Completing engineering school doesn't make you an expert - at least in fluid power. Here's some
of the most common fluid power mistakes most courses never cover, and how to avoid them.
Face it: If you were educated in a four-year mechanical engineering curriculum, you probably didn't learn
much about fluid power. American universities typically teach fluid mechanics, fluid dynamics, and
thermodynamics. But they seldom delve deeply into the subjects of hydraulics or pneumatics as a power
medium.
That's why most design engineers in this country learn their fluid power on the job. And it's why they
sometimes make mistakes they could easily avoid if the theoretical underpinnings of the subject were
more readily available.
"You may have left school with a mechanical engineering degree, but that does not mean you have a
good grasp of fluid power," notes an engineer from a major fluid power supply company.
Fortunately, many hydraulic and pneumatic component suppliers offer training classes for design
engineers. Parker Hannifin, Vickers, Mannesmann Rexroth, Festo and others teach the basics of
hydraulics and pneumatics. "Most of these classes offer 95% of the material that design engineers
need," notes Don Caputo, marketing manger for Parker Hannifin's Hydraulic Valve Division. "We want to
get the word out to customers, many of whom are engineers, who never had this material in school."
For those who can't immediately attend such programs, Design News offers a compilation of some of
the most common mistakes in fluid power design. The mistakes cover a broad range, from problems
with pneumatic tubing to errors in hydraulic force calculation. Some may seem elementary. But suppliers
agree on one point: Avoiding them in your projects will not only cut time and save money, it will eliminate
countless headaches.
HYDRAULICS
Mistake #1: Failure to recognize maximum flow
You're designing a hydraulic actuator that will operate at a prescribed speed. To accomplish that, you
calculate that the cylinder needs a flow rate of 10 gallons per minute (gpm). So you size your hydraulic
system for 10 gpm, right?

Not necessarily. Many applications call for the return stroke to be faster than the power stroke. In the
application described above, it's not uncommon for the return stroke to need a flow rate of 20 gpm.
If, however, the return lines and filters are sized for 10 gpm, then the user has a problem. The system
builds up heat. Undersized filters fail to properly clean the hydraulic fluid. Leaks result.
Remedy: Consider the return rate
Remember, the flow rate needed for cylinder extension is not always the system's fastest flow rate.
"Typically, the user wants to extend the cylinder with a great deal of control," Caputo says. "But on the
way back, they're not doing any work, so they want the cylinder to get back as fast as it can." In most
applications, Caputo says, the return rate is twice that of the extension flow rate.
Mistake #2: Undersized piping
After selecting a hydraulic motor, engineers often look at the motor's port sizes before choosing their
piping. If the motor's port sizes are, say, three-quarters of an inch, then they choose three-quarter-inch
fittings and three-quarter-inch outer diameter piping.
Determining pressure drop in a length of pipe
hQ
P=
18,300d4
Where P = pressure drop/ft of pipe
h = viscosity (ssv)
Q = flow
d = ID of pipe
That's a mistake. Too often, such snap decisions result in undersized piping. And undersized piping, in
turn, causes larger pressure drops and more heat generation than the system is designed for.
Remedy: Check ID, flow velocity, pressure drop
A designer who quickly sizes piping simply by looking at the motor's port risks making several mistakes.
First, a three-quarter-inch outer diameter is too small. Why? Because a three-quarter-inch OD may have
an inner diameter of as little as half an inch. Second, selection of piping requires more thoughtful
consideration. Designers must consider velocity of flow through the pipe and pressure drop per foot of
pipe (see equations above and below). Experts say that pressure drop can be important, especially in
systems using long sections of piping. They also recommend that designers maintain flow velocities with
certain parameters. Exceeding those parameters may cause turbulence in the flow, which can affect the
Reynolds number of the fluid.

The information presented is in Bimbas best engineering opinion and should be used for reference only. Recommendations derived should be verified under
actual operating conditions. Bimba reserves the right to change specifications without prior notice.
Bimba Manufacturing Company
Monee, IL 60449-0068
Telephone: 708.534.8544
Email: cs@bimba.com
www.bimba.com
Rev Level: 0

Leaders in Actuation.

To learn more about this


product, scan this QR code
with your mobile device.

Determining velocity of flow through a pipe


V=

.3208(GPM)

A
Where V = flow velocity
GPM = gallons per minute of flow into the system
A = area inside the pipe (in2)
Mistake #3: Reservoir size too small
By dissipating heat, reservoirs in any hydraulic system play an important role. If the reservoir is
undersized, however, it can't properly dissipate the heat. As a result, performance suffers and
components wear out earlier. "A lot of users assume their reservoir is big enough without sitting down to
calculate the heat dissipation," Caputo says. "If they would do some simple calculations, they might find
that their system needs a bigger reservoir or even a heat exchanger."
Remedy: Calculate dissipation capabilities of the reservoir in horsepower
In general, a 60-gallon tank will dissipate half a horsepower, given a 50 temperature differential between
the oil in the reservoir and the air outside it. Compare that to your system's horsepower. Use a bigger
reservoir or a heat exchanger, if necessary, depending on your packaging constraints.
Determining heat dissipation of a reservoir
HP= 0.001AT
Where HP = horsepower dissipated
A = surface area of reservoir (ft2)
T = temperature difference between oil in tank and air outside (deg F)
(1HP = 2544 BTU/hr)
Mistake #4: Proportional valves too big
When selecting a directional valve, designers usually check their system's flow rate, open a catalog, and
look for a valve with a corresponding rating.
So what's wrong with that? Nothing, if you're picking a directional valve. Proportional valves, however,
are different. "Proportional and servo valves exhibit their control through a high pressure drop," notes
Larry Schrader, director of motion control training for Parker Hannifin. The valve's flow rating, he says, is
usually based on a specific pressure drop. Therefore, if your application's pressure drop is significantly
different than the rated pressure drop of the valve, you'll probably select the wrong valve. Usually,
Schrader says, engineers end up with an oversized proportional valve.

The information presented is in Bimbas best engineering opinion and should be used for reference only. Recommendations derived should be verified under
actual operating conditions. Bimba reserves the right to change specifications without prior notice.
Bimba Manufacturing Company
Monee, IL 60449-0068
Telephone: 708.534.8544
Email: cs@bimba.com
www.bimba.com
Rev Level: 0

Leaders in Actuation.

To learn more about this


product, scan this QR code
with your mobile device.

Sizing a proportional valve by flow rate


QR = QOUT

PR
PA

Where QR = valve's rated flow for your application


QOUT = output flow needed for application
PR = rated pressure drop of proportional valve
PA = actual pressure drop needed for application
If they do select an oversized valve, users are unlikely to get true proportional performance. In most
cases, the valve will open all the way before it's supposed to, denying users the resolution that they
seek.
Remedy: Use pressure drop to determine flow rate
Experts recommend that designers use this method to check the flow rating of their valve. In most
cases, they say, the flow rating they obtain by this method will differ from the flow ratings in the catalog.
Mistake #5: Specific gravity problems In many cases, users want to replace conventional hydraulic oil
with phosphate esters of water glycol fluids. That's fine, say experts, as long as you understand that
hydraulic pumps can't lift those fluids as easily as they lift hydraulic oil. The reason: Conventional
hydraulic oil has a specific gravity of about 0.85, while water glycol typically is about 1.0. Phosphate
ester is even heavier at 1.1.
If design engineers don't make special accommodations for those heavier fluids, users soon notice that
pumps make too much noise. Ultimately, cavitation of the pump occurs.
Remedy: Put the reservoir higher than the pump
Manufacturers call this "flooded suction." The pump doesn't need to work as hard to move the heavier
fluid. If you're not sure about the specific gravity of the fluid you're using, call the pump's manufacturer to
see if they require a flooded suction for that fluid.

The information presented is in Bimbas best engineering opinion and should be used for reference only. Recommendations derived should be verified under
actual operating conditions. Bimba reserves the right to change specifications without prior notice.
Bimba Manufacturing Company
Monee, IL 60449-0068
Telephone: 708.534.8544
Email: cs@bimba.com
www.bimba.com
Rev Level: 0

Leaders in Actuation.

To learn more about this


product, scan this QR code
with your mobile device.

PNEUMATICS
Mistake #6: Force miscalculation
If you know the loads, sizing a cylinder is easy. Unfortunately, knowing the loads can sometimes be
difficult. Forces caused by friction and acceleration are more difficult to calculate, and are often
overlooked. Worse, designers can't always foresee how the machine will be used. "For the design
engineer, it's not always as easy as, 'I need to lift 50 pounds,'" says Jerry Scherzinger, senior support
engineer for Bimba Manufacturing. "A lot of times the designer is coming up with a best estimate, and
there are many factors involved in estimating that force." Too often", Scherzinger says, "The designer
underestimates the force requirement, rather than overestimates it. As a result, the system doesn't move
the load fast enough, or doesn't move it at all".
Remedy: Oversize by 25%
That's what Scherzinger recommends to account for frictional loads. If you suspect that the cylinder will
be subjected to greater loads later on, you might even consider exceeding that 25% rule of thumb. The
only downside to doing that is cost: Initial costs and operating costs can rise. In the long run, however,
users usually find that a larger cylinder provides greater benefits. "Don't hesitate to oversize the cylinder,"
he says. "The advantages of oversizing outweigh the disadvantages."
Mistake #7: Wrong valve for E-stop
Emergency-stop situations demand that a pneumatic system come to a complete halt. Sometimes,
however, a pneumatic valve is already shifted when power is cut off. Afterwards, that valve shifts back
and the associated pneumatic cylinder moves. That scenario can take place when certain 5-way valves
are used with double-acting cylinders. And the results, in some cases, can be damaging or even
dangerous for personnel.
Remedy: Check with valve manufacturer first
In most cases, users notice the problem before damage occurs. By that time, however, the valve has
already been specified and installed. As a result, changing to the right valve can be time-consuming and
costly. For that reason, experts say that engineers must be vigilant early in the design process. "They
have to understand their machine and ask all of the 'what if?' questions," notes Daniel Sandoval, didactic
training manager for Festo. "What if power is cut-off? What if the PLC goes bad? What if someone hits
the E-stop? The solutions to these problems have to be dealt with in hardware. It's not permissible to
remedy those problems in software." Because there are many different types and brands of valves,
Sandoval says designers must consult with the valve manufacturer to learn how the valve will behave
when power is cut off.

The information presented is in Bimbas best engineering opinion and should be used for reference only. Recommendations derived should be verified under
actual operating conditions. Bimba reserves the right to change specifications without prior notice.
Bimba Manufacturing Company
Monee, IL 60449-0068
Telephone: 708.534.8544
Email: cs@bimba.com
www.bimba.com
Rev Level: 0

Leaders in Actuation.

To learn more about this


product, scan this QR code
with your mobile device.

Mistake #8: High-speed undersizing


High-velocity pneumatic applications require sufficient force and high flow rates. Unfortunately, system
designers don't always provide both of those features. Too often, air cylinders are too small to provide
the force needed for quick acceleration. And valves don't have the necessary flow rates to achieve high
speed.
Remedy: Double the bore diameter of the chosen cylinder
For speeds above 16 inches/second, if you're planning on selecting a one-inch cylinder, select a twoinch model instead. Also, pneumatics manufacturers say that designers must look carefully at the flow
ratings of the valves they plan to use in high speed applications. Catalog ratings are usually sufficient,
they say, but are too often ignored or misinterpreted.
Mistake #9: Failure to specify tough-enough construction
Pneumatic-component manufacturers say they see them all the time: cylinders, working in tough,
corrosive environments, unable to stand up to every day wear-and-tear. Before long, the cylinders draw
in dirt, then fail to perform properly. In most cases, they say, the problem occurs because designers
never foresee the breadth of application for their technology. "Sometimes a designer will design a system
that's so good, three or four industries can use it," Scherzinger says. "All of a sudden, their equipment is
in an application where they never expected it."
Remedy: Better materials
If you suspect that your machine will be used in such applications as food or pharmaceutical processing,
be prepared to improve the materials of construction of your cylinders. Stainless steel or anodized
aluminum bodies resist corrosion more effectively, particularly in wash down environments. Also consider
use of plastic end caps, wipers, scrapers or rod boots as a means of preventing ingress of dirt into the
cylinder.
Mistake #10: Insufficient tubing Most designers are trained to think of a pneumatic system as a
collection of pumps, cylinders, and valves. Somewhere in between those pumps, cylinders, and valves,
however, lies an equally important component: tubing. Improperly designed tubing can cause
disturbances in flow and pressure. Too often, it becomes the limiting factor in a pneumatic system.
Remedy: Pay attention
Experts say that tubing mistakes fall into two categories: too long or too skinny. Long sections of tubing
create unwanted pressure drops and skinny tubes cause valves to work improperly. Unfortunately, they
say, designers can only remind themselves to be aware of the problems caused by improperly designed
tubing. "When you look at a drawing, the tubing looks like a bunch of insignificant lines," Sandoval says.
"But if you don't pay attention to it, it can cause a lot of trouble for you.
Slimebusters: Plastic end caps and stainless steel bodies, like
those shown here, keep fluid power equipment operating even
in aggressive environment applications.

The information presented is in Bimbas best engineering opinion and should be used for reference only. Recommendations derived should be verified under
actual operating conditions. Bimba reserves the right to change specifications without prior notice.
Bimba Manufacturing Company
Monee, IL 60449-0068
Telephone: 708.534.8544
Email: cs@bimba.com
www.bimba.com
Rev Level: 0

Leaders in Actuation.

To learn more about this


product, scan this QR code
with your mobile device.

You might also like