05: the System Program Director announced delay in meeting NPOESS
aratory Program (NPP) launch date
005: NPOESS Tri Agency (DoD, NOAA, NASA) EXCOM directed IRT to look
ug: EXCOM receives results of NPP IRT, and then directed an IPA and OSD
G review of the entire NPOESS program
005: SecAF notified Congress of PAUC threshold breach greater than 15%
ggered Nunn-McCurdy (N-M) breach notification
ov: IPA and OSD CAIG brief EXCOM of PAUC and APUC growth much
ter than 25% (PAUC 820/0, APUC 202%)
005: the acting SPD signed a program deviation report, PAUC and APUC will
er than 25%
..,~
0
0 ~
:::J
~
.., --
~
CL CD
Q)
:::J
:::T C
C-
--
- -U
;0
--
en
--
~
--
~ 0
~ 7'
'<
'< CD
:::J C
--
~
Q)
CD
n--
-
en
--
0
:::J
..,--
C
<
CD
~
6 107 108 109 110 I 11 1 12 113 1 141 15 1 161 171 18 1 191 20 1 211 221 23 I 24
,7 _ Ps<O,5
r to enhance weather forecasting
owave imager/sounder on C1
OP scatterometer for ocean winds and waves becomes primary
ment until new imager/sounder is available on C2
IClass I Array
NOAA Comprehensive Large
Data Stewardship System
.- NPOESS Data & Control Flow
.......... NPP Data & Control Flow
g) .~ PRESSURE (SURFACEJPBOF,
rophyll
ER CERES
X (4)
THI~KNess
E SIZE
Degl
degraded performance) OMPs-N
EDRs
(1)
07 November 2006
Key Performance Parameters DOC, NOAA, NESDIS. rc1.l
RO Environmental Data Records
Integratcd Program Office
rv, HOI ',1t" Dr'!' 'f '·/1 H,1:~~" ~
es degraded performance)
PP EDRs
07 November 2006
S Key Performance Parameters DOC, NOAA, NESDlS, ra:I
LRD Environmental Data Records
Integrated Program Office
r'J KI if",,·!C:wr- ~ U H.-l.'"'l . .
~
o ~~) ,II. ~ ~,::r J ·/.11 d f.-C n'l
)
Q) SEA SURFACE WINDS
HT ~ Auroral Boundary
[~ CLOUD ICE WATER PATH
ERS ~ Auroral Energy DeposiIlon(J
PART SIZE
[) Ice Surface Temperature (Deg) c:=
Surface Wind Stress
I;J Energetic Ions (Deg)
HICKNESS ~ IMAGERY (DEGt ~ TOTAL WATER CONTENT
(] Mad Energy ChQd
T [) Sea Ice Charaderization (Deg)
~] Supra-1'henn-AU,
URE
n~ sg ~PVERIDEf!IH(DEG) ,/
RATURE
MP
u SEA sURfACJ DlftlWUBicPIG»)'/'
~ SOIl MOISTURE(DEG) ...•. . /. 0 ~ ATM VERT
o~ ATUVERT
_1/"
~PRE"I
rophyll
ER
X
THICKNESS
E SIZE
Total Column
CLE SIZE
s degraded performance)
guration Description
• NPOESS bus sized to carry full sensor configuration
ave Image/Sounder, • Constellation of 2 EMD and 2 Production satellites
S • Terminate CMIS; Compete new Microwave Imager/Sounder starting
ave Imager/Sounder with C2
• NOAA/NASA forecasting models and selected climate continuity
CrIS, ATMS,
preserved
(C1 ),OMPS-Nadir,
• Restructuring of NGST contract required; Renegotiation of NGST fee
• All secondary sensor integration planned and budgeted for
• DoD will lose day/night imagery in mid-AM for up to 8 years Gap
mb, ERBS, Full duration contingent upon satellite performance
• Contractor and government management continuity preserved 14
A is on orbit and working
working with EUMETSAT on reducing data latency
in August to lay groundwork
ow on in late November/early December
TSAT is anxious to reduce latency
eptive to Antarctic site
Evaluating 3 potentials
ng to discuss improving Svalbard capability
scussing a day/night capability for MetOp D
her down the road
add it to their requirements list
ussion at UNCLAS level, using examples from Chris Elvidge and
Lee
15
ew program has emerged from
ernment mandated restructure
7 program planning is almost complete
8-2013 planning to be completed by
ober 2007
planned to be launched in Sept 2009
16
•
OJ
»
o
~
c
-u
o
Q)
,......
Q)
VIIRS X X X X X
ager/Sounder X X X
CrIS X X X
ATMS X X X
OMPS Nadir X X X
ED and TED) X X
CERES X
SARSAT X X X X
ADCS X X X X
bility Sensor X X X X
ERBS X
ALT X X
TSIS X X
OMPS Limb X X
APS X
18
Govt. 2010-2011
with Aus DoD on status. Will need to work
Implementation Plan via IA for Aus DoD and 80M
KSAT Subcontract 2010-2011
Commercial 2010-2011
Commercial 2010-2011
I i