Early in the
project the progress is slow due to mobilization and the need for large numbers of
workers is limited. During the middle portion maximum output is expected since most
trades are able to work on site. At the end of the job few workers are needed and the cash
flow slows down. If your project is ahead or behind the curve then more attention is
needed by you to find out why.
18-6
19-1
b. Additional notes are added like a diary with new dates until the item is
closed.
7. New Business
a. Notes taken in the same manner as Old Business
b. Contractor is asked to submit any new items prior to the meeting.
8. Changes
a. Based on the meeting discussion determine if any new changes have been
created.
b. Add new changes to the Change Order Log (see Topic 23).
c. Review the status of pending changes
i. Pricing submission by contractor
ii. Designer review and recommendation to owner
iii. Assignment of formal change order numbers to approved changes.
When the minutes are distributed, they also include a copy of the RFI Log, Submittal
Log, Change Order Log, and a summary project schedule (time scaled CPM bar chart).
This document is sent to the attendees and other interested parties (your boss for one).
With so many action items to remember and a multitude of action agents, an accurate set
of minutes will be an essential tool to monitor the progress of everyone, including the
owner representative.