Professional Documents
Culture Documents
Document Path..ppt
1
Current Date
Dual
Feed
Substations
Uninterruptible
Power
Supplies (UPS)
Back
-up
Power
Generation
Multiple
Utility
Feeds
Document Path..ppt
2
Current Date
Document Path..ppt
3
Current Date
Document Path..ppt
4
Current Date
5
Current Date
Document Path..ppt
6
Current Date
Document Path..ppt
7
Current Date
Document Path..ppt
8
Current Date
Document Path..ppt
9
Current Date
Document Path..ppt
10
Current Date
What to monitor?
Service Entrance
Monitored
Parameters
Recorded Data
Log
Waveform
Capture
Alarm Relay
Software
Functions
Blown Fuse
Voltages
Min. 60 cycle
Pretrigger
10cycles
To Central
Monitoring Station
Ground I
Neutral I
Phase I
Voltages
60 Cycle
To Central
Monitoring Station
Trip Unit
Trip Status
Instantaneous V,I
Demand I
60 Cycle
To Central
Monitoring Station
Feeder
Transformer
Fan Failure
Coil Temp.
Overtemp
Feeder Demand
K-Factor
Current THD
To Central
Monitoring Station
Utility
Synch Pulse
Interruptible
Rate
Demand
Power Factor
4 cycle
To Generators
and Transfer
Switch
Interuption:
Page and E-Mail
Position Status
Test Position
Gen Demand
Gen V,I,THD
60 Cycle
To Central
Monitoring Station
Surge
Protection
Ground Fault
Transfer Switch
Document Path..ppt
11
Current Date
What to Monitor?
Generator
Parameters
Battery Charger
Waveform
Capture
DC Bus Level
Alarm Relay
Software
Functions
To Central
Monitoring Station
DC Voltage
History Log
Priority Alarm
Priority Alarm
Ambient Temp.
Sensors
Water Temp
OV / UV
Fuel
Generator
Demand
V, I, THD, Hz
60 Cycle
To Central
Monitoring Station
Page Event
Priority Alarm
Generator
Output
Sag / Swell
Generator
Demand
V, I, THD, Hz
Ambient
60 Cycle
To Central
Monitoring Station
Page Event
Priority Alarm
Protective
Relays
Reverse Power
High / low Oil
Water Temp
OV / UV
Overspeed
Fuel
Status Change
Generator
Demand
V, I, THD
60 Cycle
To Central
Monitoring Station
Page Event
Priority Alarm
Generator
Demand
V, I, THD
60 Cycle
To Central
Monitoring Station
Priority Alarm
Page Event
Parallel
Switch Gear
Document Path..ppt
12
Current Date
What to Monitor?
UPS
Parameters
Waveform
Capture
Alarm Relay
Software
Functions
UPS on Battery
UPS on Bypass
UPS Summary
UPS On Line
Even Harmonics
UPS Input THD
60 Cycle
UPS Output
UPS Input
To Central
Monitoring Station
To Generator
Priority Alarm
Page Event
Input THD
4 Cycle
UPS Output
Sag Swell
UPS Demand
V, I, THD
60 Cycle
UPS Battery
Ambient Temp.
DC V,I
History Log
UPS Data
Internal Alarms
UPS Measures:
Bypass V,I
UPS V,I
Input V,I
DC V,I
Custom Table
Alarm Log
UPS Alarms
UPS Input
Document Path..ppt
Priority Alarm
History Log of
Harmonics
To Central
Monitoring Station
Page Event
Priority Alarm
13
Current Date
What to Monitor?
PDU
Parameters
Waveform
Capture
Alarm Relay
Software
Functions
PDU Alarms
Transformer OT
EPO
60 Cycle
To Central
Monitoring Station
Priority Alarm
Page Event
PDU Output
Load Currents
Overload Limits
K- Factor
Output Demand
Output V,I
Ambient
Current
To Central
Monitoring Station
Priority Alarm
History Table
Environmental
Conditions
Water Detection
Temperature
Humidity
To Central
Monitoring Station
Page Event
Priority Alarm
Document Path..ppt
Temperature
14
Current Date
15
Current Date
Functionality Summary
Low-end Metering
Metered parameters:
kWH, kW, kVA, VAR,
Power factor (3 +
total), Amps (3 +
total), Volts L-L (3 +
total)
Document Path..ppt
Document Path..ppt
17
Current Date
CTS
COM
CARD
Document Path..ppt
18
Current Date
Remote
Monitoring
Via WAN or
Internet
SNMP
SNMP
Ethernet
(Wide Area Network)
PMM
Document Path..ppt
Ethernet
(Local Area Network)
Modbus
Protocol
Or
Generator
Monitoring
UPS
Ethernet
Gateway
Utility
Monitoring
19
Current Date
Document Path..ppt
20
Current Date
Document Path..ppt
21
Current Date
Document Path..ppt
Transients
Harmonics
Loss of power
Disturbance direction (Upstream/Downstream)
22
Current Date
Document Path..ppt
23
Current Date