1

Introduction ................................................................................................................................ 3

Range of Applicability................................................................................................................ 4

Objectives ................................................................................................................................... 5

Content Procedure ..................................................................................................................... 5


4.1

Step 1: Qualifications of Personnel ................................................................................... 5

4.2

Step 2: Identification of Flammable Substances .............................................................. 5

4.3

Step 3: Properties of Flammable Substances ................................................................... 5

4.4

Step 4: Source of Release and Ventilation ........................................................................ 6

4.5

Step 5: Hazardous Areas Classification ............................................................................. 6

4.6

Step 6: Hazardous Areas Drawing .................................................................................... 7

4.7

Step 7: Equipment Selection ............................................................................................ 7

4.8

Step 8: Installation of Equipment .................................................................................... 10

4.9

Step 9: Assessment of Equiment / Installation Initial Inspection ................................. 10

4.10

Step 10: Documentation for Permitting .......................................................................... 11

4.11

Step 11: Availability of Documents ................................................................................. 12

Definitions and Abbreviations ................................................................................................. 13

References Documents............................................................................................................ 15

Obsolete Documents ............................................................................................................... 16

Annexes .................................................................................................................................... 16
8.1 Annex 1 Oil and Gas Characteristics in OMV Petrom EP ..................................................... 17
8.2 Annex 2 Types of Protection for Electric Equipment .......................................................... 18
8.3 Annex 3 Types of Protection Non Electrical Equipment ..................................................... 19
8.4 Annex 4 Conformity Assessment Procedure ....................................................................... 20
8.5 Annex 5 Conformity assessment procedure ....................................................................... 21
8.6 Annex 6 Deliverables List ..................................................................................................... 22

Interpretation sheet for Annex 6 Deliverables List....23

PE D HA PRO 001 01 E
ATEX Procedure for Projects

Page 2 of 22

Valid from: 31.03.2012


Edition: 01

OMV Petrom S.A. Regulation


1
Introduction
Hazardous area classification is an important part of processes safety and integrity.
The term hazardous area , in the meaning of this document, refers to an area created by the
presence of an explosive atmosphere.
The term is also known as Electrical Area Classification, in the older references, or as "zoning".
In Europe and beyond, ATEX (ATmospheres EXplosive) became an accepted standard for the
management of the activity in the hazardous areas in order to protect staff and assets, and is
based on the same principles, regardless of the country where the facility is located.
There are, however, differences between national laws governing these activities.
This document outlines legislation, regulations and standards applicable in Romania in order to
guide their own engineering staff or contractors due to differences from other countries.
ATEX is governed by Directive 94/9/EC, Directive for equipment and by Directive 1999/92/EC,
Directive for personnel. Both Directives have been transposed into the Romanian legislation.
Consequently, ATEX regulations and reference standards, e.g. series of standards EN 60079, EN
/ ISO 80079, EN 1127 and EN 13463 are mandatory.
List of reference standards are periodically updated and published in the Official Journal of the
European Union, available on the website:
http://ec.europa.eu/enterprise/policies/european-standards/harmonised-standards/equipmentexplosive-atmosphere/index_en.htm
ATEX regulations refer to all equipment, electrical and non-electrical.
The latest edition of standard EN 60079-0, divides the explosive atmospheres into 3 groups:
group I mines susceptible to firedamp
group II gases, vapours or mist, other than those from the mines susceptible to
firedamp
group III explosive dusts, other than those from the mines susceptible to firedamp
Subdivision of group II
IIA, typical gas: propane
IIB, typical gas: ethylene
IIC, typical gas: hydrogen
Subgroup of group II are divided considering the maximum experimental safe gap MESG or
minimum ignition current or MIC( minimum ignition current ) of explosive gaseous
atmosphere in which the equipment may be installed (EN 60079-20-1).
In oil and gas installations of OMV Petrom, EP Division, were identified explosive substances
from group II (gases) and its subgroups, IIA (propane), respectively, IIB (ethylene).
No substances from subgroup IIC (Hydrogen) or group III (dusts) were identified.
Substances from group I (firedamp) were identified locally, e.g. in oil mine Monteoru.

PE-D-HA-PRO-001-01-E
ATEX Procedure for Projects

Page 3 of 22

Valid from: 31.03.2012


Edition: 01

OMV Petrom S.A. Regulation


Relation with other standards
Standard

Status

Applicable

Projects, including extensions, modernizations or changes


PE-D-HA-PRO-001-01-R_ ATEX Procedure for Projects

In force

Projects

EP FA HA 01 ST PETROM Standard for Areas Classification

In force

Projects
Operation

RO-EP-SR-GDL-001-01-E _Process Safety and Integrity


Engineering and Design 29112011

In force

Projects

TO-HQ-02-019 Rev 00 Philosophy for Hazardous Area Classification


and HVAC Onshore

In force

NO*

Operation-Maintenance-Procurement-Inspection-Attestations (Permits)
RO-EP-DMSS-STD-046-01-R _Standardization of types of explosion
proof for low voltage electric motors ( in Romanian version)

In force

Maintenance
Procurement

PE-D-HA-GDL-001-01- R_ATEX_Attestation_of_Plants_06.03.2012

In force

Operation
Attestations

EP HA 10 PR R1 Equipment Inspection in Hazardous Areas

Under
review

Inspection

EP -MNT-RO-06-POL-16-01.00R_ Maintenance And Inspection


Strategy Of Ex Equipment( in Romanian version)

In force

Maintenance
Inspection

Withdrawn
RO-EP-SR-SOW-001-01-R _Scope of Work for ATEX certification of
plants ( in Romanian version)

Withdrawn

NO

RO-EP-SR-PRO-001-01-R_Ex Certification Procedure (in Romanian


version)

Withdrawn

NO

RO-EP-SR-STD-001-01-E Company Standard for Selection of Ex


Equipment

Withdrawn

NO

RI EX 9.2006 Procedure for Self-Certification for Three-Phase,


Squirrel Cage Induction Motors in Normal Construction Used In
Zone 2

Withdrawn

NO

Note * OMV philosophy contains conflicting standards with present procedure.

2
Range of Applicability
This procedure applies for the following:
Projects, including extensions, modernization/upgrades or changes, starting from
concept phase until commissioning and operation readiness, including permits system,
in OMV Petrom EP installations where explosive atmospheres generated by gas,
vapours or mist may occur.
The procedure does not apply for the following:
For installations of OMV Petrom EP beyond the Romania s borders
Release of air-gas mixture as a consequence of an uncontrolled well blow-out or a
catastrophic rupture of a pipe or a pressure vessel
This procedure shall be applied by the following people:
Contractors and their subcontractors
PE-D-HA-PRO-001-01-E
ATEX Procedure for Projects

Page 4 of 22

Valid from: 31.03.2012


Edition: 01

OMV Petrom S.A. Regulation


Project and engineering team members of OMV Petrom E&P
Ex Responsible
Maintenance personnel involved in extension, modernization or changes of existent
plant.
3
Objectives
This document presents the applicable regulations and standards, the steps to be followed in
different phases of a project, and the documents to be prepared in order to conform to national
legal requirements.
In order to achieve the same outcome for all installations, documentation must meet both the
requirements of authorities and the requirements of OMV Petrom.
4
Content Procedure
The next chapters mentions briefly the minimum requirements and actions to be taken in
engineering, design, construction and operation readiness of plants where explosive
atmospheres are present or where they are expected to occur.
Where, for those actions, there is an applicable standard it was preferred to refer to the
appropriate standards, without going into details.
4.1 Step 1: Qualifications of Personnel
The area classification should be carried out by those who understand the relevance and
significance of properties of flammable materials and by those who are familiar with the
process and the equipment. Such personnel should consult with safety, electrical, mechanical
and other qualified engineering personnel as required.
The design of the installation, the selection of equipment and the installation covered by this
standard shall be carried out only by persons whose training has included instruction on the
various types of protection and installation practices, relevant rules and regulations and on the
general principles of area classification. The competency of the person shall be relevant to the
type of work to be undertaken.
Note 1: Requirements for qualification of personnel are described in the 5th edition of standard EN 6007914
Nota 2: According to NEx 01-06 the companies that design, construct, maintain or repair equipment in
explosive atmospheres or prepare documentation for obtaining attestation of facilities shall have
certified staff and specific procedures.

4.2 Step 2: Identification of Flammable Substances


The identification of flammable substances is made using analysis reports of crude oil, gases or
water injection. These documents are usually available to the Assets.
If such reports are not available or don t contain enough data, the contractor shall order them,
at his own expenses, from an authorized laboratory.
4.3 Step 3: Properties of Flammable Substances
The standard EN 60079-20-1 gives the characteristics of flammable substances as follows:
Equipment Subgroup / Energy of ignition
Auto-ignition temperature / Temperature class
Flash Point
The most common flammable substances present in plants of E&P are (in order of
increasing hazard):
Methane (IIA T1) Lean gas
PE-D-HA-PRO-001-01-E
ATEX Procedure for Projects

Page 5 of 22

Valid from: 31.03.2012


Edition: 01

OMV Petrom S.A. Regulation


Hexane / Octane (IIA T3) Rich gas or crude oil, H2S not present
Hydrogen Sulphide (IIB T3)
Annex 1 lists the relevant properties, for this document, of crude oil, and gas. The Data has
been obtained from the examination of over than 40 analysis reports and Material Safety Data
Sheets (MSDS) of flammable petroleum used in E&P.
Consequently the subgroup IIB and temperature class T3 cover the usual requirements for oil
and gas installations from E&P.
In case more hazardous substances are identified than those above mentioned they will be
listed by CAS number (Chemical Abstract System).
Unclassified liquids:
Petroleum products having a Flash Point higher than 100 C will not be classified in the
conditions specified in the Company Standard for Areas Classification.
Water Injection circuits, e.g. pumps or manifolds, where fluids contain less than 200 ppm of
hydrocarbons, is not classified. Exceptions:
o
o

Tanks for untreated reservoir water or which may be occasionally used for oil storage
Pumps that may be used for conveying oil or because the location of those pumps fits in
the zone produced by neighbouring equipment.

Deliverable: Hazardous area classification data sheet


characteristics according to EN 60079-10-1

Part I: Flammable material list and

4.4 Step 4: Source of Release and Ventilation


The basic elements for establishing the hazardous zones types are the identification of the
sources of release and the determination of the grades of release.
4.4.1 Identification of Source of Release
The sources of release may be classified as continuous, primary or secondary grade.
4.4.2 Characteristics of Ventilation
Type of ventilation:
natural or artificial ventilation (general or local)
Degree of ventilation (dilution): high, medium, low
Availability of ventilation:
good, fair, poor
Combining the concepts of degree of ventilation and level of availability depending on the
grade of release results in a quantitative method for the evaluation of zone type (see Annexes B
and C of EN 60079-10-1).
4.5 Step 5: Hazardous Areas Classification
Area classification is a method of analysing and classifying the environment where explosive
gas atmospheres may be present so as to facilitate the proper selection and installation of
equipment to be used in that environment. The classification also takes into account the
ignition characteristics of the gas or vapour such as ignition energy (equipment group) and
ignition temperature (temperature class).
In particular, zone 0 or zone 1 areas should be minimised in number and extent by design or
suitable operating procedures. In other words, plants and installations should be mainly zone 2
or non-hazardous.
Where the release of flammable material is unavoidable, process equipment should be limited
to those which give secondary grade releases or, failing this (that is where primary or
continuous grade releases are unavoidable), the releases should be of very limited quantity and
rate. In carrying out area classification, these principles should receive prime consideration.
PE-D-HA-PRO-001-01-E
ATEX Procedure for Projects

Page 6 of 22

Valid from: 31.03.2012


Edition: 01

OMV Petrom S.A. Regulation


Where necessary, the design, operation and location of process equipment should ensure that,
even when it is operating abnormally, the amount of flammable material released into the
atmosphere is minimised, so as to reduce the extent of the hazardous area.
Hazardous areas are classified in zones based on the frequency and duration of explosive
atmospheres. Areas (0,1, 2 or unclassified) are defined in Art. 5, Definitions.
Hazardous area classification is considered for normal operation.
Hazardous area classification shall be in compliance with EN 60079-10-1 and Company
Standards for Areas Classification.
Deliverable: Hazardous area classification data sheet Part I: List of sources of release
according to EN 60079-10-1.
4.6
Step 6:
Hazardous Areas Drawing
After classifying areas, a risk assessment shall be performed in order to determine if the
consequences of ignition of an explosive atmosphere requires the use of equipment with a
level of explosion protection (EPL) higher than what would normally be required, or if you can
use a device with a lower EPL than normally required.
Requirements for EPL / ATEX category will be listed in the ATEX documents, including
Hazardous plan to allow the correct choice of equipment.
Hazardous area plan will include the following:
Plans and elevations of three-dimensional model, if any, showing the type and extent of
zones (quotas) and the requirements listed below
Classification of gases or vapours in relation to equipment group or subgroup
Temperature class or ignition temperature of the gas or vapours existing in the
hazardous area
External influences and ambient temperature
Requirements for the protection level of equipment (EPL). This requirement applies even
if the consequences were not subject to a risk assessment
Calculus criteria, including the source and grade of release and the type, degree and
availability of ventilation (EN 60079-10-1).
Hazardous area drawings will be delivered both in a signed form, on paper, and in native
format (e.g. AutoCAD), non-secured. Recommended format: A2/A3. Areas will be highlighted
by patterns, according to EN 60079-10-1, so that black and white print does not create
confusion. Paper format will be presented and laminated for posting in site.
Deliverable: Area classification drawings.
4.7
Step 7:
Equipment Selection
For new installations the selected equipment must have been tested and certified in
accordance with directive 94/9/EC and current editions of the standards series EN 60079, EN
13463 and EN / ISO 80079.
Note: The addition, expansion or modification of existing facilities is considered a new installation.

The types of anti explosive protection are shown in Annexes 2 and 3.


If no risk assessment was done then the typical risk assessment from EN 60079-14 (see Table
no. 1) shall be used.

PE-D-HA-PRO-001-01-E
ATEX Procedure for Projects

Page 7 of 22

Valid from: 31.03.2012


Edition: 01

OMV Petrom S.A. Regulation

Table no. 1 - Relationship between Zones, EPLs and ATEX categories


Zone

Permitted explosion protection levels (EPLs)

Permitted ATEX Category

Ga

1G

Gb

2G

Gc

3G

The use of equipment with a lower or higher EPL than was specified in the Table no. 1 shall be
demonstrated.
To allow access to the bidding of different manufacturers and, taking into consideration the
progress of technology, references to Ex equipment will be made quoting the following:
The area where the equipment will be used (zone 0,1 or 2) and,
o The required EPL, or
o The required ATEX equipment category and
Equipment Group and Temperature Class (usually IIB T3)
Justified: type of explosion protection.
Note 1: Mentioning the type of protection may be necessary in Detailed Design Phase, case in which e.g.
for Ex i equipment (safety intrinsically), it is necessary to design appropriate circuits.
Note 2: The use of a higher EPL than requirement is allowed in procurement phases as a result of a
better offer. Example: the requirement is for an EPL Gc. 1st offer: intrinsically ic (EPL Gc), price A. 2nd
offer: intrinsically ia (EPL Ga) or ib (EPL GB), both of them at price B < A. 2nd offer is preferred and the
reason is: it presents the best price with respect of technical criteria.
Note 3: Since July 2012 mentioning EPL on the marking for each Ex equipment is mandatory.

4.7.1
Conformity Assessment Procedure
Depending on the intended ATEX category, the manufacturer or his authorized representative
established in the EU may choose one of the procedures described in Directive 94/9/EC that
ensures and declares the compliance of product with the requirements of the directive.
The conformity assessment procedures allowed by the Directive are presented in Annex 5.
4.7.2
Preferred Types of Protection
Table no. 2 presents the types of protection currently used in OMV Petrom EP and gives
recommendations on their use. This table serves as a guide only and is not intended to
influence the choice of technology.
The contractor must provide justification for the use of another type of protection than the ones
mentioned below (e.g. a better price for another protection type may be a reason but
traditionally manufacturers offer only this type of protection is not acceptable).
Types of protection unchecked in the table are not commonly used in OMV Petrom EP.
Table no. 2 Types of protection currently used in OMV Petrom E&P
Type of protection
Intrinsically safe

Code

According to:

EN 60079-11

Protection by encapsulation

EN 60079-18

Protection by flameproof
enclosures

EN 60079-1

Protection by increased safety

EN 60079-7

Recommended for:
1)

A2)

Boxes3)

Motors4)

No

No

Yes

Zone 1

Yes
Yes
No

Yes

PE-D-HA-PRO-001-01-E
ATEX Procedure for Projects

Page 8 of 22

Valid from: 31.03.2012


Edition: 01

OMV Petrom S.A. Regulation


Type of protection

Code

According to:

Protection by oil immersion

EN 60079-6

Protection by pressurized
enclosures

EN 60079-2

Protection by powder filling

EN 60079-5

Protection by using optical


radiation
Non-sparking equipment
Fieldbus non-incendive concept
(FNICO)

Recommended for:
1)

A2)

Boxes3)

Motors4)

EN 60079-28
n

EN 60079-15

Yes

EN 60079-27

Note 1: Field instruments, e.g. sensors, transmitters, measuring equipment


Note 2: Command or control devices, e.g. command buttons, solenoids
Note 3: Connection or junction boxes
Note 4: Three phases squirrel cage induction motor

4.7.3 Motors Supplied by Converter


It is normally expected that motors and converters will be evaluated as a system.
Motors intended to be driven by converters will have the following additional markings (in
accordance with standard EN 60079-0, edition 6):
"For Converter Supply"
Frequency / minimum speed / maximum speed allowed
Type of converter accepted
Note 1: The term converter (used for driving of electric motors) is also known as a frequency converter,
inverter or variable speed drive - VSD.

Additionally, regardless of the zone (1 or 2), there are additional requirements that the
following types of motors must meet:
Exe with EPL Gb or Gc
o thermal protection requirements
o motor and a converter shall be tested as a complete unit
Exd with EPL Gb or EPL Gc
o thermal protection requirements
o embedded temperature detectors, for direct controlling of temperature,
o it is not mandatory for the motor and converter to be tested as a complete unit.
Ex nA with EPL Gc
o Type testing of motor together with the specific converter, in accordance with EN
60079-15:2010
Note 2: Presentation of conditions for motors type Exd was made just in case and does not contradict the
recommendation from Table no. 2.
Note 3: Using existing motors with variable speed drives (VSD), although not recommended, may be
done only for Zone 2, with accomplishing protection conditions specified above and if the
manufacturer's VSD (converter) or his authorized representative issue a written declaration that it is
possible and safety.
PE-D-HA-PRO-001-01-E
ATEX Procedure for Projects

Page 9 of 22

Valid from: 31.03.2012


Edition: 01

OMV Petrom S.A. Regulation


4.7.4 Gas Detectors
Gas detectors, to be used as a protective measure (e.g. de-energise equipment if gas is
detected), shall be used in accordance with relevant requirements of IEC 60079-29-1 and IEC
60079-29-4.
Gas detection may be used as a method of protection enabling the use of electrical equipment
in hazardous areas where that equipment might not have otherwise been allowed.
Reference: IEC 60079-14, ed.5, Annex N.
4.7.5 Light Metals as Construction Materials
Installation materials (e.g. cable trays, mounting plates, weather protection) shall not contain
more light metals than required by IEC 60079-0 for equipment.
4.8 Step 8: Installation of Equipment
The equipment shall be installed in accordance with its documentation.
Reference standard: EN 60079-14.
4.9 Step 9: Assessment of Equiment / Installation - Initial Inspection
After the installation of the equipment is complete, an initial inspection must be carried out in
accordance with IEC 60079-14 Explosive atmospheres, Edition 5 - Part 14: Design, selection and
construction of electrical installations.
Note: Development of this standard is ongoing. Until the next edition is in force, the initial inspection
shall be performed in accordance with the current edition of standard EN 60079-17 Explosive
atmospheres - Part 17: Maintenance and inspection of electrical installations.

The following aspects will be considered for initial inspection:


That the initial checking of electrical installation was performed according to SR HD
60364-6 and that the verification report has been prepared and is available.
That equipment is properly marked with CE marking and Ex, in accordance with
Directive 94/9/EC, with referenced standard and EC certificate / declaration of
conformity.
That the classification of the installed equipment is appropriate for the installation area.
That the Ex Certificate / declaration of conformity are available and contain the minimum
information specified in Directive 94/9/EC and relevant standards. The content of
Declaration of Conformity is described in Annex 4.
Declaration of manufacturer for equipment without its own source of ignition and are
considered out of scope of Directive 94/9/EC
Declaration of manufacturer for equipment considered as "simple apparatus" according
to Directive 94/9
That documents for equipment with special conditions of operation (e.g. equipment
having certificate number with the suffix "_X") have been provided, and that the
installation has taken into account any relevant special conditions.
Descriptive declaration of the intrinsically safety system
Risk assessment for assemblies, issued by the manufacturer, as it is defined in ATEX
Guide 3rd Edition / 2009.
The results of the assessment are to be recorded in a table that will contain at least the
information listed in Table 3.
Initial inspection report will be recorded.
PE-D-HA-PRO-001-01-E
ATEX Procedure for Projects

Page 10 of 22

Valid from: 31.03.2012


Edition: 01

OMV Petrom S.A. Regulation


Table no. 3 Equipment list
Date
tehnice
(Un, In,
Nn)

Grad de
protecie
(Codul IP)

Categoria
ATEX /
EPL

Conditii
Speciale

Ex
Ingress
Name of
Manufacturer Technical
Temperature
Ex
Zone
protection Group
protection
equipment/installation
/ Year
data
Class
certificate
(IP code)
type

ATEX
category

Special
Conditions

Denumire echipament
sau instalaie

Zona

Fabricant /
An fabricaie

Tip
protecie
(Ex)

Grupa

Clasa de
temperatura

Certificat
Ex

/ EPL

4.10 Step 10:


Documentation for Permitting
This section presents the documentation to be produced/reviewed and attestations to be
obtained, for installations in explosive atmospheres, namely:
Explosion protection document as a requirement of the Directive 1999/92/EC, also
known as ATEX 137 or the directive for staff, transposed by HG 1058/2006
Attestation of plant, based on documentation and an inspection on site, by National
Authority, as a provision of normative NEx 01-06.
According to the normative and regulations mentioned above the responsibility for preparing
documentation and obtaining the attestation is the responsibility of the user.
Considering that, for new and modernized plants and for the various phases of the project, the
majority of these documents are prepared by the Contractor the responsibility for
documentation preparation and for obtaining of attestations will be transferred, by clear
provisions of contract, to the Contractor.
4.10.1 Explosion Protection Documentation
The documentation shall contain, as minimum:
Presentation memo
Area classification drawings
Classification of Ex equipment and Ex certificates
Guidelines for maintenance of equipment, as per SR EN 60079-17
Qualification and training of personnel referring to protection against explosion
Nomination of Ex responsible person
Specifications for PPE
Explosion risk assessment.
4.10.2 Document for Attestation of Plants by INSEMEX
The documentation shall contain, as minimum:
General plant description
Process flow diagrams
The list of equipment (electrical and mechanical) placed in classified areas (e.g. motors,
instruments, pumps, lighting, junction boxes). The list will include the equipment s rated
characteristics. An example of equipment list is presented in table no. 3.
Areas classification drawings
Assessment of conformity with the requirements of Annex 1 of NEx 01-06
Initial inspection of equipment as per standard SR EN 60079-17.

PE-D-HA-PRO-001-01-E
ATEX Procedure for Projects

Page 11 of 22

Valid from: 31.03.2012


Edition: 01

OMV Petrom S.A. Regulation


4.10.3 Document Presentation
The above mentioned documents will be approved by User before they are submitted to the
Authority.
After receipt of the attestation, the Contractor will send to user the documentation together
with the attestation.
The Documentation will be delivered with respect of the following requirements:
Both in hardcopy and in softcopy
Original/native documents in editable format (MS Office, Adobe 6, AutoCAD 6)
Romanian and English languages
Separate file (from other technical documents)
Contractor may combine both sets of documents in a single file
Taxes and other expenses required for attestation will be Contractor's responsibility.
Note: Some requirements e.g. "Nomination of Ex responsible person" will be fulfilled with user's support.

4.10.4 Delivery Time


The initial inspection shall be carried out after the mounting of equipment and before it is put in
function (energised). The attestation shall be obtained before the equipment is deemed to be
ready for operation. It is the Contractor's responsibility for the timely submission of documents
and coordination with Authority.
4.11 Step 11:
Availability of Documents
In order to ensure correct installation or extension of plants, the following information,
additional to the requirements for non-hazardous areas, is required, where applicable.
Reference: EN 60079-14 standard, ed. 5
4.11.1 Site
Area classification drawing, as indicated in [4.6]
Optional assessment of consequences of ignition
Material characteristics including electrical resistivity
4.11.2 Equipment
Instructions for installation and initial inspection
Documents for electrical equipment with conditions of use, e.g. for equipment with
certificate numbers which have the suffix _X
Descriptive system document for the intrinsically safe system
Details of any relevant calculation, e.g. for purging rates, for instruments or analyser
houses
NOTE: As part of the obtained documentation, information for maintenance and repair should be
available in accordance with IEC 60079-17 and IEC 60079-19 respectively.

4.11.3 Installations
Necessary information to ensure correct installation of the equipment provided in a form
which is suitable to the personnel responsible for this activity (see IEC 60079-0
Instructions)

PE-D-HA-PRO-001-01-E
ATEX Procedure for Projects

Page 12 of 22

Valid from: 31.03.2012


Edition: 01

OMV Petrom S.A. Regulation


Documentation relating to the suitability of the equipment for the area and environment
to which it will be exposed, e.g. temperature ratings, type of protection, IP rating,
corrosion resistance
Details of the type of wiring system
Record of selection criteria for cable entry system, for compliance with the
requirements for particular types of protection
Drawings and schedules relating to identification of circuits.
4.11.4
Personnel
Evidence of personnel competency (Annex A of EN 60079-14, ed.5).
4.11.5 Approval of Documents
Documents will be approved by competent persons and who own a valid attestation, according
to [4.1], and who meet the required approval level given in the Discipline Authority Framework
(DAF) and specified in Annex 6.
4.11.6 Documents Keeping
After commissioning of plant, the documents mentioned in this chapter, together with those
mentioned in 4.9 and 4.10, including documentation for obtaining certificates, will be posted on
SharePoint, by care of Responsible Ex, with support of Technical Compliance Office Facility
Engineering Department.
4.11.7 Deliverable
Deliverables by project phases, maturity and level of approval are presented in Annex 6
5
Definitions and Abbreviations
For the purpose of this procedure the following definitions are given:

Asset

Operating and Production Area (subunits) of Division OMV


Petrom E&P

E&P

OMV Exploration & Production Division of Petrom

Ex Responsible
(ATEX expert)

The person appointed by Asset Manager, part of the Facility


Engineering, included in PE Asset Department, in order to
comply with the requirements of the Explosion Protection
Document. This person must be attested by INSEMEX.

FE

Facility Engineering

PE Asset

Project and Engineering Department from Asset

ATEX

ATmosfere EXplosive (Directive 94/9/CE)

Attestation

Document issued by the Authority

Authority

National Authority for Explosion Protection, INCD INSEMEX


Petroani

Explosive gas
atmosphere

Mixture with air, under atmospheric conditions, of flammable


substances in the form of gas or vapour, which, after ignition,
permits self-sustaining flame propagation in entire mixture
(Directive 94/9/EC)

Hazardous area
(on account of
explosive gas
atmospheres)

An area in which an explosive gas atmosphere is or may be


expected to be present, in such as quantities to require special
precautions for the construction, installation and use of
equipment (IEV 426)
PE-D-HA-PRO-001-01-E

ATEX Procedure for Projects

Page 13 of 22

Valid from: 31.03.2012


Edition: 01

OMV Petrom S.A. Regulation

ATEX Category

Defined by directive 94/9/EC. Similarly definitions with EPL


ATEX categories are, for Group II - gases and vapours: 1G, 2G
and 3G

Ex Certificate

Certificate of conformity , as defined in Directive 94/9/EC

CAS number

Chemical Abstract System. Unique numerical identifier assigned


to each substance described in scientific literature

Temperature Class

Classification of equipment for explosive atmospheres in terms


of maximum surface temperature (IEV426).

Documentation

Set of documents prepared in accordance with and in order to


accomplish legal requirements

Declaration of
Conformity

Document prepared by manufacturer or his authorized


representative in accordance with Directive 94/9/CE

Explosion
Protection
Document

Documentation elaborated as a requirements and in conformity


whit Directive 1999/92/EC respectively GD 1058/2006

Equipment
protection level
(EPL)

The level of protection assigned to equipment based on its risk


of becoming a source of ignition and distinguishing the
differences between explosive gas atmospheres, explosive dust
atmospheres and coal mines.

EPL

Ga

ATEX II 1G
Category

EPL Gb

ATEX II 2G
Category
EPL Gc

ATEX II 3G
Category

Equipment for explosive gas atmospheres, having a "very high"


level of protection, which is not a source of ignition in normal
operation, expected malfunction or when subject to rare
malfunction. Such equipment will have a form of protection,
which will remain effective even in the presence of two potential
faults (for example, intrinsic safety, level of protection ia ), or
will have two independent means of protection (for example, Ex
e and Ex d acting independently of each other).
Equipment for explosive gas atmospheres, having a "high" level
of protection, which is not a source of ignition in normal
operation or when subject to faults that may be expected,
though not necessarily on a regular basis. (The majority of the
standard protection concepts bring equipment within this
equipment protection level).
Equipment for explosive gas atmospheres, having a "normal"
level of protection, which is not a source of ignition in normal
operation and which may have some additional protection to
ensure that it remains inactive as an ignition source in the case
of regular expected occurrences (for example failure of a lamp).
Typically this will be an Ex n equipment.

(Auto) Ignition
temperature of an
explosive gas
atmosphere

Lowest temperature of a heated surface which, under specified


conditions according to specific conditions will ignite a
flammable substance in the form of a gas or vapour mixture with
air( IEV 426, EN 60079-20-1)

FTS/MSDS

Material Safety Data Sheet prepared in accordance with ISO


11014, as a requirement of the Directive 91/155/EC
PE-D-HA-PRO-001-01-E

ATEX Procedure for Projects

Page 14 of 22

Valid from: 31.03.2012


Edition: 01

OMV Petrom S.A. Regulation


Situation when the equipment is operating within its designed
parameters

Normal operation

(Equipment) Group

LEL - lower
explosive limit

Protection level

Type of protection

NOTE 1: Minor releases of flammable material may be part of normal


operation. For example, releases from seals, which rely on wetting by
the fluid that is being pumped, are considered to be minor releases.
NOTE 2: Failures (such as the breakdown of pump seals, flange gaskets
or spillages caused by accidents), which involve urgent repairs or
shutdown, are not considered to be part of normal operation nor are
they considered to be catastrophic.
NOTE 3: Normal operation includes start-up and shutdown conditions.

Classification of electrical equipment related to the explosive


atmosphere for which it is to be used (IEV 426)
NOTE: EN 60079-0 standard, ed. 5, defines 3 groups: group I(mines
susceptible to firedamp) group II (vapours and gases) group III
(dusts)

Concentration of flammable gas, vapour or mist in air below


which an explosive gas atmosphere will not be formed ( IEV 426)
Subdivision of the type of protection, correlated with the
explosion protection level (EPL) that differentiates the probability
for an equipment to become a source of ignition (EN 60079-0)
Explanatory note: Type of intrinsically protection (i) is divided in levels
of protection "ia", "ib" and ic , and that they are correlated with EPL's
Ga, Gb and Gc (for explosive gas atmospheres)

Specific measures for equipment applied to prevent ignition of


explosive atmospheres surrounding ( IEV 426)
Highest temperature which is attained in service under the most
adverse conditions (but within the specified tolerances) by any
part or surface of equipment

Maximum surface
temperature

Flash point

Lowest liquid temperature at which, under certain standardized


conditions, a liquid gives off vapours in a quantity such as to be
capable of forming an ignitable vapour/air mixture( IEV 426)

UEL- upper
explosive limit

Concentration of flammable gas, vapour or mist in air, above


which an explosive gas atmosphere will not be formed ( IEV 426)

User

For the purpose of Directive 99/99/EC and NEx 01-06: Company


who operate the plant. The user may not be the same with the
owner.

Zone 0

An area in which an explosive gas atmosphere is present


continuously or for long periods or frequently ( IEV 426)

Zone 1

An area in which an explosive gas atmosphere is likely to occur


in normal operation occasionally( IEV 426)

Zone 2

Area in which an explosive gas atmosphere is not likely to occur


in normal operation but, if it does occur, will persist for a short
period only( IEV 426)

NOTE: This temperature may occur on an internal component or on the


external surface of the enclosure, depending upon the type of
protection employed

PE-D-HA-PRO-001-01-E
ATEX Procedure for Projects

Page 15 of 22

Valid from: 31.03.2012


Edition: 01

OMV Petrom S.A. Regulation

Non-hazardous
area (on account of
explosive gas
atmospheres)

An area in which an explosive gas atmosphere is not expected to


be present in such as quantities to require special precautions
for the construction, installation and use of equipment

References Documents
Directive 94/9/EC transposed by HG 752/2004, modified
Directive 99/92/EC, transposed by HG 1058/2006
Normative NEx 01-06
ATEX Guideline 3rd Edition July 2009
EN 1127-1 Explosive atmospheres - Explosion prevention and protection - Part 1: Basic
concepts and methodology
Series standards SR EN 60079 Explosive atmospheres
Series standards SR EN 13463 Non-electrical equipment for use in potentially explosive
atmospheres
Series standards ISO/IEC 80079 Explosive atmospheres. Non-electrical equipment for
use in potentially explosive atmospheres
International Electrotechnical Vocabulary. Part 426 Electrical apparatus for explosive
atmospheres (IEV 426)
SR HD 60364-6 Low voltage installations. Part 6: Verification
EP FA HA 01 ST PETROM Standard for Areas Classification
RO-EP-QA-MAN-002-01-R Quality manual of Facility Engineering Department ( in
Romanian version)
Obsolete Documents
RO-EP-SR-PRO-001-01-R_Ex Certification Procedure (in Romanian version)
RO-EP-SR-STD-001-01-E Company Standard for Selection of Ex Equipment
RO-EP-SR-STD-001-01-R Company Standard for Selection of Ex Equipment
RO-EP-SR-SOW-001-01-R _Scope of Work for ATEX certification of plants ( in Romanian
version)
RI EX 9.2006 Procedure for Self-Certification for Three-Phase, Squirrel Cage Induction
Motors in Normal Construction Used In Zone 2

Note: EP HA 10 PR R1 Equipment Hazardous Areas 2007-10-10 procedure remains in force, it will be


reviewed

8
8.1
8.2
8.3
8.4
8.5
8.6

Annexes
Annex 1
Annex 2
Annex 3
Annex 4
Annex 5
Annex 6

Oil and Gas Characteristics in OMV Petrom EP


Types of Protection for Electric Equipment
Types of Protection Non-Electrical Equipment
Content of the EC Declaration of Conformity
Conformity Assessment Procedure
Deliverables List

PE-D-HA-PRO-001-01-E
ATEX Procedure for Projects

Page 16 of 22

Valid from: 31.03.2012


Edition: 01

OMV Petrom S.A. Regulation


8.1 Annex 1 Oil and Gas Characteristics in OMV Petrom EP
CAS
Number

Material/ Composition

Equipment
Group

Temperature
Class

(Auto) Ignition
Temperature (C)

Formula

LEL (%)

UEL(%)

74-82-8

Methane*

IIA

T1

600 CH4

5,0

15,4

74-84-0

Ethan

IIA

T1

515 CH3CH3

3,0

15,5

74-98-6

Propane

IIA

T2

450 CH3CH2CH3

2,1

9,6

106-97-8

n-Butane

IIA

T2

372 CH3(CH2)2CH2

1,5

8,5

109-66-0

n Pentane

IIA

T3

243 CH3(CH2)3CH3

1,3

7,6

110-54-3

Hexane (n-hexane)

IIA

T3

225 CH3(CH2)4CH3

1,1

7,5

142-82-5

Heptane (n-heptane)

IIA

T3

204 C7H16

1,1

6,7

111-65-9

n-Octane

IIA

T3

206 CH3(CH2)6CH3

1,0

6,5

111-84-2

Nonane

IIA

T3

205 CH3(CH2)7CH2

0,74

5,6

124-18-5

n-Decane

IIA

T3

235 C10H22

0,7

5,6

7783-06-4

Hydrogen Sulphide

IIB

T3

260 H2S

4,0

45,5

8008-20-6

Diesel fuel No. 2))

IIA

T3

254 C15 C21

0,6

6,5

8006-61-9

Gasoline (benzine)

IIA

T3

280

1,4

7,6

T2

>300

0,6

6,0

537

5,0

15,0

>250

0,6

6,0

Condensate - Asset II - INCERP


Rich gas- Asset VII

INCPDM

Gasoline - Asset VII


Note*: Content< 25% (V/V) of Hydrogen (see EN 60079-20-1)

PE-D-HA-PRO-001-01-E
ATEX Procedure for Projects

Page 17 of 22

Valid from: 31.03.2012


Edition: 01

OMV Petrom S.A. Regulation


8.2 Annex 2 Types of Protection for Electric Equipment
EPL

ATEX Category

Type of protection

Code

Protection by Intrinsically safe


Protection by Encapsulation
Ga

1G

ia

EN 60079-11

ma

EN 60079-18

Two independent types of protection, each


satisfying the conditions imposed by the
Gb level

EN 60079-26

Protection of equipment and transmission


systems using optical radiation

2G

EN 60079-1

Protection by Increased safety

EN 60079-7

Protection by Intrinsically safe

ib

EN 60079-11

Protection by Encapsulation

m sau
mb

EN 60079-18

Protection by Oil immersion

EN 60079-6

p , px or
py

EN 60079-2

EN 60079-5

Protection by Pressurized enclosures


Protection by Powder filling
Fieldbus intrinsically safe concept (FISCO)

EN 60079-27

Protection using optic radiation

EN 60079-28
ic

EN 60079-11

mc

EN 60079-18

n or nA

EN 60079-15

Restricted breathing equipment

nR

EN 60079-15

Energy limitation equipment

nL

EN 60079-15

Sparking equipment

nC

EN 60079-15

Protection by Pressurized enclosures

pz

EN 60079-2

Protection by Intrinsically safe


Protection by Encapsulation
Non-sparking equipment
'Gc'

3G

EN 60079-28
d

Protection by Flameproof enclosures

Gb

According to:

Fieldbus non-incendive concept (FNICO)

EN 60079-27

Protection by using optical radiation

EN 60079-28

PE-D-HA-PRO-001-01-E
ATEX Procedure for Projects

Page 18 of 22

Valid from: 31.03.2012


Edition: 01

OMV Petrom S.A. Regulation


8.3 Annex 3 Types of Protection Non-Electrical Equipment

EPL

ATEX Category

Ga

1G

Gb

Gc

2G

3G

Type of protection

Code

According to:

Constructional safety

"c"

EN 13463-5

Control of ignition source

"b"

EN 13463-6

Liquid immersion

"k"

EN 13463-8

Flameproof

"d"

EN 13463-3

Constructional safety

"c"

EN 13463-5

Control of ignition source

"b"

EN 13463-6

Pressurization

"p"

EN 13463-7

Liquid immersion

"k"

EN 13463-8

Flow restricting enclosure

"fr"

EN 13463-2

Flameproof

"d"

EN 13463-3

Constructional safety

"c"

EN 13463-5

Control of ignition source

"b"

EN 13463-6

Pressurization

"p"

EN 13463-7

Liquid immersion

"k"

EN 13463-8

PE-D-HA-PRO-001-01-E
ATEX Procedure for Projects

Page 19 of 22

Valid from: 31.03.2012


Edition: 01

OMV Petrom S.A. Regulation


8.4 Annex 4 Content of EC declaration
The EC declaration of conformity must contain the following elements [Directive 94/9/EC,
Annex X, B]:
the name or identification mark and the address of the manufacturer or his authorized
representative established within the Community
a description of the equipment, protective system, or device referred to in Article 1 .(2) of

directive

all relevant provisions fulfilled by the equipment, protective system, or device referred to
in Article 1. (2) of directive
where appropriate, the name, identification number and address of the notified body and
the number of the EC-type-examination certificate
where appropriate, reference to the harmonized standards
where appropriate, the standards and technical specifications which have been used
where appropriate, references to other Community Directives which have been applied
identification of the signatory who has been empowered to enter into commitments on
behalf of the manufacturer or his authorized representative established within the
Community.
The manufacturer or his authorized representative must keep a copy of the declaration of
conformity for a period of at least 10 years from the date of manufacture the last equipment. If in
case when neither the manufacturer nor his authorized representative not domiciled or have
registered in Romania or in an EU Member State, obligation to keep available the technical
documentation shall be the responsibility of the person who places the equipment or protective
system on the market.

PE-D-HA-PRO-001-01-E
ATEX Procedure for Projects

Page 20 of 22

Valid from: 31.03.2012


Edition: 01

OMV Petrom S.A. Regulation

8.5 Annex 5 Conformity Assessment Procedure


Equipment of Groups I and II
Categories M1 and 1* and
Autonomous Protective
Systems

EC type Examination
Annex III

or

YES

Internal combustion
engine or electrical
equipment

EC type
Examination
Annex III

and

Production
QA
Annex IV

Equipment of Groups I and II


Categories M2 and 2*

Internal control of
production Annex VIII

and

and

OR

NO

Internal control
of production
Annex VIII

Product
verification
Annex V

Conformity to
type
Annex VI

Equipment of group II
Category 3*

or

Communicate a
technical
documentation to
a Notified Body
Product QA
Annex VII

Equipment of Groups I and II


and Autonomous Protective
Systems

Unit verification
Annex IX

(*) and their components and devices, if separately assessed

PE-D-HA-PRO-001-01-E
ATEX Procedure for Projects

Page 21 of 22

Valid from: 31.03.2012


Edition: 01

OMV Petrom S.A. Regulation


8.6 Annex 6 Deliverables List
Project
Phase

Document

Maturity

Approval

Select

Evidence of personnel competency

Final

Select

Specification for hazardous areas classification - Part I List


of flammable materials and their characteristics

Final

Define

Explosion risk assessment

Optionally

DA2

Define

Hazardous Areas Drawing

Baseline

DA2

Define

Equipment Ex specifications

Preliminary

DA2

Execute

Evidence of personnel competency

Final

DA3

Execute

Specification for hazardous areas classification - Part II


List of sources of release

Final

Execute

Hazardous Areas Drawings

Final

DA2

Execute

Equipment Ex specifications

Final*

DA3

Execute

Materials characteristics, including electrical resistivity

Final*

DA3

Execute

Ex certificate of conformity

Final

DA3

Execute

Declaration of conformity EC

Final

DA3

Execute

Equipment manufacturer's Declaration which have not


own source of ignition and are considered outside the
scope of Directive 94/9/EC

Final

Execute

Documents for electrical equipment with conditions of


use, e.g. for equipment with certificate numbers which
have the suffix _X

Final

Execute

Descriptive Declaration of the intrinsically safety system

Final*

Execute

Risks assessment for assemblies, issued by the


manufacturer, as defined in ATEX Guide Edition 3-a/2009.

Final

Execute

Details of any relevant calculation, e.g. for purging rates,


for instruments or analyser houses

Final

Execute

Plans showing and details of type of wiring system

Final

Execute

Record of selection criteria for cables entry system, for


compliance with the requirements for particular types of
protection

Final*

Execute

Drawings and schedules relating to circuits identification

Final

DA3

Execute

Instructions for initial inspection and Installation

Final

DA3

Execute

List of equipment and their characteristics

Final

DA3

Execute

Report regarding initial inspection

Final

DA3

Execute

Information for Maintenance and repairs

Final

DA3

Execute

Explosion Protection Document

Final

DA3

Execute

Attestation EX, as a requirement of normative NEX 01/06

Final

DA3

DA3

DA3
DA3
DA3
DA3
DA3

PE-D-HA-PRO-001-01-E
Page 22 of 22

DA2

DA3

Note* Some information are not required as separate document

ATEX Procedure for Projects

DA2

Valid from: 31.03.2012


Edition: 01

PE-D-HA-PRO-001-01-E
ATEX Procedure for Projects
IS 2014

Aceasta Foaie de Interpretare a fost creat ca urmare si pentru a evita in viitor confuziile in
utilizarea listei de livrabile din Anexa 6.
In principiu doar documentele marcate cu verde ar trebui sa fie considerate livrabile.
Celelalte documente sau informa ii trebuie sa fie de asemenea disponibile, in faza de proiect
men ionat , chiar daca sunt incluse in documente apar innd diferitelor discipline sau sunt
livrate de produc torii de echipamente.
In orice caz, toate documentele trebuie analizate si aprobate de autorit ile pe disciplina, in
conformitate cu DAF si faza de proiect

This Interpretation Sheet (IS) has been developed as result of and in order to avoid in the
future any confusion in use of Deliverable List from Annex 6.
In principle only the documents in green should be considered as deliverable.
The other documents shall be also available in the mentioned project phase, even if they are
included in documents which belong to other disciplines or are delivered by manufacturers.
In every case, all documents shall be reviewed and approved by discipline authority,
according to DAF for Project Phase.

Author
Jugravu Nicolae

ATEX Procedure for Projects


Interpretation Sheet 2014

Page 1 of 7

Valid from: 2014

Nr. Crt.

Fazele
proiectului

Document

Dovezi ale competen ei personalului


1.

All

Proiectan
a)
b)
c)
d)
e)
f)
g)
h)

Evidence of personnel competency

Observa ii

Livrabile

Proiectan ii trebuie s poat s - i demonstreze competen ele i s aduc


dovezi de nsu ire a cuno tin elor i a abilit ilor relevante solicitate
pentru tipul de protec ie i/sau tipul de echipament utilizat (ref.: EN 600791
14). A se vedea Nota .
n conformitate cu Nex 01-06, personalul i companiile trebuie s fie
atestate de c tre INSEMEX.

Designers shall be able to demonstrate their competency and provide


evidence of attaining the knowledge and skill requirements relevant to the
types of protection and/or types of equipment involved (ref.:EN 60079-14).
See also Note1.
According to NEx 01-06, personnel and companies shall be attested by
INSEMEX.

ii ar trebui s posede pe lng cele necesare ndeplinirii sarcinilor, urm toarele:


Cuno tin e detaliate ale principiilor generale de protec ie la explozie;
Cuno tin e detaliate ale principiilor generale ale tipurilor de protec ie i marcare;
Cuno tin e detaliate ale acelor aspecte ale proiect rii echipamentelor care afecteaz conceptul de protec ie;
Cuno tin e detaliate ale con inutului de certificate i ale p r ilor relevante ale acestui standard
n elegerea abilit ilor practice pentru preg tirea i instalarea conceptelor de protec ie relevante
Cuno tin e detaliate a importan ei adi ionale a sistemelor Permis de lucru i izolare de siguran n rela ie cu Protec ia la Explozie
Cuno tin e detaliate ale tehnicilor particulare folosite pentru selectarea sau respingerea unui echipament n conformitate cu acest standard
n elegere general a cerin elor pentru inspec ie i mentenan ale CEI 60079-17.

Designers shall possess, to the extent necessary to perform their tasks, the following:
a) detailed knowledge of the general principles of explosion protection;
b) detailed knowledge of the general principles of types of protection and marking;
c) detailed knowledge of those aspects of equipment design which affect the protection concept;
d) detailed knowledge of content of certificates and relevant parts of this standard;
e) understanding of practical skills for the preparation and installation of relevant concepts of protection;
f) detailed knowledge of the additional importance of Permit to Work systems and safe isolation in relation to Explosion Protection;
g) detailed knowledge of the particular techniques to be employed in the selection and erection of equipment referred to in this standard;
h) general understanding of Inspection and Maintenance requirements of IEC 60079-17.

ATEX Procedure for Projects Interpretation Sheet 2014

Page 2 of 7

Valid from: 2014

Nu

Maturitate

Nr. Crt.

Fazele
proiectului

Document

Specifica ii pentru clasificarea ariilor


periculoase Partea I Lista de materiale
inflamabile i caracteristicile lor

2.

Select

Specification for hazardous areas


classification - Part I List of flammable
materials and their characteristics

Planul de zonare

Hazardous Areas Drawing

Evaluarea riscurilor de explozie


3.

Define

Explosion risk assessment

Specifica ii pentru clasificarea ariilor


periculoase Partea a II-a Lista surselor
de emisie
4.

Define

Specification for hazardous areas


classification - Part II List of sources of
release

Observa ii

Livrabile

Informa ii care vor indica dac materialele inflamabile, dac exist , pot
forma atmosfere explozive n condi iile date de proces. Important n mod
special pentru i ei greu, tratamentul apei, gaze cu con inut mare de CO2
sau gaze de combustie, unde informa ii ca de exemplu: punctul de
inflamabilitate, con inutul de hidrocarburi n ap sau compozi ia gazului
pot sus ine decizia dac este cazul sau nu pentru zonare.
Nu se ntocme te pentru proiecte de ex. drumuri, comprimare aer, apa
industriala in care absenta materialelor inflamabile, in cantit i
semnificative, este evidenta.
Daca se ntocme te plan de zonare, specifica ia va face parte din acesta.

Information which will indicate if flammable materials, if any, may form


explosive atmospheres under given process condition.
Important especially for heavy oil, water treatment, natural gas with high
contain of CO2 or combustion gas where information such e.g. Flash
Point, contain of hydrocarbon in water or gas composition will support
the decision if areas classification is required or not.

Not required for projects e.g. roads, air compression, industrial water
where the lack of flammable substances in significant amount is
obviously
If a hazardous area drawing is developed, the specification is part of it.
Depinde de decizia de mai sus.

Maturitate

Yes,
as
independ
ent
documen
t or part
of
hazardou
s areas
drawing,
if case

Baseline

Op ional

Depend of the above decision


Trebuie ntocmit doar dac se a teapt rezultate diferite de cele standard
ca de ex. un EPL mai mare sau mai mic. A se vedea art. [4.7].
Evaluarea este parte din zonare, nu un livrabil n sine.

Shall be developed only if is expected a different results than standard


ones e.g. a higher or lower EPL. See also clause [4.7].
The assessment is part of hazardous areas drawing not a deliverable
itself.

Nu

Op ional

Nu

Final

Baz pentru ntocmirea i parte a planului de zonare.

Basis and part of areas classification drawing

ATEX Procedure for Projects Interpretation Sheet 2014

Page 3 of 7

Valid from: 2014

Nr. Crt.

Fazele
proiectului

Document

Planul de zonare
5.

Define

Hazardous Areas Drawing

Specifica iile echipamentului Ex


6.

7.

8.

Define

Execute

Execute

10.

Execute

Livrabile

Based on the plant layout, hazardous assessment and relief study, the
Hazardous area plan should provide info about Ex-Zones, their size and
category. The zones have to be calculated according norm with regards to
medium, pressure, flow and relief source. Zone definition and relief radii
have to be fixed in DEFINE phase.
Drawing will include horizontal and vertical projections, dimension of
zones, gas group, temperature class and EPL or ATEX Category
Informa ii incluse n specifica iile/ fi ele de date ale echipamentului. n
mod curent se va include Grupa de echipamente, Clasa de temperatur i
Categoria ATEX/ EPL

Information included in equipment specification/ datasheet. Usually will


include Equipment Group, Temperature Class and EPL/ATEX Category

Planul de zonare

Va fi parte din EPD

Hazardous Areas Drawing

Will be part of EPD

Caracteristicile materialelor, inclusive


rezistivitatea electric

Sunt livrate de c tre furnizor.


Asemenea informa ii ar putea fi necesare de ex. pentru evaluarea
desc rc rilor electrostatice i ar trebui livrate de ex. pentru echipamentele
necertificate confec ionate din materiale neconven ionale (sticl , plastic).

Materials characteristics, including


electrical resistivity

Delivered by vendor
Such information may be required e.g. for assessment of electrostatic
discharge and should be delivered e.g. for uncertified equipment made of
unconventional material (glass, plastic)

Certificatul de conformitate Ex

Sunt livrate de c tre furnizor. Vor fi parte din EPD.

Ex certificate of conformity

Delivered by vendor. Will be part of EPD

Declara ia de conformitate EC

Sunt livrate de c tre furnizor. Vor fi parte din EPD.

Declaration of conformity EC

Maturitate

Pe baza planului general al instala iei, evaluarea pericolelor i a studiului


de degajare, zonarea ar trebui s furnizeze informa ii despre zonele Ex,
m rimea i categoria lor. Zonele trebuie s fie calculate innd cont de
mediu, presiune, debit i sursele de degajare. Definirea zonelor i
extinderea acestora trebuie s fie fixate n faza DEFINE.
Desenele vor include proiec ii orizontale i verticale, dimensiunile zonelor,
grupa de gaze, clasa de temperatur i categoria ATEX sau EPL-ul

Equipment Ex specifications

Execute

9.

Observa ii

Delivered by vendor. Will be part of EPD

ATEX Procedure for Projects Interpretation Sheet 2014

Page 4 of 7

Valid from: 2014

Da

Final

Nu

Final

Nu

Update

Nu

Final

Nu

Final

Nu

Final

Nr. Crt.

Fazele
proiectului

Document
Declara ia produc torului pentru
echipamente care nu de in surse de
aprindere proprii i sunt considerate a fi
n afara scopului Directivei 94/9/EC.

11.

Execute
Equipment manufacturer's Declaration
which have not own source of ignition
and are considered outside the scope of
Directive 94/9/EC

12.

Execute

Documente pentru echipamentele


electrice nso ite de condi iile de
utilizare, de ex. pentru echipamente cu
numere de certificate care au sufixul
_X .

Documents for electrical equipment with


conditions of use, e.g. for equipment
with certificate numbers which have the
suffix _X

13.

Execute

Descriptive Declaration of the


intrinsically safety system

Declara ie descriptiv a sistemelor de


securitate intrinsec .

14.

Execute

Evaluarea de risc pentru ansamble, emis


de produc tor, conform definirii din
Ghidul ATEX edi ia 3/2009.

Risks assessment for assemblies, issued


by the manufacturer, as defined in ATEX
Guide 3rd Edition /2009.

Observa ii

Livrabile

Maturitate

Sunt livrate de c tre furnizor. Vor fi parte din EPD.

Delivered by vendor. Will be part of EPD

Nu

Final

Nu

Final

Nu

Final

Nu

Final

Sunt livrate de c tre furnizor. Vor fi parte din EPD.

Delivered by vendor. Will be part of EPD

Faza de construc ie. A se vedea i EN 60079-25.


Modelul Petrom este n curs de elaborare. Trebuie sa fie disponibile
caracteristicile aparatelor ex. U,L,C,I.
Va fi parte din EPD.

Construction phase. See also EN 60079-25.


PETROM template under development.
It requires the availability of apparatus characteristics e.g. U,L,C,I
Will be part of EPD.
Sunt livrate de c tre furnizor. Vor fi parte din EPD.

Delivered by vendor. Will be part of EPD

ATEX Procedure for Projects Interpretation Sheet 2014

Page 5 of 7

Valid from: 2014

Nr. Crt.

15.

16.

Fazele
proiectului

Execute

Execute

Document

Observa ii

Detalii ale oric rei calcula ii relevante,


ex. rata de purjare pentru instrumente
sau l ca urile analizoarelor.

Details of any relevant calculation, e.g.


for purging rates, for instruments or
analyser houses

17.

18.

19.

20.

Execute

Plans showing and details of type of


wiring system

Not required as separate document

Not required as separate document. Will be part of EPD

Scheme i grafice pentru identificarea


circuitelor.

Nu este solicitat ca document separat.

Drawings and schedules relating to


circuits identification

Not required as separate document

Execute

Execute

21.

Execute

22.

Execute

Instructions for initial inspection and


Installation
Lista de echipamente i caracteristicile
lor

List of equipment and their


characteristics

Report privind inspec ia ini ial (ATEX i


Electric)

Final

Nu

Final

Nu

Sunt livrate de c tre furnizor. Vor fi parte din EPD.

Delivered by vendor. Will be part of EPD

Final
Nu
Nu

Final

Nu

Final

Nu

Final

Inclus n EPD ca parte din inspec ia ini ial .

Included in EPD as part of initial inspection

Inclus n EPD, a se vedea EN 60079-14 i HD 60364-6

Included in EPD, see EN 60079-14 and HD 60364-6

Informa ii pentru mentenan

Inclus n EPD

i revizie.

Nu

Final

Report regarding initial inspection (ATEX


and Electric)
Information for Maintenance and repairs

Final

Nu este solicitat ca document separat. Va fi parte din EPD.

Record of selection criteria for cables


entry system, for compliance with the
requirements for particular types of
protection

Instruc iuni pentru inspec ia ini ial


instalare.

Nu

If case, it shall be part of hazardous areas drawing.


Nu este solicitat ca document separat.

Execute

Maturitate

Dac este necesar, trebuie s faca parte din planul de zonare

Planuri care arat i detaliaz tipurile de


conexiuni n sistem.

nregistrarea criteriilor de selec ie a


sistemului de intrare a cablurilor, pentru
conformarea cu cerin ele pentru tipurile
particulare de protec ie.

Livrabile

Included in EPD

ATEX Procedure for Projects Interpretation Sheet 2014

Page 6 of 7

Valid from: 2014

Nr. Crt.

Fazele
proiectului

Document

Observa ii

Livrabile

Ref: Directiva 1999/92, HG 1058/2006

23.

Execute

Documentul de protec ie la explozie


(EPD)

Explosion Protection Document (EPD)


Atestare (certificate, permis) de la
INSEMEX, conform solicit rii
2
normativului NEX 01/06
24.

Maturitate
Final

Se va furniza n format nativ, nu doar raportul, n cazul n care raportul a


fost ob inut de la Autoritate (INSEMEX).
Da

Ref: Directive 1999/92, HG 1058/2006


To be provided in native format, not only the report, in case a report have
been obtained from Authority (INSEMEX)
Final
Documenta ia depus
nso it de atestare

pentru atestare trebuie furnizat

n format nativ

Execute

Da

Attestation (certificate, permit) from


INSEMEX, as a requirement of normative
NEX 01/063

Documentation submitted for attestation shall


format together with attestation itself

be provided in native

Atestarea de la INSEMEX poate s nu fie solicitat n cazul n care proiectul afecteaz doar par ial instala ia care deja posed o atestare valabil , considernd c atestarea ar trebui
emis pentru ntreaga instala ie. Modific ri/ m riri de capacitate/ moderniz ri,vor fi considerate, atunci cnd se solicit o nou atestare/ re-atestare.

Attestation from INSEMEX may not be required in case if the project affects only partially the plant which already owns a valid attestation, considering that the attestation shall be
issued for whole plant. Plant modification / upgrade/ revamp will be considered when it will apply for a new attestation/re-attestation.

ATEX Procedure for Projects Interpretation Sheet 2014

Page 7 of 7

Valid from: 2014

You might also like