Professional Documents
Culture Documents
Width
i) Ordinary soil
R / wall
B / Wall
450.00
250.00
450.00
1.35
B/ Wall
250.00
1.10
S. No
1
Description of Item
450.00
250.00
Parapets
250x1.0
Unit
quantity
Height /
thickness
5
1.35
1.10
0.60
0.60
0.975
0.85
Rate
Rs. Np
8
Amount in
Lacs
8
cum
cum
T
364.50
165.00
529.00
162.89
0.87
0.10
cum
60.75
0.10
cum
T
27.50
88.25
3656.41
3.23
cum
cum
1316.25
425.00
1741.25 @
60%=1044.75
75.00
3.00
2.00
Total
0.3 Sqm
G. Total
1119.75
2876.50
32.21
0.975
0.85
3.00
2.00
cum
cum
1316.25
425.00
Total
1741.25 @
40%696.50
1938.18
13.49
450.00
250.00
450.00
0.60
450.00
250.00
450.00
250.00
2.50
cum
675.00
793.33
5.35
2.50
1.50
Sqm
Sqm
Total
1,125.00
375.00
1500 @ 60%
=900.00
47.05
0.40
RM
RM
T
450.00
250.00
700.00
268.32
1.88
124.60
89.00
0.11
tkm
14578.20
4.03
0.59
10
11
tkm
tkm
T
249.20
249.20
124.60
4.85
9.76
89.00
0.01
0.02
0.11
cum
436.70
71.65
0.32
tkm
tkm
tkm
cum
37730.88
1397.44
1397.44
436.70
4.03
4.85
9.76
8.50
1.52
0.07
0.14
0.04
cum
93.95
43.27
0.04
tkm
tkm
Cum
6595.29
338.22
338.22
4.03
4.85
9.76
0.27
0.02
0.03
Cum
93.95
8.50
0.01
Total = 436.70cum
Haulaage of sand from Johama for an
avg lead of 58 kms
Surface Road (54Kms)
Gravel road 2kms
Track 2kms
Unloading of sand
Loading of stone agg by Mech Means
16
17
Cum
2416.25
71.65
1.73
18
19
tkm
tkm
tkm
Cum
150774.00
7732.00
7732.00
2416.25
4.03
4.85
9.76
8.50
6.08
0.38
0.75
0.21
Total
67.62
Executive Engineer