c.
The tie block and each of four ties submitted for testing shall be carefully measured and examined to
determine their compliance with the requirements of Section 4.2, Material and Section 4.3, Tie
Dimensions, Configuration and Weight. Upon satisfactory completion of this examination, the tie block
and two ties, which shall be known and identified as Tie 1 and 2, shall be subjected to performance
tests specified in Article 4.9.1.4, Article 4.9.1.5, Article 4.9.1.6, Article 4.9.1.7, Article 4.9.1.8,
Article 4.9.1.9, Article 4.9.1.10, Article 4.9.1.11, Article 4.9.1.12, Article 4.9.1.13, and Article 4.9.1.14.
The remaining two ties, which will be known and identified as Ties 3 and 4, will be retained by the
engineer for further test use and as a control for dimensional tolerances and surface appearance of ties
subsequently manufactured.
Rail Seat Vertical Load Test (described in Article 4.9.1.4). Shall be performed on one rail seat,
hereinafter designated rail seat A.
d. Rail Seat Vertical Load Test (described in Article 4.9.1.4). Shall be performed on the other rail seat,
hereinafter designated rail seat B.
e.
Rail Seat Repeated Load Test (described in Article 4.9.1.5). Shall be performed on rail seat B.
f.
Bond Development, Tendon Anchorage, and Ultimate Load Test (described in Article 4.9.1.8). Shall be
performed on rail seat A.
Fastening Insert Test (described in Article 4.9.1.9). Shall be performed on all inserts.
b. Fastening Uplift Test (described in Article 4.9.1.10a and b). Shall be performed on one rail seat.
c.
4
4.9.1.3 Sequence of Design Tests (Tie Block)
The sequence of design performance tests using the tie block shall be as follows:
a.
e.
f.
Test shall be conducted on three pads. The two pads providing highest and lowest spring rate values shall be discarded and remaining
pad shall be used for tests Article 4.9.1.3b through h.
30-4-27
Concrete Ties
g.
Following the vertical load test for positive moment on rail seat B, the load shall be increased at rate of at
least 5 kips (22 kN) per minute until the tie is cracked from its bottom surface up to the level of the lower
layer of reinforcement.
30-4-28
Concrete Ties
With the tie supported and loaded as shown in Figure 30-4-9 a load increasing at a rate not grater than 5 kips
(22kN) per minute shall be applied until the load required to produce the specified negative center design
moment from Table 30-4-3 is obtained. The load shall be held for not less than 3 minutes, during which time an
inspection shall be made to determine if structural cracking occurs. An illuminated, 5-power magnifying glass
may be used to locate cracks. If structural cracking does not occur the requirements of this test will have been
met.
Pretensioned concrete ties shall be tested for bond development, and ultimate strength as specified
below:
30-4-29
Concrete Ties
(1) With the tie supported and loaded at rail seat A as shown in Figure 30-4-8, a load increasing at a rate
not greater than 5 kips (22 kN) per minute shall be applied until a total load of 1.5P is obtained (the
load P shall be as determined in Rail Seat Vertical Load Test for positive moment).
(2) If there is no more than 0.001 inch (0.025 mm) tendon slippage determined by an extensometer
reading to , of an inch ( mm), the requirements of this test will have been met. The
measurement shall be made on the outermost tendons of the lower layer. The load shall then be
increased until ultimate failure occurs and the maximum load obtained shall be recorded.
b. Post-tensioned concrete ties shall be tested for tendon anchorage and ultimate strength as specified
below:
With the tie supported and loaded as shown in Figure 30-4-8, a load increasing at a rate not greater than
5 kips (22 kN) per minute shall be applied until a total load equal to 1.5P is obtained. If the tie can
support this load for a period of 5 minutes, the requirements of this test will have been met. The load
shall then be increased until ultimate failure of the tie occurs, and the maximum load obtained shall be
recorded.
The pull-out test shall performed on each insert as shown on Figure 30-4-11. An axial load of 12 kips
(53.4 kN) shall be applied to each insert separately and held for not less than 3 minutes, during which
30-4-30
Concrete Ties
NOTE:
Mortar cracking in the vicinity of the insert is not a cause for failure. If failures occur, then the
requirements of this test will not have been met. Inability of the insert itself to resist the 12
kips (53.4 kN) load without permanent deformation shall also constitute failure of this test.
b. Following successful completion of the insert pull-out test, the torque test shall be performed on each
insert. A torque of 250 ft-lbarema (339 Nm) shall be applied about the vertical axis of the insert by
means of a calibrated torque wrench and a suitable attachment to the insert. The torque shall be held for
not less than 3 minutes. Ability of the insert to resist this torque without rotation, cracking of the
concrete, or permanent deformation shall constitute passage of this test.
An 18 to 20 inches (460 mm - 510 mm) piece of the proper section of rail shall be secured to one rail seat
using a complete rail fastening assembly, including pads, bolts, clips and associated hardware, as
recommended by the manufacturer of the rail fastening system. In accordance with the loading diagram
in Figure 30-4-12, an incremental load shall be applied to the rail. The load P (measured load plus
unsupported tie weight plus frame weight) at which separation of the rail from pad or pad from rail seat
occurs (whichever occurs first) shall be recorded.1
30-4-31
Concrete Ties
An 18 to 20 inches (460 mm - 510 mm) section of new rail from which loose mill scale has been removed
by wiping with a cloth shall be secured to the rail seat in the block using a complete rail fastening
assembly. In accordance with the loading diagram in Figure 30-4-12 determine the load P that will just
cause separation of the rail from the rail seat pad or the pad from the rail seat whichever occurs first.1
This load may be determined during the Fastening Uplift Test described in Article 4.9.1.10 in which case
a new set of fastening clips shall be used for the repeated load test.
b. An 18 to 20 inches (460 mm - 510 mm) section of new rail from which loose mill scale has been removed
by wiping with a cloth shall be secured to the rail seat in the tie block using a complete rail fastening
assembly. In accordance with the loading diagram in Figure 30-4-13, alternating downward and upward
loads shall be applied at an angle of 20 degrees to the vertical axis of the rail at a rate not exceed 300
cycles per minute for 3 million cycles. The rail shall be free to rotate under the applied loads. One cycle
shall consist of both a downward and an upward load. The magnitude of the upward load shall be 0.6P
where P is the load determined in paragraph a. If springs are used to generate the upward load the
downward load shall be 30 kips (133.5 kN) plus 0.6P. If a double-acting hydraulic ram is used to generate
both the upward and the downward load, the downward load shall be 30 kips (133.5 kN).
c.
This repeated load test may generate heat in elastomeric rail seat pads. Heat build-up in such pads must
not be allowed to exceed 140 degrees F (71 degrees C). Heat build-up can be controlled by reducing the
rate of load application or by providing periods of rest to allow cooling of the pad to take place.
d. Rupture failure of any component of the fastening system shall constitute failure of this test.
2001, American Railway Engineering and Maintenance-of-Way Association
30-4-32
Concrete Ties
30-4-33
Concrete Ties
For this test, retorquing of threaded elements subsequent to the completion of 500,000 cycles of load
shall not be permitted without the written approval of the engineer.
30-4-34
Concrete Ties
incrementally until a load of 2.4 kips (10.7 kN) is reached. This load shall be held for not less than 15 minutes.
The rail shall not move than 0.20 inch (5 mm) during the initial 3-minute period, and there shall be no more
than 0.01 inch (0.25 mm) movement of the rail after the initial 3 minutes. The fastening shall be capable of
meeting the requirements of this test in either direction. If these criteria are met, the tie and fastenings will
have successfully passed this test.
With a suitable length of new rail of the size to be used in the track affixed to the tie block in a manner
appropriate to the fastening being used, the entire assembly is supported and loaded as shown in
Figure 30-4-15. The loading head is to be fixed against translation and rotation. The wood block shall be
10 10 thick (254 mm 254 mm 19 mm) 5 ply, exterior grade plywood.
(1) A preload of 20 kips (89 kN) is to be applied to the rail to seat the rail in the fastening. Upon release
of the preload, a zero reading is to be taken on the dial indicators which measure rail translation.
Load is to be applied at a rate not to exceed 5 kips (22 kN) per minute until either 41 kips (182 kN)
has been applied or the rail base has translated inch (3.18 mm), whichever occurs first. Inability
of the fastening to carry the 41 kip (182 kN) load with inch (3.18 mm) or less of rail translation
shall constitute failure of this test. Complete failure of any component of the tie or fastening is cause
for rejection.
(2) With all load removed from the rail, a roller nest is placed between the fixed loading head and the
wood block on the rail head. The roller nest shall not offer resistance to lateral movement of the rail
head.
b. After taking zero reading on the dial indicators, which measure gage widening and rail translation, a
load of 20.5 kips (90.2 kN) is to be applied at a rate not to exceed 5 kips (22 kN) per minute. Rail rotation,
gage widening less rail translation, greater than inch (6.35 mm) shall constitute failure of this test.
Two short pieces of rail are affixed to Tie 2 using tie pads, insulators and fastenings in a manner
appropriate to the fastening system to be used.
Within 1 hour after removal from water an a-c 10-volt 60-Hertz potential is applied across the two rails
for a period of 15 minutes. If the rails are rusty or contain mill scale, the contact points must be cleaned.
d. The current flow in amperes is read using an a-c ammeter and the impedance determined by dividing the
voltage (10) by the current flow in amperes.
e.
If the ohmic impedance determined in paragraph c exceeds 20,000 ohms, the tie will have passed the test.
The tie pad shall be loaded vertically using a rail section in a manner similar to its use in the fastening
system.
b. A cyclic load varying from 4 kips to 30 kips (17.8 kN to 134 kN) shall be applied continuously at a rate of
4 to 6 cycles per second for a total of 1,000 cycles.
30-4-35
Concrete Ties
c.
A static load shall be applied, at a rate between 3 and 6 kips/min (13.4 and 26.7 kN/min) in increments of
1 kip (4.45 kN) up to a maximum of 50 kips (223 kN). For each load increment, vertical pad deflection
shall be measured to the nearest 0.0001 inch (0.0025 mm) and recorded values for vertical load versus
30-4-36
Concrete Ties
30-4-37