INTRODUCTION
Government of NWFP intends to appoint qualified consultant to provide service for the
Consultancy Services (Planning and Designing) of Feasibility Study for Construction of
Kotkai Bridge (Sub Structure) in South Waziristan Agency.
In response to letter No. 1836/15-MA, dated Tank the 02/05/2001,from the EXECUTIVE
ENGINEER DEV: C & W DIVISION SWA TANK, to the pre qualified consultants (by Chief
Engineer South), for submission of technical and financial proposals for the above
mentioned project, we, the Khyber Consulting Engineers (KCE) submit Technical and
Financial Proposal for carrying out feasibility study and detailed design and preparation of
BOQs and PC-I.
2.
BRIEF DESCRIPTION
The bridge site is located at a distance of about 14-km from Jandola over WACHA
khawar Nullah on Jandola-Kotkai-Sararogha road (Refer to AnnexureIII). The old steel
Structure Bridge with concrete deck was damaged due to high floods about 20 years ago.
All the population along this road has an access to Jandola, which is main hub of the
area, through this bridge site for their day to day life needs. In normal whether it is not
difficult to cross the khawar with out a bridge but during floods traffic through this
suspended for quite a long time.
2.1
/var/www/apps/conversion/tmp/scratch_4/300816212.doc
2.2
3.
4.
STAGE-II
TASKS
-
PRELIMINARY ENGINEERING
STAGE-III
TASKS
-
CONCEPT/PLANNING
DETAILED ENGINEERING
/var/www/apps/conversion/tmp/scratch_4/300816212.doc
CONCEPT / PLANNING
4.2
:
:
3 Days
Consultants ready for commencement of work
on the project.
4.3
:
:
6 Days
The reconnaissance survey will result in a clear
line of action for the field surveys and
investigative work. Efforts will be made to the
most technically and functionally feasible
locations for the proposed bridges.
Geotechnical Investigation
Activities:
Under this activity, geological and soil investigation will be carried out
including field and laboratory testing. The suitability of site for
construction of bridges including foundation requirements and stability of
slopes will be determined on the basis of the field and laboratory test
results. The number of bore holes, field testing, and collection of sample
shall be based on the requirement of the proposed site as indicated in
the TOR. Tests as envisaged in the TOR shall be conducted to determine
the physical, engineering and chemical properties of the sub-surface
/var/www/apps/conversion/tmp/scratch_4/300816212.doc
4.4
:
:
12 Days
The result of this activity will be the appropriate
locations of the proposed bridges and the design
requirements of its sub structures and
foundation which will be carried out by the
Consultants specialist Bridge Engineer.
Hydrological Studies
Activities:
These studies would be conducted for determining the waterways
opening and other structure parameters. The hydrological design
parameters for the proposed bridges will be determined by using the
available data however additional, meteorological data will also be
collected for developing necessary curves, if required. This will be help
full in the determination of suitable return period (flood frequency) for the
most economical design of the proposed bridges. Information regarding
high flood levels and maximum discharges will be collected by inquiring
the local inhabitants supplemented by observations of the existing flood
marks on the banks of the flood streams. Providing the free board at
sufficient margin will compensate the uncertain of this procedure.
Hydrological studies would also include identification of flood protection
works and guide banks requirement, determination of scour depths and
required width of waterway at the proposed sites of bridges on the flood
streams.
Duration
Output
4.5
:
:
6 Days
The result of this activity will be safe design
requirements of the bridges structures and
requirements (high flood level, max, discharge
under the bridge and scour depth etc.), for flood
protection and training works which will be
assessed by the Consultants specialist
engineering staff.
/var/www/apps/conversion/tmp/scratch_4/300816212.doc
a)
Horizontal Control
A closed polygon (loop) traverse will be established on
monuments and permanent points at suitable locations, using 1
second Theodolite and EDM. All distances and angles both
horizontal and vertical shall measured as per requirements.
b)
Vertical Control
Vertical Control will be established on the same traverse
monuments and other BMs established at convenient and safe
locations for further use in the construction activities. For
establishing vertical control automatic levelling instruments shall
be used and the acceptable mis-closure between the two results
shall be according to the requirement as indicated in the TOR.
c)
Terrestrial Survey
The existing features will be surveyed including telephone,
power lines etc. Water levels and possible high water marks will
be recorded.
d)
STAGE-2
4.6
Duration
Output
PRELIMINARY ENGINEERING
Preliminary Design Structures and Approach Roads
Activities:
Based upon the information collected from the field surveys and
investigations, preliminary engineering will commence, During this stage
established. Design criteria and design specification shall be based on
/var/www/apps/conversion/tmp/scratch_4/300816212.doc
4.7
:
:
5 Days
Location plan, L-Section and Cross-Section of
the approaches and bridge to indicate the type
and sizes of piers, abutments and foundations.
STAGE-3
4.8
:
:
3 Days
PC-I Proforma and design report in required
number of copies.
DETAIL ENGINEERING
Detail Engineering Designs and Preparation of Structural Drawings
Activities:
The detailed engineering stage shall be undertaken after approval of
preliminary stage and shall comprise of all necessary working drawings,
specifications, bill of quantities, contract documents, cost estimates etc.
The detailed engineering design will comprise, but shall not be limited to
the following elements:
1.
2.
3.
4.
5.
6.
7.
8.
Duration
Output
8 Days
Detailed designs of pavement for the
approaches and structural design of the bridge
substructures and superstructure components
including structural drawings.
/var/www/apps/conversion/tmp/scratch_4/300816212.doc
4.9
5.
:
:
6 Days
Contract
Document,
Specifications.
Bill
of
Quantities,
WORK PLAN
The proposed work plan and manning schedule based on the task/activities mentioned in
Section 3 for the subject project in placed at Annexure-IV.
6.
PROJECT SCHEDULE
The tasks identified in our work plan, under the Terms of Reference will be completed in
One 1) month excluding two weeks for mobilization and approvals.
7.
PROJECT ORGANIZATION
A flow chart of the project organization and project activities is given at Annexure-V. The
resume of professionals assigned to this project are detailed at Annexure-VII.
8.
COMPLETION TIME
Based on our experience for project preparation of similar projects the completion time
for design and estimation of the proposed bridge is One (1) month. This excludes two
weeks for mobilization and approvals.
9.
OUTPUT TO BE SUBMITTED
The Consultant will submit outputs according to the requirement of the Clients at various
stages as per TOR of the project.
10.
THE CONSULTANT
Khyber Consulting Engineers, a locally based organization with its head office at
Hayatabad Township Peshawar, is fully equipped with all the modern available equipment
and computing facilities. KCE have organized a distinguished pool of human intellectual
resources to engineer the development projects in many fields and in civil engineering in
particular. An introduction to the Khyber Consulting Engineers is placed at Annexure-VI.
/var/www/apps/conversion/tmp/scratch_4/300816212.doc
11.
ON-THE-JOB TRAINING
Being a local firm and equipped with latest surveying, computing and designing facilities
and qualified staff, the Khyber Consulting Engineers offer free training facilities to at least
one Engineer free of charge.