You are on page 1of 38

DE SISTI LIGHTING

PROFILE

THE HISTORY
Founded in February of 1982 by the internationally acclaimed
designer Mario De Sisti, De Sisti Lighting has emerged as a world
leader in the manufacture and distribution of top quality lighting
equipment in the motion picture, television, theatre and professional
photography industries.
With a strong emphasis on craftsmanship and performance, the
company has been responsible for numerous major technological
advances both in the electromechanical and photometric areas of
luminaire development.
As trend setters in the entertainment industry, De Sisti has guided
such important innovations as flicker-free electronic ballasts, singleend high efficiency HMI lamps, motorised self-climbing hoists,
telescopes and, most recently, robotic controlled lighting.

GLOBAL DISTRIBUTION
Headquartered in Rome, Italy, the company presently
operates in 42 countries around the globe. This extensive network of
professional and experienced personnel enables De Sisti to provide
unmatched levels of stock, service, customer support and project
management, while maintaining its leadership position on the creative
advancement of the art of Lighting.

ORGANIZATION CHART DE SISTI LIGHTING S.p.A.


President
President
&&CEO
CEO

Mario
MarioDe
DeSisti
Sisti

General
GeneralDirector
Director
Operations
Operations

General Director
General Director
Commercial&Marketing
Commercial&Marketing
Fabio De Sisti

Sergio
SergioDe
DeSisti
Sisti

Assistent
Assistentofof
Gen.
Gen.Dir.
Dir.Oper.
Oper.

Fabio De Sisti

Luigi
LuigiCogliano
Cogliano

Technical
Technical
Director
Director

Production
Production
Director
Director

Sergio
SergioDe
DeSisti
Sisti

Luigi
LuigiCogliano
Cogliano

Electr.Control
Electr.Control Electr.
Electr.Power
Power Mechanical
Mechanical Workshop
Workshop
Director
Director
Director
Prototypes
Director
Director
Director
Prototypes
Giuseppe Paolilli
Paolo Brevetti
Giuseppe Paolilli

Paolo Brevetti

Giorgio
GiorgioIori
Iori

Production
ProductionPlanning
Planning
&&Purchasing
PurchasingDep.
Dep.

Electronic
Electronic
Department
Department

Claudio
ClaudioRinaldi
Rinaldi

Production
Production
Planning
Planning

Purchasing&
Purchasing&
Expediting
Expediting

CDL
CDL1121.1
1121.1

CDL
CDL1121.2
1121.2

Cost
CostControl
Control&&
Subcontractor
Subcontractor
Activities
Activities
CDL
CDL1121.3
1121.3

Aldo
AldoPedacchia
Pedacchia

Personal
Personal
Administr.
Administr.

A.A.Campanella
Campanella

Paolo
PaoloRadi
Radi

Massimo
MassimoLobefaro
Lobefaro

Roberto
RobertoRinaldi
Rinaldi

G.
G.Scasciafratte
Scasciafratte

Davide
DavideRenis
Renis

Office
OfficeSales
Sales
North
NorthItaly
Italy

Coordination
Coordination
Export
ExportOffice
Office

Secretariat
Secretariat
&&Support
Support

Projects
Projects
Planning
Planning

Gianni
GianniFelici
Felici

Office
OfficeSales
Sales
Foreign
ForeignCountry
Country

Claudio
ClaudioCappelletti
Cappelletti

Aldo
AldoPedacchia
Pedacchia

General
General
Accounting
Accounting

A.A.Scaglioni
Scaglioni

Project
Project
Specialist
Specialist

Administration
Administration
Director
Director

Production
Production
Unit
Unit
A.A.Scaglioni
Scaglioni

Warehouse
Warehouse
Finished
FinishedProduct
Product
Andrea
AndreaMariotti
Mariotti

Warehouse
Warehouse
Comp.&
Comp.&Raw
RawMater.
Mater.
A.A.Scardaoni
Scardaoni

Production
Production
ofof Ballast
Ballast

Production
Production
HMI
HMILuminaires
Luminaires

Spare
SpareParts
Parts
Preparation
Preparation

Technical
Technical
Assistance
Assistance

Production
Productionofof
Fluorescent
Fluorescent

Production
Productionofof
Quartz
QuartzLumin.
Lumin.

Mechanical
Mechanical
Assembly
Assembly

Electrical
Electrical
Assembly
Assembly

Material
MaterialPrepar.
Prepar.
for
forProject
Project

Material
Material
Handling
Handling

CDL
CDL1122.1
1122.1

CDL
CDL1122.2
1122.2

CDL
CDL1122.3
1122.3

CDL
CDL1122.4
1122.4

CDL
CDL1124.1
1124.1

CDL
CDL1124.2
1124.2

CDL
CDL1124.3
1124.3

CDL
CDL1124.4
1124.4

CDL
CDL1125.2
1125.2

CDL
CDL1125.1
1125.1

DE SISTI Manufacturing

Going through an exceptional growth and


many important achievements, De Sisti
today is:
based with his Factory (tot. Area 5.000
sq.m.) in the South of Rome-Italy within
an Industrial area;
it employs 110 persons;
it is supported by a network of very
specialised subcontracting firms (laser
cutting, high precision machine shops,
paint, plating, electronic boards
manufacturing and tropycalizing, etc.)
that work exclusively for it and employ
another 200 persons in total;
Thanks to the above structure, the
Company is capable to absorb
exceptional work loads. Historically
there have been a tremendous number
of projects carried on at the same time.

De Sisti Head quarter - Factory

Laser Cutting
Technology

DE SISTI Research & Development

R&D Team of 30 Specialists .


R&D Program: Rigging Products (Hoists, telescopes,
pantographs, Scenery Hoists, etc.) with simple or
automated controls, Tungsten and Discharge Lighting
products, Electronic Ballasts , Motorised Lighting Fixtures
and a number of special accessories.
R & D Specializations:

Motorised Lights R&D

Electronic Ballasts
R&D

mechanics, optics, photometry, electric, power and control


electronics, thermodynamic.
An internal Laboratory is available for thermal test,
mechanical stress test, rain protection test, insulation test with
earth leakage measurements, photometry measurements. At
the factory is also available a 12 m. high crane, specifically
equipped to perform extension test on rigging products.
These Specialists are managing the product inspections at
the external laboratories and SAFETY Institutes, like TV,
VBG, UL.

SAFETY STANDARDS
De Sisti products are designed and
manufactured up to the most severe
safety standards available
internationally.
All the rigging devices are approved
to the DIN 15560 part 46 standards
by the TV,
an independent German
Institute having the
authority to certify the
product safety.

Drop Test
Rain Protection Test

THE PRODUCTS
LIGHTING FIXTURES
Studio Lights
Location Lights
Tungsten sources
Discharge sources
Fluorescent sources
Electronic ballasts
Cold lighting - CD range
Fully automated set lights

RIGGING EQUIPMENT
Self Climbing Hoists
Grid Mounted Hoists
Modular Hoists
Mini Hoists
Telescopes & Trolleys
Pantographs & Spiders
Scenery Hoists
Manual or positioning
controls

STUDIO SYSTEMS

COMPLIMENTARY STUDIO DESIGN.

BUDGETING AND PRELIMINARY DRAWING SUBMITTAL.

SUGGESTIONS OF STRUCTURAL SOLUTIONS,

INTEGRATION MECHANICAL AND ELECTRICAL PLANT.

PROJECT MANAGEMENT.

INSTALLATION SUPERVISION
& PERSONNEL TRAINING.

SUPPORT FOR MAINTENANCE


& SPARE PARTS

Technical Dept.

De Sisti Project Team


CUSTOMER
CUSTOMER
Responsible
Responsibleof
ofthe
theProject
Project
from
fromthe
theCustomer
Customerside
side
Inquiries
Inquiriesand
andContacts
Contacts

SENIOR
SENIORMANAGEMENT
MANAGEMENT
CONTRACT
CONTRACTSUPERVISION
SUPERVISION
MARIO
MARIODE
DESISTI
SISTI
FABIO
FABIODE
DESISTI
SISTI
SERGIO
SERGIODE
DESISTI
SISTI

PRODUCTION
PRODUCTION&& PLANNING
PLANNING
MANAGEMENT
MANAGEMENT
Ing.
. LUIGI
Ing
Ing.
LUIGICOGLIANO
COGLIANO

PROJECT
PROJECTMANAGEMENT
MANAGEMENT
CLAUDIO
CLAUDIOCAPPELLETTI
CAPPELLETTI
Ing.
. DAVIDE
Ing
Ing.
DAVIDERENIS
RENIS
FIELD
FIELDENGINEERS
ENGINEERS
On
Onsite
siteSupervision:
Supervision:

Quality
Qualitycontrol
controland
andproper
proper
execution
executionofofjobs.
jobs.
Labour
Labourco-ordination
co-ordination
Fine
Finetuning
tuning&&
Commissioning
Commissioningofofsystem
system
Training
Trainingofofpersonnel
personnel

ANDREA
ANDREA
FORMICHELLA
FORMICHELLA
Electric
Electricsystem
system
Electronic
Electronicsystem
system
&&controls
controls
FRANCESCO
FRANCESCO
MERCURI
MERCURI
Mechanical
Mechanicalsystem
system
&&specialised
specialisedworks
works

Project
ProjectManagement:
Management:
Drawings/Manuals
Drawings/Manualsfor
for

projects
projects
Standards
Standards&&Normative
Normative
Co-ordination
Co-ordinationofofworks:
works:
Planning/Purchasing
Planning/Purchasing
Formal
Formalhand
handover
overofofthe
the
project.
project.

DESIGN
DESIGN
SPECIALISTS
SPECIALISTS
&&PRODUCTS
PRODUCTS
SUPPORT
SUPPORT
Ing.
. GIUSEPPE
Ing
Ing.
GIUSEPPEPAOLILLI
PAOLILLI
Controls/Logic
Controls/Logic
Electronics
ElectronicsSystems
Systems&&
software
software
GIORGIO
GIORGIOIORI
IORI
Mechanics,
Mechanics,Optics
Optics
Supporting
SupportingStructure
Structure
dimensioning
dimensioning&&Design
Design
Ing.
. PAOLO
Ing
Ing.
PAOLOBREVETTI
BREVETTI
Power
PowerElectronics
Electronics&&
Power
PowerSystems
Systems

Background on Projects

De Sisti Lighting project Team is a well proved group providing


high quality services for the proper execution of system works.
The Target of such an important institution within the Company is
to satisfy the needs of the customer, putting on practice within the
scheduled time those products and installation works proposed,
making sure of their compliance with safety standards and
performances.
De Sisti Project Team has an extensive and prestigious reference
of TURN KEY projects made along the years, the individual
Specialists forming the group are not only well educated in the
different subjects, but also experienced in such a delicate activity.
Please look at the De Sisti reference list of main projects to see
the types, quality and quantity of works performed by our Project
Team.

Turn Key Project examples


Universal Studios
Orlando USA

Lifetime Astoria Studios


New York USA

U.R. TV
Stockholm SWEDEN

S.R. TV Fully Automated Studios


Saarbrucken GERMANY

WOX TV Studios

Videa Studios

Essen GERMANY

Rome ITALY

NOB Studios
Hilversum HOLLAND

LIGHTING SUSPENSIONS
In studios the majority of lighting is placed at a reasonable
height above the acting area, as the floor cannot be full of Lighting
and distribution equipment, considering the clutter of Video Camera
and Booms.
This requirement combined with the lighting fixture choice and
positioning has pushed the industry to develop a range of lighting
suspension products in order to fulfil the different studio sizes,
requirements (type of programs) and budgets.
De Sisti Lighting, being fully committed with this particular
sector of the entertainment industry, has developed a wide range of
rigging and lighting products, designed and manufactured up to the
most severe Safety Standards and applying the concept of total
quality.

PRODUCTS & SOLUTIONS


RIGGING EQUIPMENT
Self Climbing Hoists:
Fixed
Trackable

Grid Mounted Hoists:


ropes in line or 2+2
Heavy duty grid hoist
Modular Hoists
Mini Hoists
Fixed
Trackable

Telescopes & Trolleys:


grid or rail mounted
Pantographs & Spiders
Scenery Hoists
Rail systems

Lighting
Saturation of net
production area

Movable Systems:
punctual coverage
of net production
area

Rigging range for medium/large studios

GRID MOUNTED HOISTS


For installation above grids.
Load Capacity max. 160 kg.
Max. net extension 10,5 m.
Min./Max. Pipe length = 1,5 m. / 4,5 m.

SELF CLIMBING HOISTS


For Fixed or Rail mounting
Load Capacity max. 140 kg.
Max. net extension 10,5 m.
Min./Max. Pipe length = 1,5 m. / 4,5 m.

CYCLORAMA LIGHTING HOISTS


Load Capacity max. 160 kg.
Max. net extension 10,5 m.
Min./Max. Pipe length = 4 m. / 8 m.

Rigging range for medium/small studios

MINI HOISTS
For Fixed or Rail mounting
Load Capacity max. 60 kg.
Max. net extension 13,5 m.
Pipe length = 2 m.

SCENERY HOISTS
For Fixed or Rail mounting
Load Capacity max. 140 kg.
Max. net extension 10,5 m.

PANTOGRAPHS
Load Capacity max. 30 kg.
Max. net extension up to 5 m.

Rigging range - Telescope technique

MOTORIZED TELESCOPE/TROLLEY
For Rail mounting
Load Capacity max. 80 kg.
Max. net extension 10,5 m.

GRID TELESCOPE/TROLLEY
For Grid mounting
Load Capacity max. 80 kg.
Max. net extension 10,5 m.

POWER RAIL TELESCOPE/TROLLEY


Fully automated system
Load Capacity max. 80 kg.
Max. net extension 10,5 m.

Rigging range - the SPIDER

A new rigging element based on a motorised


double pantograph structure.
Available for either 40 kg. or 70 kg. Lifting
capacity.
FIXED or RAIL mounting (manual or
motorised trolley).
Manual or Positioning control.
Very compact closed dimensions, to optimise
the use of the STUDIO HEIGHT.
Very STABLE support for moving lights.
Possibility to add several standard cables for
technical devices (AUDIO-VIDEO).
Cost effective if compared to telescope
solutions.

Rigging range - Self Climbing Hoists


Total lifting capacity of winch unit: 240 kg / 530 lbs.
Net lifting capacity of Hoist: It is determined from the tot. 240 kg /
530 lbs. minus the self weight of the hoist moving part, that can
vary from 70 to 130 kg., depending on the construction. Normally
the Safe Working Load is 140 kg. / 309 lbs.
Lift cables:4 x 4 mm. diameter, 7 x 19 construction, galvanised
steel wire ropes, specific resistance class 180 kg. : sq.mm. UNI
7293-74. Minimum breaking load 955 kg. / 2.108 lbs.
Winch Unit specs for Vertical lift: 1,1 kW, 3 phase AC primary
supply, 1,5 HP. Insertion factor 0,4 = 4 minutes continuous
operation, 6 minutes rest.
Transmission ratio 238,1:1
Automatic interlock: Sd Dynamic automatic interlock
Motor speed n1 = 2.800 rpm Output speed n2 = 11,8 rpm.
Nominal Output Torque = 270 Nm.
Thermal protection on motor for 90C intervention. Automatic
resetting.
Load Sensing: Over/under load sensing mechanism independent
on each lift cable.
Travel Limit Mechanism: TUV approved, 3 mm. resolution,
continuous tuning, double safety switches.

Typical Trackable Hoist with catwalk

Rigging range - Scenery Hoists


Net lifting capacity: 140 kg. / 309 lbs.
Lift cables: 2 x 4 mm. diameter, 7 x 19 construction,
galvanised steel wire ropes, specific resistance class
180 kg. : sq.mm. UNI 7293-74. Minimum breaking load
955 kg. / 2.108 lbs.
Winch Unit specs for Vertical lift: 1,1 kW, 3 phase AC
primary supply, 1,5 HP. Insertion factor 0,4 = 4 minutes
continuous operation, 6 minutes rest.
Transmission ratio 238,1:1
Automatic interlock: Sd Dynamic automatic interlock
Motor speed n1 = 2.800 rpm Output speed n2 = 11,8
rpm.
Nominal Output Torque = 270 Nm.
Thermal protection on motor for 90C intervention.
Automatic resetting.
Load Sensing: Over/under load sensing mechanism
independent on each lift cable.
Travel Limit Mechanism: TUV approved, 3 mm.
resolution, continuous tuning, double safety switches.

Rigging range - Modular Lighting Hoists


Total lifting capacity of winch unit: 240 kg / 530 lbs.
Net lifting capacity of Hoist: It is determined from the tot. 240 kg /
530 lbs. minus the self weight of the hoist moving part, that can
vary from60 to 100 kg., depending on the construction. Normally
the Safe Working Load is 140 kg. / 309 lbs.
Lift cables: 2 x 4 mm. diameter, 7 x 19 construction, galvanised
steel wire ropes, specific resistance class 180 kg. : sq.mm. UNI
7293-74. Minimum breaking load 955 kg. / 2.108 lbs.
Winch Unit specs for Vertical lift: 1,1 kW, 3 phase AC primary
supply, 1,5 HP. Insertion factor 0,4 = 4 minutes continuous
operation, 6 minutes rest.
Transmission ratio 238,1:1
Automatic interlock: Sd Dynamic automatic interlock
Motor speed n1 = 2.800 rpm Output speed n2 = 11,8 rpm.
Nominal Output Torque = 270 Nm.
Thermal protection on motor for 90C intervention. Automatic
resetting.
Load Sensing: Over/under load sensing mechanism independent
on each lift cable.
Travel Limit Mechanism: TUV approved, 3 mm. resolution,
continuous tuning, double safety switches.

The lifting device: it is the section fixed to the


studio grid and contains all the primary elements
for the motion generation, control and safety; this
section is divided in three elements: 2 ropes
diverter/load sensing boxes, 1 motorised winch
drive unit.

The moving batten: it is the moving section where


can be fixed up to 4 cyclorama lights, 4
compartments each, electrically connected to the
dimmer circuits channelled through a flat folding
cable and to a distribution box.

SAFETY STANDARDS
De Sisti products are designed and manufactured up to
the most severe safety standards available
internationally.
All the rigging devices are approved to the DIN 15560
part 46 standards by the TV, an independent German
Institute having the authority to certify the product safety.
The safety is a basic design parameter, the rigging
products in the range are available in different versions,
to fulfil the different Countries requirements (U.L. for
North America, CE for Europe, etc.).

EXAMPLE OF CERTIFICATIONS: TV - UL

STATE OF THE ART LIGHTING AUTOMATION


ZDF - CAPITALSTUDIOS -BERLIN (GERMANY)

Month Year

Customer

Studio

City

03-99

ZDF

Studio 1

Berlin

03-99

ZDF

Studio 2

Berlin

01-00

ZDF

Studio 3

Berlin

Country

Type of Suspension
system installed

GERMANY 12 Motorized TV
Telescopes, 110 Motorized
Telescopes, 134 Motorized
Trolley, 110 Motorized
2kW Fresnel Spotlights
GERMANY 72 Telescopes, 8 TV
Telescopes, 72 Motorized 2
kW Fresnel Spotlights.
GERMANY 48 Spider Hoists.

AUTOMATED SET LIGHTS AND RIGGING


SYSTEMS - ICARUS 2000

INCLUDES MOTORISED LIGHTS AND RIGGING.


ALLOWS DETAILED FOCUSING, MEMORIZATION OF
POSITIONS AND PLAYBACK FROM ONE OR MORE
REMOTE CONTROLS.
THE MOTORIZED DEVICES ACCEPT DUAL CONTROL
INPUTS: STANDARD DMX 512 and ICARUS 2000.
MOVING LIGHTS FOR EFFECTS, COLOR CHANGERS
AND OTHER DMX CONTROLLED STANDARD DEVICES
ARE COMPATIBLE WITH THIS SYSTEM.

AUTOMATED SYSTEM BENEFITS


Standardization: the system can be controlled by standard DMX consoles, the
ICARUS section is supervising and getting back the information at control level,
giving an 100% BACK UP.
1 Person running the whole system.
Artistic benefit: any light source can be vertically moved, finally adjusted, change in
colour and beam spread within seconds from 1 person.
Fast turn-around of set ups.
Efficiency in dimensioning the system: because of the high degree of movement it is
not necessary to saturate the ceiling of the Studio. The saving in quantity of light
points experienced in the installations around the world is 50%.
Energy saving : an equivalent system using a conventional lighting technology would
require more light sources (at least 2 times those used in a fully automated system)
kept on for a much longer time during preparation, with a consequent higher energy
consumption and bigger requirement of air conditioning because of the higher heat
produced.
Safety: because of the remote control feature it is not necessary to physically reach
the light sources, unless for inspection or maintenance.

Rigging range - Automated Telescopes/Trolleys


on rails and electrified lines

Two axis for lighting points positioning.


Reduced number of units, thanks to large movement range and memorised set ups.
DMX and ICARUS data lines on SLIDING CONTACTS.
V-H-V (Vertical - Horizontal - Vertical) automated playback with ICARUS.

Automated Lighting Fixtures


Fresnel Spotlights:
PAN - 370
TILT - 90
FOCUS - Spot/Flood
BARNDOOR ROTATION 180
4 LEAF (Independent) - 130
SPEED CONTROL

Fresnel Softlights:
PAN - 370
TILT - 90
SPEED CONTROL

Accessories:
COLOR CHANGERS
MECHANICAL DIMMERS
ELECTRONIC BALLASTS
FOR DISCHARGE LAMP
FIXTURES

Automated Systems Installed Around the World


TVE - Studio 6 - Barcelona - Spain
UR TV - Studio A & B - Stockolm - Sweden
S.R. TV - Studio 1, 2 & 3 - Saarbrucken - Germany
ABC - Studio 1 - New York - U.S.A.
N.O.B. - Studio Interactive - Hilversum - Holland
Hoffburg House - Congress Hall - Vienna - Austria
Opera Theatre - Vienna - Austria
Congress Hall - Lille - France
UR TV - Studio B - Sweden
P.O.P.B. Palays Omnisport de Paris Bercy - Paris - France
Channel 5 - Studio 3 - Bangkok - Thailand
YLE - Studio 4 - Helsinky - Finland
YLE - Studio A - Tampere - Finland
TELECINCO -Studio 6 - Madrid - Spain
ZDF - Capital Studios 1, 2 & 3, Berlin - Germany
CCTV - Bejing - China
S.R. TV - Studio 3 - Germany HR - Studio 1 - Frankfurt - Germany
VIDEOTIME - Studio 14 - Milan - Italy

P.O.P.B. - Paris - France

Tungsten Lighting - The Studio Fresnels


LEONARDO 5 kW
LEONARDO DUAL FILAMENT 2,5+2,5 kW

LEONARDO 2 kW
LEONARDO DUAL FILAMENT 1,25+1,25 kW
LEONARDO DUAL FILAMENT 1,25+2,5 kW

LEONARDO 1 kW

MAGIS 300/500/650 W

Available either with Manual


or Pole operated yoke and
focusing

Tungsten Lighting - The Studio Softlights

WYETH RANGE: 2 versions


z 1 lamp 118 mm. Tot. Max. Power 1 kW
z 2 lamps 118 mm. Tot. Max. Power 2 kW

BOTTICELLI RANGE: 3 versions


z 1 lamp 189 mm. Tot. Max. Power 1,25 kW
z 2 lamps 189 mm. Tot. Max. Power 2,5 kW
z 4 lamps 189 mm. Tot. Max. Power 5 kW

Tungsten Lighting - Cyclorama front lights


z

GIOTTO Overhead lights


1 compartment
2 compartment horizontal
2 compartments vertical
3 compartments horizontal
4 compartments horizontal
4 compartments vertical (2 + 2)

DUCCIO Ground-row lights


Modular system
Hinged and rigid
BOTH RANGES AVAILABLE IN MULTIPIN CONNECTOR ARRANGMENTS

Fluorescent Lighting - De Lux range

DE LUX 36 W LAMPS
2 LAMPS
4 LAMPS
6 LAMPS

POWER CONSUMPTION OF THE UNITS = 55W x number of lamps


versions:
ON/OFF - ANALOG - DMX - PHASE CONTROL
MANUAL OR POLE OPERATED
HIGH FREQUENCY ELECTRONIC POWER SUPPLIES

DE LUX 55 W LAMPS
2 LAMPS
4 LAMPS
6 LAMPS

Cold Lighting - The CD Lights


CD7F 70W Fresnel

CD15S 150W Softlight

CD15F 150W Fresnel

CD15B 150W
Broadlight

CD15P 150W Par

HIGH EFFICIENCY ~ 90 lum/watt (more than 4 times an equivalent filament source)


LONG LAMP LIFE ~ 10.000 hours
LAMPS: either 3.000K or 4.200K (3.000K can be mixed with filament or fluorescents)
COLD BEAM FOR TALENT CONFORT (small AIR CONDITIONING requirements)
ENERGY SAVING (ideal for small studios for news, video catalogue, conferences, etc)

Fluo-Lights R-G-B-W for back-light cycs

The system is formed by a number of 4


lamp (white, red, green and blue
phosphors) fluorescent units spaced on 1
m. centres and 1 m. behind a white
translucent screen.
By changing the intensities of the different
primary colour lamps, it can be obtained
any colour on the cyclorama. Full power of
either the green or the blue lamps will
obtain a perfect matching with the relevant
Chroma-key.
Each unit requires 4 channels of DMX,
one per lamp, with the control of each
lamp intensity performed directly from a
DMX
control console.
The R-G-B-W
units
need a direct mains
and a DMX connection.
The address of each
unit is locally
configurable by acting
on two push buttons.
Both mains and DMX
can be daisy chained
on multiple units

R-G-B-W Fluorescent unit

Fluo-Lights R-G-B-W for back-light cycs


COST SAVINGS & BENEFITS
OVER TUNGSTEN FRONT CYC
LIGHTs:

Extended lamp life


No need for colour filters
Low energy consumption
Small heat projection (Smaller Air
conditioning requirements).
More free studio floor space
Possibility of effects and
projections on the screen.

Track mounting provides the


flexibility to position the units along
the studio walls.

HORIZONTAL or VERTICAL
mounting for different types of
effects.

Lighting - The DAYLIGHTS

THE LARGEST AND MOST INNOVATIVE RANGE


OF PARS, FRESNELS, BROAD-SHADOWLIGHTS
AND ELECTRONIC BALLASTS

You might also like