CREATING SUSTAINABLE

ENERGY FUTURE

INTEGRATED RENEWABLE ENERGY PARK

BUKIT PALONG, NEGERI SEMBILAN

RENEWABLE ENERGY PARK

KUALA PERLIS, PERLIS

RENEWABLE ENERGY PARK

RIMBA TERJUN, JOHOR

INTEGRATED RENEWABLE ENERGY PARK

PAJAM, NEGERI SEMBILAN

Transforming dump sites, an environmental bane to an economic and environmental boon is the raison
detre of our business. The critical goal of landfill remediation is to protect human health and the environment
by eliminating airborne vectors, contamination of land and water, air pollution and a host of other problems
caused by open dumping. The ultimate aim is to return land back to the community in a form that will benefit
the environment and the community.
As an environmental technology and engineering specialist, Cypark combines technologies and
engineering proficiency, with high-end research and development, to develop systems specifically for
restoring brownfields like the Contaminated Land Assessment Remediation and Information System
(COLARIS), Sustainable Environmental Restoration (SER) and Groundwater Assessment Remediation and
Information System (GARIS).
We have taken our business a step further by venturing into the renewable energy sector. We have
transformed the restored landfill in Pajam, Negeri Sembilan into an integrated renewable energy park,
an Entry Point Project under the nations Economic Transformation Programme. Such a project unlocks the
economic potential of landfills, employing landfill by-products like biomass and biogas as well as sunlight
to create renewable energy, which will undoubtedly help meet the countrys growing demand for energy.
Leveraging the synergy from restoring landfills to the creation of renewal energy has placed Cypark at the
forefront of sustainable development and green energy generation. We are proud to note that the Pajam
Solar Park has been awarded by the Malaysian Book of Records as the largest grid connected solar park in
Malaysia.
At Cypark, we recognise that a balanced enduring
approach is needed to ensure sustainability in
economic activity, environmental responsibility and
social progress. Our commitment to sustainable
development is evidenced by what we do. We help
INTEGRATED RENEWABLE
to preserve our environment, preventing further
ENERGY PARK
degradation to land, water and air with a strong
BUKIT PALONG, NEGERI
aspiration to help create aSEMBILAN
sustainable, healthy and
economically stable environment for our children
and future generations.

ENVIRONMENTAL
TRANSFORMATION

PRE-CLOSURE

POST-CLOSURE

ECONOMIC TRANSFORMATION

Our Services
Integrated Renewable Energy Parks
Engineering, Procurement, Construction (EPC)
solar plant contract is a complex undertaking
that involves various agencies and many integral
components.

obtaining the necessary administrative permits,


to engineering, procurement, construction,
testing, commissioning, monitoring, operations
and maintenance -- Cypark does it all.

As owner, developer and power producer of


Malaysias first and largest grid-connected
Integrated Renewable Energy Park (IREP),
Cypark is now pleased to offer our EPC services
to organisations looking to develop sustainable
energy generation.

Through a team of young and energetic


skilled professionals, with a strong sense of
teamwork, and a clear commitment towards
green sustainable energy, Cypark is able to offer
solutions that are reliable, cost effective and
sustainable for our clients; providing client with
simple EPC contract where there is:

Cypark far outshines other solar plant EPC


contractors for one simple fact --- Cypark has
proven its capability, efficiency and effectiveness
through the timely completion and launch of
Malaysias first fully operational 8 MW solar park
(first phase) in Pajam, Negeri Sembilan, Malaysia.
Backed by robust technical experience and
vast network of contacts, Cyparks total
solution, one-stop EPC service encompasses
an
integrated
conception-to-maintenance
cycle of a solar farm. From viability studies
and project development, to financing and

o Complete Scope of Work


o Minimum Owner Effort
o One Point of Contact (Simple, Uncomplicated
to Monitor and Coordinate)
o Straight-Forward Post-Commissioning Services
o Quality Assurance
o Investment Figure Known from Inception
o Project Duration and Expectations
o Quality Products and Workmanship
o Cost and ROI Projections

ENVIRONMENTAL TRANSFORMATION

INTEGRATED RENEWABLE ENERGY PARK


PAJAM, NEGERI SEMBILAN

PRE-CLOSURE

POST-CLOSURE

ECONOMIC TRANSFORMATION

COLARIS

Environmental Remediation

An internally developed comprehensive remediation


and treatment system that provides assessment and
remediation service related to contaminations that arise
from mining, industrial, as well as landfill and dumpsite
activities. It can be divided into two components: -

Environmental remediation is a complex, scientific,


engineering rehabilitation process that not only
brings about environmental but also economic
transformation. Through our extensive environmental
engineering expertise and experience, coupled
with a broad spectrum of innovative technologies,
degraded contaminated areas such as unsightly
and hazardous dump sites would be restored and
transformed into green lungs with economic and
social value.

s Contaminated Land Site Assessment


Conducted to determine the condition of the site and its
surroundings before any remediation activities can be
designed and implemented, this process involves preliminary
assessment as well protrusive assessment which requires
development of monitoring wells, soil investigations,
monitoring works, lab test and so forth.

s Remediation
Cyparks remediation services could be divided into
three components
o on-site remediation (in situ zone remediation,
containment, protection, pathway prediction and
fate of offsite receptors)
o off-site remediation (zone remediation, containment
and protection)
o special collection and disposal services (on-site
and off-site soil treatment).

Environmental Management & Monitoring


Services
Once a contaminated land or environmental
facility project has been completed, the site must
undergo systematic management and monitoring.
Environmental management is a key process
requirement to ensure that completed works are
maintained and not damaged either by external
elements or due to natural occurrences such as land
settlement. Continuous periodic monitoring of water,
air and soil quality within or surrounding the project
boundary of a project is essential. Information
collected over a period of time, through Cyparks
environmental management and monitoring services
could be used to assess the trends of contamination
levels and alert relevant parties.

ENVIRONMENTAL TRANSFORMATION

POST-CLOSURE

RENEWABLE ENERGY PARK


RIMBA TERJUN, JOHOR

PRE-CLOSURE

ECONOMIC TRANSFORMATION

Integrated Waste Management


(incorporating Waste-to-Energy plant)
Environmentally unfriendly waste management
practices have been attributed globally as one of the
major causes of pollution. Urbanisation and population
growth have made proper waste management to
be very critical to ensure the sustainability of our
environment.
Cypark has the experience, expertise and resources
to facilitate government initiatives in implementing
sustainable integrated waste management facility that
encompasses the following areas:o Transfer Station
o Collection and Disposal
o Waste Receiving Facility (WRF)
o Waste Segregation Facility (WSF) with material
recovery/recycling facility
o Fuel Derivation Facility which includes Fully
Anaerobic Bioreactor System (FABIOS) Plant and
Refused-Derived Fuel (RDF)Plant
o Power Generation Facility which includes Biogas
Power Plant and Waste-to-Energy Plant
o Sanitary Landfill for commingled, inert solid waste
and processed waste residuals
o Environmental Treatment Systems including
Leachate Treatment Facility and Passive Landfill
Gas Venting System
o Salvaging Yard for combustible solid

waste and recyclable

Developed to support landfill owners manage the leachate


associated with landfill and dumpsites, Cyparks Leachate
Treatment Plant (LTP) can be divided into two
o On-site Leachate Treatment Plant
A large scale comprehensive leachate management system
designed and developed as a long term solution for either a
new sanitary or a closed landfill.
o Mobile Leachate Treatment Plant (MLTP).
Typically used in cases where site size is restricted and the
volume of leachate is not large, this facility allows leachate
treatment process to continue to be part of an integral
component of any waste management facility. MLTP could also
be deployed as an emergency response treatment system, for
both planned or unplanned plant shutdown.

Ground Water Assessment, Remediation, And


Information System (GARIS)
An in-house developed process in which detailed assessment
and testing are carried out on the impact of pollution to the
groundwater system. Remediation work would be implemented
based on design developed using the assessment. Upon
completion, continuous monitoring work and relevant information
system would be carried out and managed for reference
respectively.
GARIS would provide critical environmental assessment and
mitigation process to help protect groundwater resource from
contamination.

ENVIRONMENTAL TRANSFORMATION

o Administration and Support Facilities


o Operations & Maintenance of Waste

Facility Infrastructural and

Ancillary Works

Waste Water Treatment


RENEWABLE ENERGY PARK
KUALA PERLIS, PERLIS

ECONOMIC TRANSFORMATION

PRE-CLOSURE

POST-CLOSURE

Cypark : At a Glance
Cypark Resources Berhad is a leading public listed
company on the Main Board of KLSE. Cypark specialises in
providing integrated renewable energy and environment
engineering services, focusing on
o integrated renewable energy generation
biogas, biomass, waste-to-energy)

(solar,

o waste management
o environmental remediation (i.e. landfill restoration)
o scientific closure and remediation of contaminated land
through internally developed technology (COLARIS)
o ground water assessment, remediation and information
system (GARIS)
o environmental monitoring and management, as well as
o wastewater treatment

Contact Information
Cypark endeavours to build customer loyalty by doing
what we say we will do every time and on time. We
believe the satisfaction of our customers is the best
measure of our success.
For more information on our services, please contact
us at:

Cypark Resources Berhad


13A-09 Block A, Phileo Damansara II
No. 15 Jalan 16/11,
46350 Petaling Jaya Selangor,
Malaysia.
Tel: +6 03 7660 6170

Fax: +6 03 7660 6169

Email:
o General Information: info@crbenv.com
o Investor Relations: irinfo@crbenv.com
o Media Contact: media@crbenv.com
Website: www.crbenv.com