 0.20 kg per
sqm on the prepared bituminous/granular surface
cleaned with mechanical broom as per clause 503
of MORTH Specification - over bituminous
surfaces

490.00 m2

SI.
No

Description of Work

Quantity

8
Providing and Laying 50mm thick Bituminous
Macadam using course aggregate and VG30
bitumen which shall consist of construction in a
single course base/binder course confirming to
the specfication on a previously prepared base.
(using Mini Hot Mix Plant and Power Roller)
including cost of material, labour charges, rentals
for machinery, fuel and all other incidental
charges etc., complete as per clause 504 MORTH
Rev-5 (Mix-in-place method)

13.00 m3

Bituminous Concrete (Table 500-17) Providing


and laying bituminous concrete with hot mix
plant using crushed aggregates of specified
grading, premixed with bituminous binder
(Viscosity Grade-30) at percentage specified by
Job Mix Formula of mix and filler, transporting
the hot mix to work site, laying with a hydrostatic
paver finisher to the required grade, level and
alignment,rolled as per clause 501.6 and 501.7 to
achieve the desired compaction as per clause No.
507 of MORTH Specification complete in all
respects - Grading II

22.50 m3

SI.
No
11

Description of Work

Quantity

Excavation
for
Roadway
and
drainage
Excavation including removal and satisfactory
disposal of all materias necessary for the
construction of roadway and side drains in
accordance with the specifications and the lines,
grades and cross sections shown in the drawings
or as indicated by the Engineer, as per MORTH
Specification. Formation of embankment using
Box cut earth including Compaction by power
roller

45.00 m3

Total
13 Provision for Labour Welfare Fund 1%

14 Provision for Quality Control Charges and Centage


Charges
Contingencies

GRAND TOTAL

PALAYAM ROAD KM 8/2 - 8/4 (ODR)

ATE

Estimate Amount: Rs.4,05,500/-

Rate

Amount

50.60/m3

18216

205.05/m3

26657

1159.75/m3

60307

Rate

Amount

1353.32/m3

52779

61.67/m3

16034

11.93/m3

3102

14.52/m3

7115

Rate

Amount

4900.54/m3

63707

6673.78/m3

150160

Rate

12.85/m3

Amount

578

398655

4055

2737
53
GRAND TOTAL

405500

NAME OF WORK: RESTORATION TO VENKITTAPURAM - KALIPALAYAM ROAD KM


(ODR)

Estimate Amount: Rs.7


SI.
No.

Description

Length
(m)

No.

Width
(m)

Excavation for Roadway and drainage Excavation including removal and satisfacto
of all materias necessary for the construction of roadway and side drains in accordan
specifications and the lines, grades and cross sections shown in the drawings or as in
the Engineer, as per MORTH Specification.
Km 8/4 - 8/750
Km 8/750 - 9/0
2

x
x

1
1

340.00
260.00

2.00
2.00

Gravel Filling including cost and conveyance including labour charges for fillin
watering tamping under opumum moisture content to get the maximum density all
charges etc., complete With a lead of 1Km
Km 8/750 - 9/0

1
1

260.00

2.00

Granular Sub-base with Graded Material (Table:- 400-1) - Plant Mix Method Cons
granular sub-base by providing close graded Material, mixing in a mechanical mix pla
carriage of mixed Material to work site, spreading in uniform layers with motor
prepared surface and compacting with vibratory power roller to achieve the desir
complete as per clause 401 of MORTH Specification- for grading- V Material
Km 8/750 - 9/0

260.00

2.00

Wet Mix Macadam (Table 400-13) Providing, laying, spreading and compacting gr
aggregate to wet mix macadam specification including premixing the Material with wa
in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform
paver in sub- base / base course on well prepared surface and compacting with vibrato
achieve the desired density, Complete as per clause 406 of MORTH Specification.
Km 8/750 - 9/0

260.00

2.00

Prime coat Providing and applying primer coat with bitumen emulsion (SS-I type) o
surface of granular Base including clearing of road surface and spraying primer at
0.70 kg/sqm using mechanical means as per clause 502 of MORTH Specification over

Km 8/750 - 9/0
6

260.00

2.00

Tack coat - Providing and applying tack coat with bitumen emulsion (RS-I t
emulsion pressure distributor at the rate of 0.25 kg per sqm on the
bituminous/granular surface cleaned with mechanical broom as per clause 503
Specification- over granular surfaces treated with primer
Km 8/750 - 9/0

260.00

2.00

Tack coat - Providing and applying tack coat with bitumen emulsion (RS-I t
emulsion pressure distributor at the rate of 0.20 kg per sqm on the
bituminous/granular surface cleaned with mechanical broom as per clause 503
Specification - over bituminous surfaces
Km 8/750 - 9/0

260.00

1.75

Providing and Laying 50mm thick Bituminous Macadam using course aggregate
bitumen which shall consist of construction in a single course base/binder course co
the specfication on a previously prepared base.(using Mini Hot Mix Plant and Pow
including cost of material, labour charges, rentals for machinery, fuel and all other
charges etc., complete as per clause 504 MORTH Rev-5 (Mix-in-place method)
Km 8/750 - 9/0

260.00

2.00

Bituminous Concrete (Table 500-17) Providing and laying bituminous concrete wi


plant using crushed aggregates of specified grading, premixed with bituminous binder
Grade-30) at percentage specified by Job Mix Formula of mix and filler, transporting t
to work site, laying with a hydrostatic paver finisher to the required grade,
alignment,rolled as per clause 501.6 and 501.7 to achieve the desired compaction as
No. 507 of MORTH Specification complete in all respects - Grading II

Km 8/750 - 9/0
10

260.00

3.75

Excavation for Roadway and drainage Excavation including removal and satisfacto
of all materias necessary for the construction of roadway and side drains in accordan
specifications and the lines, grades and cross sections shown in the drawings or as in
the Engineer, as per MORTH Specification. Formation of embankment using Box
including Compaction by power roller
Km 8/750 - 9/0

260.00

1.50

11

Excavation for Roadway and drainage Excavation including removal and satisfacto
of all materias necessary for the construction of roadway and side drains in accordan
specifications and the lines, grades and cross sections shown in the drawings or as in
the Engineer, as per MORTH Specification. Formation of embankment using Gravel
Compaction by power roller
Km 8/4 - 8/750

Assistant Divisional Engineer, (H)


,Palladam Sub Division
Palladam

340.00

2.00

Assistant Engineer, (H)


,Palladam Section
Palladam

IPALAYAM ROAD KM 8/2 - 8/4


Estimate Amount: Rs.7,41,700/Depth
(m)

Quantity

g removal and satisfactory disposal


side drains in accordance with the
in the drawings or as indicated by

0.30
0.90

204.00
468.00
672.00

abour charges for filling inlayers,


he maximum density all incidental
0.50

260.00
260.00

Plant Mix Method Construction of


in a mechanical mix plant at OMC,
orm layers with motor grader on
ler to achieve the desired density,
ng- V Material
0.20

104.00
104.00

ding and compacting graded stone


ing the Material with water at OMC
o site, laying in uniform layers with
d compacting with vibratory roller to
RTH Specification.
0.15

78.00
78.00

n emulsion (SS-I type) on prepared


and spraying primer at the rate of
MORTH Specification over WMM

520.00
520.00

men emulsion (RS-I type) using


kg per sqm on the prepared
om as per clause 503 of MORTH
520.00
520.00

men emulsion (RS-I type) using


kg per sqm on the prepared
om as per clause 503 of MORTH
455.00
455.00

using course aggregate and VG30


e base/binder course confirming to
Hot Mix Plant and Power Roller)
inery, fuel and all other incidental
n-place method)
0.05

26.00
26.00

bituminous concrete with hot mix


with bituminous binder (Viscosity
and filler, transporting the hot mix
o the required grade, level and
e desired compaction as per clause
ding II

0.03

29.25
29.25

g removal and satisfactory disposal


side drains in accordance with the
in the drawings or as indicated by
mbankment using Box cut earth

0.15

58.50
58.50

g removal and satisfactory disposal


side drains in accordance with the
in the drawings or as indicated by
bankment using Gravel including

0.30

Assistant Engineer, (H)


,Palladam Section
Palladam

204.00
204.00

NAME OF WORK: RESTORATION TO VENKITTAPURAM - KALIPALAYAM ROAD KM 8/2 ABSTRACT ESTIMATE


SI.
No

Description of Work

Quantity

Excavation
for
Roadway
and
drainage
Excavation including removal and satisfactory
disposal of all materias necessary for the
construction of roadway and side drains in
accordance with the specifications and the lines,
grades and cross sections shown in the drawings
or as indicated by the Engineer, as per MORTH
Specification.

672.00 m3

Gravel Filling including cost and conveyance


including labour charges for filling inlayers,
watering tamping under opumum moisture
content to get the maximum density all incidental
charges etc., With a lead of 1 Km

260.00 m3

Granular Sub-base with Graded Material (Table:400-1) - Plant Mix Method Construction of
granular sub-base by providing close graded
Material, mixing in a mechanical mix plant at
OMC, carriage of mixed Material to work site,
spreading in uniform layers with motor grader on
prepared surface and compacting with vibratory
power roller to achieve the desired density,
complete as per clause 401 of MORTH
Specification- for grading- V Material

104.00 m3

Estimate Amo

SI.
No

Description of Work

Quantity

4
Wet Mix Macadam (Table 400-13) Providing,
laying, spreading and compacting graded stone
aggregate to wet mix macadam specification
including premixing the Material with water at
OMC in mechanical mix plant carriage of mixed
Material by tipper to site, laying in uniform layers
with paver in sub- base / base course on well
prepared surface and compacting with vibratory
roller to achieve the desired density, Complete as
per clause 406 of MORTH Specification.

78.00 m3

Prime coat Providing and applying primer coat


with bitumen emulsion (SS-I type) on prepared
surface of granular Base including clearing of road
surface and spraying primer at the rate of 0.70
kg/sqm using mechanical means as per clause
502 of MORTH Specification over WMM

520.00 m2

Tack coat - Providing and applying tack coat with


bitumen emulsion (RS-I type) using emulsion
pressure distributor at the rate of 0.25 kg per
sqm on the prepared bituminous/granular
surface cleaned with mechanical broom as per
clause 503 of MORTH Specification- over
granular surfaces treated with primer

520.00 m2

Tack coat - Providing and applying tack coat with


bitumen emulsion (RS-I type) using emulsion
pressure distributor at the rate of 0.20 kg per
sqm on the prepared bituminous/granular surface
cleaned with mechanical broom as per clause 503
of MORTH Specification - over bituminous
surfaces

455.00 m2

SI.
No

Description of Work

Quantity

8
Providing and Laying 50mm thick Bituminous
Macadam using course aggregate and VG30
bitumen which shall consist of construction in a
single course base/binder course confirming to
the specfication on a previously prepared base.
(using Mini Hot Mix Plant and Power Roller)
including cost of material, labour charges, rentals
for machinery, fuel and all other incidental
charges etc., complete as per clause 504 MORTH
Rev-5 (Mix-in-place method)

26.00 m3

Bituminous Concrete (Table 500-17) Providing


and laying bituminous concrete with hot mix
plant using crushed aggregates of specified
grading, premixed with bituminous binder
(Viscosity Grade-30) at percentage specified by
Job Mix Formula of mix and filler, transporting
the hot mix to work site, laying with a hydrostatic
paver finisher to the required grade, level and
alignment,rolled as per clause 501.6 and 501.7 to
achieve the desired compaction as per clause No.
507 of MORTH Specification complete in all
respects - Grading II

29.25 m3

SI.
No
11

Description of Work

Quantity

Excavation
for
Roadway
and
drainage
Excavation including removal and satisfactory
disposal of all materias necessary for the
construction of roadway and side drains in
accordance with the specifications and the lines,
grades and cross sections shown in the drawings
or as indicated by the Engineer, as per MORTH
Specification. Formation of embankment using
Box cut earth including Compaction by power
roller

58.50 m3

Excavation
for
Roadway
and
drainage
Excavation including removal and satisfactory
disposal of all materias necessary for the
construction of roadway and side drains in
accordance with the specifications and the lines,
grades and cross sections shown in the drawings
or as indicated by the Engineer, as per MORTH
Specification. Formation of embankment using
Gravel including Compaction by power roller
with a lead of 1km

204.00 m3

12

Total
13 Provision for Labour Welfare Fund 1%

14 Provision for Quality Control Charges and Centage


Charges
Contingencies

GRAND TOTAL

PALAYAM ROAD KM 8/2 - 8/4 (ODR)

ATE

Estimate Amount: Rs.7,41,700/-

Rate

Amount

50.60/m3

34003

205.05/m3

53313

1164.15/m3

121072

Rate

Amount

1353.32/m3

105559

61.67/m3

32068

11.93/m3

6204

14.52/m3

6607

Rate

Amount

4900.54/m3

127414

6673.78/m3

195208

Rate

Amount

12.85/m3

752

205.05/m3

41830

724030

7417

10040
213
GRAND TOTAL

741700