Professional Documents
Culture Documents
DESCRIPTION
PAGE
General
1-1
1.2
Project Location
1-1
1.3
1-1
1.4
1-2
1.5
1-2
1.6
1-2
Topographic Surveys
2-1
2.2
2-6
Background
3-1
3.2
3-1
3.3
Hydrology
3-2
Regional Geology
4-1
4.2
4-1
4.3
4-3
4.4
Seismicity
4-10
4.5
Construction Material
4-10
5-1
5.2
Power Potential
5-6
6-1
6.2
Project Layout
6-1
6.3
6-2
6.4
6-5
Design Parameters
7-1
7.2
Pelton Turbines
7-1
7.3
7-3
7.4
7-4
7.5
Auxiliary Equipment
7-5
7.6
Electrical Equipment
7-6
7.7
System requirements
7-7
7.8
7-18
Project Implementation
8-1
8.2
8-3
List of Figures
Figure-1.1: Location Map of the Project
Figure-1.2: Schematic Diagram of the Project
Figure-1.3: Project Layout Plan
Figure-1.4: Access to Gilgit City by Road
Figure-1.5: Access to Project Site from Gilgit City
Figure-2.1: Demarcation Map of Project Area
Figure-2.2: Layout Plan of Geotechnical Investigation
Figure-3.1: Mean Monthly Precipitation
Figure-3.2: Mean Monthly Temperature
Figure-3.3: Catchment Area of Naltar River at Proposed Naltar-III Weir Site
Figure-3.4: Flow Duration Curve at Naltar-III Weir Site
Figure-3.5: Frequency Analysis of Instantaneous Peak Discharges at Naltar-III
Figure-4.1: Tectonic Map of the Project
Figure-4.2: Regional Geological Map
Figure-4.3: Preliminary Geological Map
Figure-5.1: Naltar-III Hydropower Station Detail Design Parameters
Figure-6.1: Break up of Project Layout Plan
Figure-6.2: Tyrolean Weir Plan
Figure-6.3: Tyrolean Weir X-Section A-A
Figure-6.4: Tyrolean Weir X-Section B-B
Figure-6.5: Tyrolean Weir Longitudinal Section C-C
Figure-6.6: Connection Channel Typical X-section
Figure-6.7: Sand Trap Plan
Figure-6.8: Sand Trap X-Section A-A & X-Section B-B
Figure-6.9: Sand Trap Longitudinal Section C-C
Figure-6.10: Headrace Typical X-Section
Figure-6.11: Headrace Typical X-Section at RD. 0+100
Figure-6.12: Headrace Typical X-Section at RD. 1+200
List of Tables
Table-1.1: Salient Features of the Project
Table-2.1: Details of Survey Control Points
Table 2.2: Breakup of Geotechnical Investigations
Table 2.3: Tentative Quantity of Field & Laboratory Testing
Table 3.1: Mean Monthly Precipitation
Table-3.2: Mean Monthly Temperatures
Table-3.3: Mean Monthly Discharges at Naltar-III Weir Site
Table-3.4: 10-Daily Discharges at Naltar-III Weir Site
Table-3.5: Mean Monthly Discharges at Naltar-III Weir Site (with Actual and
Generated Series)
Table-3.6: Comparison of Flow Patterns at Naltar III Weir Site
Table-3.7: Instantaneous Peak Flow and Daily Max Flow at Daniyor Bridge and
Naltar
Bala
Table 3.8: Results of Frequency Analysis of Instantaneous Peak Discharges at
Naltar-III
Table-5.1: Efficiency Coefficients of Various Power Plant Components
Table-5.2: Design Parameters of Turbine
Table-5.3: Power Simulation Corresponding to 16 Mw Installed Capacity on the
Basis of Hydrology for the Period 1995 To 1999 and 2006 To 2010
Table-7.1: Selected Turbines Data
Table-7.2: Preliminary Cooling System
Table 7.3: Generator Design Data
Table-7.4: Transformer Data
Table-7.5: 66kV Switchgear design data
Table-7.6: Powerhouse DC Supply Requirements
Table-7.7: Intake (Forebay) DC Supply Requirements
Table-7.8: Generator Protection
Table-7.9: Protection of Other Equipment
Table-7.10 Capacity Requirements of Diesel Set
List of Plates
5