You are on page 1of 10

QM Work Instructions

MO-SKT030

Application

Heating Module Assembly, Contiform S/H

Subapplication

Assembly of the Control/Directing Cam, Assembly and Adjustment of the Preform Rejection Unit, Cpl.

Table of Contents:
1. Assembly of the Control / Directing Cam
1.1 Assembling the Control Cam ........................................................
1.2 Assembling the Directing Cam.....................................................

2
3

2. Assembly and Adjustment of the Preform Rejection Unit, Cpl.


2.1 Assembling the Preform Rejection Unit ...................................
2.2 Adjusting the Preform Rejection Unit.......................................

6
9

3. State of Revisions
3.1 1st Revision.....................................................................................

4. Test Record Sequence


4.1 Test Record Sequence...................................................................

10

Department

Date

Name

Created by

MO-SKT

31.01.2007

Mr. Wolf

Released by

QA

31.01.2007

Mr. Held

Page 1 of 10

Signature

Update 31.01.2007
Revision: 1

QM Work Instructions
MO-SKT030

Assembly of the Control/Directing Cam, Assembly and Adjustment of


the Preform Rejection Unit
MHM
1.

Assembly of the Control / Directing Cam


1.1 Assembling the Control Cam

STRAIGHT PIN A 20 m6X 40


ST ISO8735 hammer in at left and right
of the main frame.
The straight pins are used as support for the cam holder.

Centre the complete cam holder 2786019061 and fasten it on the main frame with hexagon head screws
M12X 30, retaining rings, and large-diameter washers.

Prior to installing the control head cam, check the guiding function of the cam segment pos. 10, and level it
by turning the piston rod. The cam segment should smoothly move upwards and downwards.

Page 2 of 10

Update 31.01.2007
Revision: 1

QM Work Instructions
MO-SKT030

Assembly of the Control/Directing Cam, Assembly and Adjustment of


the Preform Rejection Unit
MHM

Centring

Centre the complete control head cam and fasten it on the cam holder with hexagon head screws, retaining
rings, and washers.

1.2

Assembling the Directing Cams

Height adjustment

Prior to installing the directing cams, check the moveable cam segment for smooth running.

Page 3 of 10

Update 31.01.2007
Revision: 1

QM Work Instructions
MO-SKT030

Assembly of the Control/Directing Cam, Assembly and Adjustment of


the Preform Rejection Unit
MHM

Use a water level to ensure parallel mounting of


the directing cam at the heating module discharge.
Adjust the height of the directing cam so that the
guide's control device (pos. 2) is swivelled towards
the centre of the plastic switching roller (pos. 1).
While swivelling in, the guides control device
must not contact the plastic roller.

Use a water level to ensure parallel mounting of


the directing cam at the heating module infeed.
Adjust the height of the directing cam so that the
mandrel, stroke 44, can be pressed down another
5 mm.

5 mm

The directing cam settings specified in these instructions are to be used for the initial start-up of the heating module.
For the final adjustment of the directing cams, see operating instructions 031, Adjusting the transfer.
The guiding cam position will then result from the adjustment of the transfer positions.

Page 4 of 10

Update 31.01.2007
Revision: 1

QM Work Instructions
MO-SKT030

Assembly of the Control/Directing Cam, Assembly and Adjustment of


the Preform Rejection Unit
MHM

Check:

Clearance of the running rollers on the


directing cam at the infeed.

Check:

Page 5 of 10

Check:

Clearance of the running rollers and


guides on the cam segments at the discharge.

Clearance of the running rollers and guides on the cam segments at the
heating module infeed.

Update 31.01.2007
Revision: 1

QM Work Instructions
MO-SKT030

Assembly of the Control/Directing Cam, Assembly and Adjustment of


the Preform Rejection Unit
MHM
2.

Assembly and Adjustment of the Preform Rejection Unit, Cpl.


2.1

Assembling the Preform Rejection Unit


Prior to installing the preform rejection unit: Turn the piston rod to adjust the pulling-off
jaws at a right angle to the pulling-off device.
Both pulling-off jaws must be positioned at the same height.
Mount the pulling-off jaws flush at the outside
Piston rod

Preform rejection unit,


cpl.

Adjust the rocker switch and the proximity


Turn the adjusting screw to adjust the switching device at a right angle.
switch as shown in the illustration.
Switching distance 0.3 mm.
Adjust the height of the preform rejection unit by fitting shims as described in the following.
The set-point dimension between bottom edge of the neck ring and top edge of the switching device is
0.3 0.4 mm.
Page 6 of 10

Update 31.01.2007
Revision: 1

QM Work Instructions
MO-SKT030

Assembly of the Control/Directing Cam, Assembly and Adjustment of


the Preform Rejection Unit
MHM

Shims for height adjustment

The rejection unit must be installed as shown in the illustration.


The rejection unit must be positioned in such a way that the preform can be
pulled off before the mandrel chain passes around the cam (line marked
red).

Page 7 of 10

Update 31.01.2007
Revision: 1

QM Work Instructions
MO-SKT030

Assembly of the Control/Directing Cam, Assembly and Adjustment of


the Preform Rejection Unit
MHM

Use the adjusting device to install the rejection unit.


Use adjusting device 0901349251 to install the rejection unit centrally to
the mandrel chain.

Page 8 of 10

Update 31.01.2007
Revision: 1

QM Work Instructions
MO-SKT030

Assembly of the Control/Directing Cam, Assembly and Adjustment of


the Preform Rejection Unit
MHM
2.2

Adjusting the Preform Rejection Unit, Cpl.


Gap between lower edge of the rejection unit
and upper edge of the preform neck ring: 1 mm
Gap between upper edge of the switching device and lower edge of the preform neck ring: 0.3 0.4 mm

Gap between preform and switching device: 1 mm

For rejection unit adjustment, use a preform gripper for standard PCO
neck finishes 0900966245 and a preform, e.g. 809908P067, with a
neck finish height of 21 mm.
The total dimension of preform gripper and preform should amount
to 79.7 mm, measured from the centre of the pin (preform gripper) to
the bottom edge of the neck ring (preform).

Page 9 of 10

Update 31.01.2007
Revision: 1

QM Work Instructions
MO-SKT030

Assembly of the Control/Directing Cam, Assembly and Adjustment of


the Preform Rejection Unit
MHM
3.

State of Revisions
3.1 1st Revision
Description of the directing and control cam assembly / rejection unit assembly

4.

Test Record Sequence


The test records for the respective work instructions are stored on the department disk drive. They
must be included in the assembly documentation. The person in charge must fill in the actual values.
The assembly documents with the test records must be handed over to the subsequent workstation as
assembly progresses. When final assembly is complete, the test records must be collected and handed
over as a whole to the Final Acceptance Department.

Muster

Page 10 of 10

Update 31.01.2007
Revision: 1

You might also like