Professional Documents
Culture Documents
MINKA
Descripcion
Und.
Cant.
1.00
1.10
60
1.20
unid
1.30
unid
1.40
15
1.50
unid
1.60
und
1.70
unid
1.80
Pegamento de 1/4
unid
2.00
Tubera EMT
2.10
30
2.20
unid
2.30
unid
2.40
unid
2.50
30
2.60
unid
12
2.70
unid
12
2.80
unid
14
2.90
Caja 400x400x150 mm
unid
2.10
Caja 100x100x50
unid
2.11
unid
15
2.12
Arandela de 3/8
unid
15
2.13
unid
15
2.14
unid
2.15
unid
2.16
unid
12
2.17
unid
2.18
unid
2.19
unid
3.00
3.10
rollo
3.20
unid
3.30
unid
3.40
unid
3.50
unid
3.60
unid
3.70
Cinta aislante
unid
4.00
HERRAMIENTAS
4.10
Taladro percutor
unid
4.20
Taladro de fierro
unid
4.30
Pruebas de megado
unid
4.40
unid
4.50
unid
4.60
unid
4.70
unid
4.80
unid
4.90
unid
4.10
unid
4.11
unid
4.12
Hoja de sierra
unid
4.13
Baln de gas
unid
4.14
Extintor
unid
5.00
IMPLEMENTOS DE SEGURIDAD
5.10
Guantes de Hilo
unid
5.20
Lentes de Seguridad
unid
5.30
Casco de Seguridad
unid
5.40
Arnes de Seguridad
unid
5.50
Tapon de Odo
unid
5.60
Botas de Seguridad
unid
5.70
Cintas de Peligro
unid
5.80
Conos de Peligro
unid
5.90
Polizas
glb
5.10
glb
5.11
glb
5.12
Resane de pases
glb
5.13
glb
La propuesta incluye el suministro de materiales, el transporte, mano de obra para el montaje, prestacin de equipos y herramien
seguros, direccion tcnica, gastos generales y utilidad.
Cualquier reparacin, modificacin o alteracin del equipo por personas ajenas a ENGINEER SOLUTION SAC, invalidara la garanta
La propuesta considera: Canalizacin al Cuarto de Control con tubera PVC enterrada y tubera EMT : La canalizacion se realiza se
realizadas en campo, desde el BE al cuarto de control : Cableado desde el Intercomunicador del Ascensor al Telefono ubicado en
considera cable UTP Categoria 6, segn lo indicado por el Cliente.
La propuesta excluye: Limpieza de buzones elctricos que se encuentren con desperdicios al momento de aperturar dichos buzon
para ejecucion de trabajos.
Plazo de ejecucion en obra sera de 8 dias, se considera a apartir del material puesto en obra.
TERMINOS COMERCIALES
Forma de Pago
40% de adelanto y saldo contraentrega de los trabajos y/o conformidad del cliente 60 dias despues.
Tiempo de ejecucion
Los trabajos seran entregados en un plazo de 7 - 10 dias a partir del envio de la OC y/o deposito del ad
Tipo de moneda
Nuevos soles
Validez de la Oferta
Garantia
Fsiesquen@engineersolutionsac.com
Fecha:
Cotizacion:
3/9/2016
COT.SEG-407-2016
le lo siguiente:
MINKA
P. Unit.
P. Total
S/.
10,143.37
S/. 10.83
S/. 650.00
S/. 3.90
S/. 31.20
S/. 3.90
S/. 31.20
S/. 4.77
S/. 71.50
S/. 3.90
S/. 7.80
S/. 5.20
S/. 41.60
S/. 2.60
S/. 10.40
S/. 39.00
S/. 39.00
S/. 19.00
S/. 570.00
S/. 5.20
S/. 20.80
S/. 5.20
S/. 20.80
S/. 11.70
S/. 35.10
S/. 27.00
S/. 810.00
S/. 7.80
S/. 93.60
S/. 7.80
S/. 93.60
S/. 13.37
S/. 187.20
S/. 156.00
S/. 156.00
S/. 10.40
S/. 31.20
S/. 2.60
S/. 39.00
S/. 3.50
S/. 52.50
S/. 3.50
S/. 52.50
S/. 23.40
S/. 46.80
S/. 42.00
S/. 84.00
S/. 7.80
S/. 93.60
S/. 6.50
S/. 52.00
S/. 39.00
S/. 195.00
S/. 7.80
S/. 39.00
S/. 560.00
S/. 1,120.00
S/. 325.00
S/. 325.00
S/. 260.00
S/. 260.00
S/. 325.00
S/. 325.00
S/. 91.00
S/. 91.00
S/. 13.00
S/. 26.00
S/. 7.50
S/. 37.50
S/. 195.00
S/. 195.00
S/. 130.00
S/. 130.00
S/. 195.00
S/. 195.00
S/. 78.00
S/. 78.00
S/. 52.00
S/. 52.00
S/. 65.00
S/. 65.00
S/. 65.00
S/. 65.00
S/. 21.67
S/. 65.01
S/. 13.00
S/. 39.00
S/. 32.50
S/. 65.00
S/. 49.83
S/. 149.49
S/. 6.50
S/. 19.50
S/. 120.00
S/. 120.00
S/. 100.00
S/. 100.00
S/. 6.50
S/. 26.00
S/. 8.13
S/. 32.50
S/. 39.00
S/. 156.00
S/. 97.50
S/. 195.00
S/. 3.50
S/. 14.00
S/. 34.66
S/. 103.97
S/. 65.00
S/. 130.00
S/. 13.00
S/. 78.00
S/. 400.00
S/. 400.00
S/. 300.00
S/. 300.00
S/. 380.00
S/. 380.00
S/. 500.00
S/. 500.00
S/. 750.00
S/. 750.00
S/.
S/.
S/.
10,143.37
1,622.94
11,766.31
ONDICIONES LABORALES
tubera PVC enterrada y tubera EMT : La canalizacion se realiza segn las indicaciones
do desde el Intercomunicador del Ascensor al Telefono ubicado en Cuarto de Control : Se
nte.
ERMINOS COMERCIALES
os trabajos.
DESCRIPCIN
Und.
Tiempo
Total
Mes
GASTOS OPERATIVOS
Cuota Sindical
MES
GLB
MES
Examenes medicos
GLB
GLB
MES
GLB
GLB
MES
Planos As-Built
GLB
Dosier de Calidad
GLB
Charla de Capacitacion
GLB
Gerencia General
GLB
Gerencia de Operaciones
GLB
Comercial y ventas
GLB
GLB
Sistemas y logistica
GLB
GLB
GLB
Personal de obra
GLB
Herramientas y materiales
GLB
Andamios certificados
GLB
SUB TOTAL 01
GASTOS ADMINISTRATIVOS
SUB TOTAL 02
TRANSPORTE Y OTROS
SUB TOTAL 03
TOTAL GASTOS GENERALES
P.V.T
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00