You are on page 1of 19

OESS Restructure Overview

Mike Haas
vironmental Satellite Program Executive Office
Senior Technical Advisor

November 2006
05: the System Program Director announced delay in meeting NPOESS
aratory Program (NPP) launch date

005: NPOESS Tri Agency (DoD, NOAA, NASA) EXCOM directed IRT to look

ug: EXCOM receives results of NPP IRT, and then directed an IPA and OSD
G review of the entire NPOESS program

005: SecAF notified Congress of PAUC threshold breach greater than 15%
ggered Nunn-McCurdy (N-M) breach notification
ov: IPA and OSD CAIG brief EXCOM of PAUC and APUC growth much
ter than 25% (PAUC 820/0, APUC 202%)

005: the acting SPD signed a program deviation report, PAUC and APUC will
er than 25%

005: USecAF sent "reasonable cause letter" to USD(AT&L) of PUAC and


eaches greater than 25%

006: SECAF notified Congress by letter of N-M certification breach 2


Notification of at least 25% cost breach
- Jun 06: OSD led N-M certification process
n 06: USD (AT&L) certified restructured program
tion Determination
OESS requirements validated by the JROC plus NASA and DOC
Initial system must perform to the same levels as DMSP / POES core sensors
System design flexible-enables spiral development to lORD capability
G cost estimate executable
ion Decision Memorandum's Major Direction
d to CAIG estimate
rd fee approach consistent with new DoD I AF I DOC guidance
ntain EXCOM approved management structure
rterly reviews with senior contractor management
Orbit Program Plan
manifest sensors-continue to fund integration
minate CMIS-compete Micro-wave imager with reduced requirements
3
• • • •
» G)
.., r
0
()

..,~

0
0 ~
:::J
~
.., --
~
CL CD
Q)
:::J
:::T C
C-
--
- -U
;0
--
en
--
~

--
~ 0
~ 7'
'<
'< CD
:::J C
--
~

Q)
CD
n--
-
en
--
0
:::J
..,--
C
<
CD
~

6 107 108 109 110 I 11 1 12 113 1 141 15 1 161 171 18 1 191 20 1 211 221 23 I 24

,7 _ Ps<O,5
r to enhance weather forecasting

e upon METOP in mid-morning orbit


RR vs VIIRS: preserves some imagery capability
OP scatterometer and advanced atmospheric sounder enhance
tional weather forecasting capability in mid morning orbit

owave imager/sounder on C1
OP scatterometer for ocean winds and waves becomes primary
ment until new imager/sounder is available on C2

e reliance on DMSP for ocean wind speed


6
NESDIS/NCEP

IClass I Array
NOAA Comprehensive Large
Data Stewardship System
.- NPOESS Data & Control Flow
.......... NPP Data & Control Flow

nnection- High Speed Network for Rapid Data Dissemination


HT ~ Auroral Boundary
ERS ~ Auroral Energy Deposition;.ti
[) Ice Surface Temoerature (Oeg)
PART SIZE ~ Energetic Ions (Deg)
o ~ IMAGERY (OEG)
HICKNESS ~ Mad Energy Chgd .
T [)Sea Ice Characterization (Deg)
URE ~ SNOW COVERIOEPTH (DEG)
(J Supra-1llerm-'
o [) SEA SURfACE TEMPERATURE (OlEO 0 ~ ATM VERT MOIST PROFILE
RATURE
MP
o ~ SOIL MOISTURE (DEG) 0 ~. ATM VERT TEMP PROFILE .

g) .~ PRESSURE (SURFACEJPBOF,

rophyll
ER CERES
X (4)
THI~KNess

E SIZE

~ VJ I Vlttl \,NlumJl fGlW \.!fj

OJ Profile lO~PS. Nadir 0nIv. j

Degl
degraded performance) OMPs-N
EDRs
(1)
07 November 2006
Key Performance Parameters DOC, NOAA, NESDIS. rc1.l
RO Environmental Data Records
Integratcd Program Office
rv, HOI ',1t" Dr'!' 'f '·/1 H,1:~~" ~

Ll ~:' (JI • k:,r' ,.1 ·/,..'!'I,u;;'lI!J


GHT
Q) SEA SURfACE WINDS
l~ CLOUD ICE WATER PATH
AYERS
E PART SIZE
[) tee Surface Temoeralure (Deg) [) Surface Wind Stress
THICKNESS ~ IMAGERY (DEG) ~ TOTAL WATER CONTENT
HT () Sea Ice Characterization (Oeg)
SSURE ~ IIlIOW S;O¥l!WWH (DEG) j
PERATURE
() R...W/lCE TEIIPIIlttllJ!ll! ~~ 6111 ~RT MOIST PBQFq,E (DEG)
~ SOIL MOIS1'UIE (DE') '; ;!j,~lo ~ ATM VERT TEMP PROfLE (DEG)
TEMP

Deg) . . ~ PRESSURE (SVRFACEJPRQFlLE),


~ lDEG) ,
loropbytl
TER
EX
AL THICKNESS
CLE SIZE

• Final MIS EDRs wil


be determined after
MIS selection

es degraded performance)

PP EDRs
07 November 2006
S Key Performance Parameters DOC, NOAA, NESDlS, ra:I
LRD Environmental Data Records
Integrated Program Office
r'J KI if",,·!C:wr- ~ U H.-l.'"'l . .
~
o ~~) ,II. ~ ~,::r J ·/.11 d f.-C n'l
)
Q) SEA SURFACE WINDS
HT ~ Auroral Boundary
[~ CLOUD ICE WATER PATH
ERS ~ Auroral Energy DeposiIlon(J
PART SIZE
[) Ice Surface Temperature (Deg) c:=
Surface Wind Stress
I;J Energetic Ions (Deg)
HICKNESS ~ IMAGERY (DEGt ~ TOTAL WATER CONTENT
(] Mad Energy ChQd
T [) Sea Ice Charaderization (Deg)
~] Supra-1'henn-AU,
URE
n~ sg ~PVERIDEf!IH(DEG) ,/
RATURE
MP
u SEA sURfACJ DlftlWUBicPIG»)'/'
~ SOIl MOISTURE(DEG) ...•. . /. 0 ~ ATM VERT
o~ ATUVERT
_1/"
~PRE"I

rophyll
ER
X
THICKNESS
E SIZE

Total Column

• Final MIS EDRs wit


be determined after
MIS selection OJ Profile COMPS, Nadir Only,
Deal
degraded performance) OM...
P EORs
(1)
07 November 2006
Key Performance Parameters
RD Environmental Data Records
DOC NOAA, NFSDlS,
Iflh:9r~t('d Progr3111 Offic(!
P.' HfY'.-il" in', r·.' t-!d;",~'~
I~I

('I ~¥" Ui ~: ,. 1 .J ',\'1 1.!.-J..., It



GHT
6) SEA SURFACE WINDS
[~ CLOUD ICE WATER PATH
YERS
[) Ice Surface Temperature (Oeg) [) Surface Wind Stress
E PART SIZE
THICKNESS ~ IMAGERY (DEG) ~ TOTAL WATER CONTENT
HT c= Sea Ice Characterization (DIg)
SURE
RATURE c:= SEA SURFACE ._.lDIG)!
~ SNOWCOVERIDIPJIf·~

EMP ~ ATM VERT MOIST PRQFLE {DEG}


~ SOIL MOfStUItI 11111
~ ATM VERT TEMP PROfLE (DEG)
eg) ~ PRE&SURE (SURfACEIPROFILE)
(DE )
orophyll
TER
EX
AL THI~KNess

CLE SIZE

• Final MIS EDRs wil


be determined after
MIS selection

s degraded performance)

PP EORs 07 November 2006


S Key Performance Parameters
LRD Environmental Data Records
DOC. NOM, NESDIS.
Integrated Program Office
r'.,~ hor'rit'nrT; td
U ~:~ld·L:·",J
H~,".:i'~~
'.-VLI,l.,i",'nh
I~ I
1:J Geomagnetic Field
1:J In·situ Plasma FluctuaticMt
B:~~}!~
(] Neutral DensitY ,
o ~ SOIL MOISTURE (DEG)

[~ Down l WRadiance (Sfc)


~ Down SW Radiance (:
~ Net Solar Radiation
~ Outgoing LW ~•. fJl
~ AEROSOL OPTICAL THICKNESS
~ AEROSOL PARTICLE SIZE
APS Q;l Profile (QMP§, Nadir Only. ()egl
(4)
r.JII Aerosol Refractive Index,
~ Single Scatter Albedo, Shape
OMPs..L
~ Cloud Particle Size/Distrlb (1) [) OCEAN WAVE CHARACTERISTICS
[) Sea Surface Height

05 October 2006 ALT


K.y P..f.,manc. Pa..m.t.", DOC. NOAA, NESDIS. (2)
RD Environmental Data R&tords InlC'!Jf<llcd Program Office
,
\1 o()r"ri{br<r'~1 M H.4;.J';';
(J <;.fJl ~ 1.. . 1' .J ·//t~, ".. :"l!t I Vi. I
degraded performance)
MIS (Rep) C-3 x
CrlS X a IX
ATMS X a IX
aMPS N N
SESS a a
SEM (Rep X
ADCS X x
SARSAT X X
CERES C-1
ERBS a
TSIS a
ALT a
SuSS Ia a
0= demanifested by Nunn McCurdy
I,
=
':N 'Nadir
:
sensor only
;;ftEP == Replaces
End of Constellation Service Life:
2026+

guration Description
• NPOESS bus sized to carry full sensor configuration
ave Image/Sounder, • Constellation of 2 EMD and 2 Production satellites
S • Terminate CMIS; Compete new Microwave Imager/Sounder starting
ave Imager/Sounder with C2
• NOAA/NASA forecasting models and selected climate continuity
CrIS, ATMS,
preserved
(C1 ),OMPS-Nadir,
• Restructuring of NGST contract required; Renegotiation of NGST fee
• All secondary sensor integration planned and budgeted for
• DoD will lose day/night imagery in mid-AM for up to 8 years Gap
mb, ERBS, Full duration contingent upon satellite performance
• Contractor and government management continuity preserved 14
A is on orbit and working
working with EUMETSAT on reducing data latency
in August to lay groundwork
ow on in late November/early December
TSAT is anxious to reduce latency
eptive to Antarctic site
Evaluating 3 potentials
ng to discuss improving Svalbard capability
scussing a day/night capability for MetOp D
her down the road
add it to their requirements list
ussion at UNCLAS level, using examples from Chris Elvidge and
Lee

15
ew program has emerged from
ernment mandated restructure
7 program planning is almost complete
8-2013 planning to be completed by
ober 2007
planned to be launched in Sept 2009

16

OJ
»
o
~

c
-u
o
Q)
,......
Q)
VIIRS X X X X X

ager/Sounder X X X

CrIS X X X

ATMS X X X

OMPS Nadir X X X

ED and TED) X X

CERES X

SARSAT X X X X

ADCS X X X X

Non-manifested (Integration only provided for specified orbit)


, TPS, SEM)
X X
S, HEPS, LEPS)

bility Sensor X X X X

ERBS X

ALT X X

TSIS X X

OMPS Limb X X
APS X
18
Govt. 2010-2011
with Aus DoD on status. Will need to work
Implementation Plan via IA for Aus DoD and 80M
KSAT Subcontract 2010-2011
Commercial 2010-2011
Commercial 2010-2011

I i

DOC ARB and State Dept clearance received. IPO


NSFMOU 2010-2012 Complete signature on MOA received. FY06 funding at risk-
investigating options with Program Control
Commercial 2010-2012
Govt. 2010-2012 Support ISRO meeting, when scheduled.
Commercial 2010-2012
Commercial 2010-2012

Application Ready for


Commercial 2014-2015
Filing
Commercial 2014-2015 In work IIPO letter sent. No action requested.
Need assistance from NOAA & NTIA frequency
Commercial 2014-2015 In work personnel in NASA ESA coordination issues. No IPO
action requested.
NESDIS FM working coordination issues with NASA
Commercial 2014-2015 In work
White Sands; No action requested at this time
Commercial 2014-2015 In work
Multiple good candidate sites identified, all govt land.
TBD 2014-2015 In work
See next slide.

You might also like