You are on page 1of 4

S857

LOT 8MD1, PUTRAJAYA


PPA1M - 12 Storey (36,064.66 m2)
Constituent
Functional Element

Estimated
Construction
Cost

Cost
per m2
of GFA

Cost
per ft2
of GFA

Remarks

8.00 SERVICES
8.01

Cold Water & Sanitary Plumbing

1,883,681.00

52.21

4.85

Mild steel riser pipes, frp water tanks,


pump sets, polysteel dropper pipes,
hdpe distribution pipes, upvc soil and
waste pipes

8.02

Fire Protection System

720,222.50

20.02

1.86

Wet riser, hose reel, fire alarm, fire


extinguishers, CO2 system for genset

587,267.00

16.25

1.51

Sch 40 seamless pipes, gas detector

8.04 Electrical Services

4,028,330.80

111.73

10.38

Electrical, telephone, SMATV,


standby genset, substation equipment

8.05 Lift Installation

1,500,000.00

41.55

3.86

2 nos 15 persons (1000kg)


passenger lifts

400,100.00

11.09

1.03

Air cooled wall mounted split type:


13,000 Btu/hr, 330 cfm

8.03 Natural Gas System

8.06 Air Conditioning and Mechanical


Ventilation
8.07 BSS (CCTV)

8.08 PA

8.09 Main Switch Board/Metering

8.10 Lightning Protection System

8.11 RWHS/Irrigation

8.12 Faade Lighting

03/12/2016
S857/file:///var/www/apps/conversion/tmp/scratch_7/309438934.xlsx_NAB-nam

1]

S857

LOT 8MD1, PUTRAJAYA


PPA1M - 12 Storey (36,064.66 m2)
Constituent
Functional Element

Estimated
Construction
Cost

Cost
per m2
of GFA

Cost
per ft2
of GFA

8.07 Builders Profit & Attendance

inclusive

inclusive

inclusive

8.08 BWIC

inclusive

inclusive

inclusive

9,119,601.30

252.85

23.49

37,925,536.93

1,051.60

97.70

Group Element Total


TOTAL FOR
BUILDING COST
(Excl. Prelim & Contingencies

03/12/2016
S857/file:///var/www/apps/conversion/tmp/scratch_7/309438934.xlsx_NAB-nam

Remarks

24.04

2]

15,335.00
LOT 8MD1 - 13 Storey (15,335 m2)
Estimated
Construction
Cost

Cost
per m2
of GFA

Cost
per ft2
of GFA

Remarks

2,370,000.00

154.55

14.36

We need to compare nos of toilet.


Total Water Capacity is for 2 days
storage, FRP Tank, secondary
booster pump for the unit above
the mechanical floor, PPR pipe for
all, FT for all F/F riser.

1,500,000.00

97.82

9.09

Sprinkler System, Wet Riser


System, Hose Reel System, Fire
Alarm System (Smoke/Heat/Break
Glass/MFAP), Clean Agent System,
Fixed CO2 System, Portable Fire
Extinguisher

3,240,900.00

211.34

19.63

1,200,000.00

78.25

7.27

4 Nos Lift (minimum 15P)

17,500.00

1.14

0.11

Only for Lift MotoRoom, Control


Room and MDF Room

253,500.00

16.53

1.54

For All Staircase, Lift Lobby

360,000.00

23.48

2.18

Fire Requirement

500,000.00

32.61

3.03

TNB and Electrical System


Requirement

300,000.00

19.56

1.82

High Rise Building Requirement

129,000.00

8.41

0.78

PjC Rquirement

360,000.00

23.48

2.18

RM180,000/Block

03/12/2016
S857/file:///var/www/apps/conversion/tmp/scratch_7/309438934.xlsx_NAB-nam

SSB/DB, Sub-Main Cablimg, Lighting


Point, Ceiling Fan Point, A/C Point for
every Room, Water Heater Point For
Every Toilets, Washing Machine Point
(For Common Area), Ironing Point,
Ceiling Fan For Common Area, Light
Fittings For Common Area, SMATV,
Tel/Data, EL, Keluar Sign, Card
Acces System For Every unit,

3]

15,335.00
LOT 8MD1 - 13 Storey (15,335 m2)
Estimated
Construction
Cost

Cost
per m2
of GFA

Cost
per ft2
of GFA

Remarks

205,000.00

13.37

1.24

Allowed at 2%, QS To include All


M&E Rooms and Tank @ Basement
area.

205,000.00

13.37

1.24

Allowed at 2%

10,640,900.00

693.90

31,743,000.00

2,069.97

64.46

33.52

192.30

03/12/2016
S857/file:///var/www/apps/conversion/tmp/scratch_7/309438934.xlsx_NAB-nam

4]

You might also like