Back Filling
Lean Concrete
RCC Foundation
RCC Column
Masonary Works
Roof Slab
Installation of Gates
Installation of Windows
Plumbing Works
Paint of Control, AC, DC, Battery, PLC, Kitchen, Store Room from Inside & Outside
FoundationsofS.A.andCCforKorangiLine
FoundationsofS.A.andCCforBalochLine
FoundationsofS.A.andCCforPipriLine
FoundationsofS.A.andCCforGulAhmedLine
FoundationsforC.S.E.forBlockTransformer2,3,4&5
FoundationsforC.S.E.forBlockTransformer1
Cable Trenches
Cable Trenches
Cable Trenches
Cable Trenches
Cable Trenches
Cable Trenches
Construction of new Cable Trench at Line Side for Korangi Line and CSE Foundation
Cable Trenches
Construction of new Cable Trench at Line Side for Baloch Line and CSE Foundation
Cable Trenches
Construction of new Cable Trench at Line Side for Pipri Line and CSE Foundation
Cable Trenches
Construction of new Cable Trench at Line Side for Gul Ahmed Line and CSE Foundation
Cable Trenches
Cable Trenches
Construction of New Cable Trench for Fiber Optic Cable of Gul Ahmed Line
Water Proofing
Repairing of staircase
Painting of Building
RelocationofNeutralGroundingResistorforPowerTransformer#4
RelocationofTransmissionLineTowernearTransformer#4
RelocationofSurgeArrestorsforPTR1
RelocationofSurgeArrestorsforPTR2
RelocationofMVCablesforPTR1
Installation of Equipment
Installation of Equipment
Installation of Equipment
Installation of Equipment
Installation of Equipment
Installation of Equipment
Installation of Equipment
Installation of Equipment
Installation of Equipment
120kVSurgeArrestorforBlockTransformer#1
120kVSurgeArrestorforPowerTransformers3
120kVSurgeArrestorforPowerTransformers4
120kVSurgeArrestorforPowerTransformer1
120kVSurgeArrestorforPowerTransformer2
120kVSurgeArrestorforTransmissionLineKorangiWest
120kVSurgeArrestorforTransmissionLineBaloch
120kVSurgeArrestorforTransmissionLinesPipri
120kVSurgeArrestorforTransmissionLinesGulAhmed
132/12kV,31.5/40MVA,PowerTransformer#3
Installation of Equipment
Installation of Equipment
Installation of Equipment
Installation of Equipment
Installation of Equipment
Installation of Equipment
HVAC System
Installation of Equipment
Installation of Equipment
Installation of Equipment
Installation of Equipment
Installation of Equipment
Installation of Equipment
Installation of Equipment
Installation of Equipment
Installation of Equipment
Installation of Equipment
Installation of Equipment
RTU
Installation of Equipment
SCADA Equipment
Installation of Equipment
Installation of Equipment
Installation of Equipment
Installation of Equipment
Installation of Equipment
132kVLineTrap,1250AmpereforPipriLine
132kVCouplingCapacitor,>6000pFforKorangiLine
132kVCouplingCapacitor,>6000pFforBalochLine
132kVCouplingCapacitor,>6000pFforPipriLine
11kVSurgeArrestors
SteelStructureforSAandCSEofPTR3&4
Installation of Equipment
Installation of Equipment
SteelStructureforSAandCSEofPTR2
SteelStructureforSA,CSE<ofKorangiLine
SteelStructureforSA,CSE<ofBalochLine
SteelStructureforSA,CSE<ofPipriLine
SteelStructureforSAandCSEofGulAhmedLine
SteelStructureforCSEofBlockT/F2,3,4&5
SteelStructureforCSEofBlockTransformer1
SteelStructure/CableClampforGISCSE
Installation of Equipment
Installation of Equipment
Installation of Equipment
Installation of Equipment
Installation of Equipment
Installation of Equipment
Installation of Equipment
Installation of Equipment
Installation of Equipment
Installation of Equipment
Installation of Equipment
Nitrogen Injection Fire & Explosion Prevention System
Piping Work
145kVSingleCore,500mmsqXLPECablesforBlockTransformers
145kVSingleCore,500mmsqXLPECablesforPowerTransformers
145kVSingleCore,800mmsqXLPECablesforKorangi&BalochLine
145kVSingleCore,800mmsqXLPECablesforPipriLine
145kVSingleCore,800mmsqXLPECablesforGulAhmedLine
145kVCableOutdoorSealingEndforBlockT/F2,3,4&5
145kVCableOutdoorSealingEndforBlockT/F1
145kVCableOutdoorSealingEndforPowerT/F3&4
145kVCableOutdoorSealingEndforPowerT/F1
145kVCableOutdoorSealingEndforPowerT/F2
145kVCableOutdoorSealingEndforKorangiLine
145kVCableOutdoorSealingEndforBalochLine
145kVCableOutdoorSealingEndforPipriLine
145kVCableOutdoorSealingEndforGulAhmedLine
145kVCableGISSealingEnd
LinkBoxeswithSVL
BondingCables
15/8.7 kV Three Core, 95 mm sq XLPE Copper Cable for Aux. Transf. to MV Panel
15/8.7 kV Three Core, 240 mm sq XLPE Copper Cable for Capacitor Bank to MV Panel
AC/DC Power and control Cable for Block Transformers 2,3,4 and 5
Earthing Work
Earthing Work
Earthing Work
Earthing Work
Earthing Work
120 kV Surge Arrestor & Cable Sealing End near Block Transformer
Earthing Work
120 kV Surge Arrestor & Cable Sealing End near Power Transformer
Earthing Work
120 kV Surge Arrestor & Cable Sealing End near Transmission Line
Earthing Work
Panels Earthing
Control Panels
Protection Panels
Internal Lighting & Small Power System for Control Room Building
Internal Lighting & Small Power System for Existing Control/PLC Room Building
ForBaluchtoGizriGridStationCircuit
Cable Trays
Cable Trays
Cable Trays
Cable Trays
Cable Trays
Cable Trays
For132kVUnderGroundCablesofTransmissionLineBayofKorangiLine
For132kVUnderGroundCablesofTransmissionLineBayofBalochLine
For132kVUnderGroundCablesofTransmissionLineBayofPipriLine
For132kVUnderGroundCablesofTransmissionLineBayofGulAhmedLine
For11kVCablesfromPowerTransformer#3&4toMVPanels
For11kVCablesfromGEJB#4toBlockTransformer#2
For11kVCablesfromAuxiliaryTransformertoMVPanel
For11kVCablesfromCapacitorBanktoMVPanel
ForDC&LVControlandPowerCablesfromControlPanelstoPowerTransformers
ForDC&LVControlandPowerCablesfromControlPanelstoBlockTransformers
ForDC&LVControlandPowerCablesfromGIStoLCCPanel
Cable Trays
For DC & LV Control and Power Cables from LCC to Control & Protection Panel
Cable Trays
Cable Trays
Cable Trays
Cable Trays
Cable Trays
Cable Trays
Cable Trays
Cable Trays
Cable Trays
Cable Trays
From ST to GIS
Generation
General Civil Works
Room For Battery Charger,DCS,UPS,DC supply system, Surge arrestor,MV Switch gear
Foundation of Generator
Laboratory Room
Admin Block
Admin Block
Admin Block
Substructure
Admin Block
Superstructure
Admin Block
Interior Finishes
Admin Block
Admin Block
Faade/Elevation Finishes
Fabrication of Header
Installation of Fans
Shimming on Foundation
Installation of Generator
Leveling & Alignment of Turbine Gear Box and Genrator on each Other
Piping of Turbine
Installation of Transformers
11 Kv Connection/Termination
11 Kv Connection/Termination
11 Kv Connection/Termination
11 Kv Connection/Termination
11 Kv Connection/Termination
Turbine Package (ST Generator wiring / loop testing including Excitation System)
Battery Charger
Battery Charger
Battery Charger
Battery Charger
Field Instrumentation
Field Instrumentation
Field Instrumentation
Field Instrumentation
Field Instrumentation
Section-1 (Power Cable Tray installation , laying, testing for Section-I Boilers & Equipments)
Section-1 (Control/Instrument Cable Tray installation , laying, testing for Section-I Boilers & Equipments)
Section-2 (Power Cable Tray installation , laying, testing for Section-II Boilers & Equipments)
Section-2 (Control/Instrument Cable Tray installation , laying, testing for Section-II Boilers & Equipments)
Section-3 (Power Cable Tray installation , laying, testing for Section-III Boilers & Equipments)
Section-3 (Control/Instrument Cable Tray installation , laying, testing for Section-III Boilers & Equipments)
Section-4 (Power Cable Tray installation , laying, testing for Section-IV Boilers & Equipments)
Section-4 (Control/Instrument Cable Tray installation , laying, testing for Section-IV Boilers & Equipments)
Turbine Package (Power Cable Tray installation, laying / testing for Turbine & Equipment)
ACC (Power Cable Tray installation, laying / testing for ACC & Equipment)
BOP (Power Cable Tray installation, laying / testing for BOP & Equipment)
Transfomers (Power & Control Cable Tray/Trench work from Section-IV to Block Trafo)
Transfomers (Power & Control Cable laying / testing / tagging, from Section-IV to Block Trafo)
Transfomers (Power & Control Cable Tray/Trench work for ST- Block Trafo)
Transfomers (Power & Control Cable laying / testing / tagging for ST- Block Trafo)
Transfomers (Power & Control Cable laying / testing / tagging for ST- AUX Trafo)
Transformers
Transformers
Transformers
Transformers
Transformers
Transformers
ForCompleteLightingSystem
Grid
General
General
General
145 kV GIS
General
General
120kVSurgeArrestorforBlockTransformers2,3,4and5
120kVSurgeArrestorforBlockTransformer#1
120kVSurgeArrestorforPowerTransformers3
120kVSurgeArrestorforPowerTransformers4
120kVSurgeArrestorforPowerTransformer1
120kVSurgeArrestorforPowerTransformer2
120kVSurgeArrestorforTransmissionLineKorangiWest
120kVSurgeArrestorforTransmissionLineBaloch
120kVSurgeArrestorforTransmissionLinesPipri
120kVSurgeArrestorforTransmissionLinesGulAhmed
145kVUnderGroundCablesandAccessoriesofPowerT/F#3
145kVUnderGroundCablesandAccessoriesofBlockT/F#2
145kVUnderGroundCablesandAccessoriesofKorangiLine
145kVUnderGroundCablesandAccessoriesofBlockT/F#3
145kVUnderGroundCablesandAccessoriesofBlockT/F#4
145kVUnderGroundCablesandAccessoriesofBlockT/F#5
145kVUnderGroundCablesandAccessoriesofPowerT/F#4
145kVUnderGroundCablesandAccessoriesofBalochLine
145kVUnderGroundCablesandAccessoriesofBlockT/F#1
145kVUnderGroundCablesandAccessoriesofPowerT/F#1
145kVUnderGroundCablesandAccessoriesofPowerT/F#2
145kVUnderGroundCablesandAccessoriesofPipriLine
145kVUnderGroundCablesandAccessoriesofGulAhmedLine
General
Sergi System
General
11kVPowerCableforPTR#3
11kVPowerCableforPTR#4
11kVPowerCablefromAuxiliaryTransformertoMVSwitch
11kVPowerCablefromCapacitorBanktoMVSwitch
11kVPowerCablefromGEJBSection4toBlockT/F#2
LoopTestingofDC&LVControlandPowerCable
CapacitorBank
NGR
EarthingWork
220VDCBatteries&Chargers
48VDCBatteries&chargers
General
General
General
General
General
General
General
General
General
General
General
General
General
General
General
General
General
General
General
General
General
General
General
General
General
General
General
General
General
General
General
General
Control&ProtectionPanels
220VDCDistributionPanel
AuxiliaryTransformer(500kVA)
400VACSystem
FiberOpticCableforLineDifferentialRelay
HVACSystem
OverheadGantryCrane
General
General
RTU
General
SCADA Equipment
General
General
General
General
General
General
General
Testing of GIS Bay Alarm, Status and Trip contact for PTR # 3
General
Testing of GIS Bay Alarm, Status and Trip contact for Block T/F 2
General
Testing of GIS Bay Alarm, Status and Trip contact for Korangi Line
General
Testing of GIS Bay Alarm, Status and Trip contact for Block T/F 3
General
Testing of GIS Bay Alarm, Status and Trip contact for Block T/F 4
General
Testing of GIS Bay Alarm, Status and Trip contact for Block T/F 5
General
Testing of GIS Bay Alarm, Status and Trip contact for PTR # 4
General
Testing of GIS Bay Alarm, Status and Trip contact for Baloch Line
General
Testing of GIS Bay Alarm, Status and Trip contact for Block T/F 1
General
Testing of GIS Bay Alarm, Status and Trip contact for PTR # 1
General
TestingofGISBayAlarm,StatusandTripcontactforPTR#2
TestingofGISBayAlarm,StatusandTripcontactforPipriLine
TestingofGISBayAlarm,StatusandTripcontactforGulAhmedLine
Energizationof145KVGIS
General
General
General
General
General
General
General
General
General
11 kV Incoming Panel # 1
11 kV Incoming Panel # 2
11 kV Incoming Panel # 3
11 kV Incoming Panel # 4
Generation
Testing and Commissioning of RO Plant
Commissioning of Boilers
Commissioning of Dampers
ST no load test
Commissioning of Control Panels (Servers, Controllers, I/O Cards etc.) & HMIs