Professional Documents
Culture Documents
8
SHORT TERM
PRIMAVERA
SHORT TERMCOURSE
COURSEINCERTIFICATE
PUBLIC
ON HEALTH ENGINEERING.-
NEW DEVELOPMENT CHENNAI -- INDIA
IN WATER TREATMENT. KOLKOTTA—INDIA.
9
EXPEERIENCE CERTIFICATE FROM SKS Co - KUWAIT
10
PLANNING ENGINEER IN MINA ABDULLAH PROJECT CB/1208-KUWAIT
11
PLANNING ENGINEER IN MINA AHMADI PROJECT CA/PD/ 3631-KUWAIT
12
PLANNING ENGINEER IN MINA AHMADI PROJECT CA/PD/ 3638- KUWAIT
13
APPRECIATION LETTER FROM KNPC- KUWAIT
14
WEEKLY PROGRESS MEETING
No. 004
Item
Minutes Action
No.
2.1 Mobilization
JEC briefed QP that the mobilization is in progress and awaiting MIC QP
approval for Land Lease to proceed further. JEC requested QP
assistance to expedite this matter.
EXPERIENCE CERTIFICATE FROM METRO WATER
15
MY POSITION IN THE METRO WATER ORGANIZATION CHART.
CIVIL ID
COPY
*
*
*
*
*
*
*
*
*
*
*
*
*
KUWAIT
DRIVING
LISENCE
COPY
*
*
*
*
*
*
*
*
*
*
*
*
*
KUWAIT NATIONAL PETROLIUM CORPORATION- ENTRANCE PASS
MEDICAL FITTNESS CERTIFICATE
WEEKLY PROGRESS MEETING
No. 010
Item
Minutes Action
No.
2.1 EDM group requested JEC to submit the Daily report by fax. 477-1007 to Mr. John D. JEC
Munro (A/EDM/4).
2.2 JEC informed QP that Kranbau is currently carrying out fabrication works. Info
2.3 JEC stated that Fantuzzi will be in Qatar by 05.11.2007 and a meeting is proposed with
QP on 06.11.2007. Info
P 1/4
WEEKLY PROGRESS MEETING
No. 010
2.4 JEC stated that MA consultant will carryout the HV System Design Engineering works. Info
QP informed JEC to proceed the Engineering works if they are proceed the Engineering
works if they are satisfied with their qualification.
3.0 Safety:
6 Total man hours Till last week..160…hours During this week 64 hours Total …224 hours
worked since
beginning of the
project.
4.1 JEC stated that the progress achieved as of today is 16.28% Vs planned 11.% as JEC
detailed below:
PREVIOUS PERIOD THIS PERIOD TODATE
Wt.
Planned Actual Variance Planned Actual Variance Planned Actual Variance
1 Engineering 3.90% 93.13 82.13 -11.00 0.90 1.90 1.00 94.03 84.03 -10.00
2 Procurement 75.96% 3.33 14.64 11.31 6.17 2.38 -3.79 9.51 17.02 7.51
3 Construction 20.14% 1.14 0.20 -0.94 0.22 0.18 -0.04 1.36 0.38 -0.99
Total 100.00% 6.40 14.37 7.97 4.77 1.92 -2.85 11.16 16.28 5.12
P 2/4
WEEKLY PROGRESS MEETING
No. 010
6.0 Documentation:
6.1 JEC informed QP that subsequent approval for Building Permit DC1 will be carried out JEC
by MA consultant.
6.2 JEC stated that all relevant Method Statements pertaining to Electrical and Civil works JEC
are submitted. QP requested JEC to give advance copy to EDM/4 group.
7.0 Procurement:
7.1 JEC stated that HV cable is approved and procurement is in progress. JEC
7.2 RMU is approved with comments, however JEC to expedite the final approval from JEC
Kahramaa.
7.3 QP stated that JEC to submit all other outstanding items such as cable Tiles, Ducts and JEC
warning tapes etc. at the earliest.
8.0 Construction:
8.1 QP stated that all S/D related activities for Kangaroo Crane and other works to be JEC
discussed with Port Manager. (Captain Claudio).
8.2 QP stated that JEC to carryout the conditions survey before TOP of any renovation / JEC
refurbishment works. Survey Report to be recorded and agreed with Port authorities.
9.0 QA/QC
10.1 QP emphasized JEC to achieve the Milesstone-1 as per the schedule and requested JEC
JEC to update the delivery status of all the Milestone-1 items.
P 3/4
WEEKLY PROGRESS MEETING
No. 010
12.1 JEC stated that M/s Fantuzzi will be in Qatar on 5th Nov. 07 and will meet QP on 6th Nov JEC
07 as per QP schedule sent to JEC earlier.
12.2 QP requested JEC to submit the QP/JEC Inspection visits schedule to Kranbau in JEC
Germany. JEC advised that as agreed during the Oct. 11, 2007 Meeting in Doha. There
will be three visits, as follows:
Visit 3 – F.A.T.
QP informed the next meeting will be on the 5th November 2007 at 9:00 AM at JEC site Info
office.
P 4/4